C-8 SOS B1 THRU 61 Part 1.pdf

PDF 1 MB Posted

Attached to
Student Support/Facilities Operation Maintenance Services Federal contract opportunity
Solicitation number
70LCHS25RPFB00001
Issued by
Department of Homeland Security Federal Law Enforcement Training Center

About this file

This file is a Schedule of Services (Attachment C-8) detailing janitorial and maintenance requirements for multiple buildings at the Federal Law Enforcement Training Centers in Charleston, SC. The document provides detailed cleaning frequency schedules for Buildings 1 (50,000 ft²), 11 (4,100 ft²), 16 (22,500 ft²), 17 (5,775 ft²), 46 (39,600 ft²), 46-A (39,600 ft²), 46-B (39,600 ft²), 49 (500 ft²), 53 (2,200 ft²), 59 (10,595 ft²), 61 (188,000 ft²), and 62-1 through 62-5 (2,500 ft² each).

The schedule specifies frequency requirements (daily, weekly, monthly, quarterly, etc.) for routine cleaning, floor care, restroom cleaning, glass cleaning, and exterior cleaning tasks. Notable requirements include specialized cleaning for exercise mats/equipment, swimming pool maintenance with detailed chemical testing and equipment checks, commercial curtain cleaning in the auditorium, and enhanced cleaning protocols for medical offices. Services are generally categorized as "As Needed," "Daily" (Sunday through Saturday), "5/Wk" (Monday through Friday), "2/Wk" (Monday & Thursday), "1/Wk" (Wednesday), "1/Mo" (first Tuesday), "1/Qtr" (January, April, July, October), "2/Yr" (June & December), and "1/Yr" (September).

View the file

Other files for this federal contract opportunity

Other files attached to Student Support/Facilities Operation Maintenance Services, newest first.
File Type Posted
Sol_70LCHS25RPFB00001_Amd_0006.pdf PDF
Site Visit Rosters.pdf PDF
Section L 70LCHS25RPFB00002 3-27-2025.pdf PDF
Clarification Questions 70LCHS25RPFB00001-70LCHS25RPFB00002 1-347.pdf PDF
Section C Intro and General Requirements for Student Support Services 3-10-25.pdf PDF
Exhibit I-3 Personnel Resume Format 3-7-25.pdf PDF
Section M 70LCHS25RPFB00001 3-10-25.pdf PDF
Clarification Questions 70LCHS25RPFB00001-70LCHS25RPFB00002 1-288.pdf PDF
Section L_70LCHS25RPFB00002 3-5-2025.pdf PDF
Section C.5.B Transportation Amend 0002 3-5-25 .pdf PDF
Section M 70LCHS25RFPB0001 3-5-25.pdf PDF
Section I 70LCHS25RPFB00002 Revised 3-3-25.pdf PDF
70LCHS25RPFB00002 Attachment 1B- Facility Maintenance Prior Experience Questions.pdf PDF
Section M (1).pdf PDF
Attachment C-4 FTC-ADM-1A FLETC Purchase Requisition PRRev.pdf PDF
Attachment C-7 Dumpsters at FLETC 11-15-23.pdf PDF
Attachment C-9 Contractor Furnished MaterialsandSuppliesRev.pdf PDF
Attachment C-13 GroundsMaint MapJBS Weapon StationRev.pdf PDF
Exhibit G-1 Optional Form 347 Order for Supplies or Services (1).pdf PDF
Exhibit H-4 I-9 Form.pdf PDF
Exhibit H-5 Contractor Badge Application.pdf PDF
Exhibit H-6 OSHA 300 300A Log Report Summary 12-12-2024-.pdf PDF
Exhibit H-8 Sample Environmental Friendly Products (1).pdf PDF
Section B 70LCHS25RPFB00001 2-26-25.pdf PDF
Section D 70LCHS25RPFB00001 (1).pdf PDF
Section F 70LCHS25RPFB00001 2-26-25.pdf PDF
Section G 70LCHS25RPFB00001 2-26-25.pdf PDF
Attachment C-5 Government Furnished Equipment-Property Updated 5-1-2024.pdf PDF
Attachment C-11 Sample Class Photograph.jpg JPG image
Attachment C-17Summer Weekend Bus Schedule.pdf PDF
ATTACHMENT C-22 FLETC CHARLESTON FLEET VEHICLES AS OF 12-17-24.pdf PDF
Attachment C-38 Student Population.pdf PDF
Attachment C-40 Sample Weekly Food Service Menu.pdf PDF
Exhibit E-2 Section E - Es QASP attachments.pdf PDF
Exhibit G-1 Optional Form 347 Order for Supplies or Services (2).pdf PDF
Exhibit H-4 I-9 Form (1).pdf PDF
Exhibit H-6 OSHA 300 300A Log Report Summary 12-12-2024- (1).pdf PDF
Exhibit H-8 Sample Environmental Friendly Products.pdf PDF
Section A 70LCHS25RPFB00002 2-26-25.pdf PDF
Section D 70LCHS25RPFB00002.pdf PDF
Section G 70LCHS25RPFB00002 2-26-25.pdf PDF
Section I 70LCHS25RPFB00002 2-27-25.pdf PDF
Section L_70LCHS25RPFB00002 2-27-2025.pdf PDF
C-8 SOS B62-1 THRU B682 Part 2.pdf PDF
Attachment C-11 Grounds Acreage 11-17-2023.xlsx XLSX spreadsheet
Exhibit E-2 Section E - Es QASP attachments (1).pdf PDF
Exhibit E-3 Contractor Performance Assessment Report CPAR (2).pdf PDF
Exhibit H-3 SF 85P .pdf PDF
Exhibit I-1 Summary Subcontract Report SF-295 (2).pdf PDF
Section A 70LCHS25RPFB00001 2-26-25.pdf PDF
Show all 50

Student Support/Facilities Operation Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C-8

Schedule of Services

Building No. 1 Total SF: 50,000ft² (Est.)

Headquarters Bldg., Administrative Offices

Frequency As

Needed Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.

“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Federal Law Enforcement Training Centers Charleston SC Solicitation 70LCHS25RPFB00002

Building No. 11 Total SF 4,100ft² (Est.)

Maritime Training Classroom

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning/Disinfecting:

Entrance Mats X Empty Waste Containers X X All areas listed below to Disinfect X X Clean Venetian Blinds X Scotchguard/Clean Upholstery Low Dust X High Dust X Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning/Disinfecting:

Clean Walls/Partitions X X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.

“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.

Exact Requirements are outlined in C-5.A.

Building No. 16 Total SF: 22,500 sf (Est.)

Administrative Offices / IT Mgmt / FOSS Offices

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.

“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 17 Total SF 5,775ft² (Est.)

Administrative Building

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning/Disinfecting:

Entrance Mats X Empty Waste Containers X X All areas listed below to Disinfect X Clean Venetian Blinds X Scotchguard/Clean Upholstery Low Dust X High Dust X Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning/Disinfecting:

Clean Walls/Partitions X X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.

“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.

Exact Requirements are outlined in C-5.A.

Building No. 46 Total SF: 39,600ft² (Est.)

Student Center & Gym

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery X X Odor Control X X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Clean/service equipment X X Clean/exercise mats/mat rooms and Basketball Court

X X

Vacuum Carpets/Rugs/Mats X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning/Disinfecting:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Showers & Drains X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Note – Janitorial services for the FLETC Express Store and Barbershop are done under a separate contract.

Building No. 46-A Total SF: 39,600ft² (Est.)

Trainer’s office/therapy room and Medical office

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery X X Odor Control X X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Clean/service equipment X X Clean exercise mats/tables X X Vacuum Carpets/Rugs X Spot Clean Carpets X X Steam Clean Carpets X Restroom/Therapy Room/Exam Room:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean whirlpool X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

**Medical office to be cleaned after office closes**

Building No. 46-B Total SF: 39,600ft² (Est.)

2nd Floor Administrative Offices

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X Clean Mirrors X Clean Sinks/Lavatories X Clean Showers X Clean Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 49 Total SF 500ft² Armory

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans Clean Venetian Blinds Low Dust X High Dust X

Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer tissue, towels)

Glass Cleaning:

Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:

Policing Grounds X Training Vehicles

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday.

“5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 53 Total SF Hangar Offices 2200ft² (Est.)

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X Clean Mirrors X Clean Sinks/Lavatories X Clean Showers X Clean Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.

“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Attachment C-8

Building No. 59 Total SF: 10,595ft² (Est.)

Swimming Pool

Frequency

As Needed

Daily 2x Daily

3x Daily

1/Wk 2/Wk 3x/Wk 1/Mo 1/Qtr

Routine Cleaning:

Entrance Mats X Sweep/Mop Floors X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Low Dusting X High Dusting X

Floor Care:

Sweep/Squeegee X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Floors X Clean/Disinfect Shower X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Interior Glass X Entrance Doors X Exterior Glass X Exterior Cleaning:

Outdoor Lawn Furniture X Policing Grounds X Pool Requirements:

Vacuum Pool X Water Testing (Chlorine, Bromine, pH) X Check Automatic Chlorination System – Add chemicals as necessary

X

Check Pool Temperature X Backwash Filters X Check CO2 Tanks X Clean hair and lint trap X Check Automatic Controller X X Wipe down stainless hardware X X Clean in-line pool filtration system X X Check bolts on lifeguard chairs, ladders, and diving boards

Inspect Eyewash Station X

Building No. 61 Total SF: 188,000ft² (Est.)

Classroom Complex / Guard Post / Govt & Contractor Staff Offices

Frequency

As Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Classroom Furniture/Equipment

X X

Low Dust X High Dust X Curtain Cleaning, Commercial** X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors X X Interior Glass X X Exterior Glass X X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

**Refers to curtains hanging in the auditorium.

Building No. 62-1 thru 62-5 Total SF: 2,500 each (Est.)

MAT Rooms & Locker Room

Frequency

As Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Clean Exercise Mats/Mat Rooms X X Low Dust X X High Dust X Odor Control X X

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Seams of Mats X X Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean/ Floors X Clean Showers X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.C.5.a.1.f.1 **Note – Mats should be cleaned after each class to include vacuuming and mopping/disinfecting.

SOS Bldg 1
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 11
Frequency
SOS Bldg 16
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 17
Frequency
SOS Bldg 46
Student Center & Gym
Frequency
SOS Bldg 46-A
Trainer’s office/therapy room and Medical office
Frequency
SOS Bldg 46-B
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 49
Frequency
SOS Bldg 53
Frequency
SOS Bldg 59
Frequency
Entrance Mats
Sweep/Squeegee
Clean Walls/Partitions
Interior Glass
Vacuum Pool
Check Automatic Chlorination System – Add chemicals as necessary
X
Check Pool Temperature
Check CO2 Tanks
Clean hair and lint trap
Check Automatic Controller
Wipe down stainless hardware
Clean in-line pool filtration system
SOS Bldg 61
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 62-1 thru 62-5
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions

File details come from the government source that posted it. Updated .