C05_Statement_of_Work.pdf
PDF 101 KB Posted
- Attached to
- CAR WASH SYSTEM REPLACEMENT
- Solicitation number
- 140R3022Q0059
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R3022Q0059.pdf | ||
| C05_140R3022Q0059_RFQ.pdf | ||
| C05_Combined_Synopsis.pdf | ||
| C05_Salient_Characteristics.pdf | ||
| C05_Clauses_and_Provisions.pdf | ||
| C05_SF-18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Car Wash Replacement
1.0 Background
1.1 The Property and Vehicle Maintenance Group of the Hoover Dam, Boulder City, NV requires the current wash rack electric pressure washer and water recycle system to be replaced. The current pressure washer and water recycle system are at the end of their usable life.
1.2 The wash rack pressure washer is used daily to clean vehicles and equipment and is integral to maintenance and care of these assets.
2.0 Scope
2.1 The government expects to accomplish the purchase and installation of a new LP
Gas fired, electric hot water pressure washer. Additionally, the government expects to have the existing pressure washer system removed and disposed of.
2.2 The government expects to accomplish the purchase and installation of a new water recycle system. Additionally, the government expects to have the existing water recycle system removed and disposed of.
3.0 Objectives
3.1 The result is expected to be a new electric pressure washer and water recycle system purchased, installed, and fully functional.
3.2 Additionally, the removal of the old electric pressure washer, water recycle system, and components is expected.
3.3 The contractor shall provide on-site training upon completion of the tasks in section.
3.4 The government expects to receive operation and maintenance manuals for the installed systems.
4.0 Tasks
4.1 This is a Detailed Statement of Work
4.2 The tasks the contractor is to complete are as follows:
4.2.1 Remove existing pressure washer and all related components
4.2.2 Remove existing water recycle system and all related components
4.2.3 Supply, deliver, and install the new electric pressure washer and all related components. See Salient Characteristics
4.2.4 Supply, deliver, and install the new water recycle system and all related components as per the salient characteristics. See Salient Characteristics
4.3 The contractor shall provide operation and maintenance manuals.
5.0 Delivery
5.1 The contractor shall deliver all items per the salient characteristics to the Hoover
Dam Central Warehouse, U.S. Highway 93 / NV State Route 172, Boulder City, NV
89005
6.0 Government Furnished Property
6.1 None
7.0 Security
7.1 The contractor and its employees will be escorted by a Bureau of Reclamation employee in secure areas required to complete all tasks.
7.2 No contract employees will receive a badge.
8.0 Place of Performance
8.1 The contractor shall complete all items and perform all tasks at the Hoover Dam
Central Warehouse: U.S. Highway 93 / NV State Route 172, Boulder City, NV 89005
9.0 Period of Performance
9.1 The contractor shall complete all tasks no later than (NLT) 60 days after the contract is awarded
9.2 The contractor shall complete all tasks within 14 days of starting work.
File details come from the government source that posted it. Updated .