CN-370000-CN215-T8.pdf

PDF 680 KB Posted

Attached to
Master Agreement FL|GC730|ee1db7bd17344cb3147c24f29444a15c
Contract number
GC730
Issued by
Florida

About this file

This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN215, Task Assignment 8. The contract involves the FDEP as the owner and Gresham Smith serving as the consultant, with Jody A. Braswell, P.E. as the consultant representative and Ralph Perkins as the FDEP Contract Manager. The project is titled "Park Redevelopment Project (Hurricane Milton)" and addresses emergency assessments at Lovers Key State Park and George Crady State Park following Hurricane Milton damage.

The scope of work comprises two primary tasks: Task 1 involves an emergency inspection of the Fishing Pier structure at George Crady State Park with an assessment of damage and recommendations for reopening to pedestrian use, while Task 2 includes emergency inspection of the Tram Bridges at Lovers Key State Park with a similar assessment and reopening recommendation. Labor costs for Task 1 total $5,956.32, consisting of 16 hours of Chief Engineer time at $226.27/hour, 12 hours of Project Engineer time at $180.77/hour, and 2 hours of Administrative support at $83.38/hour. Task 2 labor costs total $7,584.48, comprised of 20 hours of Chief Engineer time, 16 hours of Project Engineer time, and 2 hours of Administrative support at the same rates. The total fixed price cost is $13,540.80 with no cost reimbursement authorized. Payment will be made upon FDEP approval of deliverables for each task. The project start date is upon execution with a completion date of March 5, 2025, and activities are scheduled for 14 and 21 calendar days respectively following authorization.

View the file

Other files

File Type Posted
CN-370000-GC730-A14.pdf PDF
CN-370000-GC730-A2.pdf PDF
CN-370000-GC730-A4.pdf PDF
CN-370000-GC730-A7.pdf PDF
CN-370000-GC730-A8.pdf PDF
CN-370000-GC730-AR1.pdf PDF
CN-370000-GC730-AR1.pdf.crdownload CRDOWNLOAD file
CN-370000-GC730-CMC3.pdf PDF
CN-370000-GC730-A5.pdf PDF
CN-370000-GC730-A6.pdf PDF
CN-370000-GC730-CMC.pdf PDF
CN-370000-GC730-CMC2.pdf PDF
CN-370000-GC730.pdf PDF
CN-370000-GC730-A12.pdf PDF
CN-370000-GC730-A13E2.pdf PDF
CN-370000-GC730-A15.pdf PDF
CN-370000-GC730-CMC1.pdf PDF
CN-370000-GC730-A10.pdf PDF
CN-370000-GC730-A11E1.pdf PDF
CN-370000-GC730-A3.pdf PDF
CN-370000-GC730-A9.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN215 8 FDEP 6M410

Park Redevelopment Project (Hurricane Milton)

Gresham Smith

Jody A. Braswell, P.E. (678) 518-3655 jody.braswell@greshamsmith.com

Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov

This project consists of assessing damage & providing a written report for Lovers Key (Pedestrian Walkway, FLAIR CC: 36) & George Crady (fishing pier structure, FLAIR CC: 45). Per attached proposal dated 10/29/2024

Garland Sandel or successor

Upon Execution $ 13,540.80 3/5/2025 $ 0.00

$ 13,540.80

Tamika Bass

Garland Sandel

Ralph Perkins

Jody A. Braswell, P.E.

Michael W. Foster Jr., P.E.

6M410 FD097 37502300000 080039/25 408001 U3200 131500 PF $ 13,540.80

$ 13,540.80

Project Description: Lovers Key State Park

Park Redevelopment Project CN215, Task Assignment 8

This Task Assignment 8 is to perform the emergency evaluations for various bridges/parks as a result of damage caused by Hurricane Milton and the associated storm surge damage. The proposed work includes emergency field inspections at multiple locations and to attend follow-up meetings with FDEP staff.

Task 1 Hurricane Milton/George Crady Inspection

Description: Services include performing an emergency inspection of the Fishing Pier structure at George Crady State Park to review site conditions and asses any damage, and to make a recommendation on reopening the bridge for pedestrian use.

Deliverables:

Inspection report for the Fishing Pier Structure at George Crady State Park.

Performance Measure: Deliverables will be reviewed by the Florida Department of Environmental Protection (FDEP) within two weeks of submittal to confirm they are complete, accurate, and timely.

Task 1 - Hurricane Milton/George Crady Inspection Company Classification Hours Billable Rate Revenue

Gresham Smith (GS) Chief Engineer 16 $226.27 $3,620.32 Gresham Smith (GS) Project Manager 0 $171.92 $0.00 Gresham Smith (GS) Project Engineer 12 $180.77 $2,169.24 Gresham Smith (GS) Engineer 0 $117.95 $0.00 Gresham Smith (GS) Engineering Intern 0 $80.25 $0.00 Gresham Smith (GS) Engineering Tech 0 $90.98 $0.00 Gresham Smith (GS) Administrative 2 $83.38 $166.76 Subtotal = $5,956.32

Task 2 Hurricane Milton/Lovers Key Inspections

Description: Services include performing an emergency inspection of the Tram Bridges at Lovers Key State Park following Hurricane Milton and to prepare a report with recommendation on re-opening the bridge for pedestrian use.

Deliverables:

Inspection report for the Tram Bridges at Lovers Key State Park.

Performance Measure: Deliverables will be reviewed by the Florida Department of Environmental Protection (FDEP) within two weeks of submittal to confirm they are complete, accurate, and timely.

Task 2 - Hurricane Milton/Lovers Key Inspections Company Classification Hours Billable Rate Revenue

Gresham Smith (GS) Chief Engineer 20 $226.27 $4,525.40 Gresham Smith (GS) Project Manager 0 $171.92 $0.00 Gresham Smith (GS) Project Engineer 16 $180.77 $2,892.32 Gresham Smith (GS) Engineer 0 $117.95 $0.00 Gresham Smith (GS) Engineering Intern 0 $80.25 $0.00 Gresham Smith (GS) Engineering Tech 0 $90.98 $0.00 Gresham Smith (GS) Administrative 2 $83.38 $166.76 Subtotal = $7,584.48

Summary of Fees

Task Task Fix Labor Costs

Task Fix Reimbursable

Task 1 - Hurricane Milton/George Crady Inspections $5,956.32 $0.00 Task 2 - Hurricane Milton/Lovers Key Inspections $7,584.48 $0.00

Total Fixed Price Cost $13,540.80 Total Reimbursables, Not to Exceed Budget $0.00 Total Budget (Labor and Expenses) $13,540.80

Project Schedule: Contract Execution Date – TBD

Activity Duration (Calendar Days Dates

Task 1 - Hurricane Milton/George Crady Inspection 14 Days after storm TBD

Task 2 - Hurricane Milton/Lovers Key Inspections 21 Days after storm TBD

Payment will be made upon approval of deliverables for each task by the FDEP in the amount specified.