C05 PART 2A.docx

DOCX document 38 KB Posted

Attached to
Demolition and Renovation of Lab
Solicitation number
N6893625Q0004
Issued by

About this file

This document appears to be Part 2, Attachment A of a federal contract opportunity for the demolition and renovation of a lab building at the Naval Air Warfare Center Weapons Division in China Lake, CA. The key details are:

The scope of work includes project-specific requirements that supplement the general requirements in Part 2. These include design submittal requirements, fire protection and life safety requirements, quality control processes, submittal processing, environmental controls, safety and occupational health requirements, and other facility-specific details. Construction may only proceed after government review and approval of certain submittals. Special inspections and testing are required for structural work. The contractor is responsible for obtaining "hot work" permits and requesting utility outages in advance. The overall federal contract opportunity has a Firm Fixed Price construction cost range between $100,000 and $250,000. The solicitation will be posted on SAM.gov on or about 10/8/2024 with a Q&A deadline of 10/15/2024.

View the file

Other files

File Type Posted
Construction Solicitation Amendment 25Q0004.docx DOCX document
C06 Updated Q and A 11.7.24.docx DOCX document
HVAC Grills.pdf PDF
Floor Tile.pdf PDF
Questions and Answers Final.pdf PDF
25Q0004 Amendment 2.docx DOCX document
25Q0004 Amendment 1.docx DOCX document
C05 PART 2 GENERAL REQUIREMENTS.docx DOCX document
C05 Wage Determination.pdf PDF
C05 CATEX.pdf PDF
C05 SITE MAP.pdf PDF
C05 FLOOR PLAN.pdf PDF
Construction Solicitation 25Q0004.docx DOCX document
C05 PART 3 SCOPE OF WORK.docx DOCX document
C05 Davis-Bacon Act WD CA20240020.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part 2, Attachment A Order General Requirements EC500214_PM3015_Rm.343 Gray Flag Renovation

NOTE: Use this Part 2A document as a guide to include project-specific, geographic and facility-specific requirements that are over and above or different from the corresponding paragraphs of PART 2, “BOA General Requirements”. Comments shown are examples not intended to limit editing. Only those paragraphs that are more likely to require editing are listed below; edit as necessary to include project-specific information. When printing, do not print “Hidden” text commentary.

The following requirements are project specific and may either supplement and/or modify those requirements contained in the body of Part 2, General Requirements, which is issued with the prior contract basic documents. Paragraph numbers in Part 2 correspond to those in Part 2, Attachment A. This document may also be referred to as Part 2A.

Paragraph 3: DESIGN Submit shop drawings and manufacturer’s data to demonstrate compliance with Order requirements.

NOTE: Include requirements for telephone (NCTAMS) and LAN (NMCI)

NOTE: Provide specifics, such as where Contractor is to submit materials. Recommend Over-the-Shoulder reviews jointly with Contractor and subcontractors.

Provide electronic copies of submittal materials to the COR and the Engineering Tech at least 1 week prior to that phase of the project starting.

NOTE: Edit or delete the table below as applicable. Delete rows for items not needed.

NOTE: Identify below submittals that require Government approval prior to the Contractor beginning construction.

1. Construction may commence only after Government review and approval of the following submittals:

a. Activity Hazard Analysis

b. Project schedule

2. Construction submittals are to be Contractor-approved, except those listed below:

NOTE: Identify construction submittals requiring approval by other than Contractor QC Manager.

NOTE: Coordinate with Fire Protection and Electrical Order Editors to choose submittal items in electrical construction that may require Government Approval.

Construction Submittal:
Approval Required by:
1.
Fire Protection related submittals
NAVFACSW
1.
Earthwork and Geotechnical
EC52100
1.
All components of the roof and exterior wall
EC52100
1.
All components of the interior doors, hardware, cabinets, fireproofing/fire-stopping, railings, paint, finish materials/colors.
EC52100
1.
HVAC Testing, Adjusting, and Balancing
EC52100
1.
Telecommunications
EC52100
1.
Furnishings, fixtures, and equipment packages
EC52100

NOTE: Identify construction submittals to be forwarded to the Government for surveillance. Modify this list for the project requirements.

3. Submit the following construction submittals to the Government for surveillance if required for this Order:

1. Fire protection related submittals pertaining to spray-applied fireproofing, fire stopping, fire alarm reporting or detection systems, fire suppression systems including fire pumps and standpipe systems. (Not Required)

1. Geotechnical related submittals pertaining to soils investigations, foundations, pavements structure design, and piles. (Not Required)

1. Roofing submittals pertaining to materials and systems used to make up the roof system.

1. HVAC Testing, Adjusting, and Balancing. (Not Required)

1. Telecommunications for coordination with the NMCI Contractor. (Not Required)

1. Inspection and Testing Reports.

NOTE: Retain the surveillance submittal below if the project requires US Green Building Council Certification.

Paragraph 4: FIRE PROTECTION AND LIFE SAFETY REQUIREMENTS NOTE: Alterations to floor plan layout may affect the life safety of the facility. Any alterations shall be discussed with the cognizant NAVFAC FPE to clarify the fire protection scope of the project.

NOTE: Include for projects providing new, or renovating existing, fire alarm systems, mass notification systems, or fire suppression systems (including kitchen hood fire extinguishing systems and fire pumps).

NOTE: If the work includes fire protection it requires the services of a FPE.

A Fire Protection Engineer (FPE) is not required for this Order.

Paragraph 5: QUALITY Control NOTE: Include additional or special QC requirements, such as separate QCM and project superintendent or different QC Plan requirements. Note that Paragraph 32 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS edits within this Attachment A allow for requirement of separate persons or a combination of duties serving as Superintendent and SSHO. Edit the below option to indicate if it is desired to have separate persons as the Superintendent and the QCM or if duties can be combined. Technical Submittal specific requirements are included in Paragraph 3 DESIGN requirements above.

The Superintendent may serve, as the Quality Control Manager on this project.

NOTE: Delete the following paragraph requiring Special Inspections if the project does not include any structural work, where the building is unoccupied, or where the structural portion of the work is very straightforward. Special Inspections should be required where the occupancy of the building or the complexity of the structural work requires an increased level of inspection. If the structural portion of the work requires signed and sealed structural drawings, Special Inspections are probably required. Special Inspections are also required for EIFS.

Special inspection, testing, approvals, certifications, observations and quality assurance plans as prescribed in Chapter 17 of the IBC are required.

Paragraph 6: SUBMITTAL PROCESSING NOTE: Include additional submittal requirements. This table includes Operation and Maintenance Information. If O&M manuals are required, edit Item #0 in the following table to require “OMSI Manuals” in accordance with UFGS 01 78 24.05 20, Facility Operation and Maintenance Support Information.

NOTE: Identify manufacturer’s data that is to be submitted for review and approval.

No Used.

Paragraph 7: SUPERVISION The Contractor shall have a supervisor fluent in English on the job site anytime work is in progress.

Superintendent will responsibly for Production and Safety.

The Superintendent may serve, as the Quality Control Manager on this project.

The Superintendent may serve as the Site Safety and Health Officer.

NOTE: Include requirement(s) for language fluency such as Host Nation language of foreign country project.

Paragraph 8: BUDGET MANAGEMENT NOTE: Include following paragraph if a Budget Management System is required for this project.

Not Required Paragraph 9: ACCESSIBILILTY NOTE: Include any requirements for barrier-free design for this project.

Refer to Part 2 Paragraph 10: SCHEDULE OF PRICES NOTE: Include construction category codes if applicable for DD Form 1354

Refer to Part 2 Paragraph 11: INVOICING PROCEDURES NOTE: List conditions when payment for off-site material will be allowed. Note that Part 1 must include relevant clauses for payment of material stored off-site.

Refer to Part 2 Paragraph 12: EXISTING UNDERGROUND UTILITIES NOTE: Include special requirements, such as dig permits or station requirements.

Refer to Part 2 Paragraph 13: CONTRACTOR WORK SITE NOTE: Include special constraints or requirements, such as contractor lay-down limitations, site fencing, or other site-specific requirements.

Contractor will submit a plan for his laydown yard.

Paragraph 14: TEMPORARY UTILITIES NOTE: Include water and power utility rates, specific backflow-preventer requirements and installer qualifications, plus actual location(s) for tie-ins if applicable.

Temporary use of utilities is allowed.

Paragraph 15: ENVIRONMENTAL CONTROLS AND PROTECTION NOTE: Projects that involve disturbance of site soils, building components, finishes, renovations, equipment or structures and demolition, require the contractor to complete ECATTS training. Coordinate with local environmental to ensure all applicable regulations and standards are met. As a guide, see UFC 3-800-10N for additional information. ********************************************************************************************************************** Contractor to follow Best Management Practices for Storm Water Runoff.

NOTE: Coordinate with local environmental personnel to ensure applicable regulations and standards are met for the project. Special environmental requirements apply to projects involving:

Flooring replacement, lead paint disturbance, replacement of finishes, plumbing upgrades, elevator upgrades, HVAC related work, replacements (e.g., windows, doors, cabinets, sinks, fixtures), renovations, demolition that involve removal or disturbance of more than 260 linear feet, 160 square feet or 35 cubic feet; projects that require removal or disturbance of asbestos containing materials within DoD schools; projects that require removal or disturbance of painted surfaces within a child occupied facility. See UFC 3-800-10N for additional information. Edit below to indicate special environmental requirements.

NOTE: Many states have requirements more stringent than federal regulations with regard to environmental requirements. Consult your local environmental personnel to ensure compliance with state and local regulations. ********************************************************************************************************************** Paragraph 16: WASTE MANAGEMENT Refer to Part 2 NOTE: Include special information, constraints or requirements, such as availability of landfill coupons or recycling resources.

Paragraph 17: OPERATION & MAINTENANCE (O&M) DATA Operations or Maintenance Data Required.

Paragraph 18: WARRANTY NOTE: Include special warranty requirements, such as those longer than 1 year or provided by manufacturer

Refer to Part 2 Paragraph 19: PERFORMANCE EVALUATIONS Refer to Part 2 NOTE: Include Performance Assessment Plan, with features and requirements, if applicable. Refer to Part 6 of the Download tab on the Standard Design-Build Master website for editable copy of “Performance Assessment Plan” at the following link http://www.wbdg.org/ndbm/Download/Download.html?Tab=Download. Modify to suit project.

Paragraph 20: WORK HOURS, ACCESS AND PASSES NOTE: Include any phasing requirements; define work hours if different from 0630-1700 Monday through Friday and special pass requirements.

Refer to Part 2 Paragraph 21: SECURITY REQUIREMENTS NOTE: Include special security requirements, such as escorts required.

Refer to Part 2 Paragraph 22: REQUIRED INSURANCE Refer to Part 2 Paragraph 23: GOVERNMENT FURNISHED MATERIAL AND EQUIPMENT NOTE: Include description, location, availability, and other conditions for any GFE.

None Paragraph 24: SAFETY AND OCCUPATIONAL HEALTH NOTE: Include safety and occupational health requirements beyond those specified in Part 2.

In lieu of the requirements of Part 2, the SSHO shall meet the following requirements:

1.A minimum of 3 years safety work on similar projects.
2.30-hour OSHA construction safety class or equivalent within the last 5 years.
3.An average of at least 24 hours of formal safety training each year for the past 5 years.

NOTE: Edit the following if the SSHO and Superintendent must be separate persons (see corresponding paragraph in Part 2)

The Site Safety and Health Officer may serve also as the Superintendent.

NOTE: Include additional "Hot Work" requirements such as that for the contractor to obtain services from a NFPA Certified Marine Chemist for "HOT WORK" within or around flammable materials (such as fuel systems, welding/cutting on fuel pipes) or confined spaces (such as sewer wet wells, manholes, and vaults) that have the potential for flammable or explosive atmospheres (see sub-Paragraph 32.i. ) Obtain a “HOT WORK” permit for any welding, cutting, grinding operations that product sparks.

NOTE: Include advance notice if different than 15 days and special requirements for Contractors to apply for utility outage (see sub-Paragraph 32.k. ) Request for utility outages at least 30 days in advance.

-- End of Section --