CN-370000-GC761-A14.pdf
PDF 369 KB Posted
- Contract number
- GC761
- Issued by
- Florida
About this file
Document Summary
Amendment No. 14 is a language amendment with rate increase to Agency Term Contract No. GC761 between the Florida Department of Environmental Protection (FDEP) and Groundwater & Environmental Services, Inc. (GESI). The contract, originally executed on February 17, 2014, provides petroleum contamination site response action services in the Central Region of Florida. This amendment updates the rate schedule effective June 1, 2023, for all new work assignments offered on or after the Rate Change Date, while maintaining prior rates for pre-existing and previously offered work assignments.
The amendment modifies rates across the entire service spectrum covered by the contract, including mobilization and equipment services, drilling and boring activities, sampling and analysis, disposal services, remediation system packages, and professional services. Rate increases across the 200+ pay items range from approximately 4.07% to 8.00%, with the majority of increases falling between 5.5% and 8.0%. The amendment includes a specific operational requirement that drums meet the industry standard of being 75% full and requires photographic documentation for verification. Additionally, the amendment restricts the issuance of new purchase orders or task assignments after the renewal term expires, though the contract continues for up to twelve months thereafter to allow completion of work issued during the renewal term.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
4.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.C of the Contract; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, The Agency Term Contract No. GC761 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and
GROUNDWATER & ENVIRONMENTAL SERVICES, INC. (hereinafter "Contractor") executed on
February 17, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC761
LANGUAGE AMENDMENT WITH
RATE INCREASE
AMENDMENT NO. 14
Amendment No. 14
DEP Agency Term Contract No. GC761
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.
Amendment No. 14
DEP Agency Term Contract No. GC761
5.
6.
C.
7.
8.
The following provision is hereby added to paragraph 4, Term of Contract:
This amendment shall include an update to ATTACHMENT A (V2.0), SCOPE OF SERVICES, V.
Technical Specification, B. Schedule of Pay Items, Section 12. DEBRIS, WASTE AND
PRODUCT REMOVAL AND DISPOSAL, as follows:
No new Purchase Orders or Task Assignments shall be issued or executed after renewal term. However, the Restated Contract shall continue in effect up to twelve months after expiration of the renewal term for completion of any Purchase Order or Task Assignment issued/executed during the renewal term. Purchase Orders or Task Assignments, completion of which that extends beyond the renewal term shall continue to be subject to change, as appropriate.
Photo documentation of the inside of the drums is required to ensure drums meet the industry wide standard of being 75% full.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change
Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate(1)
465.00$ $ 500.00
130.00$ $ 140.00
470.00$ $ 507.00
525.00$ $ 565.00
525.00$ $ 565.00
1,000.00$ $ 1,075.00
465.00$ $ 502.00
700.00$ $ 756.00
660.00$ $ 700.00
995.00$ $ 1,050.00
120.00$ $ 129.00
180.00$ $ 190.00
720.00$ $ 775.00
1,300.00$ $ 1,395.00
1,100.00$ $ 1,185.00
1,775.00$ $ 1,900.00
725.00$ $ 775.00
615.00$ $ 655.00
800.00$ $ 850.00
36.00$ $ 38.00
44.10$ $ 47.00
Est %
Rate
Change(2)
+7.53%
+7.69%
+7.87%
+7.62%
+7.62%
+7.50%
+7.96%
+8.00%
+6.06%
+5.53%
+7.50%
+5.56%
+7.64%
+7.31%
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
3-15.
3-16.
Description
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization
(hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
DPT Rig and Support Vehicles Mobilization - >
100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤
100 miles each way
Work Trailer - > 100 miles each way
Work Trailer - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Contractor Oversight for Non-Price Schedule
Activities
Excavator Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization
(hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review
Site Health & Safety Plan
Off-Site Property Access Agreement
Receptor Survey and Exposure Pathway
Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
Split Spoon Sampling – 2 foot (during boring)
50 to 100 feet
Split Spoon Sampling – 2 foot (during boring) <
50 feet
Loader/Backhoe Mobilization - > 100 miles each way
Loader/Backhoe Mobilization - ≤ 100 miles each way
Pay Item No.
1-1.
1-2.
1-5.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
3-11.
5-1.a.1.
5-1.a.2.
+7.73%
+7.04%
+6.90%
+6.50%
+6.25%
+5.56%
+6.58%
49.10$ $ 53.00
162.00$ $ 174.00
3,300.00$ $ 3,564.00
23.00$ $ 24.65
27.75$ $ 29.65
26.00$ $ 28.00
26.67$ $ 28.50
28.25$ $ 30.00
32.10$ $ 34.25
39.25$ $ 41.50
34.50$ $ 37.25
40.75$ $ 44.00
185.00$ $ 196.00
49.00$ $ 52.00
200.00$ $ 215.00
34.00$ $ 36.50
34.65$ $ 36.85
315.00$ $ 340.00
588.00$ $ 630.00
195.00$ $ 210.00
355.00$ $ 380.00
405.00$ $ 435.00
18.50$ $ 19.95
21.25$ $ 22.75
23.50$ $ 25.15
24.25$ $ 26.00
5-9.
5-10.
6-5.
Hand Auger Boring ≤ 10 foot total depth
Split Spoon Sampling – 2 foot (during boring) >
100 feet
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Direct Push Technology (DPT) Rig and
Equipment
6-6.
Well Redevelopment
Installation of Well Vault - 2 x 2 x 2 foot
7-2.
7-3.
7-4.
7-1.
6-10.
6-11.
6-13.
6-14.
6-15.
Surface Casing - 8 inch diameter
Surface Casing - 6 inch diameter
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, <
50 foot total depth
Well Installation - 1 inch diameter
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Above Grade Well Completion
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
6-3.a.
6-3.b.
5-1.a.3.
5-2.
5-3.a.
5-6.
5-7.
6-2.b.
5-17.
6-1.
6-2.a.
5-15.
5-16.
+7.94%
+7.41%
+8.00%
+7.17%
+6.85%
+7.69%
+6.86%
+7.50%
+7.35%
+6.35%
+7.94%
+7.14%
+7.69%
+6.19%
+6.70%
+5.73%
+7.97%
+7.98%
+5.95%
+6.12%
+7.04%
+7.41%
+7.84%
+7.06%
+7.02%
+7.22%
350.00$ $ 378.00
585.00$ $ 630.00
210.00$ $ 226.00
175.00$ $ 189.00
215.00$ $ 232.20
73.50$ $ 77.00
46.00$ $ 49.60
27.50$ $ 29.70
110.00$ $ 118.00
110.00$ $ 118.00
18.25$ $ 19.50
392.50$ $ 415.00
41.50$ $ 44.80
66.00$ $ 71.00
73.95$ $ 79.00
90.00$ $ 95.00
54.50$ $ 58.00
233.50$ $ 243.00
70.50$ $ 76.00
12.00$ $ 12.75
42.00$ $ 45.35
+6.25%
+7.98%
8-14.
9-1.
9-2.
9-3.
9-4.
9-5.
9-19.
8-5.
8-6.
8-7.
8-8.
8-11.
9-8.
9-8.a.
9-10.
Free Product Sample Collection
Monitoring Well Sampling with Water Level, >
100 foot depth
Monitoring Well Sampling with Water Level, ≤
100 foot depth
Removal of Well Pad and Manhole
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Vault - 2 x 2 x 2 foot7-5.
7-6.
7-7.
8-1.
8-2.
Soil, TRPH Fractionation (MADEP-EPH/VPH
Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum
Hydrocarbons (FL-PRO)
Electronic Data Deliverables (EDD)
Free Product Gauging & Bailing
Water Level or Free Product Gauging
Soil/Sediment Sample Collection
Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority
Pollutant Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample
Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram
Encore samples collected in the field but not submitted to the laboratory for testing
(discarded).
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA
8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or
EPA 8260)
Soil, Moisture Content (ASTM D2216-10)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020
[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471
[Mercury])
9-27.
+6.85%
+5.73%
+7.95%
+7.58%
+6.83%
+5.56%
+6.42%
+4.07%
+7.80%
+8.00%
+7.69%
+7.62%
+8.00%
+8.00%
+4.76%
+7.83%
+8.00%
+7.27%
+7.27%
67.75$ $ 73.00
90.00$ $ 97.20
62.00$ $ 66.00
76.25$ $ 81.00
12.00$ $ 12.90
12.00$ $ 12.90
12.00$ $ 12.90
12.00$ $ 12.90
20.00$ $ 21.50
12.00$ $ 12.90
12.00$ $ 12.90
35.25$ $ 37.00
11.00$ $ 11.60
15.00$ $ 16.00
14.25$ $ 15.00
13.50$ $ 14.25
25.00$ $ 26.50
56.50$ $ 60.00
88.00$ $ 92.50
+7.75%
+8.00%
+6.45%
9-49.
9-51.
9-52.
9-56.
9-79.
9-68.
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Priority Pollutant Volatile Organics (EPA
8260)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Organic Carbon, Total (SM 5310 B, SM
5310 C or EPA 9060)
Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA
9251, EPA 9053, SM 4500CI B, SM 4500CI C
or SM 4500CI E)
Water, Alkalinity [as CaCO3] (EPA 310.2 or
SM 2320 B)
Water, Magnesium, Total (EPA 200.7, EPA
6010 or EPA 6020)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Iron, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA
200.8, EPA 6010 or EPA 6020)
Air, Total Petroleum Hydrocarbons (EPA
Method 18 or TO-3)
Water, EDC [1,2-dichloroethane] (EPA Method
8021 or 8260)
9-29.
9-30.
9-31.a.
9-41.
9-42.
9-43.
9-44.
9-44.a.
9-45.
9-39.
9-40.
9-33.
9-38. +7.50%
+7.50%
+7.50%
+7.50%
+7.50%
+6.23%
+7.50%
+7.50%
+4.96%
+5.45%
+6.67%
+6.19%
+5.11%
+5.26%
+5.56%
+6.00%
175.00$ $ 188.00
168.00$ $ 177.00
4.65$ $ 5.00
3.85$ $ 4.15
50.00$ $ 53.50
147.50$ $ 158.50
30.00$ $ 32.00
28.50$ $ 30.00
31.50$ $ 33.45
31.50$ $ 33.25
31.25$ $ 33.75
26.20$ $ 28.15
130.00$ $ 140.00
0.75$ $ 0.80
125.00$ $ 135.00
0.75$ $ 0.80
9.25$ $ 9.95
2.10$ $ 2.25
9.00$ $ 9.70
2.25$ $ 2.40
1.77$ $ 1.90
0.65$ $ 0.70
90.00$ $ 95.00
103.90$ $ 110.00
119.00$ $ 126.00
+5.87%
+5.88%
15-1.a.
15-1.b.
15-1.c.
12-5.
12-6.
12-7.
9-69.
9-70.
Air, Polycyclic Aromatic Hydrocarbons (EPA
Method TO-13)
Air, Volatile Organic Aromatics (EPA Method
TO-15)
Grass - Seed and Mulch
Grass - Sod
Disposal of Petroleum Impacted Soil at a
Landfill (bulk) ≤ 450 tons
Transport Petroleum Impacted Soil (bulk) > 100 miles
Asphalt Paving - 2 inch thickness (includes sub-base)
Transport and Disposal of Petroleum Product
(bulk)
Transport and Disposal of Petroleum Product
(includes drum)
Transport and Disposal of Petroleum Contact
Water (bulk)
Transport and Disposal of Petroleum Contact
Water (includes drum)
Disposal of Petroleum Impacted Soil at a
Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a
Thermal Treatment Facility (bulk) ≤ 450 tons
Disposal of Petroleum Impacted Soil at a
Landfill (bulk) > 450 tons
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Petroleum Impacted
Soil (includes drum)
Transport and Disposal of Mixed Debris
Additional Removal/Loading Cost for Concrete -
> 4 inch thickness
Removal and Loading of Asphalt and/or
Concrete - up to 4 inch thickness
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of 11 - 20 Lines
Trenching and Installation of 1-10 Plumbing
(and Electrical) Lines in Trench
13-1.
13-2.
13-3.
13-4.
13-6.
13-7.
12-8.
12-1.
12-2.
12-9.
12-10.
12-11.
12-12.
12-13.
12-14.
12-15.
12-16.
+7.43%
+5.36%
+7.53%
+7.79%
+7.00%
+7.46%
+6.67%
+5.26%
+6.17%
+5.56%
+5.56%
+8.00%
+7.44%
+7.69%
+6.67%
+8.00%
+6.67%
+7.57%
+7.14%
+7.78%
+6.67%
+7.34%
+7.69%
80.00$ $ 86.00
29.00$ $ 31.00
16,100.00$ $ 17,000.00
19,700.00$ $ 21,000.00
3,000.00$ $ 3,200.00
3,000.00$ $ 3,200.00
3,000.00$ $ 3,200.00
3,000.00$ $ 3,200.00
3,325.00$ $ 3,550.00
3,200.00$ $ 3,450.00
2,050.00$ $ 2,200.00
3,050.00$ $ 3,294.00
7,336.88$ $ 7,922.00
2,850.00$ $ 3,050.00
6,800.00$ $ 7,344.00
4,180.00$ $ 4,500.00
1,755.00$ $ 1,895.00
2,150.00$ $ 2,322.00
2,555.00$ $ 2,750.00
2,200.00$ $ 2,350.00
2,200.00$ $ 2,350.00
2,550.00$ $ 2,750.00
2,550.00$ $ 2,750.00
3,100.00$ $ 3,300.00
3,100.00$ $ 3,300.00
+6.67%
+6.67%
+6.67%
+6.67%
+6.77%
+7.81%
+7.32%
+8.00%
+7.98%
+7.02%
+8.00%
+7.66%
+7.98%
+8.00%
+7.63%
+7.50%
+6.90%
+5.59%
+6.60%
16-24.
16-25.
17-1.
17-2.
17-3.
18-11.
18-12.
18-13.
18-14.
18-15.
18-16.
16-5.
16-7.
16-9.
16-11.
16-19.
16-21.
16-22.
16-23.
16-1.
16-3.
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - 8 hours
System Installation/Integration/Startup - 1
Technology Component - 11-20
Recovery/Treatment Points
System Installation/Integration/Startup - 1
Technology Component - 1-10
Recovery/Treatment Points
Installation of Plumbing (and Electrical) Lines
Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
Trenching and Installation of Additional 1-10
Lines Greater Than 30 Lines
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - 8 hours
System O&M Package - Large
System O&M Package - Medium
System O&M Package - Small
AS/MPE System Package - Medium
MPE System Package - Medium
MPE System Package - Medium
AS/SVE System Package - Medium
AS/SVE System Package - Medium
Air Sparge System Package - Medium
Air Sparge System - Medium - Short Term ≤ 6 mos.
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
15-2.a.
15-4.a.
15-4.b.
15-1.d.
+6.82%
+6.82%
+7.84%
+7.84%
+6.45%
+6.45%
3,100.00$ $ 3,348.00
2,800.00$ $ 3,024.00
3,350.00$ $ 3,618.00
3,300.00$ $ 3,564.00
3,750.00$ $ 4,050.00
3,600.00$ $ 3,850.00
3,150.00$ $ 3,400.00
4,015.00$ $ 4,300.00
4,015.00$ $ 4,300.00
4,835.12$ $ 5,100.00
4,835.12$ $ 5,100.00
240.00$ $ 255.00
475.00$ $ 505.00
915.00$ $ 985.00
135.00$ $ 145.00
260.00$ $ 278.00
600.00$ $ 640.00
1,700.00$ $ 1,800.00
3,700.00$ $ 3,995.00
1,975.00$ $ 2,100.00
1,150.00$ $ 1,225.00
1,102.50$ $ 1,175.00
665.00$ $ 700.00
1,365.00$ $ 1,465.00
985.00$ $ 1,060.00
1,600.00$ $ 1,725.00
10,132.50$ $ 10,800.00
13,597.50$ $ 14,500.00
+8.00%
+8.00%
19-8.
19-9.
19-10.
19-11.
19-12.
19-1.
19-3.
19-4.
19-5.
19-6.
19-7.
18-21.
18-22.
18-20.
18-17.
18-18.
18-19.
Carbon Off Gas Treatment - Add On - Large -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small-
Long Term > 6 mos.
MPE System - Large - Long Term > 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
MPE System - Medium - Long Term > 6 mos.
MPE System - Medium - Short Term ≤ 6 mos.
MPE System - Small - Long Term > 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
Level 1 Remedial Action Plan
Pilot Test Report
Pilot Test Plan
Natural Attenuation or Post RA Monitoring
Report, Annual
Natural Attenuation or Post RA Monitoring
Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan
Receptor and Exposure Pathway Report
Supplemental Site Assessment Report
General Site Assessment Report
Soil Source Removal Report
Carbon Off Gas Treatment - Add On - Large -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Small -
Short Term ≤ 6 mos.
Level 2 Remedial Action Plan
18-38.
18-35.
18-36.
18-37.
18-24.
18-25.
18-26.
18-27.
18-28.
18-39.
18-40.
+6.94%
+7.94%
+7.10%
+7.10%
+5.48%
+5.48%
+8.00%
+8.00%
+8.00%
+6.25%
+6.32%
+7.65%
+7.41%
+6.92%
+6.67%
+5.88%
+7.97%
+6.33%
+6.52%
+6.58%
+5.26%
+7.33%
+7.61%
+7.81%
+6.59%
+6.64%
1,775.00$ $ 1,900.00
3,225.00$ $ 3,450.00
5,600.00$ $ 5,950.00
7,700.00$ $ 8,100.00
3,750.00$ $ 4,000.00
815.00$ $ 875.00
2,800.00$ $ 3,000.00
375.00$ $ 400.00
1,975.00$ $ 2,100.00
3,500.00$ $ 3,700.00
1,350.00$ $ 1,458.00
725.00$ $ 783.00
675.00$ $ 725.00
365.00$ $ 394.00
1,375.00$ $ 1,475.00
122.00$ $ 130.00
102.00$ $ 110.00
97.50$ $ 105.00
93.00$ $ 99.00
93.00$ $ 99.00
81.50$ $ 87.50
72.00$ $ 77.00
80.00$ $ 86.00
65.00$ $ 70.00
57.00$ $ 61.00
52.50$ $ 56.00
135.00$ $ 145.00
115.00$ $ 123.75
115.00$ $ 123.75
115.00$ $ 123.75
355.00$ $ 383.00
885.00$ $ 940.00
+6.67%
+6.33%
+5.71%
+8.00%
+8.00%
+7.41%
+7.95%
+7.27%
+6.56%
+7.84%
+7.69%
+6.45%
+6.45%
+7.36%
+6.94%
+7.50%
+7.69%20-9.
20-10.
20-11.
21-1.
19-17.
19-13.
19-14.
19-15.
19-16.
20-8.
19-26.
19-27.
20-1.
20-2.
20-3.
20-4.
20-5.
20-6.
20-7.
19-20.
19-21.
19-22.
19-23.
19-24.
19-25.
19-18.
19-19. Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Professional Geologist (Key)
Professional Engineer (Key)
Laborers and Security Guards
Administrative
Draftsperson
Field Technician (Key)
Construction Drawings and Specs Report
P.E. Project Oversight for Remediation System
Integration and Startup - Small System
P.E. Project Oversight for Remediation
Technology Pilot Testing
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and
Soil-Boring Logging (Use hourly rate on site specific basis)
Level 4 Limited Scope Remedial Action Plan or
RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or
RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or
RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or
RAP Modification Plan
Assistant Scientist/Technical Specialist
Scientist/Technical Specialist (Key)
Hydrogeologist/Modeler (Key)
Geologist/Geoscientist (Key)
Engineer (Key)
Project Manager (Key)
Program Manager (Key)
Interim Assessment Report
Well Abandonment/Site Restoration Report
Free Product Recovery Report
Remedial Action Interim Report
Remedial Action General Report
Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or
Non-Annual
Letter/NPDES Report
21-6.a.
21-2.
21-3.
21-4.
21-5.
+6.98%
+6.25%
+5.19%
+6.67%
+7.36%
+7.14%
+7.02%
+6.67%
+7.41%
+7.61%
+7.61%
+7.61%
+7.89%
+6.21%
+7.04%
1,350.00$ $ 1,455.00
1,750.00$ $ 1,875.00
2,575.00$ $ 2,750.00
255.00$ $ 275.00
615.00$ $ 660.00
495.00$ $ 530.00
575.00$ $ 620.00
450.00$ $ 485.00
1,300.00$ $ 1,365.00
345.00$ $ 372.00
265.00$ $ 286.00
+7.83%
P.G. Review and Certification of Sufficiency of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean
Fill with Monitoring and Maintenance
Recommendations Required for a Conditional
NFA
P.E. Review and Certification of Sufficiency of
Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance
Recommendations Required for a Conditional
NFA
P.E. Project Oversight for Remediation System
Operation and Maintenance
P.E. Project Oversight for Short Term or
Episodic Remediation System Operation -
Weekly Basis
P.E. Project Oversight for Short Term or
Episodic Remediation System Operation - Daily
Basis
P.E. Project Oversight for Remediation System
Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Medium System
P.G. or P.E. Review, Evaluation and
Certification of a Soil Source Removal Report
That Includes a Recommendation for NFA
P.G. Review, Evaluation and Certification of
Plans and Project Oversight for Installation of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean
Fill Required for a Conditional NFA
P.E. Design and Certification of Plans and
Project Oversight of Installation for Engineering
Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
21-11.
21-12.
21-13.
21-6.b.
21-6.c.
21-6.d.
21-7.a.
21-7.b.
21-8.
21-9.
21-10.
+7.83%
+7.92%
+7.78%
+7.14%
+6.80%
+7.84%
+7.32%
+7.78%
+5.00%
+7.07%
235.00$ $ 253.00
235.00$ $ 253.00
235.00$ $ 253.00
130.00$ $ 140.00
245.00$ $ 264.00
235.00$ $ 253.00
265.00$ $ 286.00
385.00$ $ 415.00
700.00$ $ 755.00
1,165.00$ $ 1,250.00
135.00$ $ 145.00
265.00$ $ 286.00
480.00$ $ 515.00
715.00$ $ 765.00
265.00$ $ 286.00
+7.66%
+7.66%
+7.66%
+7.69%
+7.76%
+7.66%
+7.92%
+7.79%
+7.86%
+7.30%
+7.41%
+7.92%
+7.29%
+6.99%
+7.92%
P.E. Review, Evaluation and Certification of a
Level 1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a
Pilot Test Report
P.E. Review, Evaluation and Certification of a
Pilot Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring
Report
P.E. Review, Evaluation and Certification of a
Non-Annual Natural Attenuation or Post RA
Monitoring Report That Includes a
Recommendation for NFA or a
Recommendation to Modify the Approved
Monitoring Plan
P.E. Review, Evaluation and Certification of a
Level 2 Natural Attenuation Monitoring Plan
P.G. or P.E. Review, Evaluation and
Certification of a Receptor and Exposure
Pathway Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a Supplemental Site Assessment
Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a General Site Assessment
Report
P.E. Review, Evaluation and Certification of As-
Built Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a
Level 4 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 3 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 2 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 1 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 2 Remedial Action Plan
21-29.
21-15.
21-16.
21-17.
21-18.
21-19.
21-20.
21-21.
21-22.
21-23.
21-24.
21-25.
21-26.
21-27.
21-28.
400.00$ $ 430.00
265.00$ $ 286.00
385.00$ $ 415.00
135.00$ $ 145.00
265.00$ $ 286.00
900.00$ $ 965.00
255.00$ $ 275.00
+7.50%
+7.92%21-31.
21-32.
21-33.
21-34.
21-35.
21-36.
P.E. Review, Evaluation, and Certification of
Annual PARM Report
P.E. Review, Evaluation, and Certification of
Construction Drawings
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That
Includes a Recommendation for System
Modification or Significant Change in the
Course of Action
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report
P.E. Review, Evaluation and Certification of an
Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a
Non-Annual Operation and Maintenance Report
That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a
Remedial Action Startup Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
21-30.
+7.79%
+7.41%
+7.92%
+7.22%
+7.84%
Printed Printed Name: Name:
Title: Title:
Date: Date:
Letter/Number D (V3.5)
Type Description Attachment Rate Schedule (27 pages)
Signature of Authorized Representative Signature of Authorized Representative
GROUNDWATER & ENVIRONMENTAL
SERVICES, INC.
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
FEID No.: 232335424
List of attachments/exhibits included as part of this Amendment:
Signature of Processor Printed Name of Processor Data Entry Date
The Table 1 rate changes have been entered in the Department’s processing system with an effective Rate Change Date of:
Corresponding Rate Schedule, Attachment D
Version No. V3.5
Department Data Processing Information:
IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.
Benjamin C LaMonte
Sr. Operations Manager
5/12/2023
S f A h d
6/1/2023
Justin Wolfe Digitally signed by Justin Wolfe Date: 2023.05.30 15:08:08 -04'00'
Jamie Lopez Digitally signed by Jamie Lopez Date: 2023.06.01 14:55:14 -04'00'
File details come from the government source that posted it. Updated .