C-1245D_Summitville_Dam_Impoundment_-_Design_Plans_2015-01-14.pdf

PDF 2 MB Posted

Attached to
Summitville Dam - HEAD GATE & CONTROLS REPLACEMENT, SV-102
Solicitation number
DQ1 FAAA FEEA2015000000000002 1
Issued by
Rio Grande County, Denver City, Colorado

About this file

This is a design plans document for the Summitville Dam Impoundment project, prepared for a state or local water management authority. The document outlines the comprehensive design specifications and engineering plans for the dam impoundment facility, including structural design details, hydrological analyses, and construction methodologies. The project represents a significant infrastructure development effort requiring detailed engineering documentation to support bid preparation and construction execution. The design plans serve as the technical basis for contractors to prepare accurate cost estimates and project schedules, with the document dated January 14, 2015, establishing the reference point for all subsequent procurement activities and construction planning.

The design plans document provides the technical foundation for budget development and contractor selection, containing detailed specifications that define project scope, material requirements, and construction sequencing. The document establishes the engineering baseline from which project costs are derived and construction timelines are developed. As a design-phase deliverable, it represents the state or local jurisdiction's commitment to the Summitville Dam Impoundment improvement project and provides the technical clarity necessary for competitive bidding and contractor performance measurement throughout the construction phase.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .