C05 PART 3 SCOPE OF WORK.docx
DOCX document 44 KB Posted
- Attached to
- Demolition and Renovation of Lab
- Solicitation number
- N6893625Q0004
About this file
This document is a Statement of Work (SOW) for the complete renovation of Lab 343 at the Naval Air Warfare Center Weapons Division (NAWCWD), Point Mugu, California to accommodate Gray Flag requirements. The key details include:
The scope of work involves the removal and replacement of ceiling tiles, raised floor tiles, lighting fixtures, emergency lighting, sound proofing materials, and HVAC supply/return grills. This includes installing new dimmable LED lighting, additional electrical circuits, and new carpeted sound proofing panels. The work must follow Unified Facilities Criteria (UFC) and life-safety requirements, with adherence to mitigation measures outlined in the attached Categorical Exclusion (CATEX) document. All contracted personnel must have a valid SECNAV 5512 pass and DIBDS pass. The estimated materials include 200 ceiling tiles, 400 raised floor tiles, 21 light fixtures, and 180 linear feet of sound proofing panels. The government has issued a related federal contract opportunity, Solicitation Number N6893625Q0004, for the Demolition and Renovation of Lab Building at a cost between $100,000.00 and $250,000.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction Solicitation Amendment 25Q0004.docx | DOCX document | |
| C06 Updated Q and A 11.7.24.docx | DOCX document | |
| HVAC Grills.pdf | ||
| Floor Tile.pdf | ||
| Questions and Answers Final.pdf | ||
| 25Q0004 Amendment 2.docx | DOCX document | |
| 25Q0004 Amendment 1.docx | DOCX document | |
| C05 PART 2 GENERAL REQUIREMENTS.docx | DOCX document | |
| C05 PART 2A.docx | DOCX document | |
| C05 Wage Determination.pdf | ||
| C05 CATEX.pdf | ||
| C05 SITE MAP.pdf | ||
| C05 FLOOR PLAN.pdf | ||
| Construction Solicitation 25Q0004.docx | DOCX document | |
| C05 Davis-Bacon Act WD CA20240020.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Naval Base Ventura County Point Mugu, California
Date: 10/2/2024 Part 3
GENERAL INTENT:
General intent of this project is for the complete renovation of lab 343 to accommodate Gray Flag requirements at PM3015, Naval Air Warfare Center Weapons Division (NAWCWD), Point Mugu (PM), CA.
GENERAL REQUIREMENTS:
A. This project must follow the UFC (Unified Facilities Criteria) requirements and all life- safety requirements.
B. OPNAVINST 5100.23g paragraph 1311.b, during the design of facilities, buildings, and structures, fall hazards should be considered and eliminated whenever possible.
C. This project has a Record of Categorical Exclusions (CATEX) associated with it. The Contractor shall adhere to all the mitigation measures outlined in the attached CATEX.
D. Pass Requirements
All contracted personnel performing work on this task order shall have a current SECNAV 5512 on file with NBVC Pass and Decal, and possess a valid DIBDS pass.
SCOPE OF WORK:
Scope:
This Statement of Work (SOW) is for the complete renovation of lab 343 to accommodate Gray Flag requirements. This will include the removal and replacement of all ceiling tiles (est. 200 2’x4’ tiles). The removal of old and replacement with all new, raised floor tiles (est. 400 2’x2’ tiles). The removal of old lighting fixtures and replacement with new dimmable 2’ x 4’ LED troffers (21 total) and dimmer switches (two lighting zones). The removal of old emergency lighting and replacement with all new emergency LED lighting. The addition of multiple 120v electrical circuits to accommodate new furniture needs (est. 5). The removal of old sound proofing materials and replacement with all new, carpeted, sound proofing throughout the space (floor to ceiling). The removal of old and replacement of all new air conditioning grates/vents within lab 343 PM3015 at the Naval Air Warfare Center Weapons Division (NAWCWD), Point Mugu (PM), CA.
Demolition Detail:
· Demo and dispose of all existing ceiling tiles
· Demo and dispose of all existing raised flooring tiles
· Demo and dispose of all existing 2’ x 4’ lighting troffers.
· Demo and dispose of all existing emergency lighting
· Demo and dispose of all existing sound proofing materials
· Demo and dispose of all existing HVAC supply and return grills.
Ceiling Tile Detail:
· Replace existing ceilings tiles in lab 343
· Install new 24” x 48” suspended ceiling tiles in existing suspended ceiling grid system throughout lab343, PM3015.
· Use ACM7 Perimeter seismic clips.
· Use White “Armstrong” Cortega Second Look II, angled tegular, #2758, Fire Guard, 24” x 48’ x 3/4” lay-in panels or equivalent.
Raised Floor Tiles Detail:
· Refurbish or replace all 390+ Woodcore 1000 raised floor tiles with new (or professionally refurbished) floor tiles. Note: Newer / different floor tiles will not fit the existing floor grid.
· Color to be determined by customer.
Electrical Detail:
· Replace all light fixtures with dimmable LED fixtures. (Oracle Lighting, 24- FPL1-LED-4000L-DIM10-MVOLT-50K-85 or equivalent)
1. Lighting color temperature 5000K.
· Install night light / emergency fixture, with battery backup near exits.
· Install dimmer switches to control all lighting. Set up in two zones (front & back of room to be separate zones).
· Install 120v hard-wired LED exit signs.
· Install new emergency & exit lighting to meet current code requirements.
· The addition of (an estimated) 5 new dedicated 20A 120V circuits to supply power to new workstations.
Sound Proofing Detail:
· Installation of new, carpeted sound proofing panels to entire lab space.
· 180 linear feet, floor to ceiling.
· Carpet color to be determined by customer.
HVAC Detail:
· Installation and connection of new supply and return ceiling grills in new suspended ceiling grid system to existing HVAC system.
Fire Protection:
· Relocate/Install fire alarm speaker/strobes and smoke alarms to new ceiling.
DIVISION 01 ADMINISTRATIVE SECTION ORDER SPECIFIC REQUIREMENTS:
SECTION 01 14 00 WORK RESTRICTIONS:
1.4.4 Exclusionary Period
No Exclusionary Period.
3.1 Restricted Access Areas
For coordination and building access, contact INFO TO BE PROVIDED AT TIME OF AWARD. As requested, the Government can provide access & escort services during normal business hours.
SECTION 01 20 00.00 20 PRICE AND PAYMENT PROCEDURES:
Follow Part 2 Instructions.
SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.7.1.1.1 Site Safety and Health Officer (SSHO) Requirements and Duties Follow Part 2A Instructions.
SECTION 01 50 00 TEMPORARY PROJECT SAFETY FENCING
3.3.2 Sanitation
This task order does not require field-type sanitary facilities.
3.7 Fencing
There is no temporary construction fencing required under this order.
SECTION 01 78 00 CLOSEOUT SUBMITTALS
3.4.1 ts The work site shall be kept neat and orderly.
SECTION 01 78 23 OPERATION AND MAINTENANCE DATA
3.1 Training
None.