CN-370000-DC780-TA2CO1.pdf

PDF 790 KB Posted

Attached to
Master Agreement FL|DC780|019ed0ae68d3ee1095cf6e73cb3a158a
Contract number
DC780
Issued by
Florida

About this file

This document is a Task Assignment Change Order for the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, Bureau of Design and Construction, involving Jones Edmunds & Associates, Inc. and Scott Waldroff. The project is located at Rainbow Springs State Park and focuses on gift shop and office renovations. The change order is specifically for engineering design services related to investigating storm drain and discharge pipe locations at the park.

The scope of work includes tracing the horizontal locations of 6-inch storm drain pipes and a discharge drainage pipe, with tasks divided into field investigations and surveying. Deren Land Surveying is a subconsultant for the project. The total fee amount is $2,794.55, which covers project management, civil coordination, subconsultant services, and expenses. The project timeline includes 12 days for field investigation and 21 days for survey completion, with deliverables to be provided in electronic PDF format and AutoCAD drawings. The change order was authorized and signed by representatives from FDEP, Jones Edmunds & Associates, and Deren Land Surveying between January and February 2014.

View the file

Other files

File Type Posted
CN-370000-DC780-A1.pdf PDF
CN-370000-DC780-A2.pdf PDF
CN-370000-DC780-A3.pdf PDF
CN-370000-DC780-TA3CO1.pdf PDF
CN-370000-DC780-TA1.pdf PDF
CN-370000-DC780.pdf PDF
CN-370000-DC780-TA2.pdf PDF
CN-370000-DC780-TA3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .