CN-370000-CN223-T13CO1.pdf
PDF 702 KB Posted
- Contract number
- CN223
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN223 involving TKW Consulting Engineers, ADG Architecture, and Matern Professional Engineers. The change order modifies Task Assignment No. 13 for the Collier-Seminole State Park Bathhouse Replacement project located at Collier-Seminole State Park. The document was processed by FDEP Contract Manager Jack Brady and FDEP Project Manager Laura S. Ross, with consultant representative Douglas H. Eckmann of TKW Consulting Engineers.
Change Order No. 1 separates the original Subtask 1 into six distinct line items (Subtasks 1A through 1F) that can be invoiced separately, while maintaining the total task amount of $26,094.00 in fixed price costs. The change order extends the project end date by 120 days, from December 31, 2019 to April 29, 2020. Services include construction administration with multiple subtasks (1A-1F at $3,834.00, $3,834.00, $1,917.00, $1,917.00, $1,917.00, and $1,917.00 respectively), engineering site visits for foundation inspection (Subtask 2 at $1,510.00), plumbing and electrical rough-in inspection (Subtask 3 at $1,510.00), substantial completion inspection (Subtask 4 at $4,624.00), and final completion inspection (Subtask 5 at $3,114.00). Payment will be made upon FDEP approval of deliverables for each subtask in the amounts specified.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .