This document is a project tracking and authorization package for improvements to the Take-Out Tube Exit at Ichetucknee Springs State Park, involving the Florida Department of Environmental Protection (FDEP), the Division of Real Estate Development and Management, and Jones Edmunds & Associates, Inc. The project is identified under DMS Project 13039010 and FDEP Project 60888, with Chuck Moneyham serving as the Project Manager and Udeni T. Rosario as the Project Engineer.

The contract authorizes an additional $5,138.51 for Jones Edmunds to include a "new" scope of work involving stairs design in the 100% Construction Documents. The stairs are described as a "pool transfer step" with a 17" max tread, proposed to be added to the existing footprint with minimal changes to the site conditions. The authorization is for additional services not originally included in the initial workscope, and the funding is from the FCO/Client Agency (DEP) budget. The project involves modifications to the concrete ramp and stairs at the Ichetucknee Springs State Park, with the goal of improving accessibility and site infrastructure.

View the file

Other files

File Type Posted
CN-370000-DC780-A1.pdf PDF
CN-370000-DC780-A2.pdf PDF
CN-370000-DC780-A3.pdf PDF
CN-370000-DC780-TA1.pdf PDF
CN-370000-DC780.pdf PDF
CN-370000-DC780-TA2.pdf PDF
CN-370000-DC780-TA3.pdf PDF
CN-370000-DC780-TA2CO1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .