Bid 2460 Contract Dwgs~2.pdf
PDF 14 MB Posted
- Solicitation number
- B2626649
- Issued by
- Pennsylvania
About this file
Summary
This is a set of contract drawings for the Philadelphia Water Department (PWD) Southwest Water Pollution Control Plant Fuel Tank Replacement project (PWD Work #73105, Drawing Set 2024-0033). The project involves the complete replacement of existing fuel oil storage infrastructure with two new 12,000-gallon double-wall fuel oil storage tanks (AST-1 and AST-2) located on an exterior tank pad at 8200 Enterprise Avenue, Philadelphia, Pennsylvania 19153. The scope includes demolition of four existing fuel oil storage tanks, removal of associated fuel oil pumps and piping systems, installation of new duplex fuel oil pump sets with control panels in the basement mechanical room, installation of a fuel polishing system (DieselPure 400 Series Filter/Polisher), installation of remote fuel fill boxes with spill containment, and installation of secondary containment leak detection systems. The project also includes civil work such as site grading, erosion and sediment control, concrete foundations and pads, and structural modifications to support the new tanks and equipment. The contract drawings indicate that the work will be performed in multiple phases to minimize disruption to facility operations, with certain work potentially requiring second, third, or weekend shifts.
The pre-qualification solicitation has an estimated contract value range between $3,000,000 and $4,000,000 for the complete design and installation of the fuel tank replacement system. The drawings specify that all work must comply with the 2018 International Building Code as adopted by Philadelphia, OSHA requirements, and applicable state and local codes. Structural design loads include wind speeds of 130 miles per hour, snow loads of 25 pounds per square foot ground snow load, and seismic design category C requirements. The contractor must submit shop drawings for all equipment and materials prior to fabrication or installation, provide a detailed construction schedule, coordinate with PWD for all utility shutdowns and facility disruptions, and maintain the work site in a safe condition throughout the contract period. The contractor is responsible for obtaining all necessary permits, maintaining site security, managing material disposal in accordance with Pennsylvania state requirements, and providing a complete functional and warranted installation upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
N
THE
BURNS
GROUP
AREA OF WORK
8200 ENTERPRISE AVE
PHILADELPHIA, PA 19153
PHILADELPHIA WATER DEPARTMENT
DRAWING LIST
PWD SOUTHWEST WATER POLLUTION CONTROL PLANT
STB FUEL TANK REPLACEMENT
WORK NO. 73105
LOCATION PLAN
SERIAL NO: 20170941684
NOTIFICATION LIST
PURSUANT TO THE REQUIREMENTS OF ACT 287 AMENDED BY ACT 121 OF THE LEGISLATURE OF THE COMMONWEALTH OF PENNSYLVANIA TITLED: EXCAVATION AND DEMOLITION WORK - PROTECTION OF UNDERGROUND INSTALLATION. THE CONTRACTOR WILL BE REQUIRED, AT A MINIMUM, TO CALL THE PENNSYLVANIA ONE CALL SYSTEM 1-800-242-1776 OR 811 IN
PENNSYLVANIA.
ACT 287 AMENDED BY ACT 121 OF 2008
BURNS ENGINEERING PROJECT ENGINEER: JACQUELINE HAAS
PWD GENERAL MANAGER PLANNING & ENGINEERING: ACTING DEPUTY
COMMISSIONER OF ENGINEERING: VAHE HOVSEPIAN
PWD WATER COMMISSIONER: BENJAMIN C. JEWELL
DRAWING LIST
Sheet Number Sheet Title Sheet Description
1 CS-001 COVER SHEET
2 C-001 EXISTING CONDITIONS AND DEMOLITION PLAN - NOTES AND
LEGEND
3 C-002 EXISTING CONDITIONS AND DEMOLITION PLAN - EXISTING
TANK REMOVAL
4 C-003 EXISTING CONDITIONS AND DEMOLITION PLAN - NEW TANK
LOCATION
5 C-101 PROPOSED SITE AND GRADING PLAN - NOTES AND LEGEND
6 C-102 PROPOSED SITE AND GRADING PLAN - EXISTING TANK
REMOVAL
7 C-103 PROPOSED SITE AND GRADING PLAN - NEW TANK LOCATION
8 C-201 PROPOSED UTILITY AND EROSION & SEDIMENT CONTROL
PLAN - NOTES AND LEGEND
9 C-202 PROPOSED EROSION & SEDIMENT CONTROL PLAN - EXISTING
TANK REMOVAL
10 C-203 PROPOSED UTILITY AND EROSION & SEDIMENT CONTROL
PLAN - NEW TANK LOCATION
11 C-501 CIVIL DETAILS - 1
12 C-502 CIVIL DETAILS -2 E&S NOTES AND DETAILS
13 C-503 CIVIL DETAILS -3 E&S CONTROL DETAILS
14 S-001 STRUCTURAL NOTES, DESIGN LOADS, AND ABBREVIATIONS
15 S-100 OVERALL LOCATION PLAN
16 S-200 FUEL TANK PLANS - 12,000 GALLON TANKS
17 S-400 SECTIONS AND DETAILS
18 M-001 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS
19 DM-100 OVERALL BASEMENT MECHANICAL PLAN - REMOVALS
20 DM-200 MECHANICAL REMOVALS - ENLARGED PLANS AND SECTIONS
21 M-100 OVERALL FIRST FLOOR MECHANICAL PLAN - INSTALLATION
22 M-101 OVERALL BASEMENT MECHANICAL PLAN - INSTALLATION
23 M-200 MECHANICAL INSTALLATIONS - ENLARGED PLANS
24 M-201 MECHANICAL PIPING PLANS AND DETAILS
25 M-400 FUEL OIL FLOW DIAGRAM
26 M-600 SCHEDULES
27 E-001 GENERAL NOTES, LEGENDS, SYMBOLS, AND ABBREVIATIONS
28 E-100 SITE INSTALLATION PLAN
29 E-101 ENLARGED PLANS
30 E-400 DIAGRAMS AND SCHEDULES
COVER SHEET
CS-001
AS NOTED
RPD
JCH
-0
3- C
S-
ACTING DEPUTY COMMISSIONER OF ENGINEERING: VAHE HOVSEPIAN
3/28/2025
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
EXISTING CONDITIONS AND DEMOLITION
PLAN - NOTES AND LEGEND
C-001
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE
EXISTING CONDITIONS AND
DEMOLITION PLAN -
EXISTING TANK REMOVAL
C-002
3 30
SHEET OF 30
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE
EXISTING CONDITIONS AND
DEMOLITION PLAN -
NEW TANK LOCATION
C-003
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
PROPOSED SITE AND GRADING PLAN -
NOTES AND LEGEND
C-101
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 330
PROPOSED SITE AND GRADING PLAN -
EXISTING TANK REMOVAL
C-102
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
PROPOSED SITE AND GRADING PLAN -
NEW TANK LOCATION
C-103
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
PROPOSED UTILITY AND EROSION &
SEDIMENT CONTROL PLAN -
NOTES AND LEGEND
C-201
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
PROPOSED UTILITY AND EROSION &
SEDIMENT CONTROL PLAN -
EXISTING TANK REMOVAL
C-202
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
PROPOSED UTILITY AND EROSION &
SEDIMENT CONTROL PLAN -
NEW TANK LOCATION
C-203
3/4" BLACK CORDED HOSE
2'-0" OF ORANGE PLASTIC FLAGGING
GALVANIZED TURNBUCKLE WITH 1/4" DIA.
BOLT (FOR TREES OF 4" CALIPER AND
14 GAUGE GALVANIZED STEEL WIRE
REMOVE TOP 1/3 OF BURLAP
(3) 2" BY 3" BY 8'-0" HARDWOOD
STAKES SPACED EQUALLY AROUND TREE
BACKFILL PLANTING MIX AS SPECIFIED.
COMPACT BOTTOM LAYER TO PREVENT
* PLANT TREE AT THE SAME LEVEL AS
GROWN IN THE NURSERY
FORM 2" SAUCER
SETTLEMENT
ABOVE)
KNOTTED TO WIRES
* PRUNE DEAD OR BROKEN BRANCHES.
DO NOT LEAVE "V" CROTCHES.
DO NOT CUT LEADER
(MULCH RING TO ENCOMPASS TREE STAKES)
3" MULCH, TAPERED AT TRUNK BASE
3/28/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
CIVIL DETAILS - 1
C-501
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
CIVIL DETAILS -2
E&S NOTES AND DETAILS
C-502
3/28/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
1 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
PWD WORK #73105
AS NOTED
DNN
JAE
2242004
MG DNN JAE 30
CIVIL DETAILS -3
E&S CONTROL DETAILS
C-503
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
GENERAL SERVICE LOADS
2018 INTERNATIONAL BUILDING CODE
FLOOR LIVE LOAD (L) 150 PSF
REDUCTION FACTOR NOT USED
SNOW LOAD
GROUND SNOW LOAD (Pg) 25 PSF FLAT-ROOF SNOW LOAD (Pf) 20 PSF SNOW EXPOSURE FACTOR (Ce) 0.9 SNOW LOAD IMPORTANCE FACTOR (Is) 1.0 THERMAL FACTOR (Ct) 1.2
SLOPE FACTOR (CS) 1.0
DRIFT SURCHARGE LOAD (Pd) N/A WIDTH OF SNOW DRIFTS (w) N/A
WIND DESIGN DATA
BASIC DESIGN WIND SPEED (V) 130 MPH
VELOCITY PRESSURE EXPOSURE COEFFICIENT, Kz 0.85 TOPOGRAPHIC FACTOR, Kzt 1 WIND DIRECTIONALITY FACTORY, Kd 1 GROUND ELEVATION FACTOR, Ke 1
RISK CATEGORY IV
WIND EXPOSURE CATEGORY C
WIND PRESSURE ON TANK 9.9 KIP
SEISMIC DESIGN DATA
RISK CATEGORY IV
SEISMIC COMPONENT IMPORTANCE FACTOR (IP) 1.5
MAPPED SPECTRAL RESPONSE ACCELERATIONS
SS = 0.200 g S1 = 0.060 g
SITE CLASS D
SPECTRAL RESPONSE COEFFICIENTS
SDS = 0.213 g SD1 = 0.096 g
SEISMIC DESIGN CATEGORY C
BASIC SEISMIC-FORCE-RESISTING SYSTEM(S)
HORIZONTAL SADDLE
SUPPORTED
VESSELS/FLATBOTTOM GROUND
SUPPORTED TANKS
COMPONENT DESIGN HORIZONTAL FORCE (FP) 9.9 K EACH TANK
SEISMIC RESPONSE COEFFICIENT (CS) 0.10
RESPONSE MODIFICATION FACTOR (R) 3.0
OVERSTRENGTH FACTOR (ΩO) 2.0
DEFLECTION AMPLIFICATION FACTOR (Cd) 2.5
ANALYSIS PROCEDURE USED SEISMIC DESIGN REQUIREMENTS
FOR NONBUILDING STRUCTURES
FLOOD LOAD
FLOOD DESIGN CLASS 1
ELEVATION OF THE LOWEST FLOOR 105 FT
ELEVATION OF FLOODPROOFING 105 FT
BOTTOM ELEVATION OF LOWEST HORIZONTAL
STRUCTURAL MEMBER 105 FT
RIGHT-OF-WAY
PROPERTY LINE
RADIUS OR RISER
REINFORCEMENT
RECTANGULAR
NOT TO SCALE
NEAR FACE (REINF.)
NEAR SIDE (REINF.)
MISCELLANEOUS
OUTSIDE DIAMETER
EXP. BOLT
FIN.
FLD.
FIXT.
EXIST.
EMBED.
E.P.
EXP. JT.
DWLS.
EA.
ELEC.
E.F.
EL.
E.E.P.
DIM.
DIA. or Ø
DET.
DEG.
DWG.
EXPANSION BOLT
EXPANSION JOINT
EQUIPMENT PAD
FINISH
FIXTURE
FIELD
EXISTING
EMBEDMENT
ELECTRICAL EQUIPMENT PAD
DOWELS
ELECTRICAL
EACH FACE
ELEVATION
EACH
DIAMETER
DIMENSION
DETAIL
DEGREE
DRAWING
LONG LEG BACK TO BACK
LONG LEG HORIZONTAL
LONG LEG OUTSTANDING
LLH
MATERIAL
MAXIMUM
MEMBRANE
LOW POINT
LONG LEG VERTICAL
MATL.
MEMB.
MAX.
LLV
LLOS
L.P.
LIGHTING
ANGLE
INSIDE DIAMETER
INTERMEDIATE
JOINT
HEIGHT
LGT.
L
LLBB
INTERM.
JT.
I.D.
HT.
REINF.
SCHED.
SECT.
SHT.
REV.
R.R.
REQD.
R/W
SHEET
SECTION
REVISION
RAILROAD
REQUIRED
SCHEDULE
O. TO O.
PT.
RD.
RECT.
R
REF.
LP
PL
OPP.
PROJ.
POINT
ROUND
REFERENCE
PLATE
OPPOSITE
PROJECTION
OUT TO OUT
LC
CL.
COL.
CTSK
CONC.
BC
CIP
CJ
C/C
C.J.
B/ A.B.
BOTTOM OF CURB ELEVATION
CAST IRON PIPE
CONSTRUCTION JOINT
CONTROL JOINT
CENTER TO CENTER
CENTER LINE
CLEAR
COLUMN
COUNTERSUNK
CONCRETE
BOTTOM OF
ANCHOR BOLT
STRUCTURAL ABBREVIATIONS
FRAMING
GALVANIZED
GRADE, GROUND
GRATING
HOOK
GAGE (DISTANCE)
FOOTING
FLOOR
GAUGE (THICKNESS)
HIGH POINT
HORIZONTAL
GALV.
GRTG.
HK.
GRD.
H.P.
HOR.
FRMG.
GA.
FTG.
FLR.
GA.
FLANGE
FAR FACE
FLG.
F.F.
NO.
N.S.
N.T.S.
O.C.
OPNG.
O.D.
MIN.
MISC.
MH
N.F.
NUMBER
ON CENTER
OPENING
MINIMUM
MANHOLE
MET. METAL
WATER STOP
WELDED WIRE FABRIC
TOP OF RAIL ELEVATION
UNLESS NOTED OTHERWISE
WORK POINT, WATERPROOFING
U.N.O.
VERT.
W.W.F.
W/
W.S.
W.P.
WT.
WL
TR
TYP.
VIF
WITH
WEIGHT
WORK LINE
VERTICAL
TYPICAL
VERIFY IN FIELD
STAINLESS STEEL
SYMMETRICAL
STRUCTURAL
ST. STL.
STIFF.
TEMP.
T/
SYM.
T
THD.
SPA.
STD.
STL.
STR.
TREAD
TOP OF
TEMPORARY
THREADED
STIFFENER
STEEL
SPACE
STANDARD
SIM. SIMILAR
F.L. FULL LENGTH
VOLUMEVOL.
OPPOSITE HANDO.H.
H.H.N. HEAVY HEX NUT
E.B. EASTBOUND
WESTBOUNDW.B.
OUTSTANDINGO.S.
GENERAL
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE 2018 INTERNATIONAL
BUILDING CODE AS ADOPTED AND AMENDED BY THE PHILADELPHIA BUILDING
CONSTRUCTION AND OCCUPANCY CODE AS WELL AS ALL REFERENCED STANDARDS
CONTAINED THEREIN.
2. ALL SECTIONS, DETAILS AND NOTES ARE INTENDED TO BE TYPICAL UNLESS OTHERWISE
INDICATED.
3. ALL CURBED AND OTHER OPENINGS, EQUIPMENT BASES, DEPRESSIONS, FRAMES,
CASTINGS, PIPE SLEEVES, CONDUITS, INSERTS, ROOF DRAINS, EDGE PROTECTION,
ANCHOR BOLTS AND SIMILAR ITEMS REQUIRED FOR ALL TRADES SHALL BE PROVIDED,
LOCATED AND INSTALLED AS SHOWN ON APPROVED SHOP DRAWINGS AND WORKING
DRAWINGS FOR MANUFACTURED ITEMS AND OTHER TRADES.
4. THE GENERAL CONTRACTOR AND ELECTRICAL CONTRACTOR SHALL EXAMINE AND FIELD
VERIFY ALL EXISTING AND GIVEN DIMENSIONS AND CONDITIONS PRIOR TO
COMMENCEMENT OF THE WORK AND FABRICATION OF CONSTRUCTION MATERIALS.
VARIANCES FROM THE DRAWINGS AND SPECIFICATIONS AND POTENTIAL
INTERFERENCES SHALL BE REPORTED PROMPTLY TO THE ENGINEER OF RECORD. THE
CONTRACTOR SHALL INCORPORATE ACTUAL FIELD CONDITIONS AND DIMENSIONS IN
THE WORK. THE CONTRACTOR SHALL PERFORM THE WORK TO MEET FIELD CONDITIONS
ENCOUNTERED.
CONTRACTOR OPERATIONS:
1. THE CONTRACTOR SHALL ASSUME AN ABSOLUTE OBLIGATION TO PROTECT EXISTING
STRUCTURES AND EQUIPMENT, NEW WORK, AND THE GENERAL PUBLIC FROM DAMAGE,
LOSS OR INJURY RESULTING FROM THE CONTRACTOR'S OPERATIONS AT THE PROJECT
SITE. IN THE EVENT OF SUCH DAMAGE OR LOSS, THE CONTRACTOR SHALL PROMPTLY
RESTORE OR REPLACE THE WORK TO AN EQUIVALENT QUALITY AND AT NO ADDITIONAL
EXPENSE TO THE OWNER.
2. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BRACINGS, TEMPORARY SUPPORTS
AND SHORING DURING CONSTRUCTION.
STRUCTURAL DESIGN CRITERIA:
1. THE PROPOSED CONSTRUCTION IS DESIGNED IN CONFORMANCE WITH THE APPLICABLE
PROVISIONS AND REQUIREMENTS OF THE FOLLOWING PUBLICATIONS:
a. INTERNATIONAL BUILDING CODE, 2018 EDITION
b. SEI/ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
c. ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
d. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
e. AWS D1.1-17 STRUCTURAL WELDING CODE - STEEL
f. AWS D1.3-98 STRUCTURAL WELDING CODE - SHEET STEEL
g. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), 1970, WITH AMENDMENTS TO
DATE.
MATERIALS OF CONSTRUCTION:
CAST-IN-PLACE CONCRETE:
1. CONCRETE CONSTRUCTION SHALL FOLLOW THE REQUIREMENTS OF THE PROJECT
MANUAL, ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE", AND ACI 318
"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE".
2. ALL STRUCTURAL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE HAVING A MINIMUM
COMPRESSIVE STRENGTH OF 5,000 PSI.
3. FORMWORK SHALL NOT BE REMOVED UNTIL THE PLACED CONCRETE HAS ACHIEVED A
COMPRESSIVE STRENGTH OF AT LEAST 3,500 PSI, BUT NO SOONER THAN SEVEN (7)
DAYS.
4. LOAD SHALL NOT BE PLACED ON TOP OF FRESHLY-PLACED CONCRETE UNTIL THE
CONCRETE HAS ACHIEVED A COMPRESSIVE STRENGTH OF AT LEAST 3,500 PSI, BUT NO
SOONER THAN SEVEN (7) DAYS.
5. CONTRACTOR SHALL NOTIFY THE INSPECTION AGENCY PRIOR TO PLACEMENT OF
CONCRETE TO ALLOW FOR INSPECTION OF REINFORCEMENT PLACEMENT, CLEARANCES,
AND FORMWORK.
6. CONDUIT AND PIPING SHALL BE AS LOCATED ON THE DRAWINGS, DO NOT PLACE
CONDUITS AND/OR PIPES IN STRUCTURAL CONCRETE WITHOUT PRIOR APPROVAL FROM
THE ENGINEER.
7. NO ALUMINUM OF ANY TYPE SHALL BE ALLOWED UNLESS COATED TO PREVENT
ALUMINUM-CONCRETE REACTION. MAXIMUM OUTSIDE DIAMETER OF EMBEDDED
CONDUIT SHALL BE NO LARGER THAN ONE-THIRD OF THE SMALLEST DIMENSION OF THE
ELEMENT AND SHALL BE LOCATED IN THE MIDDLE THIRD. NO ELECTRICAL CONDUIT
SHALL BE PLACED IN THE REGION DESIGNATED AS CONCRETE COVER FOR
REINFORCEMENT.
8. WHERE NOTED "ROUGH JOINT" INDICATES CONCRETE SURFACE SHALL BE ROUGHENED
TO A ICRI CSP 7 TO 9 AND CLEANED FREE OF OIL, GREASE, LOOSE MATERIAL, AND
LAITANCE. DAMPEN SURFACES TO SATURATED SURFACE DRY (SSD) AND COATED WITH
A CEMENTITIOUS BONDING SLURRY IMMEDIATELY PRIOR TO PLACING NEW CONCRETE.
CONCRETE REINFORCEMENT:
1. EXCEPT WHERE OTHERWISE NOTED, THESE NOTES APPLY TO REINFORCING STEEL IN
CONCRETE STRUCTURES.
2. STEEL REINFORCEMENT SHALL BE ASTM A615, GRADE 60 BARS. ALL REINFORCEMENT
BARS SHALL BE EPOXY-COATED PER ASTM A775. WELDED WIRE REINFORCEMENT (WWR)
SHALL CONFORM TO A1064. ALL WWR SHALL BE UNCOATED.
3. DETAIL, FABRICATE, AND PLACE REINFORCING IN ACCORDANCE WITH THE PROVISIONS
SET FORTH BY THE AMERICAN CONCRETE INSTITUTE (ACI) AND CRSI "MANUAL OF
STANDARD PRACTICE".
4. PROVIDE SHOP DRAWINGS SHOWING FULL INFORMATION FOR REINFORCING
PLACEMENT. REINFORCING STEEL DETAILER SHALL ADEQUATELY CROSS REFERENCE
THE STRUCTURAL DRAWINGS TO THE SATISFACTION OF THE ENGINEER. REINFORCING
STEEL DETAILER SHALL DEVELOP ALL PLANS, ELEVATIONS, SECTIONS, AND DETAILS
WITH PERTINENT ELEVATIONS GIVEN TO CLEARLY INDICATE THE POSITION OF THE
REINFORCEMENT AND CONSTRUCTION JOINTS.
5. LENGTHS OF REINFORCING BARS, IF SHOWN, DO NOT INCLUDE HOOKS.
6. REINFORCEMENT NOT SHOWN ON SECTION AND PLANS IS THE SAME AS THAT SHOWN IN
SIMILAR SECTIONS AND AT SIMILAR LOCATIONS.
7. SLABS-ON-GRADE/EQUIPMENT PADS: UNLESS NOTED OTHERWISE, REINFORCEMENT
SHALL BE PLACED 1-1/2 INCHES BELOW TOP OF SLAB. CONTRACTOR SHALL SUBMIT A
LAYOUT OF PROPOSED CONSTRUCTION JOINTS.
8. MINIMUM CONCRETE COVER FOR REINFORCEMENT:.
a. FORMED SURFACES NOT IN CONTACT WITH EARTH OR LIQUID: 1-1/2 INCHES
b. FORMED SURFACES IN CONTACT WITH WATER, EARTH, OR LIQUID: 2 INCHES.
c. UNFORMED SURFACES CAST AGAINST EARTH: 3 INCHES.
9. ALL REINFORCEMENT, INCLUDED WELDED WIRE REINFORCEMENT, SHALL BE
ADEQUATELY SECURED IN POSITION PRIOR TO CONCRETE PLACEMENT.
10. ALL REINFORCEMENT SHALL MAINTAIN UNIFORM CONCRETE COVER TO MATCH THE
SLOPE OF THE CONCRETE SURFACE.
11. WHERE REINFORCING DOWELS OR HOLES FOR CONCRETE ANCHORS ARE SHOWN TO BE
POST-INSTALLED IN CONCRETE, THE CONTRACTOR SHALL LOCATE REINFORCING OR
ANY EMBEDDED CONDUITS WITH THE CONCRETE ELEMENT AND POSITION THE DOWELS
AND ANCHORS TO AVOID DAMAGING THE REINFORCING STEEL. IF ANY CONDUITS ARE
DETECTED WITHIN THE TOP 5 INCHES OF ANY CONCRETE SURFACE, NOTIFY THE
ENGINEER IMMEDIATELY.
POST-INSTALLED CONCRETE ANCHORS:
1. DRILL AND INSTALL POST-INSTALLED ANCHORS ACCORDING TO MANUFACTURER'S
PRINTED INSTALLATION INSTRUCTION AND PER MANUFACTURER'S ON-SITE TRAINING.
2. ALL POST-INSTALLED ANCHORS SHALL MEET ICC-ES COMPLIANCE FOR EACH TYPE OF
APPLICATION.
3. SUBMIT PRODUCT INFORMATION AND ICC-ES EVALUATION REPORT FOR EACH ANCHOR
TYPE.
4. ALL ANCHOR INSTALLERS OF POST-INSTALLED ANCHORS SHALL BE ACI/CRSI ADHESIVE
ANCHOR INSTALLER CERTIFIED. SUBMIT CERTIFICATES FOR RECORD.
5. ADHESIVE ANCHORS IN CONCRETE SHALL BE HILTI HY-200 OR APPROVED EQUAL.
6. EXPANSION ANCHORS IN CONCRETE SHALL BE HILTI KWIK-BOLT TZ2 OR APPROVED
EQUAL.
7. PROVIDE STANDARD HOLES IN ALL STEEL MEMBERS RECEIVING POST-INSTALLED
ANCHORS. IF OVERSIZED HOLES ARE PROVIDED FOR EASE OF INSTALLATION, PROVIDE
WELDABLE WASHERS FOR ANCHORS.
8. TESTING:
a. 10-PERCENT OF EACH TYPE AND SIZE OF DRILLED-IN ANCHOR SHALL BE PROOF
LOADED BY THE INDEPENDENT TESTING LABORATORY. ADHESIVE ANCHORS AND
CAPSULE ANCHORS SHALL NOT BE TORQUE TESTED UNLESS OTHERWISE
DIRECTED BY THE ENGINEER. IF ANY MORE THAN 10-OF THE TEST ANCHORS FAIL
TO ACHIEVE THE SPECIFIED TORQUE OR PROOF LOAD WITHIN THE LIMITS DEFINED
IN THE DRAWINGS, ALL ANCHORS OF THE SAME DIAMETER AND TYPE AS THE
FAILED ANCHOR(S) SHALL BE TESTED UNLESS OTHERWISE INSTRUCTED BY THE
ENGINEER.
b. PERFORM TENSION TESTING IN ACCORDANCE WITH ASTM E488.
c. APPLY TORQUE WITH A CALIBRATED TORQUE WRENCH.
d. APPLY PROOF LOADS WITH A CALIBRATED HYDRAULIC RAM. DISPLACEMENT OF
ADHESIVE AND CAPSULE ANCHORS AT PROOF LOADS SHALL NOT EXCEED D/10
WHERE IS D IS THE NOMINAL ANCHOR DIAMETER.
STRUCTURAL STEEL
1. STRUCTURAL STEEL SHAPES
a. W SHAPES: ASTM A992 (Fy = 50 KSI)
b. CHANNELS: ASTM A36 (Fy = 36 KSI)
c. ANGLES AND PLATES: ASTM A36 (Fy = 36 KSI) UNO OR ASTM A572 (Fy = 50 KSI)
WHERE INDICATED.
d. RECTANGULAR STRUCTURAL STEEL TUBING: ASTM A500 GRADE B (Fy = 46 KSI)
e. ROUND STEEL PIPES: ASTM A53 GRADE B (FY = 35 KSI).
2. ELECTRODES FOR WELDING: E70XX (AWS A5.1 OR A5.5); USE LOW HYDROGEN
ELECTRODES FOR FIELD WELDING.
3. HIGH STRENGTH BOLTS SHALL CONFORM TO ASTM A325 OR A490.
4. ANCHOR RODS SHALL CONFORM TO ASTM 1554 GRADE 105.
5. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED, AND ERECTED WITH THE
LATEST EDITION OF THE AISC CODE OF STANDARD PRACTICE, EXCEPT AS MODIFIED IN
THESE DRAWINGS.
SOILS NOTES:
1. SOIL DATA IS TAKEN FROM GEOTECHNICAL EVALUATION REPORT PREPARED BY CGC
GEOSERVICES, PROJECT NUMBER CG,3824.GA, DATED OCTOBER 2024.
2. MAT EQUIPMENT PAD FOUNDATIONS SHALL BEAR ON SOIL ASSUMED CAPABLE OF
SUSTAINING A NET ALLOWABLE BEARING PRESSURE OF 2000 PSF.
3. ALL FOUNDATION EXCAVATIONS SHALL BE INSPECTED AND CERTIFIED BY A QUALIFIED
SOILS TESTING FIRM. ALL REPORTS ARE TO BE SUBMITTED TO THE ENGINEER OF
RECORD.
4. ALL BEARING MATERIAL SHALL BE INSPECTED BY AN INDEPENDENT TESTING AGENCY
PRIOR TO CONCRETE PLACEMENT. THE INDEPENDENT TESTING AGENCY SHALL BE THE
SOLE JUDGE AS TO THE SUITABILITY OF THE BEARING MATERIAL. ELEVATIONS SHALL BE
ADJUSTED AS REQUIRED.
6. BOTTOM OF ALL FOOTINGS SHALL BEAR A MINIMUM OF 3'-0" BELOW FINAL GRADE FOR
FROST PROTECTION.
7. BACKFILLING AGAINST WALLS AND GRADE BEAMS SHALL BE DONE EVENLY ON BOTH
SIDES.
8. AFTER EXCAVATING FOR ALL EARTH-SUPPORTED SLABS, THE EXPOSED NATURAL SOIL
SHALL BE THOROUGHLY COMPACTED PRIOR TO PLACING FILL, STONE, OR CONCRETE.
9. ALL FILL AND TOP SOIL SHALL BE REMOVED FROM BELOW ALL PROPOSED SLABS AND
THE SUBGRADE PROOF-ROLLED. AREAS EXHIBITING PUMPING OR WEAKNESS, AS
OBSERVED BY A QUALIFIED SOILS TESTING FIRM, SHALL BE REMOVED AND REPLACED
WITH ACCEPTABLE COMPACTED FILL.
10. ALL FILL REQUIRED TO ATTAIN FINAL SUBGRADE FOR SLABS SHALL BE AN ACCEPTABLE
MATERIAL, PLACED IN LIFTS NOT EXCEEDING 12 INCHES IN LOOSE THICKNESS AND
COMPACTED TO A MINIMUM OF 95% MAXIMUM DENSITY (MODIFIED PROCTOR METHOD,
ASTM D1557).
11. NO FOUNDATIONS SHALL BE PLACED ONTO OR AGAINST SUBGRADES CONTAINING FREE
WATER, FROST, OR ICE.
11. CROSS REFERENCE ALL ELECTRICAL, MECHANICAL, STRUCTURAL, AND CIVIL DRAWINGS
TO ASSURE PROPER DIMENSIONS AND PLACEMENT OF MATERIALS.
REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
(2018 IBC TABLE 1705.3)
TYPE
CONTINUOUS
SPECIAL
INSPECTION
PERIODIC
SPECIAL
INSPECTION
REFERENCED STANDARD IBC REFERENCE
1. Inspect reinforcement, including prestressing tendons, and verify placement. — X ACI 318 Ch. 20, 25.2, 25.3, 26.6.1-26.6.3 1908.4
2. Reinforcing bar welding:
AWS D1.4
ACI 318: 26.6.4 —
a. Verify weldability of reinforcing bars other than
ASTM A706. — X
b. Inspect single-pass fillet welds, maximum 5/16". — X
c. Inspect all other welds. X —
3. Inspect anchors cast in concrete. — X ACI 318: 17.8.2 —
4. Inspect anchors post-installed in hardened concrete members (see Note 1 below).
a. Adhesive anchors installed in horizontally or upwardly inclined orientations to resist sustained tension loads.
X — ACI 318: 17.8.2.4
b. Mechanical anchors and adhesive anchors not defined in 4.a — X ACI 318: 17.8.2
5. Verify use of required design mix. — X ACI 318: Ch. 19, 26.4.3, 26.4.4 1904.1, 1904.2, 1908.2, 1908.3
6. Prior to concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.
X —
ASTM C172
ASTM C31
ACI 318: 26.5, 26.12
1908.10
7. Inspect concrete and shotcrete placement for proper application techniques. X — ACI 318: 26.5 1908.6, 1908.7, 1908.8
8. Verify maintenance of specified curing temperature and techniques. — X ACI 318: 26.5.3-26.5.5 1908.9
9. Inspect prestressed concrete for:
ACI 318: 26.10 —a. Application of prestressing forces. X —
b. Grouting of bonded prestressing tendons. X —
10. Inspect erection of precast concrete members. — X ACI 318: 26.9 —
11. Verify in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs.
— X ACI 318: 26.11.2 —
12. Inspect formwork for shape, location and dimensions of the concrete member being formed. — X ACI 318: 26.11.1.2(b) —
Note 1: Specific requirements for special inspection shall be included in the research report for the anchor issued by an approved source in accordance with
17.8.2 in ACI 318, or other qualification procedures. Where specific requirements are not provided, special inspection requirements shall be specified by the registered design professional and shall be approved by the building official prior to the commencement of the work.
STRUCTURAL NOTES, DESIGN LOADS, AND
ABBREVIATIONS
S-001
AS NOTED
RPD
JCH
-0
3- S-
PE077633
ENGINEER
REGISTERED
PROFESSIONAL
DAVID HILLEY
S-200
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
S-100
OVERALL STRUCTURAL LOCATION PLAN
1" = 20' SCALE:1"=20'-0"
0 20'20' 10'
OVERALL LOCATION PLAN
S-100
AS NOTED
RPD
JCH
-0
3- S-
N
PE077633
ENGINEER
REGISTERED
S-400
S-400
FOR SIDEWALKS
SEE CIVIL DWGS
S-400
SIM
3'-0"
S-400
1'-6"
'-0
TA
N K
4'-0"8'-6"
TANK
4'-0"
29'-6"
'-0
7'-7"
PAD
3' -8
PA
D
1' -6
2' -0
2'-3"3'-0"
'-4
3'
-0
7' -6
8'-6"
TANK
3' -0
PL
AT
FO
R M
SE
E
N O
TE
1' -0
25'-6"
1' -6
TY
P
8'-2"
1' -3
TY
P
7'-0"
(2) 12,000 GALLON FUEL
OIL STORAGE TANKS -
SEE MECHANICAL DWGS
STAIR AND CATWALK
BY TANK MFR - SEE
NOTE 1
EXISTING LIGHT POLE
TO BE SALVAGED AND
REINSTALLED - SEE
NOTE 3
FILL PORT - SEE
MECHANICAL
FUEL PIPING STUB UPS
- SEE SLAB PIPE
SLEEVE DETAIL 9/S-400
EXISTING LIGHT POLE
TO BE SALVAGED AND
REINSTALLED - SEE
NOTE 3
CJ
SADDLE PAD
(TYP OF 4)
CJ
T/PAD EL 107.00
T/PAD EL 107.00
T/EQUIP PAD EL 107.00
SEE DETAIL 3/S-400
1' -0
" M
IN
SE
E
N O
TE
FUEL POLISHER
- SEE MECHANICAL
BOLLARD SEE CIVIL
FOR LOCATIONS (TYP)
T/CONCRETE
106.76 SEE CIVIL
T/CONCRETE
106.17 SEE CIVIL
T/CONCRETE
105.46 SEE CIVIL
T/CONCRETE
106.05 SEE CIVIL
1' -6
3'-8"
4" 4"
S-400
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
30FUEL TANK PLANS - 12,000 GALLON TANKS
S-200
AS NOTED
RPD
JCH
-0
3- S-
S-200
ENLARGED PLAN
1/4" = 1'-0"
SCALE:1/4"= 1'-0"
0 4'4' 2'
NOTES:
1. TANK MANUFACTURE TO PROVIDE INTEGRATED STAIR AND ACCESS PLATFORM WITH GUARDRAILS AND
TANK WALK OFF ACCESS. COORDINATE ELEVATIONS WITH FUEL PIPE ROUTING. STAIR SHALL MEET
REQUIREMENTS OF OSHA SECTION 1910.25.
2. COORDINATE DIMESION OF CONCRETE LANDING WITH MANUFACTURE PROVIDED STAIR.
3. REMOVE EXISTING LIGHT POLE AND STORE AND PROTECT FOR RE-INSTALLATION AFTER COMPLETION OF TANK WORK. SEE DETAIL 4/S-400 FOR NEW FOUNDATION DETAIL. CONTRACTOR MAY PROTECT EXISTING
LIGHT POLE AND FOUNDATION IN PLACE DURING WORK AT THEIR OPTION.
4. COORDINATE LEVELING NUTS WITH FUEL FILL PORTS MANUFACTURE ANCHOR REQUIREMENTS. GROUT
UNDER BASEPLATE WITH NON-SHRINK GROUT.
5. CJ IS TO BE AS CLOSE TO CENTER OF PAD AS POSSIBLE WHILE MAINTAINING A MINIMUM 1'-0" CLEAR FROM EDGE OF FUEL PIPE STUB UPS. COORDINATE FINAL LOCATIONS OF STUB UPS WITH CJ IN THE FIELD.
N
PE077633
ENGINEER
REGISTERED
1'-0"
1' -2
#5@8
3' -0
" #8@8
COMPACTED
SUBGRADE
C R
U
SH
ED
ST
O N
E
8"
MIN
T/SIDEWALK
VARIES - SEE CIVIL
T/SLAB VARIES
SEE PLAN
VA
R
IE
S
(2) #5
#5@12 (TYP)
#5@8
4" CHAMFER (TYP)
2" EXPANSION JOINT
T/GRADE VARIES -
SEE CIVIL
NOTES :
1. DO NOT CUT OR DAMAGE EXISTING SLAB REINFORCING WHILE
INSTALLING ANCHORS.
2. FOR EQUIPMENT DIMENSIONS AND LOCATIONS SHOWN SEE
MECHANICAL, ELECTRICAL, AND HEATING & VENTILATION
DRAWINGS.
3. DETAIL APPLIES AT INTERIOR EQUIPMENT PADS AS WELL AS
ISOLATED PADS ON THE FUEL TANK FOUNDATION PAD.
4"
MAX
8" DIA EXPANSION
ANCHOR @ 12" O/C
(E) SLAB
FINISHED FLOOR
ROUGH JOINT
11 2" C
LE
AR
2"
CLEAR
6" U
N
LE
SS
N
O
TE
D O
TH
ER
W
IS
E
DETERMINE SIZE AND LOCATION AFTER
FINAL SELECTION OF EQUIPMENT AND IN
ACCORDANCE WITH APPROVED
SUBMITTALS (8" MAX. HEIGHT)
#5@12
2'-6" DIA.
7' -0
(10) #6 VERTICAL BARS,
EQUALLY SPACED
1' -0
REINSTALL EXISTING
LIGHT POLE IN SAME
LOCATION
#3 TIES @ 12" OC
ADDT'L #3 TIES @ 3" OC
T/GRADE
CONDUIT -
SEE ELEC
F1554 GR55, GALVANIZED ANCHOR
RODS W/ 18" MIN. EMBED.,
DIAMETER AND SPACING TO MATCH
EXISTING LIGHT POLE BASE
4' -0
GRADE
FILL 6" DIA EXTRA
STRONG STEEL PIPE
WITH CONCRETE
UNDISTURBED
SOIL
5' -0
PROVIDE PLASTIC COVERS
IN SAFETY YELLOW FOR
ALL BOLLARDS
CROWN FOR DRAINAGE
2'-0" DIA CONCRETE PIER
W/ (8) #5 VERTICAL AND
#4@12" TIES
3" C
LR NOTE: SEE CIVIL FOR
QUANTITY AND LOCATIONS2'-0" DIA
6"
#3@12
#4 BAR (TYP)
VA
R
IE
S
1'-6"
ROUGH
JOINT
EL 107.00
4'-1" SPLICE LENGTH4'-1" SPLICE LENGTH
#5@16 ROUGH
JOINT
SLAB REINFORCING
- SEE 1/S-400 (TYP)
T/SLAB VARIES
SEE PLAN
(2) #5
#5@12
(TYP)
#5@8
4" CHAMFER
(TYP)
2" TOOLED
JOINT
ROUGH
JOINT
#5@8
T/ GRADE
- SEE CIVIL
#4@8
2'-8"
4'-0"
10"
MIN
6"
MIN
COMPACTED
SUBGRADE
3' -0
" M
IN
#5 BAR
4'-1"
6"
#3@12
#4 BAR (TYP)
2"CLR
1" NOSING
SE
E
N O
TE
ACCESS STAIR
SEE NOTE 1
CONCRETE
LANDING TREAD
SEE NOTE 2
NOTE:
1. TANK MANUFACTURE TO PROVIDE INTEGRATED STAIR AND ACCESS PLATFORM WITH GUARDRAILS
AND TANK WALK OFF ACCESS. STAIR SHALL MEET REQUIREMENTS OF OSHA SECTION 1910.25.
2. LANDING TREAD RISE SHALL BE COORDINATED WITH TANK MANUFACTURE TO PROVIDE A
CONSISTENT RISE AND RUN COMPATIBLE WITH THE STAIR. COORDINATE TREAD LOCATION WITH
FINAL STAIR LOCATION.
3. PLATFORM PAD SHALL BE COORDINATED WITH STAIR/PLATFORM MANUFACTURER; FINAL SIZE AND
LOCATION SHALL BE COORDINATED WITH FINAL STAIR/PLATFORM LOCATION.
4. REINFORCING FOR CONCRETE LANDING TREAD AND PLATFORM PAD MAY BE POST INSTALLED IN
CHEMICAL ADHESIVE AT THE CONTRACTORS OPTION.
6"
3'-8"±
1'-5"±
PLATFORM SUPPORT
POSTS SEE NOTE 1
6" M
IN
2" M
AX
SE
E N
O
TE
T/CONCRETE
VARIES SEE CIVIL
ROUGH
JOINT (TYP)
T/ SLAB
3/16
ROLLED PL OR PIPE WITH
4" WALL THICKNESS
16" x 2" COLLAR ALL
AROUND W/ CONTINUOUS
WELD TO SLEEVE
4"
SLEEVE I.D. =
PIPE O.D. +2"
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
SCALE:3/4"=1'-0"
0 1'1' 6"
SECTIONS AND DETAILS
S-400
AS NOTED
RPD
JCH
-0
3- S-
S-400
SECTION THROUGH FUEL TANK FOUNDATION
3/4" = 1'-0"
S-400
TYPICAL EQUIPMENT PAD DETAIL
NTS
S-400
LIGHT POLE FOUNDATION DETAIL
1" = 1'-0"
S-400
BOLLARD DETAIL
1/2" = 1'-0"
S-400
TANK SADDLE PAD
1" = 1'-0"
S-400
CONSTRUCTION JOINT
1" = 1'-0"
S-400
SECTION - SLAB EXTENTION AT STAIR
3/4" = 1'-0"
S-400
SECTION - STAIR SUPPORT PADS
1" = 1'-0"
S-400
SLAB PIPE SLEEVE DETAIL
1'-0" = 1'-0"
PE077633
ENGINEER
REGISTERED
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
Ø DIAMETER
°F DEGREE FAHRENHEIT
" INCHES
' FEET
A AIR
ABV ABOVE
AST ABOVE GROUND STORAGE TANK
AV AIR VENT
B OR BLR BOILER
BAS BUILDING AUTOMATION SYSTEM
BF BOILER FEED
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BHP BRAKE HORSEPOWER
BLDG BUILDING
BLW BELOW
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BTU BRITISH THERMAL UNIT
CAP CAPACITY
CFM CUBIC FEET PER MINUTE
CL CENTERLINE
COND CONDENSATE
CV CONTROL VALVE
D OR DRN DRAIN
DB DRY BULB OR DECIBELS
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DN DOWN
DP DIFFERENTIAL PRESSURE
DWG DRAWING
E OR EF EXHAUST FAN
(E) EXISTING
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EW EFFLUENT WATER
EWT ENTERING WATER TEMPERATURE
EX EXHAUST
FFP FUEL FILTER/POLISHER
FFPR FUEL OIL POLISHER RETURN
FFPS FUEL OIL POLISHER SUPPLY
FLR FLOOR
FO FUEL OIL
FOF FUEL OIL FILL
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FORF FUEL OIL REMOTE FILL
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FT FEET
GC GENERAL CONTRACTOR
GF GLYCOL FEED
GL GLYCOL LOOP
GLS HEATING HOT WATER SUPPLY
GLR HEATING HOT WATER RETURN
GP GLYCOL PUMP
GPM GALLONS PER MINUTE
GV GAS VENT
HWS HOT WATER SUPPLY
HWR HOT WATER RETURN
HP HORSEPOWER OR HIGH PRESSURE
HR HOUR
HTG HEATING
HV HEATING AND VENTILATING
HX HEAT EXCHANGER
ID INSIDE DIAMETER
IN INCHES
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LB POUND
LF LINEAR FEET
LPC LOW PRESSURE CONDENSATE
LPG LOW PRESSURE GAS
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MTR MOTOR
MUW MAKE-UP WATER
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAL OVERALL LENGTH
OAW OVERALL WIDTH
OD OUTSIDE DIAMETER
PC PUMPED CONDENSATE
PD PUMPED DRAIN
PG PROPANE GAS
PHC PREHEAT COIL
PNEU PNEUMATIC
PP PROCESS PUMP
PPC PRESSURE POWERED PUMP
PRES PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PTB PRELIMINARY TREATMENT BUILDING
PW PLANT WATER
RPM ROTATIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
S STEAM
SAN SANITARY
SG SLUDGE GAS
SRV SAFETY RELIEF VALVE
STB SLUDGE THICKENER BUILING
SW SERVICE WATER
T OR TK TANK
TEMP TEMPORARY OR TEMPERATURE
THRU THROUGH
TYP TYPICAL
UH UNIT HEATER
UST UNDERGROUND STORAGE TANK
V VENT
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DEVICE
VTR VENT TO ROOF
W/ WITH
W/OUT WITHOUT
EXISTING
NEW WORK
REMOVALS
BREAK LINE (SINGLE LINE)
BREAK LINE (DOUBLE LINE DUCT/PIPE)
POINT OF CONNECTION
POINT OF DISCONNECT
KEYNOTE
EQUIPMENT, FIXTURE, OR AIR DEVICE TAG
SECTION MARKER
THERMOSTAT
CO2 SENSOR
PIPE/DUCT DOWN
PIPE/DUCT UP
PIPE TEE DN
PIPE TEE UP
PIPE PITCHING IN DIRECTION OF ARROW
REDUCER OR EXPANSION
AIRFLOW
DIRECTION OF FLOW
AUTOMATIC TWO-WAY CONTROL VALVE
AUTOMATIC THREE-WAY CONTROL VALVE
CHECK VALVE
GLOBE VALVE
BALL VALVE
BALANCING VALVE
BUTTERFLY VAVE
PIPE CAP
UNION
PRESSURE RELIEF OR SAFETY VALVE
SOLENOID VALVE
AIR VENT
PRESSURE GAUGE
THERMOMETER
THERMOWELL (FOR THERMOSTATIC CONTROLLER)
STEAM TRAP ASSEMBLY
"Y" STRAINER
"Y" STRAINER W/ BLOWDOWN VALVE&HOSE BIBB
PIPE ANCHOR
VALVE - SEE SPECIFICATIONS FOR TYPE AND SERVICE
X
T
SECTION NUMBER
DRAWING NUMBER
S
A
T
C
BLIND FLANGE
EXPANSION JOINT WITH CONTROL RODS
3/4" THREADED HOSE CONNECTION
THERMALCOUPLE/TEMPERATURE TRANSDUCER
FLOW SWITCH
METER
NORTH ARROW
PROJECT NORTH ARROW
TT
FS
M
1. ALL WORK SHALL BE COORDINATED AND EXECUTED PER THE PHASING
PLAN IDENTIFIED ON GENERAL CONTRACT DRAWINGS.
2. COORDINATE WITH THE OWNER'S PROJECT MANAGER BEFORE REMOVING
DEMOLISHED EQUIPMENT/PIPING FROM THE SITE. ANY EQUIPMENT/PIPING
NOT WANTED BY THE OWNER SHALL BE PROMPTLY REMOVED AND
DISPOSED OF IN ACCORDANCE WITH PENNSYLVANIA STATE
REQUIREMENTS.
3. WORK IN CERTAIN AREAS OF THE BUILDING MUST BE PERFORMED ON
SECOND, THIRD, OR WEEKEND SHIFTS. COORDINATE WITH ENGINEER OR
OWNER'S PROJECT MANAGER. THE CONTRACTOR SHALL INCLUDE ALL
SHIFT DIFFERENTIAL LABOR COSTS.
4. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, INCIDENTALS, METHODS,
AND SERVICES REQUIRED TO INSTALL ALL WORK INDICATED COMPLETELY
AND IN FULL OPERATION AND TO SUIT OWNER'S AND ENGINEER'S
REQUIREMENTS.
5. VERIFY ALL FIELD CONDITIONS, ACCESS WAYS, DIMENSIONS, AND DETAILS
IN THE FIELD PRIOR PRIOR TO FABRICATION.
6. ALL WORK SHALL BE IN CONFORMANCE WITH ALL APPLICABLE LAWS,
CODES, AND REGULATIONS ADOPTED BY MUNICIPAL, COUNTY, STATE, AND
FEDERAL AUTHORITIES, INSURANCE AGENCIES, AND OTHER AUTHORITIES
HAVING JURISDICTION OVER THE WORK.
7. APPLY FOR, SECURE, AND PAY FOR ALL PERMITS AND/OR CERTIFICATES
OF INSPECTION REQUIRED IN THE PERFORMANCE OF THE WORK BY THE
AUTHORITIES HAVING JURISDICTION.
8. ANY DEFECTS IN WORKMANSHIP, MATERIALS, MALFUNCTION OF
EQUIPMENT, OR UNSATISFACTORY PERFORMANCE, AND ALL OTHER WORK
OR PARTS OF THE BUILDING DAMAGED THEREBY SHALL BE REPAIRED,
REPLACED, OR OTHERWISE REMEDIED WITHOUT EXPENSE TO THE OWNER.
SUCH REPAIRS OR REPLACEMENTS SHALL BE MADE IN A TIMELY MANNER
AND AT THE CONVENIENCE OF THE OWNER.
9. IN ADDITION TO SPECIFICS AS MAY BE DEFINED HEREINAFTER, THE
CONTRACTOR SHALL PROTECT THE WORK SITE AND ALL HIS/HER WORK
AGAINST DAMAGE FROM ANY SOURCE UNTIL FINAL COMPLETION AND
ACCEPTANCE BY THE OWNER.
10. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL EQUIPMENT AND
MATERIAL BEING USED IN THE COURSE OF THE WORK, PURCHASE OF OR
INSTALLATION OF MATERIALS OR SYSTEM PARTS SHALL NOT PROCEED
UNTIL REVIEWED AND APPROVED SHOP DRAWINGS ARE RETURNED TO
THE SUBMITTING CONTRACTOR, SUBMIT SHEET METAL AND PIPING
LAYOUT DRAWINGS FOR REVIEW. INCLUDE ALL SIZES, DIMENSIONS, AND
LOCATIONS ON DRAWINGS.
11. CONTRACTOR SHALL COMPLETE ALL CUTTING AND PATCHING REQUIRED
FOR THE INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE
COMPLETED IN A NEAT AND WORKMAN LIKE MANNER. PATCHING
MATERIALS SHALL MATCH EXISTING MATERIALS TO THE GREATEST EXTENT
POSSIBLE. PROVIDE TOUCH UP PAINT TO MATCH THE EXISTING
SURROUNDING AREAS OF CUTTING AND PATCHING WORK. PIPING
PENETRATIONS TO WALL AND ROOF SHALL BE CORE DRILLED WITH A
DIAMOND BIT CORE DRILLING MACHINE. ALL PENETRATIONS SHALL BE
FIRESTOPPED TO SATISFY THE BUILDING CODE AND DETAILS PER
UNDERWRITERS LABORATORIES LATEST FIRE RESISTANCE DIRECTORY.
FIRE RESISTANCE MATERIAL MANUFACTURERS DETAILS SHALL BE
APPROVED BY THE AHJ.
12. CONTRACTOR SHALL REMOVE AND REPLACE ALL CEILINGS AS REQUIRED
FOR THE INSTALLATION WORK.
13. MAINTENANCE: THE CONTRACTOR SHALL PROVIDE SKILLED COMPETENT
WORKERS WHO ARE AUTHORIZED BY THE MANUFACTURER TO MAINTAIN
AND SERVICE THE EQUIPMENT DURING THE 12-MONTH WARRANTY PERIOD,
INCLUDING REQUIRED WARRANTY MAINTENANCE AND ALL OTHER ROUTINE
MAINTENANCE, REPAIRS, CLEANING, AND TESTING WHICH NORMALLY
SHOULD BE PERFORMED BY A PRUDENT OWNER.
14. WHERE PIPING, SHEET METAL, AND EQUIPMENT IS BEING REMOVED,
REMOVE ALL EQUIPMENT SUPPORTS, HANGERS, ANCHORS, THREADED
RODS, ETC. PATCH ALL HOLES TO MATCH EXISTING WALL CONSTRUCTION
AND FINISHES.
15. THE WORD "PROVIDE" SHALL MEAN TO "FURNISH AND INSTALL".
16. THE USE OF EXISTING BUILDING CRANES MAY BE PERMITTED. THE
CONTRACTOR SHALL FURNISH CERTIFICATION FROM THE AUTHORITY
HAVING JURISDICTION FOR ANY CRANE USED PRIOR TO AND AFTER USE.
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND
CONDITIONS IN THE FIELD BEFORE STARTING WORK.
2. EQUIPMENT DIMENSIONAL INFORMATION IS PRESENTED FOR
REFERENCE ONLY. DIMENSIONS MAY VARY ACCORDING TO THE
EQUIPMENT MANUFACTURER SELECTED AND FIELD VARIATIONS.
3. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SUPERSEDE
SCALED DIMENSIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ANY
DIMENSIONAL VARIATIONS BETWEEN THESE CONSTRUCTION
DOCUMENTS AND THE AS-DELIVERED EQUIPMENT.
5. THE CONTRACTOR IS RESPONSIBLE TO CONFIRM AND
COORDINATE JOBSITE DIMENSIONS THAT AFFECT THE ERECTION
OR OPERATION OF SYSTEMS, AS INTENDED BY THESE CONTRACT
DOCUMENTS. THE CONTRACTOR SHALL ENSURE INSTALLED
EQUIPMENT MAINTAINS ADEQUATE CLEARANCES FOR
OPERATIONAL ACCESS AND SERVICE, AND HE SHALL MAINTAIN
ANY CLEARANCES REQUIRED BY ALL APPLICABLE CODES.
6. THE CONTRACTOR SHALL INFORM THE OWNER/ENGINEER OF ANY
DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND
FIELD CONDITIONS THAT AFFECT THE WORK DESCRIBED HEREIN.
7. IF, DURING THE COURSE OF CONSTRUCTION, A CONDITION EXISTS
WHICH DISAGREES OR CONFLICTS WITH THE DRAWINGS OF
SPECIFICATIONS, THE CONTRACTOR SHALL STOP WORK AND
NOTIFY THE ENGINEER. IF THE CONTRACTOR SHALL FAILS TO
FOLLOW THIS PROCEDURE AND CONTINUES WITH THE WORK, HE
SHALL ASSUME ALL RESPONSIBILITY AND LIABILITY ARISING
THEREOF.
8. THESE CONTRACT DOCUMENTS ARE INTENDED TO INDICATE THE
WORK NEEDED TO PROVIDE A COMPLETE AND
READY-FOR-OPERATION INSTALLATION. THESE DOCUMENT ARE
INTENDED TO GUIDE THE CONTRACTOR. THESE DOCUMENTS ARE
NOT INTENDED TO SHOW EVERY DETAIL OF THE EXISTING
CONDITIONS OR NEW INSTALLATIONS, NOR DO THEY DESCRIBE
EVERY FITTING REQUIRED FOR THE INSTALLATION OF THE WORK.
9. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND SHALL
INCLUDE ALL EQUIPMENT, DEVICES, HARDWARE, MOUNTS, LABOR,
RIGGING, SUBCONTRACTS, ETC. THAT RESULT IN A COMPLETE,
FUNCTIONAL, AND WARRANTED JOB.
10. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT,
ACCESSORIES, SUPPORTS, FITTINGS, AND ALL OTHER INCIDENTAL
MATERIAL NEEDED FOR THE COMPLETE AND OPERATING
INSTALLATION, MINOR ITEMS TO FINISH THE WORK SUCH AS
PATCHING, BLOCKING, TRIM, TOUCH-UP PAINT, ETC. SHALL BE
PROVIDED WHETHER OR NOT INDICATED IN THE CONTRACT
DOCUMENTS.
11. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS
REQUIRED TO ASSEMBLE LOOSE EQUIPMENT AND PARTS AS
SHIPPED BY THE EQUIPMENT MANUFACTURES FOR ALL
OWNER-FURNISHED EQUIPMENT.
12. WITH THE SUBMISSION OF A PROPOSAL, THE CONTRACTOR
INDICATES THAT HE IS FULLY AWARE OF THE EXTENT, CHARACTER
AND INTENT OF THE WORK TO BE ACCOMPLISHED BY THIS
PROJECT. ALL CLARIFICATIONS SHALL BE RESOLVED BEFORE
SUBMITTING THE PROPOSAL. NO CONSIDERATION WILL BE
GRANTED FOR ANY MISUNDERSTANDING OF THE MATERIAL OR
EQUIPMENT TO BE FURNISHED OF WORK TO BE PERFORMED
AFTER THE CONTRACT IS EXECUTED.
13. THE CONTRACTOR SHALL GIVE NOTICES, OBTAIN PERMITS, PAY
ALL FEES AND COMPLY WITH ALL LAWS RULES AND REGULATIONS
APPLICABLE TO THE WORK.
14. THE CONTRACTOR SHALL USE SHOP SUBMITTAL FOR FINAL
COORDINATION OF THIS WORK.
15. THE CONTRACTOR SHALL SUBMIT EQUIPMENT INFORMATION, SHOP
DRAWINGS AND CONSTRUCTION SCHEDULE TO THE OWNER FOR
APPROVAL BEFORE STARTING ANY WORK OR PURCHASING ANY
EQUIPMENT.
16. ALL MATERIALS PROVIDED SHALL BE NEW AND FREE FROM ANY
DEFECT. SALVAGE OR REBUILT EQUIPMENT SHALL NOT BE
PERMITTED.
17. ALL MATERIALS, PIPING ETC., SHALL BE PROVIDED IN
ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, AND ALL
LOCAL AND NATIONALLY RECOGNIZED STANDARDS, SUCH AS NFPA,
NEC, ASTM, UL, ECT. AS EXAMPLES.
18. CONTRACTOR SHALL ENSURE COORDINATION SO THAT ONCE THE
PROJECT IS STARTED, IT SHALL CONTINUE WITHOUT DELAY UNTIL
COMPLETION
19. THE CONTRACTOR IS RESPONSIBLE FOR THE WORK OF ALL HIS
SUBCONTRACTORS, THEIR CONFORMANCE TO THESE CONTRACT
DOCUMENTS, AND COORDINATION AMONG SUBCONTRACTORS AND
TRADES.
20. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK
OF OTHER CONTRACTORS AND THE OWNER'S REPRESENTATIVES.
22. THE CONTRACTOR SHALL PROVIDE NOTIFICATION AND
OPPORTUNITY FOR INSPECTION TO THE OWNER BEFORE
CLOSING UP ANY WORK, EQUIPMENT, OR PIPING SYSTEM.
23. THE CONTRACTOR SHALL PERFORM ALL ACCEPTANCE TESTS
IN THE PRESENCE OF THE OWNER OR OWNER'S
REPRESENTATIVE.
24. THE CONTRACTORS SHALL MAINTAIN THE WORK AREA IN A
STATE FREE FROM HAZARDS. THE CONTRACTOR SHALL TAKE
ALL NECESSARY PRECAUTIONS, FOLLOW SAFE WORKING
PRACTICES, AND MAINTAIN THE SITE AND ADJACENT AREAS
SAFE FOR WORKERS, INSPECTORS, AND FACILITY
EMPLOYEES AND RESIDENTS.
25. SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
26. WHILE THE OWNERS REPRESENTATIVE MAY NOT BE FAMILIAR
WITH CONSTRUCTION SITE SAFETY REQUIREMENTS, MEETING
SITE SAFETY AND OSHA REQUIREMENTS IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. THE OWNER'S
REPRESENTATIVE RESERVES THE RIGHT TO RETAIN A THIRD
PARTY CONSULTANT IF HE OBSERVES PRACTICES THAT
APPEAR UNSAFE.
27. IF THE OWNER'S REPRESENTATIVE DEEMS THAT ANY UNSAFE
CONDITIONS EXISTS, THE OWNER HAS THE RIGHT TO STOP
ALL WORK.
28. THE OWNER REQUIRES ACCESS TO AND AROUND AREAS OF
THE SITE IMMEDIATELY ADJACENT TO AREA OF THE WORK.
ALL WORK MUST BE CONDUCTED IN A MANNER TO MINIMIZE
DISRUPTION OF NORMAL FACILITY OPERATIONS.
29. SAFE AND DIRECT ENTRANCE TO AND FROM THE SITE SHALL
BE MAINTAINED AT ALL TIMES WHILE CONSTRUCTION IS IN
PROGRESS.
30. ALL MATERIALS SHALL BE STORED IN AREAS DESIGNATED BY
THE OWNER. THE OWNER SHALL NOT BE RESPONSIBLE FOR
ANY OF THE CONTRACTOR'S SHIPPING DELIVERY OR
SECURITY ISSUES RELATED TO MATERIAL, EQUIPMENT, OR
TOOL STORAGE.
31. THE CONTRACTOR SHALL LEAVE THE SITE IN A NEAT,
ORDERLY AND SAFE CONDITION AT THE END OF EACH WORK
DAY. THE SITE AND BUILDING SHALL BE MADE AS SECURE AS
POSSIBLE SO AS TO PREVENT UNAUTHORIZED ENTRY AND
ACTIVITY. ATTENTION SHALL BE GIVEN TO WEATHER
PROTECTION, INCLUDING UNCONDITIONED AIR INFILTRATION
DURING THE CONSTRUCTION PERIOD.
32. ALL DEMOLISHED MATERIALS, UNLESS OTHERWISE NOTED,
SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND
SHALL BE REMOVED FROM THE SITE.
33. DISPOSAL OF ALL MATERIALS SHALL BE DONE BY THE
CONTRACTOR IN ACCORDANCE WITH STATE AND LOCAL
REQUIREMENTS. THE CONTRACTOR SHALL MAINTAIN THE
RECORDS OF PROPER DISPOSAL, WHICH MAY BE SUBMITTED
TO THE OWNER'S REPRESENTATIVE IF HE SO REQUESTS.
34. THE OWNER SHALL HAVE THE RIGHT AT ALL TIMES TO
EXAMINE THE WORK AND DETERMINE THE CONFORMANCE
WITH THE REQUIREMENTS AND INTENT OF THE CONTRACT
DOCUMENTS.
35. THE CONTRACTOR SHALL COMPLETE ALL WORK WITH
MINIMAL DISRUPTION OF THE FACILITY'S UTILITIES AND
OPERATIONS. ANY WORK REQUIRING A SHUTDOWN OF GAS,
ELECTRIC, STEAM OR HOT WATER UTILITIES SHALL BE
SCHEDULED AND NOTED ON THE CONTRACTORS TWO-WEEK
LOOK AHEAD SCHEDULE IN ADVANCE ALL OUTAGES SHALL BE
COORDINATED WITH THE FACILITY.
36. THE FACILITY OPERATES THROUGHOUT THE ENTIRE YEAR.
ALL SHUTDOWNS THAT REQUIRE THE LOSS OF UTILITIES TO
THE FACILITY SHALL BE LIMITED TO PERIODS & DURATIONS
AS SPECIFIED BY THE FACILITY. THE CONTRACTOR'S BID
SHALL ANTICIPATE AND INCLUDE THE NECESSARY
WEEKEND/MIDNIGHT PREMIUM TIME TO ACCOMPLISH ALL
SHUTDOWN WORK WITHIN THE LIMITATION OF MAINTAINING
CONTINUOUS SERVICE TO THE FACILITY.
37. ANY WORK SCHEDULING PROBLEMS CAUSED BY SHUTDOWN
RESTRICTIONS BY THE FACILITY SHALL NOT BE CAUSE FOR
CLAIM OR DELAY BY THE CONTRACTOR.
38. ALL WORK SHALL CONFORM TO PHILADELPHIA BUILDING
CONSTRUCTION CODE, THE PHILADELPHIA ENERGY
CONSERVATION CONSTRUCTION CODE, OSHA 29 CFR 1926
CONSTRUCTION, AND ALL LOCAL CODES, RULES,
REGULATIONS AND ZONING LAWS.
GENERAL NOTES MECHANICAL NOTES SYMBOLS ABBREVIATIONSSYMBOLS (CONT.)
MECHANICAL NOTES, SYMBOLS, AND
ABBREVIATIONS
M-001
AS NOTED
RPD
JCH
-0
3- M
-0
XXX
XXXXX
INV EL 97'-9"
(4) 2-1/2" FOS PIPING TO BE REMOVED (1 PER TANK)
(4) 2" FOR PIPING TO BE
REMOVED (1 PER TANK)
INV EL 97'-0"
DM-200
(4) EXISTING FUEL OIL
STORAGE TANKS TO
BE REMOVED
FUEL OIL FILL TO
BE REMOVED
REMOVE TANK
LEVEL CONDUITS
REMOVE ALL FOR AND FOS
PIPING TO THE ELBOW UP
TO THE BOILER ROOM
2" FOS & FOR UP
(4) 1-1/4" TANK LEVEL
CONDUITS TO BE
REMOVED (1 PER TANK)
REMOVE ALL FOS AND
FOR PIPING TO/FROM
FUEL PUMPS
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
SCALE:1"=20'-0"
0 20'20' 10'
DM-100
OVERALL MECHANICAL BASEMENT REMOVALS PLAN
1" = 20'
NOTES:
1. REFER TO DWG M-001 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. REFER TO SPECIFICATIONS AND CIVIL DRAWINGS FOR FUEL OIL
TANK AND PIPE REMOVAL REQUIREMENTS.
KEYNOTES:
1. DISCONNECT 2" FOR AND 2" FOS PIPING AT ELBOWS. PIPING
UP TO FIRST FLOOR BOILER ROOM TO REMAIN.
2. MC SHALL REMOVE EXISTING FUEL OIL SUPPLY AND RETURN
PIPING, EXPANSION JOINTS, ANCHORS, FITTINGS AND VALVES
AS SHOWN.
3. REMOVE TANKS PER SPECIFICATION 02650 "STORAGE TANK
REMOVAL".
OVERALL BASEMENT MECHANICAL PLAN -
REMOVALS
DM-100
AS NOTED
RPD
JCH
-0
3- D
M -1
N
XX
REMOVE FUEL OIL
PUMPS 3/1 AND 3/2
(E) TANK LEVEL INDICATOR
1-1/4" TANK LEVEL
INDICATOR CONDUITS
(INV EL 96'-0") TO BE
REMOVED
2" FOR (CL EL 97'-3")
TO BE REMOVED
2" FOS (CL EL 97'-3")
TO BE REMOVED
2" FOR CL EL 92'-0"
2" FOS CL EL 91'-6"
FLOOR
EL 87'-6"
2" FOS & FOR CL
(EL 98'-1") TO BE
REMOVED
C
B
AA
C
B
AA
EXISTING FUEL OIL TANKS
TO BE DEMOLISHED
EXISTING GRADE
EL 102'-0" ±
EAGLE CREEK
EL 90'-0" ±
EL 98'-6"
CL OF TANKS
E13+36.84
EXISTING CONCRETE
TIE DOWN PAD TO BE
DEMOLISHED
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
DM-200
FUEL PUMP ROOM - BASEMENT - REMOVALS PLAN
1/4" = 1'-0"
SCALE:1/4"= 1'-0"
0 4'4' 2'
NOTES:
1. REFER TO DWG M-001 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. REFER TO SPECIFICATIONS AND CIVIL DRAWINGS FOR FUEL OIL
TANK, EQUIPMENT AND PIPE REMOVAL REQUIREMENTS.
KEYNOTES:
1. MC SHALL REMOVE EXISTING FUEL OIL PUMPS, SUPPLY AND
RETURN PIPING, EXPANSION JOINTS, ANCHORS, FITTINGS AND
VALVES, AND ALL ASSOCIATED APPURTENANCES TO POINTS
INDICATED.
DM-200
FUEL TANK DEMOLITION SECTION
1/8" = 1'-0"
MECHANICAL REMOVALS - ENLARGED PLANS
AND SECTIONS
DM-200
AS NOTED
RPD
JCH
-0
3- D
M -2
M-201
M-201
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
SCALE:1"=20'-0"
0 20'20' 10'
OVERALL FIRST FLOOR MECHANICAL PLAN -
INSTALLATION
M-100
AS NOTED
RPD
JCH
-0
3- M
-1
M-100
OVERALL MECHANICAL LOCATION PLAN
1" = 20'
2" FOS & FOR
UP TO GRADE
2" FOS & FOR UP
2" FOS & FOR
M-201
M-200
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
M-101
OVERALL MECHANICAL BASEMENT INSTALLATION PLAN
1" = 20'
NOTES:
1. REFER TO DWG M-001 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
OVERALL BASEMENT MECHANICAL PLAN -
INSTALLATION
M-101
AS NOTED
RPD
JCH
-0
3- M
-1
KEYNOTES:
1. CONNECT NEW 2" FOR AND 2" FOS TO EXISTING 2" FOS & FOR
PIPING UP TO BOILER ROOM AT ELBOWS AT BASE OF RISER.
2. (4) PIPES FOR 12,000 GALLON TANK. SEE DWG M-201 FOR
CONTINUATION.
M
K
J
L
M
K
J
L
M
K
J
L
1 2 31 2 31 2 3
FOP
1A&1B
(2) 2" FOS &
(2) 2" FOR
2" FOS & FOR
TO BOILERS
2" FOS
2" FOR
NEW EQUIPMENT PAD FOR FUEL
PUMPS - SEE STRUCTURAL
DETAIL 3/S-400
(E) FAN
(E) HW
TANK
SELECTOR
VALVE
CONTROL
PANEL
UTILITY TUNNEL
TRANSITION FROM DOUBLE
WALL PIPE TO SINGLE WALL
INSIDE BUILDING (TYP)
2" FOS
DUPLEX PUMP
CONTROL PANEL
(2) 2" FOS & (2) 2" FOR
BELOW GRADE TO
FUEL TANKS
LEAK SENSOR
(TYP FOR 4).
SEE DETAIL 3/M-600.
M-200
(E) SLUDGE GAS
(E) WATER
(E) PRIMARY
SLUDGE
(E) HWS&R
2" FOS & FOR
TO FUEL OIL PUMPS
4 2" FOS & FOR
FROM FUEL TANKS
LEAK SENSOR
(TYP FOR 4).
SEE DETAIL 3/M-600.
UTILITY TUNNEL
5/07/2025
SHEET OF
JOB NO.
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
PROJECT TITLE:
REV DATE DESCRIPTION BY CK'D AP'D
DRAWING NUMBER:
DRAWING TITLE:
0 5/07/2025 ISSUED FOR BID
PWD SOUTHWEST WATER
POLLUTION CONTROL PLANT
FUEL TANK REPLACEMENT
PWD WORK #73105
2024-0033
SCALE:1/4"= 1'-0"
0 4'4' 2'
M-200
NEW FUEL PUMP LOCATION - BASEMENT INSTALLATION PLAN
1/4" = 1'-0"
NOTES:
1. REFER TO DWG M-001 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. SEE M-600 FOR EQUIPMENT SCHEDULES.
KEYNOTES:
1. MC SHALL FURNISH AND INSTALL DUPLEX FUEL OIL PUMP SET AND
ASSOCIATED EQUIPMENT PAD WITH 3" CONTAINMENT PAN & LEAK
DETECTION SENSOR.
2. MC SHALL FURNISH AND INSTALL DUPLEX FUEL OIL PUMP SET
CONTROL PANEL.
3. MC SHALL FURNISH AND INSTALL COMPLETE EPA COMPLIANT
FUEL OIL STORAGE TANK LEVEL GAUGING SYSTEM WITH
SECONDARY CONTAINMENT LEAK DETECTION. SYSTEM SHALL BE
EQUAL TO PNEUMERCATOR MODEL TMS-4000 COMPLETE WITH
MAGNETO RESTRICTIVE LEVEL PROBES, SECONDARY
CONTAINMENT LEAK SENSORS AND REMOTE ALARMS.
4. ENTER PIPE TUNNEL +/- 8" BELOW TOP OF TUNNEL, ABOVE
EXISTING SLUDGE PIPES. PROVIDE "LINK SEAL" AND DOUBLE WALL
PIPE END SEAL. SEE DETAILS 1/M-600 AND 2/M-600.
5. LOCATE EXISTING UNDERGROUND UTILITIES WITH GPR PRIOR TO
TRENCHING.
6. CORE INTERIOR REINFORCED CONCRETE WALLS FOR NEW PIPE
PENETRATIONS, IN VICINITY OF EXISTING PENETRATIONS. SCAN
WALL WITH GPR TO LOCATE WALL REINFORCING PRIOR TO
CORING; LOCATE NEW PENETRATIONS TO AVOID EXISTING REBAR.
MECHANICAL INSTALLATIONS - ENLARGED
PLANS
M-200
AS NOTED
RPD
JCH
-0
3- M
-2
FO
R
C O
N
TI
N U
A
TI
O N
R E
FE
R
TO
D
R A
W
IN
G M
-2
FO
R
C O
N
TI
N U
A
TI
O N
R E
FE
R
TO
D
R A
W
IN
G M
-1
N
M-200
SECTION AT PIPE TUNNEL
3/8" = 1'-0"
FOR SIDEWALKS
SEE CIVIL DWGS
(2) 12,000 GALLON FUEL
OIL STORAGE TANKS
3" FOF UP FROM FILL BOX W/
BALL VALVE & CHECK VALVE
STAIR, CATWALK, AND
ASSOCIATED SUPPORTS
BY TANK MFR
AST
AST
(4) 2" FOS & FOR BELOW
GRADE TO STB BASEMENT
(4) 2" FOS & FOR DN
THRU TANK PAD 2
SEE STRUCTURAL DWGS
FOR TANK PAD DETAILS
3" FOF;
BOP EL 1'-101
2"
3" FOF;
BOP EL 2'-61
2"
3" FOF; BOP EL 1'-101
2"
3" FOF; BOP EL 2'-61
2"
3" 3-WAY
DRAINS
3" FOF;
BOP EL 11'-5"
4" TANK FILL
(TYP. 2)
2" FOS;
BOP EL 10'-11"
2" FOS;
BOP EL 11'-51
2"
2" FOS;
BOP EL 10'-11"
2" FOS;
BOP EL 11'-51
2"
2" BALL
VALVE
3" BALL
VALVE
2" FOR;
BOP EL 11'-51
2"
2" FOR;
BOP EL 10'-11"
2" FOR;
BOP EL 11'-51
2"
2" FOR;
BOP EL 10'-11"FUEL RETURN
FROM PLANT
FUEL RETURN
FROM PLANT
FUEL SUPPLY
TO PLANT
FUEL SUPPLY
TO PLANT
M-201
M-201
FORF
FORF
FOR SIDEWALKS
SEE CIVIL DWGS
(2) 12,000 GALLON FUEL
OIL STORAGE TANKS
SEE STRUCTURAL DWGS
FOR TANK PAD DETAILS
AST
AST
(2) 1" 3-WAY VALVES
FFPR @ 1'-41
4"; FFPS @ 10"
(2) 1" 3-WAY DRAINS
FFPR @ 1'-41
4"; FFPS @ 10"
(2) 1" BALL VALVES
FFPR @ 3'-8"; FFPS @ 2'-4"
1" FFPS; BOP EL 10"
1" FFPR; BOP EL 1'-41
4"
1" FFPS; BOP EL 10"
1" FFPR; BOP EL 1'-41
4"
1" FFPR;
BOP EL 11'-6"
1" FFPR;
BOP EL 11'-6"
1" FFPS; BOP EL 10"
1" FFPS; BOP EL 10"
1" FFPS;
BOP EL 11'-6"
1" FFPS;
BOP EL 11'-6"
1" BALL
VALVE
FUEL FEED
TO POLISHER
FUEL RETURN
FROM POLISHER
FUEL RETURN
FROM POLISHER
M-201
M-201
FFP
STAIR, CATWALK, AND
ASSOCIATED SUPPORTS
BY TANK MFR
SECONDARY
TANK VENT
MANWAY
PRIMARY
TANK VENT
FUEL…
This is the start of the file's text. The full file is on GovTribe.