CN-370000-GC728-A7.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|GC728|8af208898ae5ee4fb9a7e402d085621c
Contract number
GC728
Issued by
Florida

About this file

This is Amendment No. 7 to Agency Term Contract No. GC728, executed between the Florida Department of Environmental Protection (DEP) and Advanced Environmental Technologies, LLC. The amendment was signed on June 9, 2020, and became effective on June 19, 2020. The contract provides petroleum contamination site response action services in the Central Region of Florida.

Amendment No. 7 modifies the Rate Schedule (Attachment D, Version 3.1) for pay items included in the contract. The amendment implements both rate increases and decreases across numerous service categories, with increases not exceeding the maximum allowable 5 percent threshold. Rate changes apply exclusively to new work assignments offered on or after the Rate Change Date of June 19, 2020, while all pre-rate-change work assignments continue under the prior rate schedule. The amendment does not add, delete, or modify any line items in the contract. Service categories covered include drilling and boring, well installation and abandonment, sample collection and field testing, laboratory analysis (soil, water, air, and product), soil source removal, debris and waste disposal, remediation system integration and operation, professional engineering and geology services, and various reports and certifications. Specific pay items range from modest increases (under 1 percent) to substantial decreases (up to 73.95 percent), with the majority of increases clustered around 4-5 percent. All other contract terms and conditions remain in effect.

View the file

Other files

File Type Posted
CN-370000-GC728-A11.pdf PDF
CN-370000-GC728-A12E1.pdf PDF
CN-370000-GC728-CMC.pdf PDF
CN-370000-GC728-A10.pdf PDF
CN-370000-GC728-A14.pdf PDF
CN-370000-GC728.pdf PDF
CN-370000-GC728-A15.pdf PDF
CN-370000-GC728-A2.pdf PDF
CN-370000-GC728-A3.pdf.crdownload CRDOWNLOAD file
CN-370000-GC728-A4.pdf PDF
CN-370000-GC728-A5.pdf PDF
CN-370000-GC728-A9.pdf PDF
CN-370000-GC728-AR1.pdf PDF
CN-370000-GC728-CMC1.pdf PDF
CN-370000-GC728-A13E2.pdf PDF
CN-370000-GC728-A3.pdf PDF
CN-370000-GC728-A6.pdf PDF
CN-370000-GC728-A8.pdf PDF
PC-370000-GC728.pdf.crdownload CRDOWNLOAD file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

All pre-Rate Change Date work assignments and previously offered work assignments will effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes

WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.0) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.0) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and

WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC728 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and ADVANCED ENVIRONMENTAL TECHNOLOGIES, LLC (hereinafter "Contractor") executed on February 27, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC728

RATE INCREASE AND DECREASE

AMENDMENT NO. 7

Amendment No. 7 DEP Agency Term Contract No. GC728

NOW THEREFORE, the parties agree as follows:

Amendment No. 7 DEP Agency Term Contract No. GC728

3.

4.

5.

6.

Attachment D, Rate Schedule (V3.1) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate schedule (V3.1) shall apply.

Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

Pre-existing Rate

Agreed New Rate(1)

532.68$ $ 525.00 367.50$ $ 385.87 584.84$ $ 580.00

475.10$ $ 498.85

534.49$ $ 561.20

630.00$ $ 661.50

1,260.00$ $ 1,000.00

17,030.00$ $ 15,000.00

140.19$ $ 147.19

27.86$ $ 29.25

33.44$ $ 35.10

40.87$ $ 38.00

31.37$ $ 32.93

39.53$ $ 41.50

50.60$ $ 44.09

63.25$ $ 49.38

36.03$ $ 37.83

45.37$ $ 47.63

60.49$ $ 53.34

57.03$ $ 59.88

33.44$ $ 35.11 40.87$ $ 42.91 55.12$ $ 48.15

+5.00%

+4.98%

-11.82%

+5.00%

+4.99% +4.99%

+4.99%

+4.99%

+4.96%

-7.02%

+4.97%

-12.65%

-11.92%

5-2.

5-6.

5-7.

5-18.

5-20.

5-21.

6-2.a.

5-12.

5-13.

5-14.

5-15.

5-8.

6-4.

Pay Item No.

1-1.

1-5.

3-7.a.

3-8.a.

6-3.a. Well Installation - 4 inch diameter (vertical)

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Well Installation - 2 inch diameter (vertical)

Well Installation - 6 inch diameter

File Review Off-Site Property Access Agreement Site Reconnaissance/Field Measurement Visit

DPT Rig and Support Vehicles Mobilization - > 100 miles each way miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton miles each way

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth total depth

Description

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes total depth depth

2-1.

3-1.

3-2.

5-9.

Est % Rate

Change(2)

-1.44% +5.00% -0.83%

+5.00%

+5.00%

+5.00%

-20.63%

+4.98%

-12.87%

-21.93%

63.51$ $ 55.00 57.33$ $ 54.30 68.88$ $ 63.68

9.33$ $ 7.21

9.92$ $ 9.21

17.50$ $ 13.57

19.75$ $ 17.42

413.44$ $ 336.32 760.73$ $ 798.75

14.00$ $ 14.70 17.50$ $ 18.37

157.50$ $ 165.37

209.57$ $ 220.04

25.20$ $ 26.45

69.63$ $ 48.90

87.47$ $ 73.84

105.00$ $ 110.25

13.75$ $ 14.43

45.49$ $ 47.76

87.77$ $ 92.15

72.22$ $ 75.83

30.33$ $ 31.84

355.52$ $ 263.98

+5.00% +4.97%

+4.95%

+4.99%

+4.99%

+5.00%

+5.00%

+5.00%

+4.96%

-29.77%

-15.58%

+5.00%

-7.16%

-22.46%

-11.80%

-18.65% +5.00%

-13.40% -5.29% -7.55%

-22.72%

9-21.

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, 1 to 2 inch diameter

Soil, Total Recoverable Petroleum Hydrocarbons (FL-

PRO)

Electronic Data Deliverables (EDD)

Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)

Vapor/Ambient Air Sample Collection - Passive

Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)

Water Level or Free Product Gauging

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

Above Grade Well Completion

Additional Well Screen > 20 feet - 6 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Surface Casing - 12 inch diameter Surface Casing - 10 inch diameter Surface Casing - 8 inch diameter

6-9.c.

6-9.d.

6-10.

6-11.

7-7.

8-1.

6-6.

6-7.

6-8.

Installation of Well Vault - 2 x 2 x 2 foot

6-9.a.

7-2.

7-1.

6-9.b.

foot depth

Removal of Well Pad and Manhole

8-14.

9-2.

9-5.

9-16.

8-7.

8-9.

8-10.

8-11.

9-8.

-25.75%

+4.98%

428.30$ $ 349.63

244.98$ $ 212.02

45.49$ $ 47.76

87.77$ $ 92.15

5.83$ $ 6.12

5.83$ $ 6.12

5.83$ $ 6.12

374.46$ $ 298.98

424.46$ $ 343.00

244.98$ $ 212.52

92.50$ $ 97.12

529.20$ $ 414.14

18.90$ $ 19.84

20.00$ $ 18.00

31.60$ $ 33.18

27.29$ $ 28.65

22.08$ $ 23.18

+4.99%

+4.97%

+4.97%

-20.16%

-19.19%

-13.25%

+4.97%

9-22.

9-24.

9-27.

9-30.

9-41.

Conventional Soil Excavation and Loading > 300 cubic yards cubic yards

Sheet Piling Installation for > 20 feet deep Excavation

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution

GC/MS)

Excavation

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution

GC/MS)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution

GC/MS)

9-67.

9-68.

10-7.

10-8.

9-58.

9-59.

9-64.

9-65.

10-2.a.

9-73.

10-1.a.

10-1.d.

-18.37%

-13.45%

+4.99%

+4.99%

+4.98%

+4.98%

-21.74%

+4.97%

-10.00%

+5.00%

110.62$ $ 116.15

96.66$ $ 101.49

115.83$ $ 121.62

104.16$ $ 109.36

22.67$ $ 23.80

21.50$ $ 22.57

10.60$ $ 11.13

8.50$ $ 8.92

45.41$ $ 47.68

5,270.93$ $ 3,893.21

253.58$ $ 217.15

7,278.46$ $ 7,642.38

5,980.86$ $ 4,590.02

9,592.81$ $ 9,000.00

11,530.66$ $ 11,000.00

2.35$ $ 2.46

2.92$ $ 3.06

29.17$ $ 30.62

191.47$ $ 201.04

19.83$ $ 20.82

26.25$ $ 27.55

27.99$ $ 29.38

27.99$ $ 29.38

+4.99%

+4.95%

+4.97%

+4.97%

-14.37%

+5.00%

-23.25%

+5.00%

-26.14%

-6.18%

-4.60%

+4.68%

+4.79%

+4.97%

+5.00%

10-15.

10-15.a.

10-15.b.

12-8.

11-3.

11-4.

12-1.

12-2.

11-1.

12-9.

12-10.

10-11.a.

10-18.

10-19.

10-22.

10-17.

10-12.a.

10-14.

1,000 gal. capacity

Disposal of Petroleum Impacted Soil at a Landfill

Transport Petroleum Impacted Soil (bulk) > 100 miles

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons

Transport and Disposal of Petroleum Impacted Soil (includes drum)

Transport and Disposal of Clean Concrete

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity

#57 Stone

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and Testing

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2) (includes installation)

Dewatering System, up to 12 well points (includes installation)

LDA Excavation and Loading With Surface Casing > 300 cubic yards

300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards cubic yards 10-9.

10-10.

12-4.

12-6.

12-7.

+5.00%

+5.00%

+5.00%

+4.99%

+4.98%

+4.98%

+5.00%

+4.94%

194.25$ $ 203.95

0.51$ $ 0.53

0.51$ $ 0.53

925.00$ $ 971.25

220.50$ $ 231.52

8.07$ $ 8.47

8.80$ $ 9.24

1.29$ $ 1.35 1.29$ $ 1.35 0.33$ $ 0.34

7,000.00$ $ 6,000.00

15,500.00$ $ 10,000.00

52.50$ $ 55.12

6,400.00$ $ 5,000.00

638.12$ $ 550.00

3,454.40$ $ 3,627.12

3,804.36$ $ 3,994.57

11,403.71$ $ 10,500.00

1,972.03$ $ 2,070.63 8,886.18$ $ 7,500.00

10,792.66$ $ 8,500.00 2,746.62$ $ 2,883.95 3,287.68$ $ 3,452.06 3,854.40$ $ 4,047.12 4,256.73$ $ 4,469.56

376.15$ $ 394.95

+5.00% -15.60%

-7.92%

-21.24% +5.00% +5.00% +5.00% +5.00%

+5.00%

-14.29%

-35.48%

+4.99%

+3.92%

+3.92%

+5.00%

+5.00%

+4.96%

+5.00%

+4.65% +4.65% +3.03%

15-4.d.

15-1.d.

12-13.

12-14.

12-16.

12-17.

12-18.

13-1.

13-3.

13-5.

13-6.

13-7.

Supplemental System O&M Package - Add Thermox or Catox Treatment

Multi-Phase Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - 8 hours

System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium MPE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium Air Sparge System Package - Medium

Groundwater Treatment System Package - Medium

Groundwater Recovery System Pilot Test - Additional Time

Concrete Paving - 4 inch thickness (includes sub-base)

System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

Grass - Seed and Mulch Grass - Sod Crushed Lime Rock Cover - 2 inch thickness

Asphalt Paving - 2 inch thickness (includes sub-base)

Additional Rental of 20 Cubic Yard Roll-Off Container

Delivery, Pick Up and Rental of 20 Cubic Yard Roll- Off Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Contact Water (bulk)

Transport and Disposal of Petroleum Contact Water (includes drum)

14-4.

14-5.

16-2.

16-18.

16-9.

16-11.

16-19.

16-20.

16-22.

16-23.

17-2.

17-3.

17-4.

17-5.

-13.81%

+5.00%

+5.00%

+4.99%

-21.88%

3,060.81$ $ 2,750.00

2,044.96$ $ 2,147.20

3,409.66$ $ 3,150.00

2,278.27$ $ 2,392.18

5,193.48$ $ 4,450.00

3,304.83$ $ 3,470.07

3,266.34$ $ 3,429.65 2,566.41$ $ 2,694.73

4,666.20$ $ 4,899.51

4,082.93$ $ 4,287.07

5,832.75$ $ 6,124.38 5,249.48$ $ 5,511.95 4,589.20$ $ 4,103.13 5,249.48$ $ 5,000.00 4,666.20$ $ 4,080.55 6,416.03$ $ 6,000.00 5,599.44$ $ 5,161.45

1,166.55$ $ 1,224.87

7,677.98$ $ 2,000.00

1,049.90$ $ 1,102.39

212.90$ $ 223.54

425.80$ $ 447.09

851.58$ $ 894.15

116.66$ $ 122.49

233.31$ $ 244.97

466.62$ $ 489.95

3,444.27$ $ 3,616.48 +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00% -10.59% -4.75%

-12.55% -6.48% -7.82%

+5.00%

-73.95%

+5.00%

-10.15%

+5.00%

-7.62%

+5.00%

-14.32%

+5.00%

+5.00% +5.00%

+5.00%

18-40.

18-38.

18-29.

18-31.

18-32.

18-35.

18-36.

18-37.

18-23.

18-25.

18-26.

18-27.

18-28.

18-39.

Carbon Off Gas Treatment - Add On - Large - Short

Carbon Off Gas Treatment - Add On - Medium -

Carbon Off Gas Treatment - Add On - Small - Short

Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months

Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Short

Groundwater Treatment - Add On - Small - Short MPE System - Large - Long Term > 6 mos.

MPE System - Medium - Long Term > 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

18-21.

18-22.

18-20.

18-11.

18-12.

18-13.

18-14.

18-15.

18-16.

18-17.

18-18.

18-19.

18.48.

+5.00%

3,965.65$ $ 4,163.93

4,778.81$ $ 5,017.75

7,418.81$ $ 5,400.00

8,138.74$ $ 4,750.00

9,467.72$ $ 5,250.00

8,486.89$ $ 8,911.23

2,505.45$ $ 2,630.72 1,533.70$ $ 1,610.38

750.92$ $ 788.46

607.55$ $ 637.92

711.74$ $ 747.32 1,433.25$ $ 1,504.91 7,389.03$ $ 7,758.48

1,575.00$ $ 1,653.75

2,161.69$ $ 2,269.77

2,270.53$ $ 2,384.05

1,765.73$ $ 1,854.00

1,095.05$ $ 1,149.80 607.30$ $ 637.65 286.65$ $ 300.95 606.90$ $ 637.24

53.02$ $ 55.67 131.25$ $ 137.81

131.25$ $ 124.45

131.25$ $ 124.45

525.00$ $ 551.25

787.50$ $ 826.87

1,050.00$ $ 1,102.50

+5.00%

+5.00%

-5.18%

-5.18%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

-27.21%

-41.64%

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+5.00% +5.00% +5.00%

21-3.

21-4.

21-6.a.

21-6.b.

21-6.c.

Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

Interim Assessment Report Well Abandonment/Site Restoration Report Remedial Action Interim Report Remedial Action General Report

Operation & Maintenance Report, Quarterly or Non- Annual

Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Receptor and Exposure Pathway Report

Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months

Supplemental Site Assessment Report General Site Assessment Report

Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Air Sparge/Multiphase Extraction (AS/MPE) System -

Air Sparge/Multiphase Extraction (AS/MPE) System -

Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months

P.E. Project Oversight for Remediation System Integration and Startup - Large System

P.E. Project Oversight for Remediation System Integration and Startup - Medium System

P.E. Project Oversight for Remediation System Integration and Startup - Small System

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and Soil- Boring Logging (Use hourly rate on site specific basis)

Remedial Action Startup Report

Professional Engineer (Key) Field Technician (Key)

18-57.

18-58.

19-3.

19-4.

19-5.

19-7.

19-19.

18-50.

18-52.

18-53.

18-55.

19-21.

19-23.

19-24.

21-1.

19-9.

19-10.

19-11.

19-13.

19-14.

20-8.

19-26.

19-27.

+5.00%

+5.00% +5.00% +4.99% +5.00% +5.00%

-44.55%

525.00$ $ 406.42

5,625.00$ $ 2,500.00

3,000.00$ $ 1,500.00

625.00$ $ 500.00

500.00$ $ 400.00

750.00$ $ 500.00

500.00$ $ 400.00

315.00$ $ 330.75

3,750.00$ $ 2,500.00

5,000.00$ $ 4,000.00

2,500.00$ $ 2,000.00

1,000.00$ $ 750.00

1,000.00$ $ 1,050.00

-50.00%

+5.00%

-22.59%

-55.56%

21-30.

21-23.

21-24.

21-28.

21-11.

21-12.

21-15.

21-17.

21-18.

21-19.

21-20.

21-7.a.

P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA

P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan

P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan

P.E. Review, Evaluation and Certification of a Level 2 Natural Attenuation Monitoring Plan

P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis

P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

21-32.

-33.33%

-20.00%

-20.00%

-25.00%

-20.00%

-20.00%

-33.33%

-20.00%

625.00$ $ 500.00

656.25$ $ 600.00

315.00$ $ 330.75

-20.00%

-8.57%

+5.00%

Notes:

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

P.E. Review, Evaluation, and Certification of Annual PARM Report

P.E. Review, Evaluation, and Certification of Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

21-34.

21-35.

21-36.

IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.

ADVANCED ENVIRONMENTAL

TECHNOLOGIES, LLC

Printed Name: s:::i;, � --,:;;;-��d

Title: :;;i(cs, oe""r / �o

Date: -.,s-/ 2 7 / "2-d� o r I

FEID No.: 412025607

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

JO h n T ru I• tt Digitally signed by John Truitt

Date: 2020.06.09 11 :14:35 -04'00'

Signature of Authorized Representative

Printed John Truitt

Name:

Title:

Deputy Secretary

Date:

(see signature block)

List of attachments/exhibits included as part of this Amendment:

Description Type Attachment

Letter IN umber D (V3.l) Rate Schedule (27 pages)

Department Data Processing Information:

The Table 1 rate changes have been entered in the Department's processing system with an effective Rate Change Date of:

Corresponding Rate Schedule, Attachment D Version No. V3.1

Signature of Processor Printed Name of Processor

Data Entry Date

06/19/2020

06/19/2020Blake Miller Digitally signed by Blake Miller Date: 2020.06.19 15:30:47 -04'00'

PA

Y

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

P R

EV

IO

U S

C O

N

TR

A C

TE

D

IT

EM

PR

IC

E

(V 3.

0)

EV

IS

ED

C

O N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

1)

1. 1-

Pe r R ev ie w

.3

.6

.0

1-

2.

Pe r S ite

.0

.0

.0

1- 2.

a.

Pe r S ite

N ot

A pp lic ab le

1-

Pe r P ac ka ge

.0

.5

.5

1- 4.

R ei m bu rs ab le

.0

5.

Pe r A gr ee m en t

.0

.5

.8

1- 5.

a.

Pe r A gr ee m en t

N ot

A pp lic

6.

R ei m bu rs ab le

7.

S ur ch ar ge

N ot

A pp lic

0.

2. 2- 1.

Pe r V is it

.9

.8

.0

2- 2.

Pe r S ur ve y

.1

.0

.0

2-

3.

R ei m bu rs ab le

2-

4.

Pe r D ay

.2

.0

.0

3. 3- 1.

Pe r R ou nd

T rip

.4

.1

.8

3- 2.

Pe r R ou nd

T

.0

.4

.2

3- 3.

Pe r R ou nd

T

.0

.0

.0

3- 4.

Pe r R ou nd

T

.6

.2

.2

3- 5.

Pe r R ou nd

T

.2

.2

.2

3- 6.

Pe r R ou nd

T

.0

.7

.7

3- 7.

Pe r R ou nd

T

.6

N ot

A pp lic

N ot

A pp lic

D

ES

C R

IP

TI

FF

IC

E

A C

TI

VI

TI

ES

Fi le

R ev ie w

Si te

H ea lth

S af et y

Pl an

Si te

H ea lth

S af et y

Pl an fo r C on tin ue d

W or k at n o co st to F

D

EP

N ot ic e of D is co ve ry o f C on ta m in at io n Pa ck ag e (In iti al o r T

PO

C

Si te

R ec on na is sa nc e/

Fi el d M ea su re m en t V is it

R ec ep to r S ur ve y an d

Ex po su re

P at hw ay

Id en tif ic at io n (E xc lu de s re po

rt) Pr of es si on al L an d

Su rv ey (I f F D

EP

a ut ho riz es

, s ub m it qu ot e( s) w ith

C ha ng e

O rd er

C on tra ct or O ve rs ig ht fo r N on -P ric e

Sc he du le

A ct iv iti es M

O B

IL

IZ

A

TI

O N

Pe rm it Fe es ac tu al fe e on ly , c os t t o ob ta in p er m it is in cl ud ed in a pp lic ab le p ay it em s

O ff-

Si te

P ro pe rty

A cc es s

Ag re em en t

Si te

P ro pe rty

A cc es s

Ag re em en t f or

S ou rc e

Pr op er ty a t n o co st to

F D

EP

Pr oj ec t S pe ci fic F in an ci al

G ua ra nt ee B on d

(if re qu ire d by

D

EP

6% H an dl in g

Fe e fo r C os t R ei m bu rs ab le

It em s

FI

EL

D A

C

TI

VI

TI

ES

G

EN

ER

A

L

M ob iliz at io n, L ig ht D ut y

Ve hi cl e

(c ar o r 1

/2 to n tru ck m ile s ea ch w ay

H ea vy D ut y/

St ak eb ed

T ru ck (3

/4 to n m ile s ea ch w ay

W or k Tr ai le r -m ile s ea ch w ay

R eg io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

Pa ge o f 2

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

eg io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

3- 7.

a.

Pe r R ou nd T rip N ot A pp lic

.0

.5

3-

8.

Pe r R ou nd T

.2

N ot A pp lic

A pp lic

3-

8.

a.

Pe r R ou nd

T rip

N ot

A pp lic

,2

.0

,0

.0

3- 9.

Pe r R ou nd

T

.5

N ot

A pp lic

A pp lic

9.

a.

Pe r R ou nd T rip N ot A pp lic

.0

.0

3-

Pe r R ou nd T

.2

N ot A pp lic

A pp lic

.a

Pe r R ou nd

T rip

N ot

A pp lic

,7

.7

,7

.7

3-

Pe r R ou nd T

.5

.2

.2

3-

Pe r R ou nd

T

.7

.5

.5

3-

Pe r R ou nd T

,5

.5

N ot A pp lic

A pp lic

.a

Pe r R ou nd T rip N ot A pp lic

.0

.0

3-

Pe r R ou nd

T

,8

.5

N ot

A pp lic

A pp lic

.a

Pe r R ou nd

T rip

N ot

A pp lic

.5

.5

3-

Pe r R ou nd T

.0

.1

.1

3-

Pe r R ou nd

T

.0

.6

.6

3-

Pe r R ou nd T

.0

.1

.1

3-

Pe r R ou nd

T

.5

.2

.2

3-

Pe r R ou nd T rip N ot A pp lic

.0

.0

3-

Pe r R ou nd

T rip

N ot

A pp lic

.5

.5

4.

m ile s ea ch w ay D

PT

R ig M ob iliz at io n m ile s ea ch w ay D

PT

R ig a nd S up po rt Ve hi cl es M ob iliz at io n m ile s ea ch w ay m ile s ea ch w ay

D ril l R ig

M ob iliz at io n m ile s ea ch w ay

LD

A

R ig a nd

S up po rt

Ve hi cl es

M ob iliz at io n m ile s ea ch w ay

Lo ad er /B ac kh oe M ob iliz at io n m ile s ea ch w ay M in i E xc av at or

/L oa de r (

Bo bc at

TM

M in i E xc av at or /L oa de r ( Bo bc at

TM

) M ob iliz at io n m ile s ea ch w ay

D ril l R ig a nd

S up po rt

Ve hi cl es

M ob iliz at io n

(h ol lo w s te m a ug er

, m ud ro ta ry o r s on ic m ile s ea ch w ay

Ex ca va to r M ob iliz at io n m ile s ea ch w ay

LD

A

R ig

M ob iliz at io n m ile s ea ch w ay

D ru m C om pa ct or m ob iliz at io n m ile s ea ch w ay

M

EA

LS

A

N D

L O

D G

IN

G

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

4- 1.

a.

Pe r P er so n, Pe r D

4-b.

R ei m bu rs ab le

5- 1.

a.

Pe r S po on

A pp lic

A pp lic a.

1.

Pe r S

A pp lic

5-

1.

a.

2.

Pe r S

A pp lic

5-

1.

a.

3.

Pe r S

A pp lic

.3

5-

1.

b.

Pe r C or e

.9

.6

.6

5- 1.

c.

Pe r C or

A pp lic

A pp lic

Pe r B or in g

.5

.1

.1

5-

3.

Pe r F oo

A pp lic

A pp lic a.

Fu ll D ay N ot A pp lic

.5

.5

5-

4.

Pe r F oo

A pp lic

A pp lic

Pe r F oo

A pp lic

A pp lic a.

Fu ll D ay N ot A pp lic

,1

.0

.0

5- 6.

Pe r F oo

.8

Pe r F oo

.4

Pe r F oo

So ni c C or e

Sa m pl in g

- 5 o r 1 fo ot (d ur in g bo rin g)

D

PT

C or e Sa m pl in g

- 4 o r 5 fo ot (d ur in g bo rin g)

Pe r D ie m

Fo r T ra ve l >

C on se cu tiv e da y (p ro ra te d in q ua rte r d ay in cr em en ts )-C ur re nt

St at e R at e

2.

1, F .S

Tr av el

V ou ch er re qu ire d an d qu ot ed ra te s ho ul d be p er p er so n pe r d ay

M ea ls , L od gi ng a nd T ra ns po rta tio n

- F or

C on tra ct or tr av el fo r s pe ci fic m ee tin gs o r l al pr oc ee di ng s re qu ire d by D ep ar tm en t, ho te l a nd m ea ls m ay b e pa id in a cc or da nc e w ith

Se ct io n

2.

1, F .S

D R

IL

LI

N G

A N

D B

O R

IN

G

Sp lit

S po on S am pl in g

- 2 fo ot (d ur in g bo rin g)

D ire ct P us h

Bo rin g D ire ct

P us h Te ch no lo gy

(D

PT

) R ig a nd

E qu ip m en t

D ire ct P us h

Bo rin g w ith C on e

Pe ne tro m et er

T es t P ro be (C

PT

D ire ct P us h

Bo rin g w ith M em br an e

In te rfa ce

P ro be (M

IP

D

PT

M em br an e In te rfa ce P ro be

(M

IP

) E qu ip pe d w ith P

ID

a nd E

C D

(A dd

-o n

C os t t o

PT

Ba se R at e)

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

5- 9.

Pe r F oo

Pe r F oo

.5

Pe r F oo

.7

Pe r F oo

Pe r F oo

.6

Pe r F oo

.2

Pe r F oo

Pe r F oo

Pe r F oo

Pe r F oo

Pe r F oo

Pe r F oo

Pe r F oo

Pe r F oo

Pe r F oo

6. 6-

Pe r F oo

6-

Pe r F oo

A pp lic

A pp lic a.

Pe r F oo t

N ot

A pp lic

.1

6-

2.

b.

Pe r F oo t

N ot

A pp lic

.5

.5

6- 3.

Pe r F oo

A pp lic

A pp lic a.

Pe r F oo t

N ot

A pp lic

.9

6-

3.

b.

Pe r F oo t

N ot

A pp lic

.7

.7

6- 4.

Pe r F oo

Pe r F oo

H

SA

o r M

R B or in g, to in ch d ia m et er fo ot to ta l d ep th o r M

R B or in g, to in ch d ia m et er , 5 to fo ot to ta l d o r M

R B or in g, to in ch d ia m et er fo ot to ta l d o r M

R B or in g, to in ch d ia m et er fo ot to ta l d c Bo rin g, to in ch d ia m et er

, 5 to fo ot to ta l d c

Bo rin g, to in ch d ia m et er fo ot to ta l d c Bo rin g, to in ch d ia m et er fo ot to ta l d c Bo rin g, to in ch d ia m et er , 5 to fo ot to ta l d c Bo rin g, to in ch d ia m et er fo ot to ta l d

W

EL

L

IN

ST

A

LL

A

TI

O

N

H

SA

o r M

R B or in g, to in ch d ia m et er

, 5 to fo ot to ta l d o r M R

B or in g, to in ch d ia m et er fo ot to ta l d c Bo rin g, to in ch d ia m et er fo ot to ta l d el l I ns ta lla tio n

- 4 in ch d ia m et er

(H or iz on ta l, by tr en ch in g, n ot d ire ct io na l d ril lin

g) W el l I ns ta lla tio n

- 6 in ch d ia m et er Su rfa ce

C as in g

- 6 in ch d ia m et er

W el l I ns ta lla tio n

- 1 in ch d ia m et er

W el l I ns ta lla tio n

- 2 in ch d ia m et er

W el l I ns ta lla tio n

- 2 in ch d ia m et er

(V er tic al

W el l I ns ta lla tio n

- 2 in ch d ia m et er (H or iz on ta l, by tr en ch in g, n ot d ire ct io na l d ril lin g)

W el l I ns ta lla tio n

- 4 in ch d ia m et er

W el l I ns ta lla tio n

- 4 in ch d ia m et er

(V er tic al

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

6- 6.

Pe r F oo

Pe r F oo

Pe r F oo a.

Pe r F oo b.

Pe r F oo c.

Pe r F oo d.

Pe r F oo

Pe r W el l

.7

.4

.3

6-

Pe r V au lt

.5

.7

.7

6-

Pe r V au

.4

,6

.0

.0

6-

Pe r W el l

N ot

A pp lic

.7

.7

6-

Pe r W el l N ot A pp lic

.5

.5

6-

Pe r W el l N ot A pp lic

.0

.0

Su rfa ce C as in g

- 8 in ch d ia m et er Su rfa ce

C as in g

- 1 in ch d ia m et er Su rfa ce

C as in g

- 1 in ch d ia m et er

In st al la tio n of W el l V au lt

- 4 x x fo ot W el l R ed ev el op m en t

R em ov al a nd

R ei ns ta lla tio n of

-in ch M an ho le a nd w el l p ad w he n a w el l p ad /m an ho le h as be en d am ag ed o r d es tro ye d

R em ov al a nd

R ei ns ta lla tio n of

2-in ch

M an ho le a nd w el l p ad w he n a w el l p ad

/m an ho ha s be en d am ag ed o r d es tro ye d

Ad di tio na l W el l S cr ee n fe et in ch d ia m et er Ad di tio na l W el l S cr ee n fe et in ch d ia m et er

Ad di tio na l W el l S cr ee n fe et in ch d ia m et er Ad di tio na l W el l S cr ee n fe et in ch d ia m et er

Ab ov e G ra de

W el l C om pl et io n

In st al la tio n of W el l V au lt

- 2 x x fo ot

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

7. 7- 1.

Pe r F oo

7-

Pe r F oo

Pe r F oo

Pe r F oo

Pe r V au

.8

.3

.3

7- 6.

Pe r V au

.5

.0

.0

7- 7.

Pe r W el l

N ot

A pp lic

.5

.3

8. 8- 1.

Pe r W el

.5

.5

.0

8- 2.

Pe r W el

.5

.0

.0

8- 3.

Pe r W el

8-

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r W el

Pe r W el

Pe r S am pl

Pe r S am pl

Pe r S am pl in g Ev en t

N ot

A pp lic

.0

.2

8-

Pe r W el l N ot A pp lic

8-

Pe r W el l N ot A pp lic

W

EL

L A

B A

N D

O N

M

EN

T G ro ut a nd

A ba nd on

W el l, to in ch d ia m et er

SA

M

PL

E

C O

LL

EC

TI

O

N A

N D

F

IE

LD

T

ES

TI

N G

M on ito rin g W el l S am pl in g w ith

W at er L ev el fo ot d ep th

D om es tic

W at er W el l S am pl in g

O th er W at er

S am pl in g

Fr ee

P ro du ct

S am pl e

C ol le ct io n

G ro ut a nd A ba nd on W el l, to in ch d ia m et er G ro ut a nd

A ba nd on

W el l, to in ch d ia m et er

G ro ut a nd A ba nd on W el l, in ch d ia m et er R em ov al o f W el l V au lt

- 2 x x fo ot

R em ov al o f W el l V au lt

- 4 x x fo ot R em ov al o f W el l P ad a nd

M an ho le

Su rv ey L at itu de /L on gi tu de o f E xi st in g

M on ito r W el ls

Su rv ey L at itu de /L on gi tu de o f N ew M on ito r W el ls

So il/

Se di m en t S am pl e

C ol le ct io n

W at er L ev el o r F re e

Pr od uc t G au gi ng

Fr ee

P ro du ct

G au gi ng

B ai lin g

Va po r/A m bi en t A ir

Sa m pl e

C ol le ct io n

- P as si ve

D os im et er , S or be nt T ub e, T ed la rTM

B ag

(o r E qu iv al en t)

Va po r/A m bi en t A ir

Sa m pl e

C ol le ct io n

- S U

M M

ATM

C an is te r ( or E qu iv al en

t) El ec tro ni c

D at a D el iv er ab le s

(E D

D

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

8-

Pe r S am pl e

N ot

A pp lic

9. 9.

A

9- 1.

Pe r S am pl

.4

.6

.6

9- 2.

Pe r S am pl

9-

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

.2

.2

.2

9- 8.

Pe r S am pl a.

Pe r S am pl e N ot A pp lic

.0

.0

9-

9.

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

En co re (2 gr am ) f or S

PL

P

So il

Sa m pl e

C ol le ct io n:

Pe r E nc or e]

Th e co st w ill in cl ud e th e g ra m E nc or e sa m pl es s ub m itt ed to th e la bo ra to ry fo r S

PL

P te st in g an d th gr am

E nc or e sa m pl es c ol le ct ed in th e fie ld b ut n ot s ub m itt ed to th e la bo ra to ry fo r t es tin g

(d is ca rd ed

LA

B

O R

A

TO

R Y

A N

A

LY

SI

S

SO

IL

/S

ED

IM

EN

T A

N A

LY

SI

S

So il, U se d O il/ U nk no w n

Pr od uc t G ro up

-T ab le D o f C h.

2-

0, F

.A .C ex ce pt fo r n on

Pr io rit y

Po llu ta nt

O rg an ic s (M ul tip le M et ho ds

So il, T ot al R ec ov er ab le P et ro le um

H yd ro ca rb on s (F

L-

PR

O

So il, T R

PH

F ra ct io na tio n

(M

AD

EP

-E

PH

/V

PH

M et ho d or

T

PH

C W

G D ire ct

M et ho d)

So il, P C

Bs [o r A ro cl or s] (E

PA

2)

So il, R

C R

A M et al s (E

PA

or E

PA

[A rs en ic

, B ar iu m

, C ad m iu m , C hr om iu m

Le ad , S el en iu m

, S ilv er ] a nd E

PA

or E

PA

[M er cu ry

So il, A rs en ic

(E

PA

or

E

PA

0) So il, C ad m iu m

(E

PA

or

E

PA

0)

So il, B

TE

X

M

TB

E (E

PA

or E

PA

0)

So il, V ol at ile

O rg an ic

H al oc ar bo ns

(E

PA

or

E

PA

0) So il, B

TE

X

M

TB

E

VO

H s

(E

PA

or

E

PA

0) So il, P ol yc yc lic

A ro m at ic H yd ro ca rb on s

(E

PA

or

E

PA

0) So il, P rio rit y Po llu ta nt V ol at ile O rg an ic s

(E

PA

0)

So il, P rio rit y

Po llu ta nt

E xt ra ct ab le

O rg an ic s- Ba se N eu tra l a nd

A ci d Ex tra ct ab le s (E li st

[e .g

EP

A

/8

EP

A

So il, C hr om iu m (E

PA

or E

PA

0)

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

9-

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

.5

.5

.9

9-

Pe r S am pl

.9

.3

.6

9-

Pe r S am pl

Pe r S am pl

.3

.9

.0

9.

B

9-

Pe r S am pl

.9

.4

.4

9-

Pe r S am pl

.9

.9

.9

9-

Pe r S am pl

Pe r S am pl il, M oi st ur e C on te nt (A

ST

M

D

-1

0) So il, T ex tu re

Se e

G ee

B au de r [

So il, G C

/M S

Fu ll

Sc an

, A lk an es

, I so al ka ne s, C yc lo al ka ne s, A ro m at ic s, B ic yc la ne

St er an e, a nd T er pa ne B io m ar ke rs (A

ST

M

D

H ig h

R es ol ut io n

G C

/M S)

So il, G as ol in e H yd ro ca rb on C om po si tio n, G as ol in e

PI

AN

O (p ar af fin s, is op ar af fin s, ar om at ic s, n ap ht he ne s an d ol ef in s)

(E

PA

0M od

, H ig h R es ol ut io n G

C /M

S)

So il, F ue l O xy ge na te s, M

TB

E, D

IP

E, T

AM

E, E

TB

E an d

TB

A (E

PA

0M od , H ig h

R es ol ut io n

G C

/M S)

So il, C

-C

A lk an e

Fi ng er pr in t, N -A lk an es a nd Is oa lk an es

(A

ST

M D

G C

/M S)

So il, L ea d (E

PA

or E

PA

0)

So il, T ox ic ity

C ha ra ct er is tic L ea ch in g

Pr oc ed ur e- Ex tra ct io n

O nl y (E

PA

1)

So il, S yn th et ic P re ci pi ta tio n

Le ac hi ng

P ro ce du re -E xt ra ct io n O nl y

(E

PA

So il, O rg an ic C ar bo n, T ot al

(E

PA

or

W al ke y-

Bl ac k)

So il, D ry

B ul k D en si ty (A

ST

M

D

-0

7, A

ST

M

D

-0

8, A

ST

M

D

-0

1, -0

4, -0 4e e1 o r A

ST

M D

-1 0)

W A

TE

R

A N

A

LY

SI

S

W at er , G as ol in e/

Ke ro se ne

A na ly tic al G ro up

-T ab le C o f C h.

2-

0, F

.A .C

M ul tip

M et ho ds

W at er , U se d

O il/

U nk no w n Pr od uc t G ro up -T ab le

D o f C h.

2-

0, F .A

.C ex ce pt fo r n on

Pr io rit y Po llu ta nt O rg an ic s

(M ul tip le

M et ho ds

W at er , B

TE

X

M

TB

E

(E

PA

, E

PA

, E

PA

or

E

PA

0) W at er

, V ol at ile

O rg an ic

H al oc ar bo ns

, e xc ep t E

D B

(E

PA

or

E

PA

0)

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

9-

Pe r S am pl

Pe r S am pl

Pe r S am pl

.a

Pe r S am pl e N ot A pp lic

9-

Pe r S am pl

Pe r S am pl

Pe r S am pl

.9

.9

.9

9-

Pe r S am pl

.6

.6

.6

9-

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

.a

Pe r S am pl e N ot A pp lic

9-

Pe r S am pl

Pe r S am pl

Pe r S am pl er , P ol yc yc lic

A ro m at ic H yd ro ca rb on s, in cl ud in g 1-m et hy ln ap ht ha le ne m et hy ln ap ht ha le ne (E

PA

[H

PL

C

EP

A

5, E

PA

or E

PA

0)

W at er , E

D B

[1 ,2

-d ib ro m oe th an e or e th yl en e di br om id e] (E

PA

.1 o r E

PA

1)

W at er , E

D B

[1 ,2

-d ib ro m oe th an e or e th yl en e di br om id e] (E

PA

SI

M

W at er

, P rio rit y

Po llu ta nt

V ol at ile

O rg an ic s [fo r N

PD

ES

p ur po se s on ly

EP

A

4) W at er

, P rio rit y

Po llu ta nt

V ol at ile

O rg an ic s (E

PA

0)

W at er , P rio rit y Po llu ta nt E xt ra ct ab le O rg an ic s-

Ba se

N eu tra l a nd A ci d

Ex tra ct ab le s

[fo r

N

PD

ES

p ur po se s on ly

EP

A lis t [ e.

g.

, E

PA

E

PA

W at er , B

TE

X

M

TB

E

VO

H s

(E

PA

/6

, E

PA

, E

PA

or

E

PA

0)

W at er , L ea d, T ot al (E

PA

.7

, E

PA

.8 , E

PA

or E

PA

0)

W at er , D is so lv ed

L ea d (in cl ud es fi lte r a pp ro pr ia te to s am pl e m et ho d

- E

PA

.7 , 2

.9

B, o r 7

0)

W at er , M er cu ry , T ot al

(E

PA

.1 , E

PA

or E

PA

0)

W at er , C al ci um , T ot al

(E

PA

.7 , E

PA

or E

PA

0)

W at er , I ro n, T ot al (E

PA

.7

, E

PA

or

E

PA

0)

W at er , P rio rit y Po llu ta nt E xt ra ct ab le O rg an ic s-

Ba se

N eu tra l a nd A ci d

Ex tra ct ab le s li st [e

.g

EP

A

/8

EP

A o r E

PA

E

PA

0)

W at er , T ot al

R ec ov er ab le

P et ro le um H yd ro ca rb on s

(F L-

PR

O

W at er

, P C

Bs [o r A ro cl or s] (E

PA

o r E

PA

2) W at er

, A rs en ic

, T ot al (E

PA

.7

, E

PA

.8 , E

PA

or E

PA

0)

W at er , C ad m iu m

, T ot al (E

PA

.7

, E

PA

.8 , E

PA

or E

PA

0)

W at er , C hr om iu m

, T ot al (E

PA

.7

, E

PA

.8 , E

PA

or E

PA

0)

Pa ge o

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

9-

.a

Pe r S am pl e N ot A pp lic

9-

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl

Pe r S am pl er , D is so lv ed

Ir on

(i nc lu de s fil te r a pp ro pr ia te to s am pl e m et ho d

- E

PA

.7 , 2

.9

B, o r 7

0)

W at er , C hl or id e

(E

PA

.0 , E

PA

6, E

PA

1, E

PA

3, S M

0C I B

, S M

0C I

C o r S M

0C I E

W at er , H ar dn es s, T ot al [a s C aC O

3] (S

M

B or

S M

C

W at er

, N itr at e

[a s

N

EP

A

0.

or

E

PA

.2

W at er , N itr at e- N itr ite

[a s

N

EP

A

0.

0, E

PA

.2

, S M

0- N

O

E or

SM

0- N

O

F)

W at er , N itr ite

[a s

N

EP

A

0.

0, E

PA

.1

, S M

0- N

O

B or

S M

0- N

O

F) W at er

, O rg an ic

C ar bo n, T ot al (S

M

B, S

M

C o r E

PA

0)

W at er , M ag ne si um

, T ot al (E

PA

.7

, E

PA

or

E

PA

0) W at er

, M an ga ne se , T ot al

(E

PA

.7 , E

PA

.8

, E

PA

or

E

PA

0) W at er

, P ot as si um , T ot al

(E

PA

.7 , E

PA

or E

PA

0)

W at er , S od iu m , T ot al

(E

PA

.7 , E

PA

or E

PA

0)

W at er , A lk al in ity

[a s

C aC

O 3]

(E

PA

.2 o r S M

B)

W at er , A m m on ia

[a s

N

EP

A

0.

1, S

M

0-

N H

C

, S M

0- N

H

D , S

M

0-

N H

G or

S M

0- N

H

H

W at er , O rth op ho sp ha te

[a s

P] (E

PA

.0

, E

PA

.1 , E

PA

.1

, E

PA

.3 , E

, S M

0-

PE

o r S

M

0-

PF

W at er , R es id ue -fi lte ra bl e

[T ot al D is so lv ed

S ol id s]

(S M

C

W at er

, R es id ue

-n on fil te ra bl e [T ot al

S us pe nd ed S ol id s] (S

M

D

W at er , S ul fa te (A

ST

M

D

6-

, A

ST

M D

6-

, E

PA

.0

, E

PA

.1 , E

PA

.2

, E

, E

PA

or S

M

0-

SO

C

Pa ge of

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

9-

Pe r S am pl

Pe r S am pl

.8

.2

.2

9-

Pe r S am pl

.8

.2

.2

9-

Pe r S am pl

.6

.4

.9

9-

Pe r S am pl

.2

.4

.0

9-

Pe r S am pl

Pe r S am pl

.3

.9

.5

9-

Pe r S am pl e

N ot

A pp lic

9-

Pe r S am pl e N ot A pp lic

9-

Pe r S am pl e

N ot

A pp lic

W at er , A cu te

B io as sa y-

H ou r, Es tu ar in e

M ar in e, V er te br at e/ In ve rte br at e [V er te br e:

M en id ia b er yl lin a, M er id ia m en id ia o r M en id a pe ni ns ul ae /In ve rte br at e:

M ys id op si s ba hi a]

6.

0/

.0

W at er , G

C /M

S Fu ll Sc an , A lk an es , I so al ka ne s, C yc lo al ka ne s, A ro m at ic s, B ic yc la ne

St er an e, a nd

T er pa ne

B io m ar ke rs

(A

ST

M D

H ig h R es ol ut io n G

C /M

S)

W at er , G as ol in e

H yd ro ca rb on

C om po si tio n, G as ol in e

PI

AN

O

[p ar af fin s, is op ar af at ic s, n ap ht he ne s an d ol ef in s] (E

PA

0M od , H ig h

R es ol ut io n

G C

/M S)

W at er , 5

F ue l O xy ge na te s, M

TB

E, D

IP

E, T

AM

E, E

TB

E an d

TB

A

(E

PA

0M od

, H ig h R es ol ut io n G

C /M

S)

W at er , C

-C

A lk an e Fi ng er pr in t, N

-A lk an es a nd

Is oa lk an es (A

ST

M

D

G

C /M

S) W at er

, B

TE

X/ M

TB

E

N ap ht ha le ne (E

PA

0)

W at er , H et er ot ro ph ic

P la te C ou nt

(S M

B)

W at er , A cu te

B io as sa y-

H ou r, Fr es hw at er

, V er te br at e/

In ve rte br at e

[V er te br e:

Pi m ep ha le s pr om el as o r C yp rin el la le ed si

/In ve rte br at e:

C er io da ph ni a du bi a]

.0

/2

2.

0)

W at er , E

D C

[1 ,2

-d ic hl or oe th an e]

(E

PA

M et ho d o r 8

0)

W at er , M et ha ne (E

PA

S

O P

R

SK

-1

Pa ge of

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

9.

C

9-

Pe r S am pl

Pe r S am pl

.1

.1

.1

9-

Pe r S am pl

.1

.1

.1

9-

Pe r S am pl

.6

.9

.9

9.

D

9-

Pe r S am pl

.3

.9

.9

9-

Pe r S am pl

.0

.2

.1

9.

E.

9-

R ei m bu rs ab le

A pp lic

A pp lic

Pe rc en t Su rc ha rg

Pe rc en t Su rc ha rg

Pe rc en t Su rc ha rg

-1

Pe r S q.

F oo t/D

A pp lic

A pp lic

-1 .a

Pe r S q.

F oo t N ot A pp lic

-1

.b

Pe r S q.

F oo t/D ay N ot A pp lic

-1

.c

Pe r S q.

F oo t/W ee k

N ot

A pp lic

Ai r, Vo la til e

O rg an ic

C om po un ds (E

PA

M et ho d

TO

-1 7)

PR

O

D U

C T

A N

A

LY

SI

S

Pr od uc t, C 3-

C

H yd ro ca rb on

F in ge rp rin t, G as ol in e

PI

AN

O

[p ar af fin s, is op ar af at ic s, n ap ht he ne s an d ol ef in s] , a lk an es a nd is oa lk an es

(A

ST

M D

H ig h R es ol ut io n G

C /F

ID

Pr od uc t, G C

/M S

Fu ll

Sc an

, a lk an es

, i so al ka ne s, c yc lo al ka ne s, a ro m at ic s, b ic yc la ne st er an e, a nd te rp an e bi om ar ke rs

(A

ST

M D

H ig h R es ol ut io n G

C /M

S)

O

TH

ER

A

N A

LY

SI

S

O th er A na ly si s, N ot

O th er w is e

Sp ec ifi ed

A

IR

A N

A

LY

SI

S

Ai r, To ta l P et ro le um H yd ro ca rb on s

(E

PA

M et ho d o r T O

-3

Ai r, Vo la til e

O rg an ic

A ro m at ic s

(E

PA

M et ho d

TO

-1

5) Ai r, Po ly cy cl ic

A ro m at ic H yd ro ca rb on s

(E

PA

M et ho d

TO

-1

3)

Ad di tio na l L ab or at or y

S ur ch ar ge a ut ho riz ed in th e

AT

C c on tra ct fo r 7

D ay

T ur na ro un d.

Ad di tio na l L ab or at or y

S ur ch ar ge a ut ho riz ed in th e

AT

C c on tra ct fo r 3

D ay

T ur na ro

Ad di tio na l L ab or at or y

S ur ch ar ge a ut ho riz ed in th e

AT

C c on tra ct fo r 1

D ay

T ur na ro

SO

IL

S O

U R

C E

R

EM

O

VA

L R

EL

AT

ED

Pa ge of

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

-1

.d

Pe r S q.

F oo t/M on th

N ot

A pp lic

-2

Pe r S q.

F oo t/W ee k

A pp lic

A pp lic

-2 .a

Pe r S q.

F oo t N ot A pp lic

-2

.b

Pe r S q.

F oo t/D ay N ot A pp lic

-2

.c

Pe r S q.

F oo t/W ee k

N ot

A pp lic

-2 .d

Pe r S q.

F oo t/M on th N ot A pp lic

-3

Pe r S q.

F oo t/M on

A pp lic

A pp lic

-4

Pe r S q.

F oo t/D

A pp lic

A pp lic

-5

Pe r S q.

F oo t/W ee

A pp lic

A pp lic

-6

Pe r S q.

F oo t/M on

A pp lic

A pp lic

-7

Pe r C ub ic Y ar d

-8

Pe r C ub ic Y ar

-9

Pe r C ub ic Y ar

.3

.6

.1

-1

0.

Pe r C ub ic Y ar

.4

-1 1.

a.

Pe r C ub ic Y ar

.3

.8

.6

-1

1.

b.

Pe r C ub ic

Y ar

.0

.0

.0

-1 2.

a.

Pe r C ub ic Y ar

.1

.3

-1 2.

b.

Pe r C ub ic Y ar

.6

.6

.6

-1

3.

Pe r C ub ic Y ar

.5

.0

.0

-1

4.

Pe r C ub ic Y ar

5.

Pe r C ub ic Y ar

5.

a.

Pe r C ub ic

Y ar d N ot A pp lic

-1

5.

b.

Pe r C ub ic

Y ar d N ot A pp lic

-1

6.

Pe r T

Sh ee t P ilin g In st al la tio n fo r > fe et d ee p

Ex ca va tio n Sh ee t P ilin g

R en ta l f or fe et d ee p Ex ca va tio n

C on ve nt io na l S oi l E xc av at io n an d

Lo ad in g cu bi c ya rd s

LD

A

Ex ca va tio n an d Lo ad in g W ith ou t C as in g cu bi c ya rd s

LD

A

Ex ca va tio n an d Lo ad in g W ith D riv en

C as in g cu bi c ya rd s

Sh ee t P ilin g R en ta l f or fe et d ee p

Ex ca va tio n Sh ee t P ilin g

R en ta l f or fe et d ee p Ex ca va tio n

Sh ee t P ilin g fo r > fe et d ee p ex ca va tio n (p er s qu ar e fo ot

Sh ee t P ilin g fo r > fe et d ee p ex ca va tio n (p er s qy ua re fo ot

Sh ee t P ilin g fo r > fe et d ee p ex ca va tio n (p er s qu ar e fo ot

C le an O ve rb ur de n U se d

As B ac kf ill, C om pa ct io n an d Te st in g cu bi c ya rd s

Pe a

G ra ve l

LD

A

Ex ca va tio n an d Lo ad in g W ith S ur fa ce C as in g cu bi c ya rd s

LD

A

Ex ca va tio n an d Lo ad in g W ith D riv en

C as in g cu bi c ya rd s Fl ow ab le F ill C on cr et e an d

In st al la tio n

C le an B ac kf ill M at er ia l, C om pa ct io n an d

Te st in g

(in cl ud es tr an sp or t) cu bi c ya rd s

Pa ge of

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

-1

7.

Pe r T

8.

Pe r D

.9

.9

.2

-1

9.

Pe r D

.5

.5

.1

-2

0.

Pe r W ee

.2

,4

.5

,4

.5

-2 1.

Pe r W ee

.4

.7

.7

-2

2.

Pe r M on

,9

.8

.4

.3

-2 3.

Pe r M on

.6

.6

.6

-1

Pe r T an

.0

.8

.0

-2

Pe r T an

.8

.5

.5

-3

Pe r T an

.8

.8

.0

-4

Pe r T an

.5

.6

.0

-1

Pe r S qu ar e

Fo

Pe r S qu ar e

Fo

-3

Pe r T

Pe r T

Pe r T

Pe r D ru

.4

.4

.0

-7

Pe r T

-8

Pe r T

-9

Pe r T

0.

Pe r T

1.

Pe r T

2.

Pe r T

#5

St on e D ew at er in g Sy st em

, u p to w el l p oi nt s (in cl ud es in st al la tio

n) Ad di tio na l D ew at er in g Sy st em

W el l P oi nt s

(2 in cl ud es in st al la tio n)

D ew at er in g

Sy st em , u p to w el l p oi nt s

(in cl ud es in st al la tio n)

R em ov e an d

D is po se

P et ro le um S to ra ge T an k

,0 to

0, ga l.

ca pa ci ty R em ov e an d D is po se P et ro le um

S to ra ge

T an k

0, ga l.

ca pa ci ty

D

EB

R

IS

, W A

ST

E

A N

D P

R O

D U

C T

R

EM

O

VA

L A

N D

D

IS

PO

SA

L R em ov al a nd L oa di ng o f A sp ha lt an d/ or C on cr et e

- u p to in ch th ic kn es s Ad di tio na l R em ov al /L oa di ng C os t f or C on cr et e in ch th ic kn es s Lo ad in g, T ra ns po rt an d

D is po sa l/R ec yc le

C le an O ve rb ur de n

Ad di tio na l D ew at er in g

Sy st em W el l P oi nt s (2 in cl ud es in st al la tio

n) D ew at er in g Sy st em

, u p to w el l p oi nt s (in cl ud es in st al la tio

n) Ad di tio na l D ew at er in g Sy st em

W el l P oi nt s

(2 in cl ud es in st al la tio n)

PE

TR

O

LE

U M

S

TO

R A

G E

TA

N

K R

EM

O

VA

L

A N

D D

IS

PO

SA

L

R em ov e an d

D is po se

P et ro le um S to ra ge T an k

,0 to

,0 g al

. c ap ac ity

D is po sa l o f P et ro le um

Im pa ct ed

S oi l a t a

L an df ill

(b ul k) to ns

D is po sa l o f P et ro le um

Im pa ct ed

S oi l a t a

T he rm al

T re at m en t F ac ilit y (b ul k) to ns

Tr an sp or t a nd

D is po sa l o f C le an

C on cr et e Tr an sp or t a nd D is po sa l o f M ix ed D eb ris

Tr an sp or t a nd D is po sa l o f P et ro le um Im pa ct ed S oi l ( in cl ud es d ru m

Tr an sp or t P et ro le um Im pa ct ed S oi l ( bu lk m ile s

Pa ge of

IT

EM

U N

IT

O

F M

EA

SU

R E

O R

IG

IN

A L

C O

N

TR

A C

TE

D

IT

EM

P R

IC

E

EV

IO

U S

C O

N

TR

A C

TE

D

E

(V

N

TR

A

C

TE

D

IT

EM

P

R

IC

E (V

C

R

IP

TI

io n:

C on tr ac to r:

C on tr ac t #

C en tra l

AD

VA

N C

ED

E

N

VI

R O

N M

EN

TA

L

TE

C H

N O

LO

G

IE

S, L

LC

G C

D

EP

R es ta te d Ag en cy

T er m C on tr ac t N o.

G

C7

Am en dm en t N o.

At ta ch m en t D

(V 3.

1)

Ra te

S ch ed ul e

-1

3.

Pe r D ru

.0

.2

.9

-1 4.

Pe r G al lo n

5.

Pe r D ru

.0

.0

.0

-1

6.

Pe r G al lo n

7.

Pe r W ee k N ot A pp lic

.0

.2

-1 8.

Pe r W ee k

N ot

A pp lic

.5

.5

-1

Pe r S qu ar e

Fo

Pe r S qu ar e

Fo

-3

Pe r S qu ar e

Fo

Pe r S qu ar e

Fo

Pe r S qu ar e

Fo

Pe r S qu ar e

Fo

-7

Pe r S qu ar e

Fo

Tr an sp or t a nd

D is po sa l o f P et ro le um

C on ta ct

W at er (i nc lu de s dr um

Tr an sp or t a nd D is po sa l o f P et ro le um C on ta ct W at er

(b ul

k) Tr an sp or t a nd D is po sa l o f P et ro le um P ro du ct (i nc lu de s dr um

C on cr et e Pa vi ng in ch th ic kn es s (in cl ud es s ub -b as e)

C on cr et e Pa vi ng ad di tio na l 1 in ch th ic kn es s C ru sh ed L im e

R oc

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .