city of mchenry bull valley 99-RFP Complete (07-14-26).pdf

PDF 39 MB Posted

Attached to
Bull Valley Road Bridge Phase II Engineering
Solicitation number
P-91-036-24
Issued by
Cook County, Illinois

About this file

Bull Valley Road Bridge Phase II Engineering - Request for Qualifications

This Request for Qualifications (RFQ) document is issued by the City of McHenry Public Works Department in accordance with the Brooks Act (Federal Public Law 92-582) and the Illinois Local Government Professional Services Selection Act (ILCS 510). The City of McHenry seeks qualified architectural and engineering firms to provide Phase II Engineering services for the Bull Valley Road Bridge reconstruction project over Boone Creek. The scope of work encompasses surveying, utility coordination, supplemental geotechnical studies, development of construction documents and specifications, IDOT permitting and approval assistance, right-of-way acquisition support, cost estimation, and project meeting attendance. The anticipated construction cost is $2,500,000. Sealed Statements of Qualifications must be submitted to Greg Gruen, P.E., at the City of McHenry Public Works Department, 1415 Industrial Drive, McHenry, IL 60050 by 3:00 PM CST on Thursday, August 13, 2026. Inquiries regarding the RFQ must be submitted via email to ggruen@cityofmchenry.org by August 6, 2026, with responses provided in written addenda by August 8, 2026. The anticipated project schedule includes SOQ evaluation and contract negotiation in September 2026, contract approval in October 2026, project kick-off in November 2026, design completion by May 2027, IDOT approval process through September 2027, construction letting in November 2027, and construction start in April 2028. A selection committee will evaluate proposals based on weighted criteria including project understanding and approach (50%), relevant experience (20%), firm capabilities (10%), general knowledge of McHenry infrastructure (10%), local presence (5%), and Disadvantaged Business Enterprise status (5%).

The RFQ requires submittals limited to specific components: a one-page cover letter, one-page firm history and overview, one-page resumes for up to three key personnel, one-page subconsultant resumes, one-page descriptions of up to three similar project experiences, and one-page project understanding and approach statement. Responses must include three hard copies and one PDF copy on a USB drive. The selection process begins with initial scoring to establish an interview list of three consultants, with final selection and scoring adjustments occurring after interviews. The project is funded through the Local Bridge Formula Program (LBFP) with an 80% federal/20% local match. Phase I engineering received $100,000 in LBFP funding with $20,000 local match in State Fiscal Year 2024. Phase II engineering funding of $100,000 (80% LBFP, 20% local match) is available, with Phase III construction engineering and construction funding of $100,000 and $1,300,000 respectively contingent on future fund availability. The project involves reconstruction of the existing Bridge No. 056-3109, which has been rated structurally deficient with a superstructure rating of 4 and sufficiency rating of 46.7. Environmental approvals, cultural resource clearances, wetland mitigation requirements, and endangered species consultations have been completed with no adverse effects anticipated.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest quality of programs and services in a customer-oriented, efficient and fiscally responsible manner.

CITY OF MCHENRY

REQUEST FOR QUALIFICATIONS (RFQ)

BULL VALLEY ROAD BRIDGE – PHASE II ENGINEERING

In accordance with the requirements of Federal Public Law 92-582 (Brooks Act) and ILCS 510 (Local Government Professional Services Selection Act), the City of McHenry is soliciting Statement of Qualifications (SOQ) from qualified firms for Architectural and/or Engineering services associated with the BULL VALLEY ROAD BRIDGE – PHASE II ENGINEERING. The scope of the improvements will include surveying, engineering, permitting and assistance with obtaining IDOT preliminary design report approval. The preliminary anticipated construction cost is $2,500,000. The exact scope of the Architectural and/or Engineering Services is to be determined during the Qualifications Based Selection (QBS) process.

All interested firms should obtain a copy of the entire RFQ located on the City website at:

http://www.cityofmchenry.org/bids_rfps_rfqs. The sealed SOQ shall be delivered the City of McHenry Public Works Department at 1415 Industrial Drive, McHenry IL 60050 by 3:00 PM on Thursday, August 13, 2026. Refer to the RFQ for submittal requirements.

Dated at McHenry, Illinois, 17th day of July, 2026.

/s/

Office of the City Clerk

City of McHenry Public Works Department

REQUEST FOR STATEMENT OF

QUALIFICATIONS

BULL VALLEY ROAD BRIDGE– PHASE II

ENGINEERING SERVICES

Response Due Date: August 13, 2026

Submit Sealed Proposals to:

Greg Gruen, P.E., Engineer City of McHenry, Public Works Department 1415 Industrial Drive McHenry, IL 60050

Request for Statement of Qualifications

2| C i t y o f M c H e n r y

Notice to Firms

The City of McHenry is requesting proposals for professional engineering services for the Bull Valley Road Bridge – Phase II Engineering Project. The included Preliminary Scope of Services provides anticipated items which may be required to perform all necessary engineering work associated with this project. The Bull Valley Road Bridge – Phase II Engineering is to be constructed in accordance with IDOT standards for STP Funding. The City intends to begin work immediately upon execution of the contract with the selected firm. It is the intent of the City to complete the Phase II Engineering and obtain IDOT approval by September 2027 for a November 2027 letting.

Questions and Addenda

All inquiries regarding this RFP shall be submitted via e-mail to Greg Gruen, P.E., Engineer, at ggruen@cityofmchenry.org no later than August 6, 2026. The City of McHenry reserves the right to not respond to any or all inquiries. Responses will be provided in a written addendum with both inquiries and responses, without stating the source of the inquiry via e-mail no later than August 8, 2026.

Contents

The following attachments are included as part of the request for the Statement of Qualifications.

NOTICE TO BIDDERS

REQUEST FOR STATEMENT OF QUALIFICATIONS

REQUIREMENTS FOR STATEMENT OF QUALIFICATIONS

SCOPE OF WORK

SCHEDULE

SCORING SHEET

ATTACHMENTS

Letter to IDOT for Funding Request (10-14-22) Letter from IDOT Granting Funding (2-16-23) Approved PDR

Department of Public Works Gregory Gruen, P.E., Staff Engineer

1415 Industrial Drive McHenry, Illinois 60050 Phone: (815) 363-2185

Fax: (815) 363-2214 ggruen@cityofmchenry.org

The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest

MEMORANDUM

DATE: JULY 2026

TO: ENGINEEERS/ARCHITECTS/SURVEYORS

FROM: Greg Gruen, P.E., Engineer

RE: REQUEST FOR STATEMENT OF QUALIFICATIONS

BULL VALLEY ROAD BRIDGE – PHASE II ENGINEERING

You are invited to submit your Statement of Qualifications to become eligible for a possible interview for professional design services for the CITY OF MCHENRY. This project’s preliminary requirements are based on studies performed by City staff.

Attached to this memo are:

1. General project description and anticipated scope of work.

2. Requirements for the Statement of Qualifications.

3. Schedule of dates.

Your cover letter and Statement of Qualifications with 3 hard copies and 1 PDF on a USB drive should be forwarded to the following address and is due by the date and time listed below:

City of McHenry Public Works 1415 Industrial Drive McHenry, IL 60050 Attn: Greg Gruen

Due: August 13, 2026, 3:00 PM (CST)

The package shall be clearly labeled with the design firm’s name with “Statement of Qualifications for BULL VALLEY ROAD BRIDGE – PHASE II ENGINEERING

The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest

REQUIREMENTS FOR STATEMENT OF QUALIFICATIONS (SOQ)

Owner: City of McHenry

Project: BULL VALLEY ROAD BRIDGE - PHASE II ENGINEERING

The following submittal requirements are intended to be brief, concise and efficient. In an effort to reduce the burden to prepare and review the SOQ, a strict limit on the number of pages for each submittal item is specified.

Your Statement of Qualifications shall include ONLY the following information:

1. Cover letter (1 page).

2. Name, address, and brief history of your firm (1 page).

3. Resume of up to 3 key personnel to be assigned to the project (1 page for each person).

4. Resume of any subconsultants (1 page).

5. Similar project experience for up to 3 projects (1 page per project). Include any relevant details including construction cost, location, roles and responsibilities, approximate dates and any unique challenges or solutions.

6. Project understanding and approach (1 page).

No additional information is to be included.

The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest

GENERAL PROJECT DESCRIPTION AND ANTICIPATED SCOPE OF WORK

Project: BULL VALLEY ROAD BRIDGE – PHASE II ENGINEERING

Contact: Greg Gruen ggruen@cityofmchenry.org

PROJECT DESCRIPTION

The City of McHenry intends on reconstructing the Bull Valley Road Bridge over Boone Creek.

The anticipated scope of work includes new abutments, approach slabs, railings to accommodate 2-12’ drive lanes, 8’ paved shoulders and a 10-ft wide multi-use path. The total width of the bridge is to be 54 feet. This will allow for future expansion of the roadway to a 3-lane section in the future. The project is generally located 1,000ft east of the Curran Road/Bull Valley Road intersection. The project and scope of work is based off the approved Project Development Report (PDR).

ANTICIPATED SCOPE OF SERVICES

The professional design services are to be determined during the contract negotiation phase of the selection process. On a preliminary basis, City staff has identified the following scope items that may be needed to complete the project:

I. Coordinate and Attend Kick-off Meeting II. Provide Topographic Survey

III. Provide Utility Coordination including USGS stream gauge relocation coordination IV. Perform supplemental Geotechnical Study and Report (if needed) V. Develop Construction Documents and Specifications

VI. Submit plans and required documents to IDOT in accordance with letting schedule VII. Assist City with completing both funding and engineering agreements

VIII. Assist City in obtaining required ROW with appraiser and negotiator IX. Provide Plat of Dedication as required for additional ROW X. Assist City in requesting additional funding from IDOT for the bridge structure

XI. Provide Estimate of Cost XII. Attend Meetings as Requested

a. FHWA Meeting

b. Monthly Progress Meetings via video

The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest

SCHEDULE

Project: BULL VALLEY ROAD BRIDGE – PHASE II ENGINEERING

The following is an anticipated schedule of activities for the Selection process through the

Phase II Engineering Process.

DATE ACTIVITY

AUGUST 2026 REQUEST STATEMENT OF QUALIFICATIONS

SEPTEMBER 2026 SOQ EVALUATION, SELECTION AND NEGOTIATION OF CONTRACT

OCTOBER 2026 DESIGN FIRM CONTRACT APPROVED

NOVEMBER 2026 KICK-OFF MEETING

NOVEMBER 2026

THRU MAY 2027

PHASE II DESIGN, OBTAIN EASEMENTS

MAY 2027 THRU

SEPTEMBER 2027

IDOT APPROVAL PROCESS

NOVEMBER 2027 LETTING

APRIL 2028 START CONSTRUCTION

SELECTION COMMITTEE SCORING SHEET

BULL VALLEY ROAD BRIDGE PHASE II

DATE:__________________________

COMMITTEE MEMBER: __________________________

CRITERIA WEIGHTING MAX POINTS WEIGHT x POINTS

Project Understanding and Approach 50% 100

Disadvanaged Business Enterprise 5% 100

Local Presence 5% 100

Relevant Experience 20% 100

Firm/Subconsultant Capabilities 10% 100

General Knowledge of City of McHenry Infrastructure 10% 100

TOTAL 100 (MAX)

Notes:

Initial scoring to be used to establish interview list of 3 consultants.

Scores are to be adjusted after the interviews to determine the seclected firm

CITY OF MCHENRY

PUBLIC

W O

RKS DE

PA

RT

ME

NT

epartment of Public WorksDep

Troy Strange, P.E . Director

1415 Industrrial Drive

K

McHenry, Illinois 650050

Phone: (815) 363-2186

Fax: (815) 363-2214 tstrange@cityofmchenry.org

October 14, 2022

Mr. Charles Riddle

Bureau Chief

Bureau of Local Roads and Streets

Illinois Department of Transportation 201 West Center Court

Schaumburg, IL 60196-1096

Re: Bull Valley Road over Boone Creek (SN 056-3109) Surface Transportation Program - Bridge (STP-Bridge) Funding Request

Dear Mr. Riddle:

The City of McHenry is in need of replacing the structure carrying Bull Valley Road over Boone Creek (Structure No. 056-3109) due to its deteriorated condition. The latest inspection has resulted in a superstructure rating of 4, 'Poor Condition - Advanced Deterioration'. This structurally deficient bridge has a sufficiency rating is 46.7 making it eligible for STP-Bridge funds.

The City requests programming for this project utilizing STP-Bridge funds for State Fiscal Years (State FY) 2023 to 2027 as shown in the table below. It is the City's understanding that all phases for this project will be funded at 80/20 match. The following is a summary of the data for this structure along with an estimated cost anticipated schedule.

Structure No.:

and

056-3109

Facility Carried: Bull Valley Road Facility Crossed: Boone Creek

Structure Type: Single Span PPC Deck Beam

Sufficiency Rating: 46.7

ADT: 9,300 (2021)

STP-Bridge Funding Request: Phase I, II, III (Engineering) and Construction Costs

Estimated 80% STP-Br 20% Local AnticipatedItem Cost Federal Cost Match Schedule

Phase I Prelim. Eng. $100,000 $80,000 $20,000 State FY 23

Phase II Final Eng. $100,000 $80,000 $20,000 State FY 25

Phase III Const. Eng.

Construction

$100,000 $80,000 $20,000 State FY 27

$1,000,000 $800,000 $200,000 State FY 27

TOTAL $1,300,000 $1,040,000 $260,000

The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest

The above costs assume bridge replacement and the project is anticipated to be processed as a Categorical Exclusion (Federal).

The City of McHenry appreciates IDOT's consideration in this matter and looks forward to working with the Department on this project. Please contact us with any questions, comments, or concerns.

Sincerely, Tuey Ahnge Troy Strange, P.E.

Director of Public Works

LOCAL ROADS AND STREETS

Local Bridge Formula Program (LBFP) City of McHenry Location: Bull Valley Road over Boone Creek Section No.: TBD Existing Structure No.: 056-3109 McHenry County

February 16, 2023

Mr. Troy Strange, P.E.

Director of Public Works City of McHenry 1415 Industrial Drive McHenry, IL 60050

Dear Mr. Strang:

We reviewed the October 14, 2022 letter requesting Local Bridge Formula Program (LBFP) funding for Bull Valley Road over Boone Creek structure in the City of McHenry. The structure information is as follows:

Location Structure

No.

Sufficiency

Rating

Last Inspection

Date Eligible For

Bull Valley Road over Boone

Creek 056-3109 46.7 3/30/2021 Reconstruction

The City may proceed to advertise for and select a qualified consultant for Phase 1 Engineering services in accordance with the Qualifications Based Selection Procurement Procedures as set forth in Chapter 5 in the Department’s Bureau of Local Roads and Streets Manual.

After selection of a consultant, please coordinate with your designated Planning Liaison to submit for our review a Draft Project Program Information (PPI) Form (D1 PI0004). Please note that the document is available via the Department’s website as follows:

Document Web Address

Project Programming Information Form (D1

PI0004)

http://www.idot.illinois.gov/Assets/uploads/files/IDOT- Forms/D1/D1%20PI0004.docx

When the PPI is approved the District will coordinate with you and your Planning Liaison, to submit the appropriate draft Engineering and Funding agreements. This project may be required to follow the Grant Accountability and Transparency Act (GATA) processing and reporting requirements.

Mr. Troy Strange, P.E.

February 16, 2022

We will fund Phase I for this project in the State’s FY 2024 Program (July 1, 2023 – June 30, 2024). When LBFP Funds become available, the City will be responsible for providing the twenty percent (20%) match.

The funding for Phase II Plan Preparation and Phase III Construction and Construction Engineering will be contingent upon the availability of funds in future fiscal years. Please include all phases of the project on the PPI form when submitted.

Additionally, as described above the funding levels will be based on the City’s request as noted in the letter. The total amount for each phase, by structure, is:

Phase Amount % Fund Allocation

Phase I Engineering $100,000.00 80% LBPF

Phase II Engineering $100,000.00 LBPF TBD

Phase III Engineering $100,000.00 LBPF TBD

Construction $1,300,000.00 LBPF TBD

If you have any questions or need additional information, please contact Charles Riddle. P.E., Bureau Chief of Local Roads and Streets via e-mail at Charles.Riddle@illinois.gov.

Very truly yours, Jose Rios, P.E.

Region One Engineer

By:

Charles F. Riddle, P.E.

Bureau Chief of Local Roads and Streets cc: Akram Chaudhry. H. R. Green (via e-mail) Alex Househ, IDOT (via e-mail) Jazmin Vega, McHenry CoM (via e-mail)

Mr. Troy Strange

2022 Bridge Safety Inspections HR Green Job No. 220656

May 31, 2022

SN 056-3109 Bull Valley Road over Boone Creek

Upstream (South) Elevation View Spalls in bottom of second beam from south

Crack in edge of deck beam Cracks and spalls in bottom of deck beam

This structure is a one span precast, prestressed concrete deck beam bridge carrying Bull Valley Road over Boone Creek. It was originally constructed in 1968 and repaired in 2000 with new fascia beams and railings.

It has a Sufficiency Rating of 46.7 and is eligible for matching funds. The original deck beams are over 50 years old.

Overall, this structure is in poor condition. The concrete wearing surface constructed in 2000, exhibits some hairline cracks, which may have formed shortly after construction. There is one (1) minor crack in the southwest wingwall, and a spalled off corner at the south end of the east abutment. We noted that the cracks, delaminations, and spalls on the underside of five deck beams are getting larger since our last inspection. This required dropping the superstructure rating to 4, which may trigger an IDOT Load Rating Inspection. The PPC Deck Beams are near the end of their service life.

This bridge should be programmed for replacement within the next 4 to 8 years. It may be possible to reuse the abutments which are in satisfactory condition.

Routine Inspection Report

90 – Inspection Date: / / 90C – Temp. (ºF)

90A – Agency Program Manager:

90A1 – Team Leader: 90A2 – Inspector:

90B – Previous Inspection Remarks:

Joint Openings: None

SN: District: Spans: Appr. Spans:056-3109 1 01 Skew: ADT: Truck Pct:15 59300

ADT Un: Maint. Co: Twsp: Status:MCHENRY OPEN - NO RESTRICTNUNDA

Facility Carried: Feature Crossed: BOONE CREEKBULL VALLEY ROAD

Location Municipality:0.2 MI E OF CURRAN R

Bridge Name: Material & Type: PRESTRESS CONCRETE/BOX BEAM OR GIRDER-MULTIBULL VALLEY BRIDGE

Resources

Time to Inspect (H:M): : Traffic Control: Boat: Waders: Snooper:

Ladder: Bucket Truck: Other: Manlift:

Prev New Comments

Inspector's Appraisals

58 – Deck Condition: 6

59 – Superstructure Cond: 5

60 – Substructure Cond: 6

62 – Culvert Condition: N

61 – Channel Condition: 8

71 – Waterway Adequacy: 8

72 – Approach Rdw Align: 8

111 – Pier Navig Protection: N

BBS-RIR (Rev. 06/29/21) (formerly BBS BIR)

Prev New

36A – Bridge Railing Adequacy: 3

Approach Guardrail Adequacy: 36B – Transitions: 3 36C – Guardrail: 3 36D – Ends: 3

New Prev New New

108A – Wearing Surface Type: R 108B – Type of Membrane: F 108C – Deck Protection: J

108D – Total Deck Thickness (in): 31.0

59A – Paint Date (Mo/Yr):

59C – Utilities Attached:

Is Delinquent: Reason:

1:0 W

90B1 – In-Depth

Insp. Intervals Routine: Fracture Critical: Underwater: Special:24 0 N/A0

Team/Sub:MC HENRY / Insp/Rte:

Element Level:

Spalls and delaminations in 4 Beams

SE Abutment corner spalled w/ exposed reinf

59B – Paint Type:

Additional Inventory Data - To Be Verified During Routine Inspection

113A - Scour Critical Analysis Date: 1/9/1997 113 - Scour Critical Rating: 8 113B - Evaluatin Method: B

Page 1 of 2Printed 05/10/2022

Prev Prev

NN

5 11 22 85

Steve Schwarz Steve Schwarz Jason Whyte

1 0 W

N

N

3 3 3

Deterioration in 4 beams. See 90B for combination of deterioration at 1/2 and 1/4 span of 4th beam.

X

Weight Limit Posting:

70A2 – Single Unit Vehicles:

70B2 – Combination Type 3S-1 (3 or 4 axles):

70C2 – Combination Type 3S-2 (5 or more axles):

70D2 – One Truck at a Time:

90B – Inspection Remarks

Signature Date

Inspection Team Leader: / /

BBS-RIR (Rev. 06/29/21) (formerly BBS BIR)

Agency Program Manager: / /

Routine Inspection Report

Structure Number: 0563109

Use Additional Forms as Needed

Page 2 of 2Printed 05/10/2022

4th Beam from N. End, Center Span 1/2 width spall, End quarter at east end has full width spall and two cracks on same side 6' longitudinal, W.quarter two cracks same side 3' longitudinal.

8th Beam from N. End, center span 1/2 width spall.

See sketch for deterioration at additional beams.

5 17 2022

5 17 2022

BBS-BIR-1 (Rev. 10/01) Sheet 4 of 4

Bridge Inspection Report

Structure Number:056-3109

Additional Comments:

2' of abutment cap undermined

XXXX

5XX

1 SF

XX

1 SF

XX

2SF

5/12/2020 sls 70

D DELAMINATION UNDERNEATH, 2020

2022 OBSERVATIONS

1 WET/LEAKING AT ABUT. SEATS

2 2 CRACKS, SAME SIDE 1/4 SPAN, 6' LONGITUDINAL

3 CRACK, 3' LONG WHERE NOTED

4 JOINT LEAK BETWEEN BEAMS (FULL LENGTH)

3 SF

6 SF

1 SF

5 SF

1 SF

3 SF

2 SF

3 SF

5/11/2022 jmw 85o

WEARING SURF. PLAN

APPROX. BEAM LOCATIONS

UNDERNEATH

5/11/2022 sls 85o

10 LF

3000 ft

N

N

BULL VALLEY

ROAD BRIDGE

Page 1 of 13 BLR 22210 (Rev. 12/06/24)

Local Project Development Report Categorical Exclusions and Design Approval

Attachments, as applicable, are to be combined into a PDF with the form, which is to be submitted to the district electronically.

Local Public Agency

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

Project is for:

Municipality

Project Number

3HBU(534)

PMA Sequence Number

26610

Project Length (Mi)

0.10

Job Number

P-91-036-24

TIP Number

11-24-0008

Route(s) Street/Road Name

FAU 3860, Bull Valley Road

Termini

Touchdown to touchdown

1. Location and Existing Conditions

a. Give a narrative description of the location

0.5 Miles west of Crystal Lake Road

(1a) Attach Location Map

b. Description of Existing Facility - Give a description of the applicable items below. Attach existing typical sections showing roadway widths, structure widths, ROW widths, sidewalk widths, guardrail, curb and gutter and surface types.

Width of Traveled Way (ft)

22'

Number of Lanes in Each Direction

Surface Type

HMA

Shoulder Width (ft) and Type

3', Gravel

Jurisdiction

Municipality

Maintenance Responsibility

Municipality

Terrain

Level Rolling

ROW Width (ft)

Side Slopes

3:1

Current Land Use (including major public facilities and local landmarks)

Agricultural

Parking Lanes N/A Yes

N/ATurn Lanes Yes

N/ASidewalks Yes

N/ATraffic Control Devices Yes

N/AUtilities Yes overhead electric, telephone

N/ADrainage Yes

N/AGuardrail Yes steel plate beam guardrail

Curb and Gutter YesN/A

N/AStreet Lighting Yes

N/AOther Yes

BLR 22210 (Rev. 12/06/24)Page 2 of 13

Local Public Agency

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

c. Traffic Data

Regulatory or Posted Speed Limit

Current ADT

10700

DHV

Year

% Trucks

5%

Functional Classification

5 - Major Collector

Are 80,000 lb trucks restricted on this route? No Yes

d. Structures

Replaced Identify location within the proposed improvement of all structures on attached location map. Attach a copy of a Master Structure Report for all structures within the project limits. Attach a copy of the Bridge Condition Report or the Bridge Deck Resurfacing approval letter for structures to be replaced, rehabilitated or resurfaced.

Structure Number

056-3109

Clear Roadway Width (ft)

Number of Spans

Wearing Surface

Additional Unreinforced Concrete Overlay - not a special mix

Superstructure Type

PPC Deck Beam

Master Structure Report Attached

Bridge Condition Report approval letter attached

Bridge Deck Resurfacing approval letter attached

Preliminary Bridge Design and Hydraulic Report approval letter attached

YesNoN/A

No YesN/A

No YesN/A

e. Railroads

Are there railroad crossings or grade separations located within or immediately adjacent?

YesNo

f. Contiguous Sections Describe the existing typical sections beyond each end of the proposed improvement as applicable.

Surface Type

HMA

Number of Lanes

Shoulder Width(ft) and Type

3' Aggregate

Width of Traveled Way (ft)

N/ATurn Lanes Yes

N/AParking Lanes Yes

Curb and Gutter N/A Yes

N/ASidewalks Yes

2. Proposed Improvement

a. Describe the purpose of this project

The City of McHenry wishes to replace the existing structurally deficient and functionally obsolete bridge with a structure which meets current design criteria and provide a bicycle path that will connect with a path system in the future.

Describe the need for this project

The existing PPC deck beams are deteriorated, which has resulted in the current structure being load posted.

Special inspections are now required on an annual basis. A new bridge is required to restore full load capacity to this Major Collector roadway.

Improvement Type

A complete replacement of the existing bridge with a new bridge with a bike path on the north side, and roadway work as needed for the required raise in profile grade line.

BLR 22210 (Rev. 12/06/24)Page 3 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

Design ADT

11160

Design Speed

50 mph

% Trucks

5%

Year

Proposed Functional Classification

5 - Major Collector

b. For areas of the project that do not involve State ROW or a State Route, mark the guidelines being used.

Design Criteria

Local Facilities Urban Rural

New Construction/Reconstruction BLRS Chapter 32

3R BLRS Chapter 33

Bicycle BLRS Chapter 42

Pedestrian BLRS Chapter 41

LAFO BLRS Chapter 46

Other

Identify each aspect to be constructed at less than the design guidelines and provide a clear description of required design exceptions and appropriate justification (BLRS Manual Section 27-7). If a design exception is required, include a copy of the signed BLR 22120 and BLR 22000 forms.

None

Attach BLR 22120 Attach BLR 22000 Coordination Meeting Minutes with Approval

c. Does the project involve State ROW and/or a State Route?

YesNo

Does the project involve a design exception on State ROW and/or a State Route?

YesNo

d. Describe type of work to be accomplished by the improvement. Discussion should include width of proposed travel, parking, bicycle and turning lanes, sidewalks, shared-use paths, guardrail, traffic control devices, drainage items (including storm sewer outfalls), alignment changes, railroad work, utility adjustments, intersection improvements, side slopes and clear zones. Specify the emax for horizontal curves. Attach typical sections, plan and profile sheets, and intersection design studies when applicable.

Width of Traveled Way (ft)

Number of Lanes

Shoulder Width(ft) and Type

10' Aggregate

Maximum Profile Grade

0.61%

Proposed New Structure N/A Yes

Existing structures being replaced or rehabilitated are addressed under 1d.

Proposed Structure Number

056-6041

Clear Roadway Width (ft)

Number of Spans

Wearing Surface

Bare Deck - No Overlay

Superstructure Type

PPC II-Beam

Preliminary Bridge Design and Hydraulic Report approval letter attached N/A No Yes

Side Slope

3:1 Clear Zone

10'

N/ATraffic Control Devices Yes

N/AUtility Adjustment Yes

USGS Gaging Station

BLR 22210 (Rev. 12/06/24)Page 4 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

N/AGuardrail Yes

Steel Plate Beam

N/AIntersection Improvement(s) Yes

N/AParking Lanes Yes

N/ATurn Lanes Yes

N/ASidewalks Yes

N/AShared Use Path Yes

Grading Only in project limits. Shared Use path to be constructed in the future.

Alignment Changes N/A Yes

Railroad Crossing Improvements N/A Yes Note: The railroad crossing(s) that are near or within the project termini shall be evaluated for any required upgrades.

Street Lighting N/A Yes

Changes in access N/A Yes

Access control changes N/A Yes

Travel pattern changes N/A Yes

Attachments N/A Yes

e. Discuss items affecting the improvement

Hazardous Mailbox Supports N/A Yes

Are there airports (private or public) or restricted landing strips within 2 miles of the project? N/A Yes

f. Estimated Total Cost of Construction $2,570,000.00

g. Analyze the need for accommodating pedestrians, bicyclists and persons with disabilities. When applicable, describe the facilities to be provided for pedestrians and bicyclists. Discuss the ADA accessibility and maximum longitudinal grade of these facilities (BLRS Manual Chapter 41).

Barrier protected shared use path is provided on new bridge. Grading for future shared use path is included in this project. Shared use path profile will be the same as the adjacent roadway.

Does the project affect accommodations for pedestrians, bicyclists and persons with disabilities?

YesNo

Sidewalks/Shared-Use Paths

Maximum 2% cross slope No Yes

ADA ramps with detectable warnings at street intersections? No Yes

If no, provide justification

There are no street intersections on this project.

Are there any portions of the proposed pedestrian accommodations which do not meet ADA accessibility requirements?

No Yes

h. Discuss any proposed improvements being considered in adjacent segments including the anticipated construction startup date of these improvements.

N/A

3. Crash Analysis (BLRS Manual Section 22-2.11(b)(9))

a. Summarize crash data for the past five years, and attach a spot map or a location map showing crash location when possible. Detail the types of crashes and include collision diagrams, if possible, especially at cluster sites.

Source of Crash Data

McHenry City Police Department

BLR 22210 (Rev. 12/06/24)Page 5 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

(3a) Attach Map Field Check Date

08/19/24

b. Analyze available crash data including results of field check. Discussion should include high crash locations, critical wet weather sites, and other crash patterns. If the data is inconclusive, make a statement to that effect.

There have been no crashes at this location in the last ten years.

Year

Weather Conditions

Clear-Dry

Clear-Wet

Clear-Ice/Snow

Rain-Wet

Rain-Ice/Snow

Snow-Dry

Snow-Wet

Snow-Ice/Snow

Totals

Year

Crash Severity

Property Damage Only

Personal Injury Crashes

Number A Injuries

Number B Injuries

Number C Injuries

Fatal Crashes

Number of Fatalities

Totals

Year

Crash Types Day Night Day Night Day Night Day Night Day Night

Turning

Angle

Fixed Object

Run off the Road

Overturned

Animal

Head-on

Sideswipe

Rear-end

Pedestrian

Pedalcyclist

Train

Totals

c. Describe how the proposed project will address any crash issues.

Not Applicable

4. Right-of-Way (BLRS Manual Section 22-2.11((b)10)

a. Does the project require right-of-way taking, including the total acreage required for each of the following categories: ROW, permanent easements, temporary easements and temporary land use permits? Include the width of taking, number of property owners, acreage of right-of-way and/or easements, character of land; i.e., farm, residential, commercial or publicly owned properties, anticipated impacts to properties that remain, and location of any improvements with respect to required right-of-way.

YesNo

Easements (Acre) * Other Impacts

Property Owner Name Tax ID # ROW (Acre) Permanent Temporary to Property ** Existing Land Use

First Midwest Trust Co. NA

14-04-100-002 0.44 0 0 Tree removal Agriculture

BLR 22210 (Rev. 12/06/24)Page 6 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

Gordon Stade Corp. 14-04-300-014 0.15 0 0 Tree Removal Agriculture

Totals 0.59 0 0

Total width of ROW or easement taking 75'

Impacts on setbacks required by zoning N/A

* Other impacts to property: Note any additional impacts to property such as tree or fence removal, residential, or business relocation.

** Existing land use: Note the type of land use such as agricultural, residential, commercial, or publicly owned.

b. Are any residents, businesses or farms to be displaced?

YesNo

5. Prime Farmland (BLRS Manual Section 20-10)

a. Does the project involve Prime Farmland?

YesNo

b. Does the project require more than 3 acres/mile (0.75 hectares/kilometers), 10 acres (4 hectares) for a non-linear improvement, or the project ROW is not contiguous to the existing ROW?

YesNo

c. The project requires consultation with the Natural Resource Conservation Service (NRCS). Form AD-1006 has been completed and submitted to the local office of NRCS.

The impact of this project on farmland conversion has been evaluated in accordance with the requirements of the US Natural Resources (NRCS). The project will cover 3 acres or less of farmland per mile (0.75 hectares or less of farmland per kilometer) and the conversion will not result in more than minor impacts. Accordingly, the project conforms to the general form AD-1006 prepared by NRCS. Therefore, further coordination with NRCS on this project will not be necessary.

6. Floodplain Encroachment (BLRS Manual Section 20-7)

a. Does the project work cross or encroach upon a 100-year floodplain, including a regulatory floodway?

YesNo

Summarize the location hydraulics study, regulatory floodway restrictions, the effect of any encroachment (including a comparison between existing and proposed conditions) and the effect of the over-the-road flow on the proposed transportation facility. Include available floodplain attachment.

Boone Creek is classified as Zone A regulatory floodplain as shown on the FEMA FIRM panels (17111C0205J and 17111C0208J). However, Boone Creek is not studied in the McHenry County Flood Insurance Study (FIS), and no detailed base flood elevations (BFE) are available. A review of the FEMA Flood Insurance Map indicates that no regulatory floodway is designated at this location. A HEC-RAS model of the crossing was completed to determine the water surface elevations for design.

StreamStats indicates that the total Boone Creek watershed is 15.62 square miles. The discharges obtained from StreamStats were used for the hydrology at this location. The soil near Bull Valley Road primarily consists of sand loam according to the soil boring and the geotechnical report. A HEC-RAS model of the crossing was completed to determine the water surface elevations for design.

The existing Bull Valley Road bridge over Boone Creek was originally constructed in 1968. In 2000 the exterior deck beams of the bridge were replaced, a waterproofing membrane was added and a 2”-4” concrete wearing surface was added. The existing structure consists of a one-span prestressed concrete deck beam structure with a total length of 62 feet and a deck width of 27 feet. The bridge is positioned at a 15-degree angle skew relative to the road. The bridge has approximately 2:1 side and foreslope on both sides at the abutments.

The existing bridge will be replaced with a single-span prestressed concrete beam and concrete deck, which will have a length of 61.4 feet face to face of abutments and a width of 54 feet. The new bridge will maintain the same 15-degree skew relative to the road, and it will retain the 2:1 slope abutment on both sides, like the existing design.

The proposed bridge with a lowered low chord by 1.2 feet, satisfies the design criteria established by IDOT and IDNR-OWR. The proposed improvements will not result in an increase in headwater elevation. There will be no

BLR 22210 (Rev. 12/06/24)Page 7 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

overtopping during any storm event. The bridge will also meet the required clearance with a clearance of 1.3 feet for the 30-year storm. There are no sensitive flood receptors in the vicinity of the bridge.

(6a) Attach available floodplain

b. Does the design year flood include over-the-road flow?

YesNo

7. Phase I & II NPDES Storm Water Permit Requirements (BLRS Manual Section 7-4.01)

a. Will the project involve soil disturbance of 1 acre (0.4 hectares) or more?

YesNo

The project must comply with the Phase II NPDES Storm Water Permit Requirements.

Total disturbed area, including disturbed areas due to removal and replacement of pavement, sidewalk and/or curb and gutter.

Acres0.90

8. "404" Permit (BLRS Manual Section 7-4)

a. Does this project involve water regulated by USACE, 404 permit?

YesNo

What type of 404 permit is required? Nationwide Individual Regional None acres0.0What is the total area of impacts to streams and/or rivers?

9. Section 9 Permit US Coast Guard (BLRS Manual Section 7-4.04) Does this project include the construction, modification, replacement, or removal of structures or causeways over a navigable waterway?

YesNo

(9) USCG Coordination, if applicable

10. Environmental Survey (BLRS Manual Section 20) Whenever a project involves land acquisition (including easements), any in-steam work (including drainage structure for run-around), is located within or adjacent to historic properties listed in (or eligible for) the National Register of Historic Places, a bridge on the historic list, is near wetlands, known locations of threatened or endangered species, or involves locations with Regulated Substances, the Environmental Survey Request Form should be submitted early in the project development phase.

a. Wetlands - Does the proposed work impact the use of wetlands?

YesNo

Indicate how the wetlands will be migrated: Banking Accumulation On-Site Other

Natural Resource Review

(10a) Attach Natural Resource

Approval Date

02/23/26

Wetland Impact Evaluation

(10a) Attach Wetland Impact

Approval Date

02/03/26

b. Archaeological and Historical Preservation. Include results of coordination. Does the project have an archaeological or historic site that is eligible for, or is on the National Historic Register?

YesNo

Cultural Resources Review

(10b) Attach Cultural Resources Documentation

Approval Date

09/12/25

Commitments

No Commitments

c. Threatened or Endangered Species - Does the project have involvement with any endangered species or plants?

No Involvement Involvement

BLR 22210 (Rev. 12/06/24)Page 8 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

(10c) Attach Natural Resources Review

Approval Date

02/23/26

d. Tree Removal and Replacement - Does the project include tree removal?

YesNo

How many trees are being removed?

YesNo

Will replacement trees be included as part of this project?

f. Following the Regulated Substances assessment screening criteria shown on Figure 20-12A of the BLRS Manual, is Preliminary Environmental Site Assessment (PESA) required? (BLRS Manual Section 20)

YesNo

Attach documentation of Level I and/or Level II Screening (10f) Attach Screening

Is work being done on property in the name of the state or are contract plans being prepared by the state?

YesNo

If a PESA is required for either state or local ROW, did the PESA results determine that the project has Recognized Environmental Conditions (REC's) for Regulated Substances?

YesNo

11. Wild and Scenic Rivers If this project crosses or affects a river on the National Wild and Scenic Rivers System or a river listed in the Nationwide Rivers

Inventory with potential for inclusion on the system, include coordination between the National Park Service and the Bureau of Design and Environment (BDE).

No Involvement Involvement

Natural Resource Review (11) Attach Natural Resource

Approval Date

12. Section 4(f) Lands (BLRS Manual Section 20-3) Does this project require any right-of-way, including temporary easements or other rights of access for the purpose of maintenance, from a publicly owned park, recreational area, wildlife and waterfowl areas, national preserves, or any historic site in or eligible for the National Register of Historic Places?

YesNo

13. Section 6(f) Lands (BLRS Manual Section 20-4) Does this project require acquisition of lands under the protection of Section 6(f) of the Land and Water Conservation Act of 1965 or other unique areas or special lands that were acquired in fee or easement with public-use money and have deed restrictions or covenants on the property?

YesNo

14. Air Quality (BLRS Manual Section 20-11) Select One

a. This project is in an attainment area outside of an area served by an MPO.

Project is within a portion of a nonattainment area for which the Chicago Metropolitan Agency of Planning (CMAP) is the MPO.

This project is included in the Fiscal Year

2023-28 (transportation plan) and in the Transportation Improvement Program (TIP), endorsed by the

Planning Organization. The

, the region's Metropolitan

.and by FTA on

(FHWA) and the Federal Transit Administration (FTA) on

(transportation plan) was found to conform by the Federal Highway Administration

. The TIP was found to conform by FHWA on

Organization

Chicago Metropolitan Planning Organization

Fiscal Year

2023-28

Date

06/16/25

Date

06/16/25 Date

06/16/25

Project is within a nonattainment area served by a Metropolitan Planning Organization other than CMAP.

BLR 22210 (Rev. 12/06/24)Page 9 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

b. Mobile Source Air Toxics (see BDE 52-06)

The ADT is projected to be less than 140,000 vehicles per day. Therefore, MSAT analysis is not required.

This project is of a type qualifying as a categorical exclusion under 23 CFR 771.117(c), or exempt under the Clean Air Act conformity rule under 40 CFR 93.126, and, as such, a Mobile Source Air Toxics analysis is not required.

c. Construction-related Particulate Matter

Demolition and construction activities can result in short-term increases in fugitive dust and equipment-related particulate emissions in and around the project area. (Equipment-related particulate emissions are usually insignificant when equipment is well maintained). The potential air quality impacts will be short-term, occurring only when demolition and construction work is in progress and local conditions are appropriate.

The potential for fugitive dust emissions typically is associated with building demolition, ground clearing, site preparation, grading, stockpiling of materials, on-site movement of equipment, and transportation of materials. The potential is greatest during dry periods, periods of intense construction activity, and during high wind conditions.

The Department's Standard Specifications for Road and Bridge Construction include provisions on dust control. Under these provisions, dust and airborne dirt generated by construction activities will be controlled through dust control procedures or a specific dust control plan, when warranted. The contractor and the Department will meet to review the nature and extent of dust-generating activities and will cooperatively develop specific types of control techniques appropriate to the specific situation.

Techniques that may warrant consideration include measures such as minimizing track-out of soil onto nearby publicly-traveled roads, reducing speed on unpaved roads, covering haul vehicles, and applying chemical dust suppressants or water to exposed surfaces, particularly those on which construction vehicles travel. With the application of appropriate measures to limit dust emissions during construction, this project will not cause any significant, short-term particulate matter air quality impacts.

d. Project-level Hot Spot Analysis. Select One

This project is in an attainment area and does not require hot spot analysis.

This project does not meet the definition of a project of air quality concern as defined in 40 CFR 93.123(b)(1).

Due to it not being a new or expanded highway project that has a significant increase in diesel vehicles, it has been determined that the project will not cause or contribute to any localized PM2.5 or PM10 violations or increase the frequency or severity of any PM2.5 or PM10 violations. USEPA has determined that such projects meet the Clean Air Act's requirements without any further Hot-Spot analysis.

This project is in a non-attainment or maintenance area and is a project of air quality concern. Therefore, a qualitative hot spot analysis is required. (14d) Attach Hot-Spot Analysis

e. COSIM Are through lanes or auxiliary turn lanes being added with this project?

YesNo

Does the project have sensitive receptors and is the highest design-year approach-volume on the business leg of the intersection project to exceed 5,000 vph or 62,500 ADT?

If yes, a COSIM pre-screen is required. If No, the project is exempt from COSIM screening.

YesNo

Explain why an analysis has not been performed

Project exempt from COSIM screening.

15. Noise (BLRS Manual Section 20-6)

Does the project involve a new alignment, additional lanes, or involve a significant alignment change?

No Yes

BLR 22210 (Rev. 12/06/24)Page 10 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

16. Work Zone Transportation Management Plan (TMP) (BLRS Manual Section 22-2.17) Does the project intersect or follow a state route?

YesNo

Is the state or local route considered a significant route?

YesNo

17. Complete Streets (BLRS Manual Chapter 10) Does the project include the addition of a travel, turning, or bi-directional turn lane on a state highway?

YesNo

18. Maintenance of Traffic (BLRS Manual Section 39-5(b)(9)) Will the proposed improvement require a detour?

YesNo

Marked detour?

YesNo

Marked Detour: The proposed work zone will be protected by closing the road to through traffic. Through traffic will follow a marked detour around the proposed work zone. The proposed detour route is adequate to carry the additional traffic. The total adverse travel distance is

3.25 miles. The appropriate traffic control measures will be provided to maintain local traffic and provide access to the adjacent property owners

Attach coordination with local public service providers such as Police, Fire, EMS, USPS and Schools.

Structure Number for structure used in detour 056-6007 (19) Attach Master Structure Report

Attach coordination with the agencies with jurisdiction and maintenance over the proposed marked detour route.

Attach an analysis of the impacts to the local property owners, adjacent businesses, on-street parking and the required mitigation measures for the impacts caused by the proposed detour.

YesNo

Are there any adverse impacts to businesses dependent on traffic?

Alternative pedestrian accommodations will be provided to maintain ADA and pedestrian access.

Other traffic control method:

19. Public Involvement (BLRS Manual Chapter 21)

a. Summarize public information meetings, formal public hearings, property owner signoffs, media coverage, and personal contact with public. Include copies of newspaper publishings, letter to property owners, public comments, and documents showing all public comments have been addressed.

A public information meeting was held at City Hall on November 25, 2025 19 days after being published in the local newspaper.

Was a public information meeting or public hearing required for this project?

YesNo

Is ROW required for this project?

YesNo

BLR 22210 (Rev. 12/06/24)Page 11 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

Number of property owners from which ROW or easement are required. 2

The property owners were sent individual letters via USPS.

YesNo

Attach:

Copies of letters of requesting comments on the proposed land acquisition

Copies of property owner comments

Copies of LPA responses to property owner comments

Was a public information meeting held?

YesNo

Date of Meeting

11/25/25

Meeting Type

In-person

Location

333 S Green Street, McHenry, IL 60050

Number in Attendance

Attach:

Sign-in Sheets

Copies of LPA responses to property owner comments

Copies of property owner comments

Advertisement and newspaper publishing certificate

Was a public hearing held?

YesNo

Briefly discuss the type and extent of opposition.

20. Coordination: LA-IDOT-FHWA (BLRS Manual Section 22-1.02)

Have there been any coordination meetings for this project?

YesNo

21. Other Coordination (BLRS Manual Section 22-2.11(14))

Attach results of other Coordination.

Date

Utilities N/A Yes 11/05/25 Utilities Coordination Results Attached

Railroad N/A Yes Railroad Coordination Results Attached

District - IDOT N/A Yes 09/05/24 District - IDOT Coordination Results Attached

Public Service Providers (Police, Fire, EMS, Public Schools, USPS)

N/A Yes 11/05/25 Public Service Providers Coordination Results Attached

Adjacent local agencies that may be impacted by this project

N/A Yes Local Agency Impacts Coordination Results Attached

USCOE correspondence Yes USCOE Correspondence Coordination Results Attached

Other

USGS Gaging Station N/A Yes 11/05/25 Other Coordination Results Attached

BLR 22210 (Rev. 12/06/24)Page 12 of 13

City of McHenry

County

McHenry

Section Number

23-00093-00-BR

22. Summary of Commitments (BLRS Manual Section 22-2.09)

PSI shall be obtained during Phase II design engineering. N/A Yes

Applicable commitments have been made to property owners. (Item #4, Item #19) N/A Yes

Commitments listed in Natural Resource Review Memo. (Item #10) N/A Yes

NPDES permit shall be obtained prior to the start of the construction activities. N/A Yes

A USCOE Section 404 permit shall be acquired prior to construction activities. N/A Yes

A Biological Assessment will be obtained prior to letting. N/A Yes

Commitments involving Illinois Historic Preservation Office. (Item #10) N/A Yes

For projects involving a road closure for marked and unmarked detours, coordination with public service process shall occur at least 48 hours prior to the closure of the road construction. (Item #18)

N/A Yes

Additional Commitments

N/A Yes

23. List of Attachments

Exhibit 1 - Location Map Exhibit 2 - Highway Classification Map Exhibit 2 - Typical Sections Exhibit 4 - Plan and Profiles Exhibit 5 - Detour Map Exhibit 6 - Engineers Opinion of Probable Construction Cost Exhibit 7 - Flood Insurance Rate Map (FIRM)

Appendix A - Environmental Coordination Appendix B - Structural and Hydraulic Approvals Appendix C - FHWA Coordination Appendix D - Traffic Data Appendix E - Utility Coordination Appendix F - Public Involvement

SUMMARY OF ATTACHMENTS

EXHIBITS

Exhibit 1 ............... Location Map Exhibit 2 ............... Highway Classification Map Exhibit 3 ............... Typical Section Exhibit 4 ............... Plan and Profile Exhibit 5 ............... Detour Map, Structural Summary Report Exhibit 6 ............... Engineers Opinion of Probable Construction Cost Exhibit 7 ............... Flood Insurance Rate Map (FIRM)

Appendix A – Environmental Coordination

Cultural Resources Review Memorandum .......................................................A-1 Natural Resources Review Memorandum and Coordination ............................A-2.1 to A-2.25 Wetland Resources Coordination .....................................................................A-3.1 to A-3.2 PESA Executive Summary ...............................................................................A-4.1 to A-4.164

Appendix B – Structural and Hydraulic Approvals

Master Structure Report ...................................................................................B-1-1.1 to B-1.2 Bridge Condition Report Approval Letter ..........................................................B-2 Preliminary Bridge Design Approval Letter .......................................................B-3 Hydraulic Report Approval Letter......................................................................B-4

Appendix C – BLRS, IDOT and FHWA Coordination

City of McHenry Kickoff Meeting (08/22/2024) ..................................................C-1.1 to C-1.4 IDOT Kickoff Meeting (09/05/2024) ..................................................................C-2.1 to C-2.12 IDOT IDNR Meeting (10/22/2025) ....................................................................C-3.1 to C-3.2

Appendix D – Traffic Data

Traffic Data Coordination .................................................................................D-1.1 to D-1.2

Appendix E – Utility Coordination

JUILIE Design Stage Request ..........................................................................E-1.1 to E-1.2 Utility Coordination Contact Table ....................................................................E-2 AT&T Coordination ...........................................................................................E-3.1 to E-3.7 ComEd Coordination ........................................................................................E-4.1 to E-4.5 USGS Coordination ..........................................................................................E-5.1 to E-5.2

Appendix F – Public Involvement

Public Involvement Meeting (11/25/2025) .........................................................F-1.1 to F-1.4 Letter To Property Owner (McHenry Fire Department) .....................................F-1 Letter To Property Owner (McHenry Police Department) .................................F-2 Letter To Property Owner (School District 15 & 156) ........................................F-3 Letter To Property Owner (Village of Bull Valley) ..............................................F-4

LOCATION MAP: BULL VALLEY ROAD BRIDGE OVER BOONE CREEK

EXISTING STRUCTURE NO. 056-3109

MCHENRY, ILLINOIS

MCHENRY COUNTY

EXHIBIT 1

HIGHWAY CLASSIFICATION MAP: BULL VALLEY ROAD BRIDGE OVER BOONE CREEK

EXISTING STRUCTURE NO. 056-3109

MCHENRY, ILLINOIS

MCHENRY COUNTY

EXHIBIT 2

BULL VALLEY ROAD BRIDGE REPLACEMENT

BULL VALLEY ROAD BRIDGE

BULL VALLEY ROAD BRIDGE

54'-0"

12'-0" 12'-0"

1'-7"

8'-0" 8'-0"

SHOULDERSHOULDER LANE LANEFUTURE PATH

11'-0" 1'-5"

C BULL VALLEY ROADL

C BULL VALLEY ROADL

11'-0"

LANE

2'-6"

SHOULDER

11'-0"

LANE

2'-6"

SHOULDER

TYPICAL SECTIONS

EXISTING TYPICAL SECTION

PROPOSED TYPICAL SECTION

EXHIBIT 3

(NO DEDICATION…