This document is an addendum to the bid solicitation for the Cleveland Community College DEVITA Project #24529 Welding Shop Corrections Facility renovation. The project involves providing new ventilation, heating, and cooling equipment, replacing the existing windows, and replacing the Federal Pacific electrical panelboard. The bid opening date has been rescheduled, and a second pre-bid meeting will be held at the project site. Bidders are required to provide the completed bid form, HUB/minority business participation forms, and bid bond as part of the bid package. The contract completion time is 120 days from the Notice to Proceed, with liquidated damages of $200 per day for late completion.
Pricing for the project will be a lump sum proposal. Alternate #1 is for the replacement of the existing windows, and Alternate #2 is the mandatory replacement of the Federal Pacific panelboard, which must be priced separately from the base bid. No further information is provided about pricing terms, funding sources, or incumbent contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cleveland Community College Addendum #2.pdf | ||
| 89-20241030(2).pdf | ||
| Cleveland Community College Addendum #3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
November 14, 2024
For: Cleveland Community College DEVITA Project # 24529
RECEIPT OF THIS ADDENDUM MUST BE NOTED ON THE BID FORM
ADDENDUM #1
TO ALL BIDDERS:
This addendum supplements and amends the original plans and specifications and shall be taken into account in the preparation of proposals and shall become part of the contract documents.
Attachments:
• Sign in attendance sheet from the pre bid 11/7/2024
• Pre bid agenda
• Rev. M1.1 Mechanical Floor Plan 11/14/2024
• Rev. E0.1 Electrical Schedules and Details 11/14/2024
• Rev. E0.2 Electrical Panel Schedules 11/14/2024
• Rev. E0.3 Electrical single Line Diagrams 11/14/2024
• Rev. E1.1 Electrical Plan 11/14/2024
• New G-001 Cover Sheet 11/14/2024 Questions and Answers:
1. The demolition plans are calling for demolition of the ductwork in the service corridor. Does all of the duct get removed or can it be reused if the appropriate size?
Answer: All the exiting HVAC ductwork is to be removed. They are over 50 years old and should not be reused.
2. Windows are identified as curtain wall on the plans but appear to be operable windows? Is there more of a description?
Answer: The windows are considered an Aluminum-Framed Storefront as described in specification section 084313, Aluminum-Framed Storefronts. The windows will opened by swinging out from the building.
3. The Drawings identify the main campus address for the building. Is there a more accurate address?
Answer: A cover sheet, G-001 has been created with a site map for clarification of the location.
• There will be a second Pre-Bid to be determined in Addendum #2 at Cleveland Community
College – 137 S. Post Rd., Jack Hunt Building – Board Room 2086, Shelby, NC 28152
• The bid opening is being rescheduled from 11/21/24 to be determined in Addendum #2 at
Cleveland Community College – 137 S. Post Rd., Jack Hunt Building – Board Room 2086, Shelby, NC 28152
END OF ADDENDUM #1
Meeting Agenda www.devitainc.com
877-4-DEVITA
corp@devitainc.com
Date: 11-07-2024
Sheet 1 and 2
Topic: Prebid Meeting
Meeting Date 11-07-2024
Time: 2:00P
Location: Cleveland Community College – 137 S. Post Rd., Jack Hunt Building –
Board Room 2086, Shelby, NC 28152
Attendance: Cleveland Community College o Stephen Matheny, VP mathenys508@clevelandcc.edu o Mark Fox foxm@clevelandcc.edu
DeVita o Michael Rogers mrogers@devitainc.com o
Agenda:
1. Review Project Scope
A. The scope of this project will be to provide ventilation, heating, and cooling to keep the building in the 65 F to 80 F range during the year.
B. A new electrical service will be required to accommodate the new HVAC equipment.
C. Owner desires to replace the existing windows with new double pane operable windows, which will be Alternate #1.
D. For alternate #2: The existing Federal Pacific panelboard will be replaced with a new panelboard. A new feeder will be required. This work is mandatory, but it will be priced as an alternate.
E. Bids will be received as a single prime contract F. The proposal will be a lump sum proposal
2. Questions A. We cannot provide responses to specific questions at this time by state bidding procedure. Any and all questions will be documented and responded to by Addenda.
B. The last day for questions will be Tuesday, November 12, 2024, NOON so we can respond to them via Addendum, no later than 7 days before bid opening.
3. Project Schedule A. Schedule for contract time of completion is currently 120 days from the NTP.
NTP is expected to occur around Mid-December, but not guaranteed B. Contractor shall be permitted to work 7:30 am to 5pm Mondays through Fridays.
C. Prior approval is required from Cleveland Community College and security to work outside these work hours.
D. There will be an establishment of a work zone perimeter around the facility involving the construction. Contractor and its employees must always remain within the designated work area.
Meeting Agenda www.devitainc.com
877-4-DEVITA
corp@devitainc.com
4. Liquidated Damages $200/day
5. Bidding Forms A. Sealed bid will be accepted at Cleveland Community College up until 3:00pm on
Thursday, November 21, 2024, in the Jack Hunt Building – Board Room 2086.
B. Provide the completed Bid Form of Proposal (leave Acceptance portion blank) C. Provide the Identification of HUB Certified/ Minority Business Participation form and Affidavit A or Affidavit B as part of the bid package.
D. Provide Form of Bid Bond as part of the bid package.
DRAWING NO.
DRAWING NAME
SEALS
Drawn By: Checked By:
REVISIONS
NO. DATE DESCRIPTION
PROJECT INFORMATION:
CONSULTANT
PROJECT NUMBER:
DISCLAIMER: THIS DOCUMENT IS THE
PROPERTY OF DEVITA & ASSOCIATES, INC.
AND IS FURNISHED WITH THE CONDITION
THAT IT IS NOT TO BE CHANGED WITHOUT
THE WRITTEN AUTHORIZATION OF DEVITA
& ASSOCIATES, INC. FURTHERMORE, THIS
DOCUMENT IS NOT TO BE COPIED,
REPRODUCED OR USED BY OTHERS EXCEPT
AS REQUIRED FOR THE WORK OF THIS
SPECIFIC PROJECT.
www.devitainc.com
877.4.DEVITA
corp@devitainc.com
NC Firm License No. C-0819
ATLANTA | CHARLOTTE | GREENVILLE | RICHMOND
DeVita & Associates, Inc. Project : 24529
ISSUED: 10/29/2024
Cleveland Community College Welding Shop Corrections Facility 260 Kemper Rd. Shelby, NC 28152
24529
CLEVELAND
COMMUNITY
COLLEGE
WELDING SHOP
CORRECTIONS
FACILITY
260 KEMPER RD
SHELBY, NC 28252
G0.1
COVER SHEET &
DRAWING INDEX
CM MR
CLEVELAND COMMUNITY COLLEGE
WELDING SHOP
CORRECTIONS FACILITY
260 KEMPER RD,
SHELBY, NC 28152
ISSUED FOR BID
OCT 29, 2024
WELDING SHOP
EXISTING GAS METER LOCATION
KEMPER RD
DRAWING INDEX
GENERAL
G001 COVER SHEET AND DRAWING INDEX X
ARCHITECTURAL
A101 FIRST FLOOR PLAN - DEMOLITION & RENOVATION X
A201 EXTERIOR ELEVATIONS - DEMOLITION X
A202 EXTERIOR ELEVATIONS - RENOVATION X
A601 WINDOW TYPE AND DETAILS X
MECHANICAL
M0.1 MECHANICAL LEGEND NOTES AND SCHEDULES X
M0.2 MECHANICAL DETAILS X
M0.3 MECHANICAL DETAILS II X
M1.0 MECHANICAL DEMO PLANS X
M1.1 MECHANICAL PLANS X X
ELECTRICAL
E0.1 ELECTRICAL LEGEND NOTES AND SCHEDULES X X
E0.2 ELECTRICAL PANEL SCHEDULE X X
E0.3 ELECTRICAL SINGLE LINE DIAGRAMS X X
E1.0 ELECTRICAL DEMO PLANS X
E1.1 ELECTRICAL PLANS X X
LOCATION MAP
NORTH
1 11/14/2024 ADDENDUM 1
IS
SU
ED
F
O R
B
ID
AD
D
EN
D
U M
MECH, ROOM
SERVICE CORRIDORTOILET
LAVATORY
SHOWER
MOP
ROOM TOILET TOILET
LOCKED
ROOMS
DOOR
COVER OVER OUTSIDE BOOTHS
SHOWER
42" WIDE
E
LE
C
TR
IC
A
L P
A N
E
LS
W
IN
D O
W
DOOR
8'-8" FLOOR TO CEILING
1ST WINDOW
4'-0" FROM
INSIDE CORNER
OVERHANG
7 BOOTHS THIS SIDE
TOILET TOILET
5 BOOTHS THIS SIDE
30" x 12" OA
B
B
24"x24" UP
22"x14" EA 32"x18" EA
22"x12" OA (BELOW)
32"x24" EA UP TO EF-1
20" x 10" EA32" x 18" EA26" x 16" EA
22"x12" OA (BELOW)
1 11
26x12" OA (BELOW)
1111111 1
111 1 1
E-A
1 1
MUA-2
2 WINDOWS
7'-0" FROM
INSIDE CORNER
OAU-1
232"x24" EA UP TO EF-2
30"x24" OA DN FROM OAU-1
28"x12" OA
28"x12" OA
28"x20" OA
28"x12" OA
28"x12" OA
28"x20" OAMUA-1
14"x12" OA
A
A
22"x12" OA22"x12" OA
14"x12" OA
14"x12" OA
M0.2
26"x16" EA
T
CONTROLS FOR MUA-1/EF-1 & MUA-2/EF-2
2" NG FROM ABOVE
1-1/4" NG FROM ABOVE
S-A
E-AS-A
S-A
S-B
S-A
S-B
EXISTING CHAIN LINK FENCE
~1 6'
-0
1-1/4" NG (ABOVE GROUND)
3" BURIED NG
GAS PIPING BURIED ON OUTSIDE SIDE OF FENCE
3" UP TO MUA-2 TEE, TRANSITION TO 2" NG UP TO ABOVE
24"x24" OA UP FROM OAU-1
24"x24" OA DN
OAU-1
(ON GRADE
BELOW)
"x
32"x24" EA FROM BELOW
EF-1 EF-226"Ø 26"Ø
32"x24" EA FROM BELOW
4 4
MUA-1
(ON GRADE BELOW)
MUA-2
(ON GRADE BELOW)
2" NG DN TO MUA-1
1-1/4" NG DN TO OAU-1
2" NG FROM BELOW
1-1/4" NG
2" NG
2" NG
16'12'8'4'0
SCALE: 3/16" = 1'-0"
M1.1
MECHANICAL FLOOR PLAN
1. PROVIDE IAP FA-0507-H HANGING FUME ARM IN-ROOM.
FIELD-COORDINATE ROUTING OF 5"Ø ROUND DUCTWORK THROUGH
EXISTING WALL OPENING INTO ROOM. ARM SHALL BE BALANCED TO
600CFM. SEE DETAILS 1 & 2 ON M0.2 FOR MORE INFORMATION.
2. PROVIDE CONCRETE PAD 6" MINIMUM AROUND PERIMETER OF
MECHANICAL EQUIPMENT. INSTALL UNIT ON FACTORY PROVIDED
EQUIPMENT RAILS. SEE DETAIL.
3. SUPPORT EXTERIOR DUCTWORK WITH MIRO INDUSTRIES DS-6 OR
APPROVED EQUAL. SEE DETAIL.
4. INSTALL FAN ON FACTORY PROVIDED EQUIPMENT RAIL WITH
VIBRATION ISOLATORS. SEE DETAIL.
KEY NOTES:
M1.1
MECHANICAL
FLOOR PLAN
DRAWING NO.
DRAWING NAME
SEALS
Drawn By: Checked By:
REVISIONS
NO. DATE DESCRIPTION
PROJECT INFORMATION:
CONSULTANT
PROJECT NUMBER:
DISCLAIMER: THIS DOCUMENT IS THE
PROPERTY OF DEVITA & ASSOCIATES, INC.
AND IS FURNISHED WITH THE CONDITION
THAT IT IS NOT TO BE CHANGED WITHOUT
THE WRITTEN AUTHORIZATION OF DEVITA
& ASSOCIATES, INC. FURTHERMORE, THIS
DOCUMENT IS NOT TO BE COPIED,
REPRODUCED OR USED BY OTHERS EXCEPT
AS REQUIRED FOR THE WORK OF THIS
SPECIFIC PROJECT.
www.devitainc.com
877.4.DEVITA
corp@devitainc.com
NC Firm License No. C-0819
ATLANTA | CHARLOTTE | GREENVILLE | RICHMOND
DeVita & Associates, Inc. Project : 24529
ISSUED: 10/29/2024
Cleveland Community College Welding Shop Corrections Facility 260 Kemper Rd. Shelby, NC 28152
24529
CLEVELAND
COMMUNITY
COLLEGE
WELDING SHOP
CORRECTIONS
FACILITY
260 KEMPER RD
SHELBY, NC 28252
16'12'8'4'0
SCALE: 3/16" = 1'-0"
M1.1
MECHANICAL ROOF PLAN
1. CONTRACTOR TO VERIFY NATURAL GAS PRESSURE ON-SITE AND
PROVIDE GAS PRESSURE REDUCERS AS REQUIRED.
GENERAL NOTES: #
CM MR
5. BURIED NATURAL GAS PIPING TO BE ROUTED FROM GAS METER AT
COMPLEX EXTERIOR. SEE LOCATION INDICATED ON G0.1 SITE PLAN
FOR APPROXIMATE LOCATION. PIPING SHALL BE BURIED BETWEEN
EXISTING GAS METER AND WELDING SHOP OUTSIDE THE FENCED
PERIMETER. APPROX. 175' TOTAL PIPING LENGTH FROM METER
SHOP TO EXISTING NATURAL GAS CONNECTION. VERIFY ROUTING
IN-FIELD.
6. SEE ARCHITECTURAL PLANS FOR WINDOW PENETRATION DETAIL
7. PROVIDE SUPPORTS FOR ROOFTOP GAS PIPING PER
SPECIFICATIONS.
1 11/14/2024 ADDENDUM 1
A-1
WIRING DEVICE SYMBOL LEGEND
SYMBOL DESCRIPTION
HOMERUN TO LIGHTING/SERVICE PANEL. HOMERUN INDICATES PANEL NAME AND
CIRCUIT NUMBER OR FEEDER TAG. CONDUCTORS SHALL BE #12 AWG IN 3/4” CONDUIT
(1” UNDERGROUND) UNLESS NOTED OTHERWISE. HOMERUNS MAY BE COMBINED INTO
A COMMON RACEWAY FOR 20A SINGLE PHASE CIRCUITS ONLY IF DEDICATED
NEUTRALS ARE USED OR HANDLE TIES ARE PROVIDED ON CIRCUIT BREAKERS TO
SIMULTANEOUSLY DISCONNECT ALL UNGROUNDED CONDUCTORS AT THE SAME TIME.
MAXIMUM OF (6) #12 AWG CURRENT CARRYING CONDUCTORS SHALL BE PROVIDED IN
RACEWAY. COMPLY WITH NEC FOR CONDUCTOR DERATING AND CONDUIT FILL..
CONDUIT STUB
CONDUIT TURNED DOWN
CONDUIT TURNED UP
CONDUIT INSTALLED BELOW GRADE OR BELOW FINISHED FLOOR
ELECTRICAL CONNECTION TO EQUIPMENT ITEM 'E101' (LETTER DESIGNATION
AS APPLICABLE) - SEE CORRESPONDING EQUIPMENT CONNECTION SCHEDULE
SPECIAL PURPOSE RECEPTACLE - HEIGHT AND TYPE AS NOTED ON DRAWINGS
SURFACE RACEWAY
JUNCTION BOX - MOUNTING HEIGHT AND SIZE AS REQUIRED BY CODE OR AS NOTED ON
DRAWINGS
JUNCTION BOX - FLOOR MOUNTED. SIZE AS REQUIRED BY CODE OR AS NOTED ON
DRAWINGS
VERTICAL SERVICE POLE
COMBINATION IN FLOOR POWER / DATA / A/V DEVICE.
PUSHBUTTON
FIRE ALARM SYMBOL LEGEND
SYMBOL DESCRIPTION
FIRE ALARM ANNUNCIATOR PANEL - WALL MOUNTED AT 60" AFF TO CENTER, UNO
FIRE ALARM CONTROL PANEL - WALL MOUNTED AT 72" AFF TO TOP, UNO
FIRE ALARM PULL STATION AT 44" AFF. UNO
MOTOR. SEE DRAWINGS FOR DESCRIPTION
COMBNATION MOTOR STARTER
MOTOR STARTER
DOOR BELL
30A/3P/20/1
FIRE ALARM VISUAL DEVICE. ROUGH-IN SUCH THAT BOTTOM OF LENS IS NO LESS THAN
80" AFF.
FIRE ALARM AUDIO/VISUAL DEVICE. ROUGH-IN SUCH THAT BOTTOM OF VISUAL LENS IS
NO LESS THAN 80" AFF.
FIRE ALARM HORN AUDIO DEVICE. ROUGH-IN SUCH THAT BOTTOM OF DEVICE IS NO
LESS THAN 80"AFF
FIRE ALARM SMOKE DETECTOR - CEILING MOUNTED, UNO
FIRE ALARM SMOKE DUCT DETECTOR
REMOTE TEST STATION FOR FA DUCT DETECTOR
TAMPER SWITCH
FLOW SWITCH
HEAT DETECTOR
CO DETECTOR
MAGNETIC DOOR HOLDER, AT 72" AFF UNO
DISTRIBUTION SYMBOL LEGEND
SYMBOL DESCRIPTION
ELECTRICAL PANEL, SURFACE MOUNTED.
ELECTRICAL PANEL, FLUSH MOUNTED.
TRANSFORMER
AUTOMATIC TRANSFER SWITCHATS
T1
LIGHTING & CONTROL SYMBOL LEGEND
SYMBOL DESCRIPTION
LIGHTING CONTROL OCCUPANCY SENSOR - CEILING MOUNTED
LIGHTING CONTROL PHOTOCELL
INTERIOR LIGHT FIXTURES AS SPECIFIED ON THE LIGHT FIXTURE SCHEDULE.
REFER ALSO TO LIGHTING CIRCUITING GUIDE.
LIGHT FIXTURE, HALF SHADING INDICATES EMERGENCY BACKUP. "NL" INDICATES 24/7
OPERATION (UNSWITCHED).
TECHNOLOGY SYMBOL LEGEND
SYMBOL DESCRIPTION
VOICE / DATA ROUGH-IN BOX, AT 18" AFF UNO. PROVIDE WITH 3/4" CONDUIT WITH PULL
STRING TO ABOVE CEILING, 6" BUSH END.
EMERGENCY LIGHTING FIXTURE, WITH BATTERY. REFER TO LIGHT FIXTURE SCHEDULE
EXTERIOR LIGHT FIXTURES AS SPECIFIED ON THE LIGHT FIXTURE SCHEDULE.
REFER ALSO TO LIGHTING CIRCUITING GUIDE.
EXIT SIGN. ARROW INDICATES ILLUMINATED DIRECTIONAL ARROWS, SHADED SECTION
INDICATES FACE WHICH IS ILLUMINATED.
VOICE / DATA ROUGH-IN BOX, FLOOR-MOUNTED. PROVIDE WITH 3/4" CONDUIT WITH PULL
STRING TO ABOVE CEILING, 6" BUSH END.
ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINSHED GRADE
ACH ABOVE COUNTER HEIGHT
AL ALUMINUM
BKR BREAKER
CU COPPER
CKT CIRCUIT
DWG DRAWING
EC EMPTY CONDUIT
EF EXHAUST FAN
EWC ELECTRIC WATER COOLER
FLA FULL LOAD AMPS
FU FUSE
FWE FURNISHED WITH EQUIPMENT
GC GENERAL CONTRACTOR
GFI/GFCI GROUND FAULT INTERRUPTER DEVICE
HPS HIGH PRESSURE SODIUM
IG ISOLATED GROUND
LRA LOCKED ROTOR AMPS
LTG LIGHTING(L)
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MH METAL HALIDE
MLO MAIN LUG ONLY
MOCP MAXIMUM OVERCURRENT CIRCUIT PROTECTION
MSB MAIN SWITCHBOARD
NL NIGHT LIGHT
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PH PHASE
PNL PANEL
RCPT RECEPTACLE
REQD REQUIRED
RTU ROOFTOP UNIT
SP SURGE PROTECTED DEVICE
SW SWITCH
UGND UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
W/ WITH
WH WATER HEATER
WP WEATHER PROOF
XFMR TRANSFORMER
SECURITY CAMERA. COORDINATE REQUIREMENTS WITH OWNER.
WIRELESS ACCESS POINT. COORDINATE REQUIREMENTS WITH OWNER.
NL
DAYLIGHT SENSOR
LIGHTING CIRCUITING GUIDE
SYMBOL DESCRIPTION
B / X-1 LIGHTING TYPE AND CIRCUIT DESIGNATION
X: REFER TO PANEL SCHEDULE, PER DRAWING
1: CIRCUIT NUMBER
B: LIGHT FIXTURE TYPE, REFER TO LIGHT FIXTURE SCHEDULE(a)
SWITCHING SCHEME OR ZONE
POWER CIRCUITING GUIDE
SYMBOL DESCRIPTION
X-1 POWER CIRCUITING DESIGNATION
X: REFER TO PANEL SCHEDULE, PER DRAWING
1: CIRCUIT NUMBER
DEVICE, JUNCTION BOX, FLOOR BOX, ETC
XXX
EQUIPMENT ABBREVIATION, REFER TO LEGEND AND
ABBREVIATION SCHEDULE FOR ADDITIONAL INFORMATION
TELEVISION OUTLET. SINGLE GANG BOX WITH SINGLE GANG PLASTER RING. PROVIDE
WITH 3/4" CONDUIT WITH PULL STRING TO ABOVE CEILING, 6" BUSH END. PROVIDE WITH
ADJACENT DUPLEX RECEPTACLE
E101
J
J
F
F
F
F
FACP
FAAP
DD
RTS
TS
HD
CO
FS
D
PC
OS
DS
TV
SC
AP
B
SAFETY DISCONNECT SWITCH. "30" INDICATES AMP RATING, "3P" INDICATES NUMBER OF
POLES, "20" INDICATES FUSE SIZE, "1" INDICATES NEMA ENCLOSURE RATING (1, 3R, 4X,
ETC). HEAVY DUTY SAFETY SWITCH UNLESS NOTED OTHERWISE. "NF" INDICATES
NON-FUSED.
SCCR SHORT CIRCUIT CURRENT RATING
FOR RECEPTACLES ABOVE, SUBSCRIPT DEFINITION AS FOLLOWS:
GFI - GROUND FAULT DEVICE
IG - ISOLATED GROUND
USB - DEVICE WITH USB PORT
WP - WEATHERPROOF
CR - CORD REEL
DUPLEX RECEPTACLE AT 18" AFF, UNO. NEMA 5-20R.
QUADRUPLEX RECEPTACLE AT 18" AFF, UNO. NEMA 5-20R.
DUPLEX RECEPTACLE - CEILING MOUNTED. NEMA 5-20R.
DUPLEX RECEPTACLE - FLOOR MOUNTED. NEMA 5-20R.
SINGLE RECEPTACLE AT 18" AFF, UNO. NEMA 5-20R.
C - MOUNTED 8" ABOVE COUNTER
H - MOUNTED HORIZONTALLY
20A SWITCH AT 44" CL AFF, UNO
FOR SWITCH OR DIMMER ABOVE, SUBSCRIPT DEFINITION AS FOLLOWS:
a,b - SWITCHING SCHEME m - MOTOR RATED
P - PILOT LIGHT
3 - 3-WAY SWITCH
4 - 4-WAY SWITCH
o - OCCUPANCY SENSOR v - VACANCY SENSOR
S
D WALL DIMMERx x
DRAWING NO.
DRAWING NAME
SEALS
Drawn By: Checked By:
REVISIONS
NO. DATE DESCRIPTION
PROJECT INFORMATION:
CONSULTANT
PROJECT NUMBER:
DISCLAIMER: THIS DOCUMENT IS THE
PROPERTY OF DEVITA & ASSOCIATES, INC.
AND IS FURNISHED WITH THE CONDITION
THAT IT IS NOT TO BE CHANGED WITHOUT
THE WRITTEN AUTHORIZATION OF DEVITA
& ASSOCIATES, INC. FURTHERMORE, THIS
DOCUMENT IS NOT TO BE COPIED,
REPRODUCED OR USED BY OTHERS EXCEPT
AS REQUIRED FOR THE WORK OF THIS
SPECIFIC PROJECT.
www.devitainc.com
877.4.DEVITA
corp@devitainc.com
NC Firm License No. C-0819
ATLANTA | CHARLOTTE | GREENVILLE | RICHMOND
DeVita & Associates, Inc. Project : 24529
ISSUED: 10/29/2024
Cleveland Community College Welding Shop Corrections Facility 260 Kemper Rd. Shelby, NC 28152
24529
CLEVELAND
COMMUNITY
COLLEGE
WELDING SHOP
CORRECTIONS
FACILITY
260 KEMPER RD
SHELBY, NC 28252
ELECTRICAL
SCHEDULES &
DETAILS
LJK TPW
E0.1
SYMBOL:
EXIT SIGN
LIGHTING SWITCH
FINISHED FLOOR 1'-4" UNO
SYMBOL:
SYMBOL:
TELEPHONE OR
TOP OF
DATA
SYMBOL ,
44" UNO
6"
MAX.
SYMBOL:
SYMBOL:
6' -8
" U N
O
ACTIVATION
HANDLE
F
F
EXIT
4'-0"
MAX.
NOT TO SCALE
E0.1
TYPICAL DEVICE MOUNTING DETAIL
FIRE ALARM
HORN / STROBE
FIRE ALARM
MANUAL PULL
STATION
120V CONVENIENCE
RECEPTACLE
1P 20A
120VAC
(M-14)
LC3
TO EF-2
LC1
M-1
M-3
TO EF-1
M-5
TO EF-1
TO EF-1
NOTES:
1. HVAC CONTROLLER SHALL BE IN A NEMA TYPE 1 ENCLOSURE SIZED AS REQUIRED. PROVIDE ENGRAVED NAMEPLATE ON
DOOR LABELED AS "HVAC CONTROLS".
2. CONTACTOR SHALL BE SQUARE D CLASS 8903 ELECTRICALLY HELD CONTACTOR OR APPROVED EQUAL. CONTACTS SHALL
BE 30A OR 60A CONTINUOUS RATED AS INDICATED. PROVIDE COIL VOLTAGE AS INDICATED.
NOT TO SCALE
E0.1
HVAC CONTROL WIRING DIAGRAM
GENERAL NOTES:
CONTRACTOR IS RESPONSIBLE TO REVIEW AND UNDERSTAND ALL DRAWINGS
SPECIFICATIONS AND ALL WORK OF ALL TRADES TO ENSURE A COMPLETE AND THOROUGH
PROJECT. CONTRACTOR SHALL COOPERATE AND COORDINATE ALL PHASES OF WORK WITH
OTHER DISCIPLINES AND GENERAL CONTRACTOR.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES PRIOR TO
INSTALLATION OF EQUIPMENT AND RACEWAYS.
CONTRACTOR SHALL OBTAIN ALL PERMITS AND COORDINATE ALL INSPECTIONS REQUIRED BY
LOCAL AUTHORIZED AGENCIES HAVING JURISDICTION. PERMIT/INSPECTION FEES SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
ALL WORK SHALL BE EXECUTED IN ACCORDANCE WITH RECOGNIZED STANDARDS OF
WORKMANSHIP. ALL WORK SHALL BE INSTALLED IN A NEAT AND ORDERLY MANNER.
ALL ELECTRICAL CONSTRUCTION SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE, NC
DOA STATE CONSTRUCTION MANUAL APPLICABLE NEMA, ANSI, AND IEEE PUBLICATIONS, U.L.
STANDARDS, AND OSHA REQUIREMENTS. WORK SHALL COMPLY WITH LOCAL, COUNTY, STATE,
AND NATIONAL CODES HAVING JURISDICTION.
PROVIDE MATERIALS AND LABOR FOR A COMPLETE ELECTRICAL INSTALLATION. ALL
ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE NEW AND BEAR
THE UNDERWRITERS LABORATORIES, INC. (UL) LABEL WHERE AVAILABLE.
ALL EQUIPMENT, FIXTURES, DEVICES, AND MATERIALS SHALL BE FREE OF CORROSION, DIRT, PAINT, SPLATTER OR DAMAGE OF ANY SORT AT FINAL ACCEPTANCE OF THE WORK.
ELECTRICAL CONTRACTOR SHALL CLEAN, REPAIR OR REPLACE SAME AS INSTRUCTED BY
OWNER BEFORE FINAL PAYMENT.
TO EF-2
TO EF-2
M-7
M-9
M-11
LC4
TO MAU-2
LC2
M-2
M-4
TO MAU-1
M-6
TO MAU-1
TO MAU-1
TO MAU-2
TO MAU-2
M-8
M-10
M-12
NEMA 1 CONTACTOR ENCLOSURE
60A 30A
60A 30A
1 11/14/2024 ADDENDUM 1
1 1
1 1
DRAWING NO.
DRAWING NAME
SEALS
Drawn By: Checked By:
REVISIONS
NO. DATE DESCRIPTION
PROJECT INFORMATION:
CONSULTANT
PROJECT NUMBER:
DISCLAIMER: THIS DOCUMENT IS THE
PROPERTY OF DEVITA & ASSOCIATES, INC.
AND IS FURNISHED WITH THE CONDITION
THAT IT IS NOT TO BE CHANGED WITHOUT
THE WRITTEN AUTHORIZATION OF DEVITA
& ASSOCIATES, INC. FURTHERMORE, THIS
DOCUMENT IS NOT TO BE COPIED,
REPRODUCED OR USED BY OTHERS EXCEPT
AS REQUIRED FOR THE WORK OF THIS
SPECIFIC PROJECT.
www.devitainc.com
877.4.DEVITA
corp@devitainc.com
NC Firm License No. C-0819
ATLANTA | CHARLOTTE | GREENVILLE | RICHMOND
DeVita & Associates, Inc. Project : 24529
ISSUED: 10/29/2024
Cleveland Community College Welding Shop Corrections Facility 260 Kemper Rd. Shelby, NC 28152
24529
CLEVELAND
COMMUNITY
COLLEGE
WELDING SHOP
CORRECTIONS
FACILITY
260 KEMPER RD
SHELBY, NC 28252
ELECTRICAL
PANEL SCHEDULES
LJK TPW
E0.2
A. EXISTING CIRCUIT DATA SHOWN IS TAKEN FROM EXISTING FACILITY
DRAWINGS AND/OR FIELD OBSERVATION. FIELD VERIFY ALL CIRCUITS.
B. REFER TO LEGEND, RISER DIAGRAM, AND PLANS FOR ADDITIONAL
INFORMATION.
C. VERIFY ALL CIRCUITS ON EXISTING PANELS. ADJUST CIRCUITING AS
REQUIRED TO MEET DESIGN INTENT OF DRAWINGS. FOR ANY VACATED
CIRCUITS, REMOVE CONDUIT AND WIRING BACK TO PANEL, TURN BREAKER
OFF, AND MARK BREAKER AS 'SPARE'. FOR EXISTING CIRCUITS MISLABELED
BUT CONNECTED TO EXISTING LOAD REQUIRED TO REMAIN, FIELD
DETERMINE LOAD AND PROVIDE APPROPRIATE DESCRIPTION IN PANEL
DIRECTORY.
D. PROVIDE NEW TYPEWRITTEN PANEL DIRECTORY TO REFLECT NEW
CONDITIONS UPON COMPLETION OF WORK DESCRIBED IN THESE DRAWINGS.
E. REUSE EXISTING CIRCUIT BREAKERS WHERE POSSIBLE. PROVIDE NEW
BREAKERS AS REQUIRED, TYPE, VOLTAGE RATING, AND AIC RATING TO
MATCH EXISTING.
F. REPAIR OR REPLACE ANY MISSING OR DAMAGED COMPONENTS ON EXISTING
PANELBOARDS; FIELD VERIFY EXACT REQUIREMENTS.
G. PROVIDE LISTED HANDLE TIES FOR ALL BREAKERS SERVING MULTIWIRE
BRANCH CIRCUITS, I.E., SEPARATE BRANCH CIRCUITS THAT SHARE THE
NEUTRAL CONDUCTOR IN ACCORDANCE WITH NEC 210.4.
GENERAL NOTES - PANEL SCHEDULES:
1 11/14/2024 ADDENDUM 1
EXISTING PEAK DEMAND PER NEC 220.87
= 16.8 KW
ASSUME 0.8 POWER FACTOR
= 21 KVA
125% DEMAND FACTOR
= 26.25 KVA
NEW LOAD FROM PANEL 'A'
= 11.7 KVA
NEW LOAD FROM PANEL 'M'
= 49.9 KVA
NEW HVAC OAU-1
= 29.4 KVA
TOTALS:
26.25 + 11.7 + 49.9 + 29.4
= 117.25 KVA
= 325.5 A
LOAD ANALYSIS
FINISHED FLOOR
EXISTING
PANEL
'DP'
600A
208Y/120V 3P, 4W
MCB
EXISTING
PANEL
'W1' 225A
208Y/120V 3P, 4W
MLO
EXISTING
PANEL
'W2' 225A
208Y/120V 3P, 4W
MLO
EXISTING
PANEL
'W3' 225A
208Y/120V 3P, 4W
MLO
FINISHED GRADE
COORDINATE INTERRUPTION OF EXISTING ELECTRICAL SERVICE WITH OWNER AND
CONSTRUCTION MANAGER NO FEWER THAN 5 WORKING DAYS IN ADVANCE OF PROPOSED
INTERRUPTION. MINIMIZE THE EXTENT OF THE DOWNTIME AS MUCH AS POSSIBLE BY
FULLY INSTALLING REQUIRED COMPONENTS AHEAD OF TIME TO THE EXTENT POSSIBLE.
EXISTING SERVICE GROUND
EXISTING
PANEL
'W4' 225A
208Y/120V 3P, 4W
MLO
EXISTING
PANEL
150A 208Y/120V
3P, 4W
MCB
TO FEEDER PANEL
IN MAIN ADMIN
BUILDING
CT
CABINET
TO
POLE-MOUNTED
UTILITY
TRANSFORMER
EXISTING
UTILITY
METER 1
(TYP)
ALTERNATE #2
FINISHED FLOOR
EXISTING
PANEL
'DP'
600A
208Y/120V 3P, 4W
MCB
EXISTING
PANEL
'W1' 225A
208Y/120V 3P, 4W
MLO
EXISTING
PANEL
'W2' 225A
208Y/120V 3P, 4W
MLO
EXISTING
PANEL
'W3' 225A
208Y/120V 3P, 4W
MLO
FINISHED GRADE
COORDINATE INTERRUPTION OF EXISTING ELECTRICAL SERVICE WITH OWNER AND
CONSTRUCTION MANAGER NO FEWER THAN 5 WORKING DAYS IN ADVANCE OF PROPOSED
INTERRUPTION. MINIMIZE THE EXTENT OF THE DOWNTIME AS MUCH AS POSSIBLE BY
FULLY INSTALLING REQUIRED COMPONENTS AHEAD OF TIME TO THE EXTENT POSSIBLE.
EXISTING
PANEL
'W4' 225A
208Y/120V 3P, 4W
MLO
NEW
PANEL
'A' 125A
208Y/120V 3P, 4W
MLO
CT
CABINET
EXISTING
UTILITY
METER
(TYP)
ALTERNATE #2
NEW
PANEL
'M' 225A
208Y/120V 3P, 4W
MLO
EXISTING SERVICE GROUND
TO
POLE-MOUNTED
UTILITY
TRANSFORMER
RISER KEY NOTES:
1. ALL EQUIPMENT SHOWN IS EXISTING U.N.O. AS "NEW".
2. EXISTING CONDUCTORS SHALL BE REMOVED. EXISTING CONDUIT SHALL
BE CUT FLUSH AND CAPPED. EXISTING FEEDER BREAKER SHALL BE
SWITCHED OFF AND MARKED AS SPARE.
3. NEW PANEL TO REPLACED EXISTING. RECONNECT EXISTING BRANCH
CIRCUITS.
WIRING SCHEDULE:
4 #1, 1 #6 GND; 2"C
4 #3/0, 1 #6 GND; 2-1/2"C
GENERAL NOTES:
A. ALL DISTRIBUTION EQUIPMENT AND FEEDERS ARE EXISTING TO REMAIN
AS IS UNLESS NOTED OTHERWISE. EQUIPMENT AS NOTED IS TAKEN
FROM EXISTING FACILITY DRAWINGS. FIELD VERIFY ALL EXISTING
EQUIPMENT AND FEEDER TYPES, RATINGS, SIZES, CONFIGURATIONS,
AND LOCATIONS.
B. FIELD VERIFY AND COORDINATE EXACT EQUIPMENT ARRANGEMENT,
LOCATIONS, CONDUIT ROUTING AND REQUIREMENTS PRIOR TO WORK.
C. NOTIFY ENGINEER IMMEDIATELY OF EXISTING CONDITIONS ARE
DIFFERENT THAN SHOWN.
ALTERNATE NOTES:
1. ALTERNATE #2 SCOPE IS TO REPLACE EXISTING FEDERAL PACIFIC
PANELBOARD WITH NEW PANEL A AND RECONNECT EXISTING BRANCH
CIRCUITS. PROVIDE NEW FEEDER TO NEW DISTRIBUTION PANEL.
2. ALTERNATE #2 IS MANDATORY WORK, BUT SHALL BE PRICED
SEPARATELY FROM BASE BID.
DRAWING NO.
DRAWING NAME
SEALS
Drawn By: Checked By:
REVISIONS
NO. DATE DESCRIPTION
PROJECT INFORMATION:
CONSULTANT
PROJECT NUMBER:
DISCLAIMER: THIS DOCUMENT IS THE
PROPERTY OF DEVITA & ASSOCIATES, INC.
AND IS FURNISHED WITH THE CONDITION
THAT IT IS NOT TO BE CHANGED WITHOUT
THE WRITTEN AUTHORIZATION OF DEVITA
& ASSOCIATES, INC. FURTHERMORE, THIS
DOCUMENT IS NOT TO BE COPIED,
REPRODUCED OR USED BY OTHERS EXCEPT
AS REQUIRED FOR THE WORK OF THIS
SPECIFIC PROJECT.
www.devitainc.com
877.4.DEVITA
corp@devitainc.com
NC Firm License No. C-0819
ATLANTA | CHARLOTTE | GREENVILLE | RICHMOND
DeVita & Associates, Inc. Project : 24529
ISSUED: 10/29/2024
Cleveland Community College Welding Shop Corrections Facility 260 Kemper Rd. Shelby, NC 28152
24529
CLEVELAND
COMMUNITY
COLLEGE
WELDING SHOP
CORRECTIONS
FACILITY
260 KEMPER RD
SHELBY, NC 28252
ELECTRICAL
SINGLE LINE
DIAGRAMS
LJK TPW
E0.3
NOT TO SCALE
E0.3
EXISTING SINGLE LINE DIAGRAM
NOT TO SCALE
E0.3
NEW SINGLE LINE DIAGRAM
1 11/14/2024 ADDENDUM 1
MECH, ROOM
SERVICE CORRIDORTOILET
LAVATORY
SHOWER
MOP
ROOM TOILET TOILET
LOCKED
ROOMS
PANEL 'W1'
PANEL 'W2'
PANEL 'DP'
PANEL 'W3'
PANEL 'W4'
CT CABINET
PANEL 'A'
METER
MAU-1
MAU-2
OAU-1
WP/GFI
A-24
WP/GFI
A-24
WP/GFI
A-24
SS
PANEL 'M'
EF-2EF-1
DRAWING NO.
DRAWING NAME
SEALS
Drawn By: Checked By:
REVISIONS
NO. DATE DESCRIPTION
PROJECT INFORMATION:
CONSULTANT
PROJECT NUMBER:
DISCLAIMER: THIS DOCUMENT IS THE
PROPERTY OF DEVITA & ASSOCIATES, INC.
AND IS FURNISHED WITH THE CONDITION
THAT IT IS NOT TO BE CHANGED WITHOUT
THE WRITTEN AUTHORIZATION OF DEVITA
& ASSOCIATES, INC. FURTHERMORE, THIS
DOCUMENT IS NOT TO BE COPIED,
REPRODUCED OR USED BY OTHERS EXCEPT
AS REQUIRED FOR THE WORK OF THIS
SPECIFIC PROJECT.
www.devitainc.com
877.4.DEVITA
corp@devitainc.com
NC Firm License No. C-0819
ATLANTA | CHARLOTTE | GREENVILLE | RICHMOND
DeVita & Associates, Inc. Project : 24529
ISSUED: 10/29/2024
Cleveland Community College Welding Shop Corrections Facility 260 Kemper Rd. Shelby, NC 28152
24529
CLEVELAND
COMMUNITY
COLLEGE
WELDING SHOP
CORRECTIONS
FACILITY
260 KEMPER RD
SHELBY, NC 28252
1. NEW PANELBOARD TO REPLACE EXISTING AS
PART OF ALTERNATE #2.
2. HVAC CONTACTOR ENCLOSURE. REFER TO
DETAIL 2/E0.1.
3. SWITCH LOCATION FOR CONTROL OF EXHAUST
FANS AND MAKEUP AIR UNITS. REFER TO DETAIL
2/E0.1. LABEL AS "FAN CONTROLS".
KEY NOTES:
ELECTRICAL
PLANS
LJK TPW
E1.116'12'8'4'0
SCALE: 3/16" = 1'-0"
E1.1
ELECTRICAL FLOOR PLAN
16'12'8'4'0
SCALE: 3/16" = 1'-0"
E1.1
ELECTRICAL ROOF PLAN
1 11/14/2024 ADDENDUM 1
| Sheets and Views |
| G0.1 - Cover Sheet-- MECHANICAL DETAILS |
| Sheets and Views |
| M1.1- MECHANICAL PLANS-- MECHANICAL FLOOR PLAN |
| Sheets and Views |
| ELECTRICAL SCHEDULES & DETAIL |
| Sheets and Views |
| ELECTRICAL PANEL SCHEDULES |
| Sheets and Views |
| ELECTRICAL SINGLE LINE DIAGRAMS |
| Sheets and Views |
| ELECTRICAL PLANS |
File details come from the government source that posted it. Updated .