This document is Amendment No. 3 to DEP Agency Term Contract No. GC752, an indefinite delivery contract between the Florida Department of Environmental Protection (FDEP) and ENVISORS-ENSOUTH JOINT VENTURE, LLC for petroleum contamination site response action services in the Central Region. The original contract was executed on April 2, 2014. The amendment was executed on May 26, 2017, with an effective Rate Change Date of May 26, 2017, as indicated in the Department Data Processing Information section.
Amendment No. 3 implements rate changes to the contract's rate schedule (Attachment D, Version 2.1). The amendment authorizes both rate increases and decreases to various pay items, with rate increases not exceeding the maximum of 5% allowed under contract provision 11.B.ii. The contractor submitted detailed justification for the rate increases, which the Department reviewed and approved. All pre-Rate Change Date work assignments continue to apply the prior rate schedule, while new work assignments offered on or after the Rate Change Date utilize the revised rates in Attachment D (V2.1). The rate changes do not affect any pay item descriptions contained in the contract. The revised rate schedule encompasses over 200 line items covering field activities, drilling and boring, well installation and abandonment, sample collection, laboratory analysis, soil source removal, debris and waste disposal, resurfacing, in-situ injection, trenching, remedial action construction, pilot testing, system operations and maintenance, reports, and professional engineering and geology services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC752-AR1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC752-A4.pdf | ||
| PC-370000-GC752.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC752-A16.pdf | ||
| CN-370000-GC752-A5.pdf | ||
| CN-370000-GC752-A7.pdf | ||
| CN-370000-GC752-CMC.pdf | ||
| CN-370000-GC752-CMC1.pdf | ||
| CN-370000-GC752-AR1.pdf | ||
| CN-370000-GC752-A11.pdf | ||
| CN-370000-GC752-A10.pdf | ||
| CN-370000-GC752-A6.pdf | ||
| CN-370000-GC752-A2.pdf | ||
| CN-370000-GC752-A9.pdf | ||
| CN-370000-GC752-A14.pdf | ||
| CN-370000-GC752-A12.pdf | ||
| CN-370000-GC752-A13E1.pdf | ||
| CN-370000-GC752-A8.pdf | ||
| CN-370000-GC752-A17.pdf | ||
| CN-370000-GC752-CMC2.pdf | ||
| CN-370000-GC752.pdf | ||
| CN-370000-GC752-A15E2.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
All pre-Rate Change Date work assignments and previously offered work assignments will effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes
WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V2.0) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V2.0) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC752 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and ENVISORS- ENSOUTH JOINT VENTURE, LLC (hereinafter "Contractor") executed on April 2, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC752
RATE INCREASE AND DECREASE
AMENDMENT NO. 3
Amendment No. 3 DEP Agency Term Contract No. GC752
NOW THEREFORE, the parties agree as follows:
Amendment No. 3 DEP Agency Term Contract No. GC752
3.
4.
5.
Attachment D, Rate Schedule (V2.1) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate schedule (V2.1) shall apply.
Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
The rate changes specified on Table 1 do not affect any change to Pay Item Descriptions contained in the Contract.
6.
Pre-existing Rate
Agreed New Rate(1)
$425.00 $446.25 $250.00 $262.50 $225.00 $236.25 $200.00 $210.00 $350.00 $367.50 $650.00 $682.50 $250.00 $262.50 $400.00 $420.00 $450.00 $472.50 $700.00 $735.00 $150.00 $157.50 $150.00 $157.50 $440.00 $462.00 $633.00 $664.65
$500.00 $525.00
$650.00 $682.50
$400.00 $420.00 $500.00 $525.00
$7,150.00 $7,507.50 $9,350.00 $9,817.50
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00%
Pay Item No.
1-1.
1-2.
1-3.
1-5.
3-14.a.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
3-11.
File Review Site Health & Safety Plan Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement Receptor Survey and Exposure Pathway Identification (excludes report)
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way miles each way Work Trailer - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton Contractor Oversight for Non-Price Schedule Activities miles each way
Excavator Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
Description
3-12.
3-13.a.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
Table 1. Listed Schedule of Pay Items with Rate Changes Est % Rate
Change(2)
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
$375.00 $393.75 $500.00 $525.00 $275.00 $288.75 $450.00 $472.50 $330.00 $250.00 $550.00 $300.00
$28.00 $29.40 $28.00 $29.40 $29.00 $30.45 $99.00 $103.95 $45.00 $47.25
$2,300.00 $2,415.00
$2,250.00 $2,200.00
$23.62 $24.80 $24.36 $25.57 $27.25 $28.61 $25.56 $26.83 $25.91 $27.20 $28.92 $30.36 $32.77 $34.41 $33.84 $35.53
+4.99% +4.97% +4.98%
+5.00% +5.00% +5.00% +5.00% -24.24% -45.45% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
-2.22%
+5.00% +4.97%
5-1.a.3.
5-1.b.
5-2.
5-3.a.
5-5.a.
5-6.
5-7.
5-12.
5-13.
5-8.
5-1.a.1.
5-1.a.2.
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth total depth
100 feet feet
Drum Compactor mobilization - > 100 miles each way way
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way 100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way total depth total depth
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)
Direct Push Technology (DPT) Rig and Equipment
Sonic Core Sampling - 5 or 10 foot (during boring) feet
3-15.
3-16.
3-17.
3-18.
3-19.
3-20.
5-9.
5-10.
5-11. +4.98%
+5.00% +4.99%
$38.56 $40.48 $32.00 $33.60
$148.00 $155.40 $40.00 $42.00
$190.00 $185.00 $52.00 $45.00 $63.00 $50.00 $74.00 $57.00
$250.00 $262.50 $700.00 $690.00
$1,375.00 $1,350.00 $75.00 $78.75
$235.00 $246.75
$285.00 $299.25 $14.40 $15.12 $16.80 $17.64 $21.60 $22.68
$517.00 $450.00 $577.00 $605.85 $150.00 $157.50 $125.00 $131.25 $150.00 $157.50
$75.00 $78.75 $75.00 $78.75 $50.00 $52.50 $25.00 $26.25 $17.00 $17.85 $45.00 $47.25 $25.00 $26.25
+5.00%
+5.00% +5.00% +5.00% +5.00% -12.96% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
-2.63% -13.46% -20.63% -22.97% +5.00% -1.43% -1.82% +5.00%
+5.00% +5.00% +5.00%
6-2.b.
6-2.a.
5-14.
6-3.a.
6-3.b.
Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, 1 to 2 inch diameter
Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)
Free Product Gauging & Bailing Water Level or Free Product Gauging Soil/Sediment Sample Collection
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Well Installation - 2 inch diameter (vertical)
Installation of Well Vault - 2 x 2 x 2 foot Above Grade Well Completion Surface Casing - 12 inch diameter Surface Casing - 10 inch diameter
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling) Well Installation - 4 inch diameter (vertical) Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
Surface Casing - 8 inch diameter6-6.
6-7.
6-8.
Well Redevelopment Installation of Well Vault - 4 x 4 x 2 foot
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Free Product Sample Collection Other Water Sampling Domestic Water Well Sampling Monitoring Well Sampling with Water Level, > 100 foot depth foot depth Removal of Well Pad and Manhole Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Vault - 2 x 2 x 2 foot
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
7-2.
7-3.
7-5.
7-1.
6-10.
6-11.
6-12.
6-13.
6-14.
6-15.
7-6.
7-7.
8-1.
8-2.
8-3.
8-4.
8-5.
8-6.
8-7.
8-8.
8-9.
+4.98%
$175.00 $75.00 $75.00 $78.75 $75.00 $50.00 $75.00 $50.00
$12.00 $12.60
$44.00 $46.20 $44.00 $46.20 $71.50 $75.07 $55.00 $57.75 $10.00 $10.50 $10.00 $10.50 $10.00 $10.50 $10.00 $10.50 $68.25 $67.00
$7.00 $7.35 $38.50 $40.42
$104.50 $75.00
$120.00 $126.00
$412.50 $433.13
$44.00 $46.20 $44.00 $46.20
+5.00%
+5.00% +5.00% +4.99% +5.00%
-57.14% +5.00%
9-12.
9-13.
9-14.
9-24.
9-26.
9-27.
9-28.
9-23.
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Moisture Content (ASTM D2216-10)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Soil, Lead (EPA 6010 or EPA 6020) Soil, Chromium (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020) Soil, Arsenic (EPA 6010 or EPA 6020) Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, Texture, (See Gee 7 Bauder [1966])
Survey Latitude/Longitude of New Monitor Wells Survey Latitude/Longitude of Existing Monitor Wells Electronic Data Deliverables (EDD) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)
Soil, Volatile Organic Halocarbons (EPA 8021 or
EPA 8260)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
8-13.
8-14.
9-2.
9-3.
9-4.
9-18.
9-19.
9-20.
8-12.
8-10.
8-11.
9-8.
9-11.
-33.33% -33.33%
-1.83% +5.00% +4.99% -28.23%
+5.00%
+5.00%
+5.00% +5.00%
+5.00% +5.00% +5.00%
$71.50 $75.07 $40.00 $42.00 $80.00 $84.00
$192.50 $202.13
$250.00 $262.50
$55.00 $57.75 $10.00 $10.50 $10.00 $10.50 $10.00 $10.50 $10.00 $10.50
$25.00 $26.25
$11.00 $11.55
$440.00 $350.00
$330.00 $346.50
$50.00 $52.50 $40.00 $42.00 $70.00 $73.50
+5.00% +5.00% +5.00%
-20.45%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%9-32.
9-29.
9-31.a.
9-41.
9-41.a.
9-42.
9-34.
9-35.
9-36.
9-38.
Water, Methane (EPA SOP RSK-175) Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
9-39.
9-40.
9-78.
9-79.
9-80.
9-64.
9-65.
+4.99%
$330.00 $250.00
$440.00 $425.00
$16.00 $16.80 $28.50 $29.92
$8.00 $7.00 $11.00 $10.50 $16.50 $17.32
$134.67 $115.00 $305.20 $280.00
$16.50 $17.32 $13.50 $14.17 $57.20 $60.06 $60.50 $55.00
$3,600.00 $3,780.00 $110.00 $115.50
$6,050.00 $6,352.50 $358.00 $350.00
$10,175.00 $10,683.75 $250.00 $262.50
$4,000.00 $4,200.00
+5.00% +5.00% -2.23% +5.00% +5.00% +5.00%
-9.09% +5.00%
-24.24%
10-18.
10-19.
10-20.
10-21.
10-22.
10-23.
10-17.
10-11.b.
10-15.a.
10-15.b.
10-16.
1,000 gal. capacity
Additional Dewatering System Well Points (2) (includes installation)
#57 Stone Pea Gravel Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
LDA Excavation and Loading With Driven Casing < 300 cubic yards cubic yards
Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Installation for > 20 feet deep Excavation
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Excavation
10-2.b.
10-2.c.
10-2.d.
10-9.
10-2.a.
9-72.
9-73.
10-1.a.
11-1.
+4.97% -14.61% -8.26% +4.97% +4.96% +5.00%
-3.41%
+5.00% +4.98% -12.50% -4.55%
$5,000.00 $5,250.00 $3.25 $3.41 $1.25 $1.31
$50.00 $52.50 $150.00 $157.50
$25.00 $26.25 $40.00 $42.00 $32.00 $33.60
$150.00 $157.50 $1.50 $1.40
$150.00 $157.50 $500.00 $525.00 $110.00 $115.50
$6.00 $6.30 $2.00 $2.10 $6.00 $6.30 $1.50 $1.57 $2.25 $2.36 $1.00 $1.05
$21.00 $22.05 $175.00 $183.75
$1,500.00 $1,575.00 $4,000.00 $4,200.00
$75.00 $78.75
+5.00% +5.00% +5.00%
+5.00% +5.00% +5.00%
+5.00% -6.67% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +4.67% +4.89% +5.00% +5.00% +5.00%
+5.00% +4.92% +4.80% +5.00% +5.00%
14-1.
12-17.
12-18.
13-1.
13-2.
13-3.
13-4.
13-5.
13-6.
12-8.
12-1.
12-2.
Concrete Paving - additional 1 inch thickness Concrete Paving - 4 inch thickness (includes sub-base) Asphalt Paving - additional 1 inch thickness
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Groundwater Injection System (not by direct push) Groundwater Injection System (not by direct push) In-Situ Injection Into Existing Well/Treatment Point Direct Push Boring with In-Situ Injection Grass - Sod Crushed Lime Rock Cover - 2 inch thickness
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Transport Petroleum Impacted Soil (bulk) > 100 miles
Asphalt Paving - 2 inch thickness (includes sub-base)
Additional Rental of 20 Cubic Yard Roll-Off Container
Delivery, Pick Up and Rental of 20 Cubic Yard Roll- Off Container
Transport and Disposal of Petroleum Product (includes drum)
Transport and Disposal of Petroleum Contact Water (bulk)
Transport and Disposal of Petroleum Contact Water (includes drum)
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons miles
Transport and Disposal of Petroleum Impacted Soil (includes drum) Transport and Disposal of Mixed Debris Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Removal and Loading of Asphalt and/or Concrete -up to 4 inch thickness
11-2.
12-10.
12-13.
12-14.
12-15.
14-2.
14-4.
14-5.
15-1.a.
12-5.
12-6.
12-7.
$35.00 $36.75
$6.00 $6.30
$8,000.00 $8,400.00
$8,500.00 $8,925.00
$9,000.00 $9,450.00
$1,200.00 $1,260.00
$1,500.00 $1,575.00 $3,500.00 $3,675.00
$220.00 $231.00 $2,100.00 $2,205.00
$220.00 $231.00 $2,350.00 $2,467.50
$220.00 $231.00 $2,600.00 $2,730.00
$220.00 $231.00 $3,000.00 $3,150.00
$220.00 $231.00 $2,750.00 $2,887.50
$220.00 $231.00
15-2.a.
15-4.a.
15-4.b.
15-4.c.
15-4.d.
15-5.
15-1.d.
Multi-Phase Pilot Test - 8 hours Air Sparging/Vapor Extraction Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours Vapor Extraction Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours Air Sparging or Biosparging Pilot Test - Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - Additional Time
Groundwater Recovery System Pilot Test - 8 hours 1 Technology Component
System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This tem is used in conjunction with 15.4.c when needed)
System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points
Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.
Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines
16-1.
16-2.
16-3.
16-4.
16-5.
16-6.
16-7.
16-8.
16-9.
16-10.
16-11.
16-12.
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
$2,800.00 $2,940.00 $350.00 $367.50
$2,450.00 $2,572.50 $4,900.00 $5,145.00 $1,920.00 $2,016.00 $3,700.00 $3,885.00 $2,750.00 $2,887.50 $4,500.00 $4,725.00 $1,920.00 $2,016.00 $3,700.00 $3,885.00 $4,000.00 $4,200.00 $6,000.00 $6,300.00 $3,000.00 $3,150.00 $4,000.00 $4,200.00 $1,800.00 $1,890.00 $2,000.00 $2,100.00 $2,175.00 $2,283.75 $2,500.00 $2,625.00
$275.00 $288.75 $5,700.00 $5,985.00 $1,928.00 $2,024.40 $2,148.00 $2,255.40 $4,146.67 $4,354.00 $3,393.33 $3,563.00 $5,446.67 $5,719.00 $4,483.33 $4,707.50 $6,780.00 $7,119.00 $5,370.00 $5,638.50 $2,753.00 $2,890.65
+5.00% +5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
+5.00% +5.00%
+5.00% +5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
18-17.
18-18.
18-19.
18-24.
Air Sparge System - Small - Long Term > 6 mos.
MPE System - Small - Long Term > 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
Supplemental System O&M Package - Add Thermox or Catox Treatment Groundwater Treatment System - Stand Alone Small -
System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small SVE System Package - Medium SVE System Package - Medium AS/MPE System Package - Medium AS/MPE System Package - Medium MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium Air Sparge System Package - Medium Groundwater Treatment System Package - Medium Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
16-18.
16-17.
16-13.
16-14.
16-19.
16-20.
16-21.
16-22.
16-23.
16-24.
16-25.
18-5.
18-21.
18-22.
16-26.
16-27.
16-28.
17-1.
17-2.
17-3.
17-4.
17-5.
18-20.
18-12.
18-14.
+5.00% +5.00%
+5.00%
$6,200.00 $5,800.00 $7,660.00 $7,000.00 $5,254.00 $5,200.00 $6,430.00 $5,000.00 $4,092.00 $3,800.00 $9,797.00 $7,000.00 $6,234.00 $5,000.00 $8,883.00 $6,000.00 $7,000.00 $6,000.00
$677.00 $650.00 $805.00 $750.00 $875.00 $918.75 $248.00 $260.40 $303.00 $318.15 $400.00 $420.00
$3,850.00 $3,400.00 $3,960.00 $3,900.00 $5,800.00 $6,090.00 $3,300.00 $3,000.00 $3,710.00 $3,400.00 $5,200.00 $5,000.00 $3,200.00 $3,360.00
-11.69% -1.52% +5.00% -9.09% -8.36% -3.85% +5.00%
-3.99% -6.83% +5.00% +5.00% +5.00% +5.00%
-6.45% -8.62% -1.03%
-22.24% -7.14%
-28.55% -19.79% -32.46% -14.29%
18-39.
18-40.
18-41.
18-42.
18-38.
18-29.
18-30.
18-31.
18-32.
18-33.
18-34.
18-35.
18-36.
18-37.
18-25.
18-27.
18-28.
Carbon Off Gas Treatment - Add On - Large - Short Carbon Off Gas Treatment - Add On - Medium - Carbon Off Gas Treatment - Add On - Small - Short
Soil Vapor Extraction (SVE) System - Small - Short Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large - Thermox/Catox Off Gas Treatment - Add On - Thermox/Catox Off Gas Treatment - Add On - Small - Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long Term > 6 mos.
Groundwater Treatment - Add On - Small - Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Short Groundwater Treatment - Add On - Medium - Short Groundwater Treatment - Add On - Small - Short MPE System - Large - Long Term > 6 mos.
18-43.
18-44.
18-45.
18-46.
18-47.
$2,750.00 $2,887.50 $3,750.00 $3,937.50 $3,000.00 $3,150.00 $5,610.00 $5,890.50 $5,390.00 $5,659.50 $4,200.00 $4,410.00 $4,250.00 $4,462.50 $5,200.00 $5,460.00 $4,900.00 $5,145.00 $7,370.00 $7,738.50 $6,930.00 $7,276.50 $1,475.00 $1,548.75 $3,280.00 $3,444.00
$750.00 $787.50 $900.00 $945.00 $550.00 $577.50
$1,100.00 $1,155.00 $700.00 $735.00
$1,050.00 $1,102.50 $9,750.00 $10,237.50
$13,125.00 $13,781.25 $1,200.00 $1,260.00 $2,250.00 $2,362.50 $3,975.00 $4,173.75 $6,575.00 $6,903.75 $2,775.00 $2,913.75
+5.00% +5.00%
+5.00% +5.00% +5.00% +5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan Level 2 Remedial Action Plan Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual Level 2 Natural Attenuation Monitoring Plan Receptor and Exposure Pathway Report
Soil Vapor Extraction (SVE) System - Large - Short Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months
General Site Assessment Report Soil Source Removal Report Air Sparge/Multphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Air Sparge/Multphase Extraction (AS/MPE) System - Small - Long Term > 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Medium - Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months
Construction Drawings and Specs Report
18-57.
18-58.
19-1.
19-3.
19-5.
19-6.
19-7.
18-56.
18.48.
18-49.
18-50.
18-51.
18-52.
18-53.
18-54.
18-55.
19-17.
19-8.
19-9.
19-10.
19-11.
19-12.
19-13.
19-14.
19-15.
19-16.
+5.00%
$550.00 $577.50 $1,950.00 $2,047.50
$235.00 $246.75 $1,350.00 $1,417.50 $2,485.00 $2,609.25
$950.00 $997.50 $450.00 $472.50 $350.00 $367.50 $250.00 $262.50
$1,200.00 $1,260.00 $120.00 $126.00 $110.00 $115.50
$85.00 $89.25 $85.00 $89.25 $75.00 $78.75 $65.00 $68.25 $45.00 $47.25 $50.00 $52.50 $50.00 $52.50 $35.00 $36.75 $30.00 $31.50
$120.00 $126.00 $120.00 $126.00 $120.00 $126.00
$120.00 $126.00 $600.00 $630.00
$3,360.00 $2,200.00
$3,600.00 $2,600.00
$4,080.00 $3,000.00
$4,800.00 $3,500.00
+5.00% +5.00%
+5.00% +5.00% +5.00% +5.00% +5.00%
+5.00% +5.00% -34.52%
-27.78%
-26.47%
-27.08%
20-3.
20-4.
20-5.
20-6.
20-7.
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-2.
21-3.
21-4.
21-5.
Assistant Scientist/Technical Specialist Scientist/Technical Specialist (Key) Hydrogeologist/Modeler (Key) Geologist/Geoscientist (Key) Engineer (Key) Project Manager (Key) Program Manager (Key) Interim Assessment Report Well Abandonment/Site Restoration Report Free Product Recovery Report Remedial Action Interim Report Remedial Action General Report Operation & Maintenance Annual Report Operation & Maintenance Report, Quarterly or Non- Annual Letter/NPDES Report
P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System Integration and Startup - Large System
P.E. Project Oversight for Remediation System Integration and Startup - Medium System
P.E. Project Oversight for Remediation System Integration and Startup - Small System
P.E. Project Oversight for Remediation Technology Pilot Testing
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and Soil- Boring Logging (Use hourly rate on site specific basis)
Remedial Action Startup Report As-Built Drawings (P.E. Sealed red lined modifications)
Professional Geologist (Key) Professional Engineer (Key) Laborers and Security Guards Administrative Draftsperson Field Technician (Key)
19-18.
19-19.
19-20.
19-21.
19-22.
19-23.
19-24.
19-25.
20-9.
20-10.
20-11.
21-1.
20-8.
19-26.
19-27.
20-1.
20-2.
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
$360.00 $378.00
$960.00 $1,008.00
$2,400.00 $800.00
$2,400.00 $525.00
$7,200.00 $1,800.00
$4,800.00 $1,200.00
$480.00 $504.00
$480.00 $504.00
$120.00 $126.00
$600.00 $400.00
$240.00 $252.00
-75.00%
+5.00%
+5.00%
+5.00%
-78.13%
-75.00%21-11.
21-12.
21-13.
21-15.
21-16.
21-17.
21-18.
21-7.a.
21-7.b.
21-9.
21-10.
P.G. or Qualified P.E. Review, Evaluation and Certification of a Supplemental Site Assessment Report
P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA
P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
P.E. Review, Evaluation and Certification of a Level 2 Natural Attenuation Monitoring Plan
P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report
P.G. Review and Certification of Sufficiency of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis
-66.67%
+5.00%
+5.00%
-33.33%
$120.00 $126.00
$240.00 $252.00 $480.00 $504.00
$2,300.00 $2,415.00 $3,300.00 $3,465.00
$360.00 $378.00
$600.00 $630.00
$960.00 $1,008.00
$240.00 $252.00
$360.00 $378.00
$360.00 $378.00
$960.00 $1,008.00
$240.00 $252.00
+5.00%
+5.00%
21-30.
21-21.
21-22.
21-23.
21-24.
21-25.
21-26.
21-27.
21-29.
21-19.
P.E. Review, Evaluation and Certification of As-Built Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report
P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan
P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot Test Report
P.E. Review, Evaluation and Certification of a Pilot Test Plan
21-31.
21-32.
21-33.
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
$240.00 $252.00
$350.00 $367.50
+5.00%
+5.00%
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
Notes:
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
P.E. Review, Evaluation, and Certification of Annual PARM Report
21-34.
21-36.
PAY
ITEM UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
1.
1-1. Per Review $ 425.00 $ 425.00 $ 446.25 1-2. Per Site $ 250.00 $ 250.00 $ 262.50
1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 225.00 $ 225.00 $ 236.25 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 200.00 $ 200.00 $ 210.00
1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.
2-1. Per Visit $ 650.00 $ 650.00 $ 650.00 2-2. Per Survey $ 350.00 $ 350.00 $ 367.50 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 650.00 $ 650.00 $ 682.50 3.
3-1. Per Round Trip $ 250.00 $ 250.00 $ 262.50 3-2. Per Round Trip $ 400.00 $ 400.00 $ 420.00 3-3. Per Round Trip $ 450.00 $ 450.00 $ 472.50 3-4. Per Round Trip $ 700.00 $ 700.00 $ 735.00 3-5. Per Round Trip $ 150.00 $ 150.00 $ 157.50 3-6. Per Round Trip $ 150.00 $ 150.00 $ 157.50
DESCRIPTION
OFFICE ACTIVITIES
File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order) Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - > 100 miles each way
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
3-7. Per Round Trip $ 450.00 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 440.00 $ 462.00 3-8. Per Round Trip $ 815.00 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 633.00 $ 664.65 3-9. Per Round Trip $ 450.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 500.00 $ 525.00 3-10. Per Round Trip $ 815.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 650.00 $ 682.50 3-11. Per Round Trip $ 400.00 $ 400.00 $ 420.00 3-12. Per Round Trip $ 500.00 $ 500.00 $ 525.00 3-13. Per Round Trip $ 8,250.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 7,150.00 $ 7,507.50 3-14. Per Round Trip $ 11,000.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 9,350.00 $ 9,817.50 3-15. Per Round Trip $ 375.00 $ 375.00 $ 393.75 3-16. Per Round Trip $ 500.00 $ 500.00 $ 525.00 3-17. Per Round Trip $ 275.00 $ 275.00 $ 288.75 3-18. Per Round Trip $ 450.00 $ 450.00 $ 472.50 3-19. Per Round Trip Not Applicable $ 330.00 $ 250.00 3-20. Per Round Trip Not Applicable $ 550.00 $ 300.00
100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way
100 miles each way Drill Rig Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
Excavator Mobilization - > 100 miles each way
LDA Rig Mobilization - > 100 miles each way
Drum Compactor mobilization - > 100 miles each way
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
4.
4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00 5.
5-1.a. Per Spoon $ 33.15 Not Applicable Not Applicable 5-1.a.1. Per Spoon Not Applicable $ 28.00 $ 29.40 5-1.a.2. Per Spoon Not Applicable $ 28.00 $ 29.40 5-1.a.3. Per Spoon Not Applicable $ 29.00 $ 30.45 5-1.b. Per Core $ 99.00 $ 99.00 $ 103.95 5-1.c. Per Core $ 15.30 Not Applicable Not Applicable 5-2. Per Boring $ 45.00 $ 45.00 $ 47.25 5-3. Per Foot $ 19.00 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 2,300.00 $ 2,415.00 5-4. Per Foot $ 25.00 Not Applicable Not Applicable 5-5. Per Foot $ 45.00 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 2,250.00 $ 2,200.00 5-6. Per Foot $ 23.62 $ 23.62 $ 24.80
Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring)
MEALS AND LODGING
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
5-7. Per Foot $ 24.36 $ 24.36 $ 25.57 5-8. Per Foot $ 27.25 $ 27.25 $ 28.61 5-9. Per Foot $ 25.56 $ 25.56 $ 26.83 5-10. Per Foot $ 25.91 $ 25.91 $ 27.20 5-11. Per Foot $ 28.92 $ 28.92 $ 30.36 5-12. Per Foot $ 32.77 $ 32.77 $ 34.41 5-13. Per Foot $ 33.84 $ 33.84 $ 35.53 5-14. Per Foot $ 38.56 $ 38.56 $ 40.48 5-15. Per Foot $ 35.50 $ 35.50 $ 35.50 5-16. Per Foot $ 38.80 $ 38.80 $ 38.80 5-17. Per Foot $ 46.50 $ 46.50 $ 46.50 5-18. Per Foot $ 41.00 $ 41.00 $ 41.00 5-19. Per Foot $ 46.50 $ 46.50 $ 46.50 5-20. Per Foot $ 57.50 $ 57.50 $ 57.50 5-21. Per Foot $ 68.50 $ 68.50 $ 68.50 5-22. Per Foot $ 79.50 $ 79.50 $ 79.50 5-23. Per Foot $ 101.50 $ 101.50 $ 101.50
6.
6-1. Per Foot $ 30.00 $ 30.00 $ 30.00 6-2. Per Foot $ 30.00 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 32.00 $ 33.60 6-2.b. Per Foot Not Applicable $ 148.00 $ 155.40
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
6-3. Per Foot $ 35.50 Not Applicable Not Applicable 6-3.a. Per Foot Not Applicable $ 40.00 $ 42.00 6-3.b. Per Foot Not Applicable $ 190.00 $ 185.00 6-4. Per Foot $ 52.00 $ 52.00 $ 52.00 6-5. Per Foot $ 41.00 $ 41.00 $ 41.00 6-6. Per Foot $ 52.00 $ 52.00 $ 45.00 6-7. Per Foot $ 63.00 $ 63.00 $ 50.00 6-8. Per Foot $ 74.00 $ 74.00 $ 57.00
6-9.a. Per Foot $ 6.60 $ 6.60 $ 6.60 6-9.b. Per Foot $ 8.80 $ 8.80 $ 8.80 6-9.c. Per Foot $ 16.50 $ 16.50 $ 16.50 6-9.d. Per Foot $ 19.80 $ 19.80 $ 19.80 6-10. Per Well $ 250.00 $ 250.00 $ 262.50 6-11. Per Vault $ 700.00 $ 700.00 $ 690.00 6-12. Per Vault $ 1,375.00 $ 1,375.00 $ 1,350.00 6-13. Per Well Not Applicable $ 75.00 $ 78.75 6-14. Per Well Not Applicable $ 235.00 $ 246.75
6-15. Per Well Not Applicable $ 285.00 $ 299.25
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter
Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)
Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
7.
7-1. Per Foot $ 14.40 $ 14.40 $ 15.12 7-2. Per Foot $ 16.80 $ 16.80 $ 17.64 7-3. Per Foot $ 21.60 $ 21.60 $ 22.68 7-4. Per Foot $ 30.00 $ 30.00 $ 30.00 7-5. Per Vault $ 517.00 $ 517.00 $ 450.00 7-6. Per Vault $ 577.00 $ 577.00 $ 605.85 7-7 Per Well Not Applicable $ 150.00 $ 157.50 8.
8-1. Per Well $ 125.00 $ 125.00 $ 131.25 8-2. Per Well $ 150.00 $ 150.00 $ 157.50 8-3. Per Well $ 75.00 $ 75.00 $ 78.75 8-4. Per Sample $ 75.00 $ 75.00 $ 78.75 8-5. Per Sample $ 50.00 $ 50.00 $ 52.50 8-6. Per Sample $ 25.00 $ 25.00 $ 26.25 8-7. Per Well $ 17.00 $ 17.00 $ 17.85 8-8. Per Well $ 45.00 $ 45.00 $ 47.25 8-9. Per Sample $ 25.00 $ 25.00 $ 26.25 8-10. Per Sample $ 175.00 $ 175.00 $ 75.00 8-11. Per Sampling Event Not Applicable $ 75.00 $ 78.75 8-12. Per Well Not Applicable $ 75.00 $ 50.00
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole
Survey Latitude/Longitude of Existing Monitor Wells
Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
8-13. Per Well Not Applicable $ 75.00 $ 50.00
8-14 Per Sample Not Applicable $ 12.00 $ 12.60
9.
9.A.
9-1. Per Sample $ 412.50 $ 412.50 $ 412.50 9-2. Per Sample $ 44.00 $ 44.00 $ 46.20 9-3. Per Sample $ 44.00 $ 44.00 $ 46.20 9-4. Per Sample $ 71.50 $ 71.50 $ 75.07 9-5. Per Sample $ 88.00 $ 88.00 $ 88.00 9-6. Per Sample $ 93.50 $ 93.50 $ 93.50 9-7. Per Sample $ 250.00 $ 250.00 $ 250.00 9-8. Per Sample $ 55.00 $ 55.00 $ 57.75
9-8.a. Per Sample Not Applicable $ 250.00 $ 250.00 9-9. Per Sample $ 55.00 $ 55.00 $ 55.00 9-10. Per Sample $ 78.00 $ 78.00 $ 78.00 9-11. Per Sample $ 10.00 $ 10.00 $ 10.50
Survey Latitude/Longitude of New Monitor Wells Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
9-12. Per Sample $ 10.00 $ 10.00 $ 10.50 9-13. Per Sample $ 10.00 $ 10.00 $ 10.50 9-14. Per Sample $ 10.00 $ 10.00 $ 10.50 9-15. Per Sample $ 49.50 $ 49.50 $ 49.50 9-16. Per Sample $ 49.50 $ 49.50 $ 49.50 9-17. Per Sample $ 38.50 $ 38.50 $ 38.50 9-18. Per Sample $ 68.25 $ 68.25 $ 67.00 9-19. Per Sample $ 7.00 $ 7.00 $ 7.35 9-20. Per Sample $ 38.50 $ 38.50 $ 40.42 9-21. Per Sample $ 165.00 $ 165.00 $ 165.00 9-22. Per Sample $ 200.00 $ 200.00 $ 200.00 9-23. Per Sample $ 104.50 $ 104.50 $ 75.00 9-24. Per Sample $ 120.00 $ 120.00 $ 126.00 9.B.
9-25. Per Sample $ 247.50 $ 247.50 $ 247.50
9-26. Per Sample $ 412.50 $ 412.50 $ 433.13
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Chromium (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, - 96e1 or ASTM D2937-10)
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods) Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
9-27. Per Sample $ 44.00 $ 44.00 $ 46.20 9-28. Per Sample $ 44.00 $ 44.00 $ 46.20 9-29. Per Sample $ 71.50 $ 71.50 $ 75.07 9-30. Per Sample $ 88.00 $ 88.00 $ 88.00 9-31. Per Sample $ 44.00 $ 44.00 $ 44.00
9-31.a. Per Sample Not Applicable $ 40.00 $ 42.00 9-32. Per Sample $ 80.00 $ 80.00 $ 84.00 9-33. Per Sample $ 93.59 $ 93.59 $ 93.59 9-34. Per Sample $ 192.50 $ 192.50 $ 202.13 9-35. Per Sample $ 250.00 $ 250.00 $ 262.50 9-36. Per Sample $ 55.00 $ 55.00 $ 57.75 9-37. Per Sample $ 55.00 $ 55.00 $ 55.00 9-38. Per Sample $ 10.00 $ 10.00 $ 10.50 9-39. Per Sample $ 10.00 $ 10.00 $ 10.50 9-40. Per Sample $ 10.00 $ 10.00 $ 10.50 9-41. Per Sample $ 10.00 $ 10.00 $ 10.50
9-41.a. Per Sample Not Applicable $ 25.00 $ 26.25 9-42. Per Sample $ 11.00 $ 11.00 $ 11.55
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENVISORS-ENSOUTH JOINT VENTURE, LLC
GC752
DEP Restated Agency Term Contract No. GC752 Amendment No. 3
Attachment D (V2.1) - Rate Schedule
9-43. Per Sample $ 10.00 $ 10.00 $ 10.00 9-44. Per Sample $ 10.00 $ 10.00 $ 10.00
9-44.a. Per Sample Not Applicable $ 25.00 $ 25.00 9-45. Per Sample $ 10.00 $ 10.00 $ 10.00 9-46. Per Sample $ 10.00 $ 10.00 $ 10.00 9-47. Per Sample $ 10.00 $ 10.00 $ 10.00 9-48. Per Sample $ 10.00 $ 10.00 $ 10.00 9-49. Per Sample $ 11.00 $ 11.00 $ 11.00 9-50. Per Sample $ 13.50 $ 13.50 $ 13.50 9-51. Per Sample $ 13.50 $ 13.50 $ 13.50 9-52. Per Sample $ 11.00 $ 11.00 $ 11.00 9-53. Per Sample $ 13.50 $ 13.50 $ 13.50 9-54. Per Sample $ 16.50 $ 16.50 $ 16.50 9-55. Per Sample $ 13.50 $ 13.50 $ 13.50 9-56. Per Sample $ 21.00 $ 21.00 $ 21.00 9-57. Per Sample $ 16.50 $ 16.50 $ 16.50 9-58. Per Sample $ 11.00 $ 11.00 $ 11.00
Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or
SM 4500-NO3 F)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)
Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
Central
ENV…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .