This is a project manual and bidding document issued by the City of Philadelphia Water Department for Bid No. 2460, which involves the replacement of fuel tanks at the Southwest Water Pollution Control Plant located at 8200 Enterprise Avenue, Philadelphia, PA 19153. The project encompasses the demolition of four existing 20,000-gallon underground storage tanks and the installation of two new 12,000-gallon above-ground fuel tanks with accompanying fill stations, fuel polisher, piping, and pumps. Prospective bidders must submit prequalification questionnaires by Thursday, April 23, 2026, with sealed quotes due before 10:30 a.m. on Tuesday, May 12, 2026, via WWW.PHLCONTRACTS.PHILA.GOV. A public opening of quotes will be held on the Zoom platform at 10:30 a.m. on the same date. Site visits are available by appointment on Wednesday, April 15, 2026, and Wednesday, April 22, 2026, at 10:00 a.m. each day; representatives must contact Plant Manager Gianna Makler at (215) 685-4000 to arrange access. The contract term is fixed at 365 calendar days from the date of Notice to Proceed.
Bid pricing is structured with a $30,000 field office maintenance allowance (Item GC-1) and four lump-sum items covering structural and civil work (GC-2), mechanical and electrical work (GC-3), removal of existing tanks (GC-4), and several unit-price items for contingent work including removal of contaminated soil, roadway reconstruction, additional fill, and pavement restoration. Prevailing wage requirements apply, with rates current as of October 7, 2025, for both building construction and heavy/highway construction classifications. The project is subject to Philadelphia's Local Business Entity (LBE) preference program, with eligible firms receiving either a 10 percent preference for bids under $1 million or 5 percent for larger bids, contingent on performing at least 51 percent of work within city limits. Contractors must comply with Pennsylvania Sales Tax regulations, diesel engine emissions control requirements, and environmental protection standards including erosion and sedimentation control, hazardous materials handling, and waste management procedures. A bid bond equal to 10 percent of the gross bid amount is required, along with certificates of insurance naming the City as additional insured.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID NO. 2460
PREQUAL BID #B2626649
ACTUAL BID #B2626650
City of Philadelphia Water Department
WORK NO. 73105
BIDDING REQUIREMENTS, CONTRACT FORMS
and
SPECIAL SPECIFICATIONS
for
FUEL TANKS REPLACEMENT
at
SOUTHWEST WATER POLLUTION CONTROL PLANT
8200 ENTERPRISE AVENUE
PHILADELPHIA, PA 19153
Quotes are to be submitted before ten thirty a.m., prevailing time, on
WWW.PHLCONTRACTS.PHILA.GOV.
An opening of quotes received will be held on the Zoom platform at ten thirty a.m., prevailing time, on
Tuesday, May 12, 2026
NOTICE:
No quote will be accepted unless the prequalification questionnaire, with all questions fully answered, is submitted within the prequalification solicitation on WWW.PHLCONTRACTS.PHILA.GOV, on or before Thursday, April 23, 2026.
http://www.phlcontracts.phila.gov/
WORK NO. 73105
T/C - 1
TABLE OF CONTENTS
BIDDING REQUIREMENTS, CONTRACT FORMS, AND GENERAL CONDITIONS
Section Section Number Title
----- Title Sheet ----- Table of Contents ----- Bid Pricing Pages ----- Local Business Entity Determination Form ----- Bid Bond Form ----- Bid Processing Fee Notice ----- Performance of Work by the Contractor ----- Act 141 Verification Form ----- Notice to Sellers ----- Diesel Engine Emission Control ----- P.I.D.C. Working Capital Line of Credit ----- Schedule of Prevailing Wage Rates ----- Prices for Contingent Work ----- Pennsylvania Sales Tax 00100 Instructions to Sellers 00110 Special Instructions 00120 Supplementary Instructions to Sellers
SPECIAL SPECIFICATIONS
00800 Supplementary Conditions 00850 Drawings and Schedules
DIVISION ONE -- GENERAL REQUIREMENTS
01010 Summary of Work, Measurement and Payment 01040 Coordination 01125 Contractor Requirements for Confined Space Entry 01126 Contractor Requirements for Entering Water Department Operating Sites with Hazardous Materials 01127 Contractor Requirements for Entering Water Department Areas Which May Contain Hazardous Gases 01300 Submittals 01323 Construction Progress Schedules 01400 Quality Control 01500 Construction Facilities and Temporary Controls 01600 Material and Equipment 01700 Contract Closeout 01750 Spare Parts
T/C - 2
DIVISION TWO -- SITEWORK
02000 Environmental Procedures 02001 Testing Laboratory Services 02002 Testing, Removal, and Disposal of Soils 02003 Construction Waste Management and Disposal 02006 Environmental Soils Handling 02025 Environmental Controls 02050 Soils Management 02100 Selective Site Clearing and Demolition 02110 Temporary Facilities and Controls 02130 Erosion and Sedimentation Control 02200 Earthwork 02471 Asphalt Paving 02650 Storage Tank Removal 02933 Soil Preparation, Planting and Site Restoration
DIVISION THREE -- CONCRETE
03200 Concrete Reinforcement 03300 Cast-in-Place Concrete
DIVISION FIFTEEN -- MECHANICAL
15058 Common Motor Requirements for HVAC Equipment 15062 Hangers and Supports for HVAC Piping and Equipment 15077 Identification for HVAC Piping and Equipment 15085 Piping and Equipment Insulation 15093 Sleeves and Sleeve Seals for HVAC Piping 15127 Meters and Gages for HVAC Piping 15192 Facility Fuel-Oil Piping and Equipment 15250 Valves
DIVISION SIXTEEN -- ELECTRICAL
16010 Basic Requirements for Electrical Systems 16060 Grounding and Bonding for Electrical Systems 16073 Hangers and Supports for Electrical Systems 16075 Identification for Electrical Systems 16091 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 16120 Low-Voltage Electrical Power Conductors and Cables 16130 Raceway and Boxes for Electrical Systems 16801 Remote Alarm Panel 16850 Electrical Heat Trace System
ATTACHED:
----- Standard Contract Requirements for Standard Public Works Contracts
Contractor:
PWD ID Description UOM Quantity Unit Price Total
GC-1 Field Office Maintenance Allowance 1.0 30,000.00$ 30,000.00$
GC-2
All structural and civil work and materials required -see specs Lump Sum 1.0 -$
GC-3
All mechanical and electrical work and materials required - see specs Lump Sum 1.0 -$
GC-4
Work and materials required for removal of the existing tanks Lump Sum 1.0 -$
GC-5 Removal of contaminated soil, if found present Cubic Yds 10.0 -$
GC-6 Roadway reconsruction - LF of Curb, if damaged Linear Ft 200.0 -$
GC-7 Additional Fill Cubic Yds 10.0 -$
GC-8 Pavement/Asphalt Restoration, if damaged Sq Yds 50.0 -$
Bid 2460 - 73105
AGGREGATE AMOUNT BID
BID PRICING PAGE - BID 2460
Rev. Jan. 2020
The City of Philadelphia Local Business Entity (“LBE”) Determination Form
In accordance with Chapter 17-109 of The Philadelphia Code relating to Local Bidding Preferences and the Regulations promulgated thereto, this opportunity/bid may be subject to a local bid preference. 1 This form is required to be uploaded to PHLContracts by the Seller along with all required supporting documentation described herein in order to be eligible for any LBE preference available.
This form does not replace the LBE certification process or the annual affidavit requirements for an LBE and is not itself an application for LBE certification. Seller must be certified as an LBE at the time of the bid opening to receive the preference. For more information regarding obtaining and maintaining LBE certification please visit: http://www.phila.gov/bids, and follow the “Local Preference” link.2
I) Contract Incorporation
This LBE Determination Form, the certifications contained herein, and all supporting documentation shall be considered incorporated into any contract resulting from this opportunity/bid if an LBE preference is awarded to Seller. Following Seller’s submission of the required materials, the Procurement Department, in its sole discretion, shall make the final determination as to whether the LBE preference is applied to Seller’s bid.
II) Definitions
For the purposes of this LBE Determination Form and certification, capitalized terms shall have the following meanings:
“Majority of Any Work” means 51% of the overall work performed on the contract resulting from this opportunity/bid, as determined by the proportionate dollar cost for the work compared to the total dollar value of the contract.
III) Certification
Seller hereby makes the following certification in connection with the grant of any local bidding preference:
A) Throughout the entirety of the contract, Seller or Seller’s LBE certified subcontractor(s) will perform the Majority of Any Work on the subject contract within the geographic limits of the City of Philadelphia and Seller or Seller’s LBE certified subcontractor(s) will maintain within the City a majority of the inventory or equipment that will be used on the contract or the amount of inventory that is customary for that industry;
B) Seller understands that failure to comply with this certification at any time during the term of its contract, may result in Seller’s LBE certification being revoked at the discretion of the Procurement Commissioner and Seller shall be in breach of such contract and subject to any and all remedies available, including payment of liquidated damages in the amount of 10% of the total awarded contract amount, and may be debarred by the Procurement Commissioner in accordance with the Procurement Department Debarment Regulation for a period of up to three years. Seller further understands that the City has the right to request any information related to this certification at any time; and http://www.phila.gov/bids http://www.phila.gov/bids
Rev. Jan. 2020
C) Seller anticipates that the percentage of work to be performed by an LBE on any contract resulting from this opportunity/bid will be as follows: 3
Seller or Subcontractor Name Description of Work Cost of Work (Dollars)
Overall Percentage of
Work (%)
IV) Supporting Documentation
Seller hereby certifies that it has submitted with this LBE Determination Form the following supporting documentation, uploaded as an attachment or attachments to PHLContracts with Seller’s bid:
A) Seller Documentation
i) A current valid certification from the Procurement Commissioner designating Seller as an LBE; and
ii) Seller’s most recent LBE annual affidavit;
B) Subcontractor Documentation 4
To the extent that Seller is relying on an LBE subcontractor to meet any of its certification requirements in section III:
i) A current valid certification from the Procurement Commissioner designating such subcontractor as an LBE; and
ii) Any such subcontractor’s most recent LBE annual affidavit.
1 For quotes of One Million Dollars or less, the preference is ten percent (10%); for all other quotes the preference is five percent (5%).
2 Evidence is required in order to obtain LBE certification and a review is conducted. The City cannot guarantee that LBE certification applications will be processed before the opportunity/bid opening date. The Procurement Department reserves the right to request any additional or clarifying information at any time prior to award of a contract, and during the performance of a contract.
3 Attach additional sheets as needed.
4 The identity of any subcontractor relied on for an LBE preference is required with Seller’s bid submission, notwithstanding any other subcontractor identification requirements contained elsewhere in the opportunity/bid or contract.
Totals
BID BOND
FOR CITY OF PHILADELPHIA BID NUMBER: __________________________
(Please fill in)
KNOW ALL MEN BY THESE PRESENTS, that we ____________________________
___________________________________________________________________________, as
Principal (hereinafter called the “Principal Obligor”), and
_____________________________, Surety, are jointly and severally held firmly bound unto the City of
Philadelphia, in the sum of
TEN PERCENT (10%) of the GROSS AMOUNT OF THE BID lawful money of the United States of America, to be paid to the said City of Philadelphia, its successors and assigns, to which payment well and truly to be made, we do bind ourselves and each of us, our and each of our successors and assigns, jointly and severally, firmly by these presents.
Sealed with our seals and dated the ____________________________________ day of
____________________ A.D. 20___.
WHEREAS, the above bounded Principal obligor, submitted a bid pursuant to the above referenced
Bid Number to perform certain work for the City of Philadelphia.
NOW, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the City of Philadelphia shall accept the bid of the Principal Obligor and the Principal obligor shall enter into a contract with the City in accordance with the terms of such bid, and furnish such bond or bonds as are specified in the bid documents with good and sufficient surety, for the faithful performance of the contract and for the prompt payment of labor and material furnished in the prosecution thereof; or in the event of the failure or refusal of the Principal obligor to enter such contract and give such bond or bonds, if the Principal Obligor shall pay to the City the difference between the amount specified in said bid and such larger amount for which the City may legally contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect.
And we do for ourselves and each of us, our and each of our. successors and assigns, hereby heirs, executors, administrators, authorize and empower the City solicitor of Philadelphia or any other attorney of any court of record in Pennsylvania or elsewhere by him or her deputized for the purpose, upon the filing of this instrument or a copy thereof, duly attested as correct by the City Solicitor of Philadelphia, to appear for us or either of us, our or either of our heirs, executors, administrators, successors or assigns, and confess a judgment against us or either of us, our or either of our heirs, executors, administrators, successors or assigns, in favor of the City of Philadelphia for the sum named in this bond, without defalcation, with costs of suit, release of errors, and with five percent added for collection fees; hereby waiving the benefit of all exemption laws and the holding of inquisition on any real estate that may be levied upon by virtue of such judgment, voluntarily condemning such real estate and authorizing the entry of such condemnation upon any writ of fieri facias and agreeing that said real estate may be sold under the same; and further waiving all errors, defects and imperfections whatsoever in the entering of the said judgment or any process thereon, and hereby agreeing that no writ of error or objection or motion or rule to open or strike off judgment or to stay execution or appeal, shall be made or taken thereto.
And for the doing of these acts, this instrument or a copy thereof attested as aforesaid shall be full warrant and authority.
CORPORATE SEAL: PRINCIPAL OBLIGOR:
_______________________ (SEAL)
President or Vice President
Secretary or Treasurer (or either of their assistants)
SURETY:
Attorney-In-Fact
Note: (1) All sellers must utilize this Bid Bond form when submitting a bid to the city.
(2) If Principal obligor is an individual or partnership, Bid Bond should be signed by owner or authorized general partner. Please identify on the Bid Bond the type of business
(e.g. individual proprietorship or partnership) and title of party executing the Bid Bond.
(3) Bid Bond must be executed by a surety c authorized and licensed to act as surety by the Pennsylvania Insurance Commissioner pursuant to the Commonwealth of Pennsylvania.
1401 John F. Kennedy Blvd #120
Philadelphia, PA 19102-1685
CONTACT US:
Email PHLContracts@phila.gov
Call 215-686-4755 or 215-686-4720 www.PHLContracts.phila.gov
BID PROCESSING FEES
Quotes shall be accompanied by a non-refundable processing fee and must be received by the City of Philadelphia prior to the date and time of the bid closing. Payments must be in the exact amount that is specified in paragraph 11 of the Standard Contract Requirements and the Seller Quote Checklist within the bid solicitation.
Electronic Payment Submission
Electronic payment submission of Bid Processing fees can be made at:
https://secure.phila.gov/PaymentCenter/AccountLookup/
Bid number must be referenced on the payment
****Please note: Electronic payments made by credit card will have an additional service charge.
And ____________________________________ hereby agrees to provide acceptable surety, both for the proper completion of the work and upon the penal bond, and to complete the whole of the work within (365) CALENDAR days from the date of the Notice to Proceed from the Chief Engineer to commence the work.
PERFORMANCE OF WORK BY CONTRACTOR
I, the undersigned Contracting Seller, am required to perform, on the site and with my own work force, work with a value of at least twenty percent (20%) of the original total contract price, exclusive of profit, overhead and the costs of procuring insurance and bonds. I, the undersigned Contracting Seller shall submit with my Quote a complete description of the work that will be performed (e.g., earthwork, paving, brickwork, roofing, etc.), the percentage of the total work this represents, and the estimated dollar value thereof.
I shall perform the following work:
Percentage of the total contract to be performed by Contracting Seller
Estimated cost of work to be performed by Contracting Seller:
NOTICE TO SELLERS
Contractors and their subcontractors are required to submit weekly certified payroll records to the Labor Standards Unit through an electronic system, LCP Tracker, or as directed by the Labor Standards Unit. Failure to pay
Prevailing Wage, as applicable, or to submit certified payroll records is a substantial breach of Contract and may be subject to fines and penalties as prescribed by Section 17-107 of The Philadelphia Code which may include withholding from any sums due to the Contractor under the Contract so much as may be necessary to pay the employees the difference between the wages required to be paid hereunder and the wages actually paid to such employees, and the City may make such payments directly to the appropriate employees.
Street Address 2
City State Zip Code
Doing Business As:
(if different from Legal Name)
Commonwealth of Pennsylvania
Public Works Employment Verification Form Complete and return the form to the contracting Public Body prior to the award of the contract.
Company Legal Name: ___________________________________________________________
Mailing Address: ______________________________________________________
Check one: Contractor Subcontractor
Contracting Public Body: _________________________________________________________
Contract/Project Number: ________________________________________________________
Project Description: _____________________________________________________________
Project Location: _______________________________________________________________
Date Enrolled in E-Verify (MM/DD/YYYY): ___________________________________________
As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I,____________________________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature Date of Signature
Printed Name: _________________________________________________________________
Phone Number: ______________________ Email: ____________________________________
Street Address 1
SAM
PLE
Act 141 VERIFICATION FORM ADDENDUM
NOTICE TO SELLERS
Pursuant to the Order, available on-line at http://www.phila.gov/ExecutiveOrders/Executive%20Orders/EO%207-14.pdf, Contractor agrees that Contractor and all of its Subcontractors, at any tier, shall report to the OIG knowledge of violations subject to investigation by the OIG pursuant to the Order; shall cooperate fully with representatives of the OIG by providing complete and accurate information as well as necessary assistance in matters under investigation; shall keep conversations and contact with the OIG confidential, except and to the extent the OIG may authorize disclosure;
and shall instruct their employees that under no circumstances shall any person take or threaten any action in an attempt to prevent anyone from providing information to a City official regarding conduct that may be investigated by the OIG, or from cooperating with the OIG, or retaliate against anyone for doing so or against anyone who is about to do so.
All entities and individuals affected by Mayor’s Executive Order 7-14 are advised to thoroughly read the Order, especially Section 3, Type of Matters Investigated by the OIG, Section 4, Entities Subject to Investigation by the OIG, Section 8, Duties of Executive Agencies and Other Entities, Section 9, Responsibilities of Officers and Employees of Executive Agencies and Other Entities, and Section 10, Responsibilities of City Contractors, Recipients of City Assistance and Recipients of City Funding.
http://www.phila.gov/ExecutiveOrders/Executive%20Orders/EO%207-14.pdf�
City of Philadelphia
Specification Language Requiring Diesel Engine Emissions Controls in Public Works Projects
DIESEL ENGINE EMISSIONS CONTROLS FOR PUBLIC WORKS PROJECTS
In accordance with Executive Order 1-07 and in furtherance of Greenworks Philadelphia, City establishes a requirement to include clean diesel specifications in public works contracts. Contractor, by submission of its bid, agrees to meet the requirements of this Section. This Section applies to bids advertised between July 1, 2013 and June 30, 2014 in which the total estimated dollar amount is
$1,000,000 or greater, and to all bids, awarded on or after July 1, 2014, regardless of estimated dollar amount. Notwithstanding the foregoing, engine noncompliance shall not constitute a material breach of contract nor shall monetary penalties be assessed as provided in subsection E.2 until after January 1, 2014. If noncompliant vehicles subject to this Section are observed prior to January 1, 2014, the City may issue written warnings to the contractor.
A. Covered Vehicles: Vehicles covered under this Section include any nonroad diesel engine that has a horsepower greater than 50.
B. Requirements
1. All bids for public works contracts and all applicable contracts entered into as a result of such bids covered under this Section shall include specifications that all contractors, and all of the contractor’s subcontractors, if any, in the performance of such contracts use ultra-low sulfur diesel fuel, and a listed clean diesel technology for reducing the emission of pollutants for diesel-powered non-road engines. Clean diesel technologies are further defined in part D of this Section. Retrofit emission control devices shall consist of diesel oxidation catalysts (“DOC”) or such other technologies that provide a minimum emissions reduction of twenty percent (20%) of particulate matter with a mean aerodynamic width of less than ten (10) microns (PM10) in the application for which it is verified. Any retrofit emission control device installed to comply with this Section must either be listed by EPA or the California Air Resources Board (CARB) as a verified diesel retrofit technology that reduces particulate matter emissions by 20% or more, or must be certified by the diesel retrofit device manufacturer as a product that reduces particulate matter emissions by 20% or more for the covered vehicle.
2. No later than two business days before any covered vehicle is brought onto the City’s contract site, the successful bidder (hereinafter, “contractor”) shall submit to the City’s project manager information about the vehicle including confirmation that the appropriate emissions control technology has been installed on the vehicle or that the vehicle is Tier 4 or Tier 4 Interim. Except as otherwise provided, any vehicle covered under this Section shall be in compliance with this Section prior to being brought onto the contract site.
a. Contractor shall submit the following information for each covered vehicle (using
Fleet Roster for Public Works Construction Projects form):
i. vehicle identification number (VIN), if applicable, or vehicle serial number, and the vehicle type, make, year and owner;
ii. the horsepower rating of each engine;
iii. the emission control device manufacturer name, model, and verifying/certifying organization; and
iv. the type of fuel to be used and approximate expected quantity.
b. In the event contractor has purchased appropriate emissions control technology, but the technology is not delivered before use of the covered vehicle is required on the contract site, the contractor shall, in addition to submission of a.i., through
iv. above, submit proof of purchase of the emissions control technology.
Installation of the appropriate emissions control technology must be completed within five (5) days of delivery of the technology. In no event may Contractor use the covered vehicle without the use of the emission control technology, for which the technology has already been purchased and identified, on the contract site for longer than sixty (60) days.
c. If a covered vehicle owned by a contractor breaks down on the contract site, contractor may use, if a compliant replacement is unavailable, a temporary vehicle that is not compliant while the covered vehicle is being repaired; the temporary vehicle cannot remain on site for more than 30 cumulative days after the date of the initial breakdown of the covered vehicle. Contractor shall notify the project manager in writing prior to bringing a non-compliant vehicle on the contract site.
3. The contractor shall establish truck-staging zones for vehicles that are waiting to load or unload material at the contract site. Such zones shall be located where the emissions from the trucks will have minimum impact to the public.
4. The contractor shall not permit idling of delivery and/or dump trucks, or equipment on the contract site during periods of non-active use, and it should be limited to three (3) minutes in accordance with the Philadelphia Traffic Code Anti-Idling Ordinance Section
12-1127(1) of The Philadelphia Code
(http://www.phila.gov/philacode/html/_data/title12/chapter_12_1100_miscellaneous_/12
_1127_excessive_idling_of_an.html) and the Pennsylvania Diesel-Powered Motor
Vehicle Idling Act, Title 35 Purdons Pennsylvania Statutes, Section 4601 et seq.
C. Exemptions
1. Subject to written approval by the City of Philadelphia Air Management Services (AMS), covered vehicles will be exempted from low diesel emission controls if one or more of the following conditions exist:
a. it is physically impossible to install appropriate emissions control technology on the vehicle;
b. installation of the appropriate emissions control technology would render vehicle operation unsafe due to obstructed sightline;
c. installation of the appropriate emissions control technology would void any applicable expressed manufacturer's warranty on the vehicle; or
d. the covered vehicle will not be at the work site for more than a total of three (3) business days.
2. In support of a request for exemption, contractors shall provide to AMS one of the following:
a. a signed letter from one or more diesel technology vendors, written on the vendor’s formal stationary, certifying that no emissions controls that would reduce Particulate Matter (PM) emissions by at least 20% and allow for safe operation could be physically installed, or the cost of installing such control technology would cost 150% more than the purchase price of the clean diesel technology device;
b. a signed letter from the vehicle manufacturer certifying that the installation of any device to reduce PM emissions by 20% or more would void the applicable expressed manufacturer’s warranty, along with a copy of the warranty for each vehicle for which an exemption is sought; or
c. a signed letter on the contractor’s company letterhead stating that the covered vehicle will remain on site for no longer than three (3) days total during the duration of the project.
3. In no event will the City grant an exemption from the required use of ultra-low sulfur diesel fuel or the idling laws.
D. Definitions
1. Contract site – all areas covered under the contract, and areas accessed for purposes of performing activity under the contract;
2. Non-active use – a period of time greater than five (5) minutes when a piece of diesel equipment is not being operated in performance of its work;
3. Non-road – diesel vehicles listed by EPA for use in non-road applications. These include construction, agricultural, and other industrial vehicles that are not legally operable on highways;
4. On-road – vehicles listed by EPA for on-highway applications;
5. Truck-staging zone – a designated area on the contract site where delivery or pickup activities will be located;
6. Ultra low sulfur diesel fuel – Diesel fuel with a sulfur content of 15 parts per million or less;
7. Vehicle – a piece of diesel-powered equipment being used for contract activities; and
8. Listed clean diesel technology – includes:
a. Diesel oxidation catalyst – a device similar to a catalytic converter that reduces diesel emissions and does not require regeneration;
b. Tier 4 or Tier 4 Interim – any vehicle certified by EPA as meeting Tier 4 emissions standards or Tier 4 Interim emissions standards;
c. Particulate filter – a device that traps soot produced by the engine and vaporizes this soot through the application of heat, requiring only periodic maintenance;
d. Closed crankcase ventilation – a device that reduces fugitive emissions from the vehicle’s crankcase by routing them through the tailpipe;
e. Selective catalytic reduction – A device that reduces emissions of oxides of nitrogen by treating exhaust with urea;
f. Emissions upgrade groups – groups of replacement components that, when installed during vehicle overhaul, reduce engine emissions;
g. Engine repower – the replacement of a vehicle’s engine with a newer model to reduce tailpipe emissions; and
h. Any other technology verified by EPA or CARB to reduce diesel particulate emissions by 20% or more.
E. Monitoring and Penalties for Non-Compliance
1. City reserves the right to request purchase and/or installation documents to verify contractor’s, and any subcontractor’s installation of the retrofit in the vehicle. These purchase documents shall be provided to the City’s project manager by the contractor within five (5) days of the City’s request.
2. Any false certification or representation in connection with these requirements for Diesel
Engine Emissions Controls and/or any failure to comply with these requirements shall constitute a material breach of contract entitling the City to all rights and remedies provided in the contract and otherwise available at law and/or in equity, including but not limited to the monetary assessment set forth herein. For contracts of $500,000.00 or less, an assessment of $500.00 per offense per day shall be imposed upon the contractor for every covered vehicle operating in violation of this section. For all other contracts, an assessment of $1000.00 per offense per day shall be imposed upon the contractor for every covered vehicle operating in violation of this section. In addition, it is understood that false certification or representation is subject to penalties under Title 18 Pa. C.S.A. §
4904 (relating to unsworn falsification to authorities).
Bid Language 09.20.2016
WORKING CAPITAL LINE-OF-CREDIT
The Philadelphia Industrial Development Corporation's ("PIDC") Contract Line-of-Credit provides access to short-term financing to small businesses who qualify for the program, including minority, woman, disabled-owned businesses performing contracts in the city of Philadelphia. Loans will typically fund the short-term capital needed to provide construction, procurement, or professional services to public, institutional or certain private users. Please contact Marla S. Hamilton at 215-496- 8125 or mhamilton@pidcphila.com for more information.
mailto:mhamilton@pidcphila.com
MEMORANDUM
TO: Municipal Operating Departments and Awarding Agencies
FROM: Andre Bragg, Director, Fair Labor Standards
DATE: Effective October 7th, 2025
RE: Updated Prevailing Wage Schedule for the City of Philadelphia
The Philadelphia Labor Standards Unit has issued an updated prevailing wage rate schedule for construction projects done on behalf of the City of Philadelphia. Enclosed herein you will find the two (2) decisions, which comprise the updated prevailing wage schedule. They are as the follows:
I. Building Construction
II. Heavy and Highway Construction
Please direct any questions or concerns regarding the prevailing wage rate schedule to my attention:
Philadelphia Labor Standards Unit
Municipal Services Bldg., 1st Floor Room 170C
1401 John F. Kennedy Blvd.
Philadelphia, PA 19102-1670
Telephone Numbers: (215) 686-2132
Fax Number: (215) 686-2116
Thank you for your cooperation.
Prevailing Wage Schedule (Effective 10/07/2025)
Building Construction
1 | P a g e
PREVAILING WAGE RATE SCHEDULE
FOR CONSTRUCTION WORK DONE ON BEHALF OF CITY OF PHILADELPHIA
INCLUDING REPAIR, ALTERATION, AND REMODELING WORK
I. BUILDING CONSTRUCTION
A. Job Classification and Wage Rates
Basic Hourly Rate Fringe Benefits
ASBESTOS WORKER
Journeyman 59.37 46.03
Handler Level 1 32.62 23.87
Handler Level 2 47.46 23.87
BOILERMAKER 52.10 35.72
BRICKLAYER 48.70 32.11
CARPENTER 55.82 30.52
CEMENT MASON 48.70 32.46
DRY WALL FINISHER 42.25 32.56
ELECTRICIAN 70.97 47.27
(Telecommunication Senior Tech) 65.86 35.64
(Telecommunication Tech A) 61.91 33.51
ELEVATOR CONSTRUCTOR 71.85 40.03
FOOTNOTES FOR ELEVATOR MECHANICS:
A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.
B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
GLAZIER 49.96 38.34
IRONWORKER
Structural & Ornamental 53.20 41.01
Reinforcing (Rodsetter) 50.29 34.77
Rigger & Machinery Mover 46.73 34.39
LABORER
Journeyman Class One 39.10 27.42
Journeyman Class Two 39.20 27.42
Journeyman Class Three 39.25 27.42
Journeyman Class Four 39.40 27.42
Journeyman Class Five 39.45 27.42
Journeyman Class Six 39.24 27.42
Journeyman Class Seven 40.38 27.42
Journeyman Class Eight 40.43 27.42
Journeyman Class Nine 40.53 27.42
2 | P a g e
Journeyman Class Ten 40.68 27.42
Journeyman Class Eleven 40.93 27.42
Journeyman Class Twelve 39.50 27.42
LABORER: ASBESTOS ABATEMENT,
LEAD ABATEMENT,
TOXIC WASTE HANDLING,
HAZARDOUS WASTE HANDLING
MASTER ABATEMENT TECHNICIAN 41.00 27.70
LANDSCAPE LABORER
Class I 30.85 24.38
Class II 30.85 24.38
LATHER 52.64 29.46
LINE CONSTRUCTION
Lineman 62.54 31.36
Winch Truck Operator 43.78 27.18
Ground hand 37.52 24.90
Watch/Flag Person 26.74 21.19
MARBLE SETTER 48.40 32.45
MARBLE FINISHER 40.52 29.90
MILLWRIGHT 57.39 35.81
(as of 5/1/2026) 60.20 35.81
PAINTER
Brush & Roller 44.38 34.55
Spray, Steel, & Swing 45.63 34.55
Bridges 61.81 33.95
PILEDRIVERMAN 51.48 41.74
(as of 5/1/2026) 53.23 41.74
(Diver) 64.35 41.74
(as of 5/1/2026) 66.54 41.74
(Diver Tender) 51.48 41.74
(as of 5/1/2026) 53.23 41.74
PLASTERER 43.78 33.09
PLUMBER 70.53 39.46
POINTER, CAULKER, & CLEANER 50.00 31.20
POWER EQUIPMENT OPERATOR
Group One 54.52 34.49
(as of 5/1/2026) 55.67 35.34
Group One A 57.52 35.38
(as of 5/1/2026) 58.68 36.22
Group Two 54.27 34.42
(as of 5/1/2026) 55.43 35.26
Group Two A 57.29 35.29
(as of 5/1/2026) 58.44 36.14
Group Three 50.18 33.22
(as of 5/1/2026) 51.34 34.06
3 | P a g e
Group Four 49.88 33.13
(as of 5/1/2026) 51.04 33.97
Group Five 48.16 32.62
(as of 5/1/2026) 49.32 33.46
Group Six 47.17 32.33
(as of 5/1/2026) 48.34 33.16
Group Seven (A)* 66.26 39.55
(as of 5/1/2026) 67.73 40.48
Group Seven (B)* 65.97 39.46
(as of 5/1/2026) 67.44 40.39
***TOXIC/HAZARDOUS WASTE REMOVAL***
ROOFER 44.13 34.77
Shingle 34.35 22.20
Slate & Tile 37.35 22.20
SHEET METAL WORKER 59.22 50.56
(Sign Makers and Hangers) 25.03 21.41
SOFT FLOOR LAYER (Resilient Floor) 53.93 30.54
SPRINKLER FITTER 66.22 34.25
STEAM FITTER 72.52 44.89
STONE MASON 48.40 32.45
SURVEYING AND LAYOUT
(Chief of Party) 65.96 30.09
(as of 5/1/2026) 67.52 30.44
(Instrument Person) 57.36 30.09
(as of 5/1/2026) 58.71 30.44
(Rodman) 45.88 23.19
(as of 5/1/2026) 46.97 23.54
TERRAZZO MECHANIC 51.36 30.16
TERRAZZO FINISHER (Grinder) 45.08 28.46
TERRAZZO FINISHER (Finisher) 44.81 28.46
TILE SETTER 51.36 30.16
TILE FINISHER 40.52 29.90
TRUCK DRIVER
Journeyman Class I 37.57 23.32
Journeyman Class II 37.67 23.32
Journeyman Class III And Low Boy 37.92 23.32
WALL COVERER 46.47 34.55
WELDER - Rate for craft to which, welding work is incidental.
WINDOW TINTER 24.97 12.38
B. Job Classification Definitions: Building Construction,
1. Laborer Classifications:
Class One: Strip concrete, dismantle concrete, load, unload, handle and/or transport reinforced steel and steel mesh, carry lumber, handle miscellaneous building materials operate
4 | P a g e jack hammers, use paving breakers and other pneumatic tools, build scaffolds, perform raking, handle asphalt, perform spading and concrete pit work, perform grading, perform form pinning or shorting, perform demolition work with exception of burners, lay conduits, lay ducts, perform sheeting or lagging, lay non-metallic pipe, perform caulking.
Class Two: Power Buggies, Burners on Demolition.
Class Three: Wagon drill operator (single)
Class Four: Powderman, wagon drill operator (multiple), perform circular caissons excavations, caisson groundman, perform underpinning excavation, perform laborers’ work at depth of eight (8) feet or below.
Class Five: Caisson bottom worker.
Class Six: Yard worker.
Class Seven: Trackmen, Brakemen, Groutmen, Bottom Shaft Men, All Other Men in Free
Air Tunnels.
Class Eight: Caisson Foreman
Class Nine: Miner Helper, Form Setters.
Class Ten: Miners Bore Driver, Blasters, Drillers, Pneumatic Shield Operator.
Class Eleven: Welders & Burners.
Class Twelve: Mason Tenders
Landscape Laborers:
Class I: Landscape laborer
Class II: Farm tractor driver, hydro seeder, mulched nozzle worker, backhoe operator, bulldozer crawler type loader, tree crane operator.
Laborer - Lather and Plasterer: Wheel and/or hod carry any lather and plaster materials used by lathering and plastering contractors’ build scaffolds; build runways; perform clean-up and removal of debris as covered by lathering and plastering contractor’s contract; deliver any material used by lathering and plastering contractor, from curbside to building and back, unless motor vehicles are permitted to enter building with required materials; all mortar designated for use by plasterer shall be carried via wheel barrow or hod; all plastering and fire proofing machines, as well as guns and mixers requiring the assistance of a worker other than plasterer operator, shall be manned by helper (tender).
2. Truck driver classifications:
Class I: Helper, stake body truck operator (single axle, dumpster).
Class II: Dump truck operator, tandem truck operator, batch truck operator, semi-trailer truck operator, agitator-mixer truck operator, dump Crete type vehicle operator, asphalt distributor, farm tractor operator (when tractor used to transport materials), stake body truck
(tandem) operator.
Class III: Euclid type; off highway equipment back truck operator; belly dump truck operator; double-hitched equipment trailer operator; straddle carrier (Ross) operator; low-bed trailer truck operator.
3. Power Equipment Operator Classifications – Building
Group One:
Handling steel and stone in connection with erection Cranes doing hook work
Any machines handling machinery
Helicopters
Concrete Pumps (building)
Machines similar to above, including remote control equipment
Group One A:
Handling steel and stone in connection with erection.
Cranes doing hook work
5 | P a g e
Any machines handling machinery
Concrete Pumps (Building)
High Rail/Burro Crane
Rail Loader (Winch Boom Type)
All equipment in this group which previously received the hour in lieu of an oiler will receive
Wage Group I (A). Equipment in this Wage Group that does not require an oiler.
Machines similar to above, including remote control equipment
Group Two:
All types of cranes
All types of backhoes
Cableways
Draglines
Keystones
All types of shovels
Derricks
Pavers 21E and over
Trenching machines
Trench shovels
Cable spinning machine
Gradalls
Front- end Loaders
Boat Captain
Hoist with Two Towers
Building Hoists-double drum (unless used as a single drum)
Pippin type backhoes
Tandem scrapers
Tower type crane operation erecting dismantling jumping or jacking
Drills self-contained (Drillmaster type)
Fork lift (20ft. and over)
Motor Patrols (fine grade)
Batch Plant with Mixer
Carryalls, Scrapers, Tournapulls
Roller (High Grade Finishing)
Spreaders (Asphalt)
Bulldozers and Tractors
Mechanic-Welder
Conveyor Loaders (Euclid-Type Wheel)
Concrete Pumps (Heavy Highway)
Milling Machine
Bobcat
Side Boom
Directional Boring Machines
Vermeer Saw Type Machine (other than hand held)
Tractor Mounted Hydro Axe
Chipper with boom
All Autograde and concrete finishing machines
Bundle Pullers/Extractors (Tubular)
Machines similar to the above including remote control equipment
*Surcharge
6 | P a g e
Group Two (A):
Crawler backhoes and Crawler gradalls over one (1) cubic yard factory rating
Hydraulic backhoes over one (1) cubic yard factory rating
Single person operation truck cranes 15 ton and over factory rating
Cherry picker type machinery and equipment 15 ton and over factory rating, etc.
Cranes doing hook work will be paid Wage Group I (A).
All equipment in this Group which previously received the hour in lieu of an oiler will receive Wage Group II (A) including concrete pumps (Heavy/Highway).
Machines similar to the above including remote control equipment
*Surcharge
Group Three:
Asphalt Plant Engineers
Conveyors (except building conveyors)
Well Driller
Forklift Trucks of all types
Ditch Witch (small trenchers)
Motor Patrols
Fine Grade machines
Rollers
Concrete Breaking Machines (Guillotine Only)
Stump Grinder
High or Low Pressure Boilers
Building Hoist (single drum)
Elevator Operator (New Construction)
Machines similar to above including remote control equipment
Group Four:
Seamen Pulverizing Mixer
Form Line Graders
Farm Tractors
Road Finishing Machines
Concrete Spreaders (Heavy Highway)
Power Broom (self-contained)
Seed Spreader
Grease Truck
Machines similar to the above including remote control equipment
Group Five:
Compressors
Pumps
Well pint pumps
Conveyors (Building)
Welding Machines
Heaters
Tireman, Power Equipment
Maintenance Engineers (Power Boats)
Miscellaneous Equipment
Operator
Elevator Operator (Renovations)
House Car
Machines similar to above including remote control equipment
7 | P a g e
Group Six:
Fireman
Oilers and Deck Hands (Personnel Boats)/Grease Truck Helpers
*Surcharge Group Seven (A):
Handling steel and stone in connection with erection Cranes doing hook work
Any machines handling machinery
Cable spinning machine
Helicopters
Concrete pumps (Building)
High Rail/Burro Crane
Rail Loader (Winch Boom Type)
Machines similar to above, including remote control equipment Group Seven B
All types of cranes
All types of backhoes
Cableways
Conveyor Loader (Euclid-Type Wheel)
Drag Lines
Keystones
All types of shovels
Derricks
Pavers 21E and over
Trench shovels
Trenching machines
Gradalls
Front-end Loaders
Boat Captain
Hoist with two towers
Concrete Pumps (Heavy, Highway)
Building Hoists-double drum (unless used as a single drum)
Milling Machine
Mucking Machines in Tunnel
Pippin type backhoes
Bobcat
Tandem scrapers
Side Boom
Tower type crane–operation, erecting, dismantling, Jumping or jacking
Directional Boring Machines
Vermeer Saw Type Machine (other that hand held)
Drills self-contained (Drillmaster type)
Fork Lift (20 ft. & over)
Track or Mounted Hydro Axe
Motor Patrols (Fine Grade)
Chipper with boom
Batch Plant with Mixer
All autograde and concrete finishing machines
8 | P a g e
Carryalls, Scapers & Tournapulls
Rollers (High Grade Finishing)
Bundle Pullers/Extractors (Tubular)
Spreaders (Asphalt)
Bulldozers and Tractors
Mechanic – Welders
Production Switch Tamper
Ballast Regulators
Tie Replacer
Rail/Road Loader
Power Jack liner
Machines similar to above, including remote control equipment
Heavy/Highway Construction
9 | P a g e
II. HEAVY AND HIGHWAY CONSTRUCTION
A. JOB CLASSIFICATION AND WAGE RATES
Basic Hourly Rate Fringe Benefits
BOILERMAKER 55.00 35.82
CARPENTER 57.36 30.09
(as of 5/1/2026) 58.71 30.44
CEMENT MASON 45.00 34.21
(as of 5/1/2026) 45.00 35.81
ELECTRICIAN 70.97 47.27
IRONWORKERS
Structural & Ornamental 53.20 41.01
Reinforcing (Rodsetter) 50.29 34.77
Rigger & Machinery Mover 46.73 34.39
LABORERS
Group One 39.80 27.80
Group Two 40.40 27.80
Group Three 40.40 27.80
Group Four 34.60 27.80
Group Five 40.65 27.80
Group Six 40.70 27.80
Group Seven 40.75 27.80
Group Eight 40.30 27.80
Group Nine 40.15 27.80
Group Ten 40.40 27.80
Group Eleven 40.20 27.80
Group Twelve 41.90 27.80
Group Thirteen 43.90 27.80
Group Fourteen 40.50 27.80
LANDSCAPING LABORER
Class I 30.43 23.95
Class II 29.13 23.95
LINE CONSTRUCTION
Lineman 62.54 31.36
Winch Truck Operator 43.78 27.18
Ground hand 37.52 24.90
Watch/Flag Person 26.74 21.19
MILLWRIGHT 57.39 35.81
(as of 5/1/2026) 60.20 35.81
PAINTERS
Brush & Roller 44.38 34.55
Spray, Steel, & Swing 45.63 34.55
Bridges 61.81 33.95
PILEDRIVERMAN 51.48 41.74
(as of 5/1/2026) 53.23 41.74
(Diver) 64.35 41.74
(as of 5/1/2026) 66.54 41.74
10 | P a g e
(Diver Tender) 51.48 41.74
(as of 5/1/2026) 53.23 41.74
POWER EQUIPMENT OPERATOR
Group One 54.52 34.49
(as of 5/1/2026) 55.67 35.34
Group One A 57.52 35.38
(as of 5/1/2026) 58.68 36.22
Group Two 54.27 34.42
(as of 5/1/2026) 55.43 35.26
Group Two A 57.29 35.29
(as of 5/1/2026) 58.44 36.14
Group Three 50.18 33.22
(as of 5/1/2026) 51.34 34.06
Group Four 49.88 33.13
(as of 5/1/2026) 51.04 33.97
Group Five 48.16 32.62
(as of 5/1/2026) 49.32 33.46
Group Six 47.17 32.33
(as of 5/1/2026) 48.34 33.16
Group Seven (A)* 66.26 39.55
(as of 5/1/2026) 67.73 40.48
Group Seven (B)* 65.97 39.46
(as of 5/1/2026) 67.44 40.39
*TOXIC/HAZARDOUS WASTE REMOVAL
POWER EQUIPMENT OPERATOR DREDGER
Class A1 42.66 14.01
Class A2 38.02 13.73
Class B1 36.89 13.66
Class B2 34.73 13.53
Class C1 33.78 13.18
Class C2 32.69 13.11
Class D 27.16 12.58
STEAM FITTER 72.52 44.89
STONE MASON 48.40 32.45
SURVEYING AND LAYOUT
(Chief of Party) 65.96 30.09
(as of 5/1/2026) 67.52 30.44
(Instrument Person) 57.36 30.09
(as of 5/1/2026) 58.71 30.44
(Rodman) 45.88 23.19
(as of 5/1/2026) 46.97 23.54
TRUCK DRIVER
11 | P a g e
Class I 37.42 23.32
Class II 37.52 23.32
Class III 38.02 23.32
B. Job Classification Definitions: Heavy and Highway Construction
1. Laborer Classifications:
Group One: Yard workers: (laborer, scale mixerman, burnerman, dustman, feeder)
. Group Two: General laborer; Asphalt Shovelers; Sheeting, Shoring & Lagging – Laborer;
Stone, Granite & Artificial Stone Setting Laborer; Hod Carriers; Scaffold Building; Relief
Joint & Approach Slabs; Assembling & Placing Gabions; Pneumatic Tool Laborers; Concrete
Forms & Stripping Laborers; Concrete Lumber Material Laborers; Steel & Steel
Mesh (carrying & handling); Form Pinners; Mortar Mixers; Pouring & Placing Concrete;
Grade Men.
Group Three: Vibrator Laborers; Finish Surface Asphalt Rackers; Jackhammer Operators;
Paving Breaker Operator; Pipelayer & Caulker (all joints up to within 5 feet of the Building
Foundation Line); Conduit & Duct Layers
Group Four: Flag person
Group Five: Miners
Group Six: Welders and Burners.
Group Seven: Miner Bore Driver; Blasters; Drillers Pneumatic Shield Operator
Group Eight: Form Setters
Group Nine: Trackmen; Brackmen; Groutmen; Bottom Shaft Men; All other Laborers in
Free Air Tunnels; Underpinning (When an underpinning excavation for a pier hole of five feet square or less and eight feet or more deep is dug, the rate shall apply only after a depth of eight feet is reached, to the men working in the bottom)
Group Ten: Circular Caissons (Where an excavation for circular caissons are dug eight feet or more below the natural grade level adjacent to the starting point of the caisson hole, at ground level, for the men working in the bottom); Welders, Burners & Air Tuggers
Group Eleven: Powdermen; Multiple Wagon Drill Operator Laborer
Group Twelve: Caisson Laborer Foreman
Group Thirteen: Toxic/Hazardous waste Handler
Group Fourteen: Wagon Drill/Hydraulic Track Drill Operator Laborer
Landscape Laborers:
Class I: Landscape laborer
Class II: Farm tractor driver, hydroseeder, mulcher nozzle worker, backhoe operator, bulldozer crawler type loader, tree crane operator.
2. Power Equipment Operator Classifications - Heavy, & Highway
Group One:
Handling steel and stone in connection with erection Cranes doing hook work
Any machines handling machinery
Cable spinning machine
Helicopters
Concrete Pumps (building)
Machines similar to above including remote control equipment
Group One A:
Handling steel and stone in connection with erection.
12 | P a g e
Concrete Pumps (Building)
High Rail/Burro Crane
Rail Loader (Winch Boom Type)
All equipment in this group which previously received the hour in lieu of an oiler will receive Wage Group I (A). Equipment in this Wage Group that does not require an oiler.
Machines similar to above, including remote control equipment
Group Two:
All types of cranes
All types of backhoes
Draglines
Keystones
All types of shovels
Derricks
Pavers 21E and over
Trenching machines
Trench shovels
Gradalls
Front- end Loaders
Boat Captain
Hoist with Two Towers
Building Hoists-double drum (unless used as a single drum)
Pippin type backhoes
Tandem scrapers
Tower type crane operation erecting dismantling jumping or jacking
Drills self-contained (Drillmaster type)
Fork lift (20ft. and over)
Motor Patrols (fine grade)
Batch Plant with Mixer
Carryalls, Scrapers, Tournapulls
Roller (High Grade Finishing)
Bulldozers and Tractors
Mechanic-Welder
Conveyor Loaders (Euclid-Type Wheel)
Concrete Pumps (Heavy Highway)
Milling Machine
Bobcat
Side Boom
Directional Boring Machines
Vermeer Saw Type Machine (other than hand held)
Tractor Mounted Hydro Axe
Chipper with boom
All Autograde and concrete finishing machines
Bundle Pullers/Extractors (Tubular)
Machines similar to the above including remote control equipment
Group Two A:
Crawler backhoes and Crawler gradalls over one (1) cubic yard factory rating
Hydraulic backhoes over one (1) cubic yard factory rating
Single person operation truck cranes 15 ton and over factory rating
13 | P a g e
Cherry picker type machinery and equipment 15 ton and over factory rating, etc.
Cranes doing hook work will be paid Wage Group I (A).
All equipment in this Group which previously received the hour in lieu of an oiler will receive Wage Group II (A) including concrete pumps (Heavy/Highway).
Machines similar to the above including remote control equipment
Group Three:
Asphalt Plant Engineers
Conveyors (except building conveyors)
Well Drillers
Forklift Trucks of all types
Ditch Witch (small trenchers)
Motor Patrols
Fine Grade machines
Rollers
Concrete Breaking Machines (Guillotine Only)
Stump Grinder
High or Low Pressure Boilers
Building Hoist (single drum)
Elevator Operator (New Construction)
Machines similar to above including remote control equipment
Group Four:
Seamen Pulverizing Mixer
Form Line Graders
Farm Tractors
Road Finishing Machines
Concrete Spreaders (Heavy Highway)
Power Broom (self-contained)
Seed Spreader
Grease Truck
Machines similar to the above including remote control equipment
Group Five:
Compressors Pumps
Well pint pumps
Conveyors (Building)
Welding Machines
Heaters
Tireman, Power Equipment
Maintenance Engineers (Power Boats)
Miscellaneous Equipment Operator
Elevator…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .