Bid_24-23_Attachment_A_RJS_MCF_Drawings.pdf

PDF 22 MB Posted

Attached to
Electrical Installation of Main Concourse HVLS Fans, RJS
Solicitation number
24-23
Issued by
Florida

About this file

This is a comprehensive set of permit documents for the Raymond James Stadium Main Concourse Fans project in Tampa, Florida, involving multiple engineering and architectural firms including Populous (architect), Walter P. Moore (structural engineer), and ME Engineers (mechanical/electrical/plumbing engineer). The project involves installing 14 Big Ass Fans (Essence 12' model) on the club concourse level to improve occupant comfort in exterior areas. The fans will be mounted on existing cast-in-place concrete beams using custom brackets, with installation planned for April 2025. The permit set includes mechanical, electrical, and structural plans detailing the fan placement across four stadium quadrants (A, B, C, and D), along with specific engineering specifications, wind load calculations, and installation requirements.

The project is funded through the Tampa Sports Authority and will be executed under the 2023 Florida Building Code standards. Each fan is a 12-foot diameter model with a 338W motor operating at 208V, capable of moving approximately 54,135 CFM. The electrical installation involves connecting the fans to existing electrical infrastructure, with fan controllers to be located in main concourse electrical rooms. The structural details specify hot-dipped galvanized mounting brackets and precise anchor points, with careful consideration to avoid damaging existing concrete beam reinforcement. The fans will be integrated with the building management system via BACnet for scheduling and control, and will include a fire relay to de-energize during fire alarm activation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Copyright 2024

ARCHITECT

Populous 4800 Main Street, Suite 300 Kansas City, MO 64112

816.221.1500

STRUCTURAL ENGINEER

Walter P Moore 201 East Kennedy Boulevard, Suite 700 Tampa, Florida 33602 813-221-2424

M/E/P ENGINEER

ME Engineers 14143 Denver West Parkway, Suite 300 Golden, Colorado 80401 303-421-6655

Volume 1 OF 1

Mechanical Electrical

/1

/2

:1

:5

P

M

Copyright 2025

16:39:53-05'00'

Architecture - Interior Design - Landscape Design

Brand Activation - Wayfinding - Product Design

Event - Urban Design - Populous Design Build

DRAWING INDEX

X0-0 - DRAWING INDEX

M0-0 – MECHANICAL LEGEND

M0-1 – MECHANICAL NOTES & SCHEDULES

M2-3A - MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN - QUAD A

M2-3B - MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN - QUAD B

M2-3C - MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN - QUAD C

M2-3D - MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN - QUAD D

E0-0 - ELECTRICAL LEGEND

E0-1 - ELECTRICAL SPECIFICATIONS

E0-3 - ELECTRICAL SPECIFICATIONS

E0-5 - ELECTRICAL ONE-LINE - MSA4 AND MSB2

E0-6 - ELECTRICAL ONE-LINE - MSC2

E0-7 - ELECTRICAL ONE-LINE - MSD2

E0-8 - ELECTRICAL SCHEDULES

E2-2 - MAIN CONCOURSE ELECTRICAL REFERENCE PLAN

E2-3A - MAIN CONCOURSE ROOF LEVEL ELECTRICAL PLAN - QUAD A

E2-3B - MAIN CONCOURSE ROOF LEVEL ELECTRICAL PLAN - QUAD B

E2-3C - MAIN CONCOURSE ROOF LEVEL ELECTRICAL PLAN - QUAD C

E2-3D - MAIN CONCOURSE ROOF LEVEL ELECTRICAL PLAN - QUAD D

E8-0 - ELECTRICAL DETAILS

ARCHITECT

Populous

4800 Main Street, Suite 300

Kansas City, MO 64112

816.221.1500

STRUCTURAL ENGINEER

Walter P Moore

201 East Kennedy Boulevard, Suite 700

Tampa, Florida 33602

813-221-2424

M/E/P ENGINEER

ME Engineers

14143 Denver West Parkway, Suite 300

Golden, Colorado 80401

303-421-6655

REVISIONS

NO. DATE DESCRIPTION

D A

C B

PROJECT NAME

RAYMOND JAMES

STADIUM MAIN

CONCOURSE FANS

4201 N DALE MABRY HWY.

TAMPA, FLORIDA 33607

ISSUED NAME

PERMIT SET

ISSUED DATE

04/02/25

ISSUED BY

POPULOUS

PROJECT NUMBER

25.6259.00

PAPER SIZE

E1

SHEET NAME

DRAWING INDEX

SHEET NUMBER

X0-0

/1

/2

:1

:5

P

T O

T H

E B

E S

T O

F T

H E

A R

C H

IT

E

C T

'S K

N O

W L

E D

G E

T

H E

P L

A N

S A

N D

S P

E C

IF

IC

A T

IO

N

S C

O M

P L

Y W

IT

H

T H

E A

P P

L

IC

A B

L E

M

IN

IM

U

M B

U

IL

D

IN

G C

O D

E S

DUCTWORK

DUCT MOUNTED SMOKE DETECTOR

FIRE DAMPER

SMOKE DAMPER

FIRE/SMOKE

DAMPER

MOTORIZED DAMPER

BACKDRAFT

DAMPER

TRANSITION:

RECTANGULAR TO ROUND

ROUND DUCT UP

CONICAL TAP

RECTANGULAR

BRANCH TAP

SECTION NO.

SECTION VIEW SHEET

NO.

DETAIL

DESIGNATION

POWERED EQUIPMENT

DESIGNATION

NON POWERED

EQUIPMENT DESIGNATION

BASEBOARD EQUIPMENT

DESIGNATION

SHEET KEY NOTES

INDICATES TYPE OF EQUIPMENT

INDICATES UNIT NUMBER WITHIN AREA

LEVEL

C - CLUB LEVEL

INDICATES AREA (A,B,C,D) ETC.

PIPING SYMBOLS

PRESSURE/TEMPERATUR

E PORT TAPS

CONCENTRIC REDUCER

ECCENTRIC REDUCER

EXPANSION JOINT

THERMOMETER W/

THERMOWELL

UNION

AIR VENT

FLEXIBLE PIPE

CONNECTOR

FLOW SWITCH

PRESSURE SWITCH

P&T

CR

ER

EJ

U

T

FS

PS

AV

FC

PRESSURE GAUGE W/

GAUGE COCK

ELBOW UP

ELBOW DOWN

TEE UP

TEE DOWN

ISOLATION VALVE, RE:

SPECS

PG

IV

OUTSIDE STEM AND

YOKE

OS&Y

DRAIN VALVE W/ HOSE

END CONNECTION

DV

PIPE CAP OR PLUG

ABBREVIATIONSYMBOL DESCRIPTION

BALL VALVE W/ HOSE

CONNECTION

CHECK VALVE WITH

INDICATION OF FLOW

DIRECTION

PRESSURE REDUCING

VALVE

CIRCUIT SETTER OR

BALANCING VALVE

GLOBE VALVE

(STRAIGHT PATTERN)

GLOBE VALVE (ANGLE

PATTERN)

BUTTERFLY VALVE

CV

PRV

GLV

BFV

CS,BV

GLV

BALL VALVE

AUTOMATIC

TEMPERATURE CONTROL

VALVE, 2-WAY

AUTOMATIC

TEMPERATURE CONTROL

VALVE, 3-WAY

BALANCING VALVE

TEMPERATURE/PRESSURE

RELIEF VALVE

STRAINER W/ BLOW-OFF &

CAPPED HOSE END

CONNECTION

BV

TCV

TCV

BV

TMP

STR

STEAM TRAPST

VALVE IN

RISER

PIPING TYPES

CHILLED WATER

SUPPLY

CHILLED WATER

RETURN

HEATING

WATER SUPPLY

HEATING WATER

RETURN

CONDENSER

WATER RETURN

CONDENSER

WATER SUPPLY

CONDENSATE

DRAIN

HIGH PRESSURE

STEAM SUPPLY

MEDIUM

PRESSURE STEAM

SUPPLY

LOW PRESSURE

STEAM SUPPLY

CHS

CHR

HWS

HWR

CWS

CWR

MPS

LPS

DR

HPS

HIGH PRESSURE

CONDENSATE RETURN

MEDIUM PRESSURE

CONDENSATE RETURN

LOW PRESSURE

CONDENSATE RETURN

REFRIGERANT

SUCTION

REFRIGERANT

LIQUID

CONTROL AIR

(PNEUMATIC)

CHS

CHR

HWS

HWR

CWS

CWR

MPS

LPS

DR

HPS

HPRHPR

MPRMPR

LPRLPR

RSRS

RLRL

AA

BOILER BLOW

DOWN

BDBD

BOILER FEEDBFBF

BLOW OFFBOBO

CHEMICAL

FEEDER

CFCF

PROCESS COOLING

WATER SUPPLY/RETURN

PCS/R

PCS/R

HIGH TEMP. HOT WATER

SUPPLY/RETURN

HTWS/RHTWS/R

PRIMARY OR DISTRICT

HEATING WATER

SUPPLY/RETURN

PHWS/RPHWS/R

PRIMARY OR DISTRICT

CHILLED WATER

SUPPLY/RETURN

PCHS/RPCHS/R

PUMPED CONDENSATE

RETURN

PRPR

EXISTING PIPING(E)(E)

EXISTING PIPING TO

BE REMOVED

(E)(E)

REFRIGERANT

HOT GAS

RHGRHG

SINGLE LINE PIPING

(UP TO 2")

DOUBLE LINE PIPING

(2" AND ABOVE)

PIPE

TYPE

MISCELLANEOUS

SUPPLY

DIFFUSER-4-WAY

THROW

SUPPLY

DIFFUSER-3-WAY

THROW

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

UC

POINT OF

DISCONNECTION

UNDERCUT DOOR (UNDER

ARCH. SECTION)

D/L DOOR LOUVER (UNDER

ARCH. SECTION)

L/D

LOUVER DOOR FULL

HEIGHT. (UNDER ARCH.

SECTION)

ARROW INDICATES

DIRECTION OF FLOW

EXTERIOR WALL LOUVER

SUPPLY

DIFFUSER-2-WAY

THROW

SUPPLY DIFFUSER-1-WAY

THROW

EQUIPMENT DESIGNATION

POINT OF CONN. (CONN.

NEW TO EXISTING)

SUPPLY OR

OUTSIDE AIR DN

NEW DUCTWORK

20"x16"

DUCT DIMENSIONS

(WIDTH x HEIGHT)

TURNING VANES

SPLITTER DAMPER

TRANSITION-RECT. TO RECT. OR

ROUND TO ROUND

UP DN

RISE IN DIRECTION

OF AIRFLOW

RETURN OR

EXHAUST AIR UP

EXHAUST AIR UP

DROP IN DIRECTION

OF AIRFLOW

RETURN OR

EXHAUST AIR DN

EXHAUST AIR DN

FITTINGS:

EJ

FS

PS

S

SV SOLENOID VALVE

F

S

F/S

M

B

A101

SIM

A

M1-01

AHU

1.01

VAV

1.01

TYPE

LENGTH

12"

FCU

CA01

S

EXHAUST GRILLE

RETURN GRILLE

H

CEILING ACCESS

PANEL

FLEXIBLE DUCT

CONNECTION

HUMIDIFIER

RETURN/EXHAUST

AIR FLOW SYMBOL

SUPPLY AIR

FLOW SYMBOL

HEAT TRACE

EXISTING

DIFFUSER

EXISTING

DUCTWORK

TO BE

REMOVED

EXISTING

DUCTWORK

ABBREVIATIONS:

ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

Y

Z

EXISTING THERMOSTAT

NEW THERMOSTAT

SPACE TEMPERATURE SENSOR

SPACE HUMIDISTAT

SPACE HUMIDITY SENSOR

SPACE PRESSURE SENSOR

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

(E)T

T

TS

H

HS

PS

CD

CO

NITROGEN DIOXIDE SENSOR ND

A AIR (COMPRESSED)

ABV ABOVE

A/C AIR CONDITIONING

AC ALTERNATING CURRENT

AIR COMPRESSOR

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACFM ACTUAL CUBIC FEET PER MINUTE

AD ACCESS DOOR

AREA DRAIN

ADJ ADJUSTABLE

AF AIR FILTER

AFC ABOVE FINISHED CEILING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHRI AIR-CONDITIONING, HEATING, AND

REFRIGERATION INSTITUTE

AHU AIR HANDLING UNIT

AL ALUMINUM

AMB AMBIENT

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AND AIR-

CONDITIONING ENGINEERS

ARCH ARCHITECT

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AND AIR-

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

ASTM AMERICAN SOCIETY OF TESTING

AND MATERIALS

AV ACID VENT

AIR VENT

AVG AVERAGE

AW ACID WASTE

AWS AMERICAN WELDING SOCIETY

AUX AUXILIARY

B BOILER

BC BELOW COUNTER

BFV BUTTERFLY VALVE

BHP BRAKE HORSEPOWER

BLDG BUILDING

BM BENCHMARK

BOD BOTTOM OF DUCT (AFF)

BOF BOTTOM OF FOOTING

BOS BOTTOM OF STRUCTURE

BT BATH TUB

BREAK TANK

BTU BRITISH THERMAL UNIT

BV BALL VALVE

BWV BACK WATER VALVE

C CELSIUS

CAB CABINET

CAV CONSTANT AIR VOLUME

CB CATCH BASIN

CC COOLING COIL

CD CONDENSATE DRAIN LINE

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CI CAST IRON

CIRC CIRCULATING

CL CENTERLINE

CLG CEILING

CLR CLEAR

CMP CORRIGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CPVC CHLORINATED POLYVINYL

CHLORIDE

CO CLEANOUT

COL COLUMN

COMB COMBINATION

COMP COMPRESSOR

CONC CONCRETE

CONCENTRIC

COND CONDENSER

CONDENSATE

CONN CONNECTION

CONT CONTINUOUS

CONTINUATION

CONTR CONTROLLER

CONTRACTOR

COP COEFFICIENT OF PERFORMANCE

CRAC COMPUTER ROOM A/C UNIT

CRU CONDENSATE RETURN UNIT

CT COOLING TOWER

CTR CENTER

CU COPPER

CW COLD WATER

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

CV CONSTANT VOLUME

dB DECIBEL

DB DRY-BULB

DC DIRECT CURRENT

DCV DEMAND CONTROLLED VENTILATION

DDC DIRECT DIGITAL CONTROL

DESIG DESIGNATION

DEFL DEFLECTION

DTL DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIFF DIFFUSER

DIM DIMENSION

DISC DISCONNECT

DN DOWN

DOAS DEDICATED OUTSIDE AIR SYSTEM

DP DISCHARGE PLENUM

DPR DAMPER

DR DRAIN

CONDENSATE DRAIN

DS DOUNSPOUT

DOUBLE SUCTION

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWP DOMESTIC WATER PUMP

DX DIRECT EXPANSION

(E) EXISTING

EA EACH OR EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

ELECTRONICALLY COMMUTATED

ECC ECCENTRIC

ECM ELECTRONICALLY COMMUTATED

MOTOR

EDB ENTERING DRY BULB

EDF ELECTRIC DRINKING FOUNTAIN

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EJ EXPANSION JOINT

EL ELEVATION

EMRG EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

ENT ENTERING

ES END SUCTION

EMERGENCY SHOWER

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETR EXISTING TO REMAIN

EVAP EVAPORATOR

EWB ENTERING WET BULB

EWT ENTERING WATER

TEMPERATURE

EX EXPLOSION PROOF

EXT EXTERNAL

EXTG EXISTING

F DEGREE FAHRENHEIT

FBO FURNISHED BY OTHERS

FCO FLOOR CLEAN OUT

FCS FLOOR CONTROL SWITCH

FCU FAN COIL UNIT

FD FLOOR DRAIN

FIRE DAMPER

FDS FIRE DEPARTMENT SIAMESE

FDV FIRE DEPARTMENT VALVE

FG FIBERGLASS

FF FINAL FILTER

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FIXT FIXTURE

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FLR FLOOR

FP FAN POWERED MIXING BOX

FIRE PUMP

FPI FINS PER INCH

FPM FEET PER MINUTE

FRIC FRICTION

FRZR FREEZER

FS FLOW SWITCH

FIRE SPRINKLER

FSK FLOOR SINK

FT FOOT

FEET

FLASH TANK

FT WC FEET, WATER COLUMN

FUT FUTURE

G GAS

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEA GREASE EXHAUST AIR

GLV GLOBE VALVE

GND GROUND

GPD GALLONS PER DAY

GPM GALLONS PER MINUTE

GV GATE VALVE

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HUB DRAIN

HF HUMIDIFIER

HORIZ HORIZONTAL

HP HORSEPOWER

HPA HOISTWAY PRESSURIZATION

AIR

HPU HEAT PUMP UNIT

HKP HOUSEKEEPING PAD

HSC HORIZONTAL SPLIT CASE

HSPF HEATING SEASONAL

PERFORMANCE FACTOR

HSTAT HUMIDISTAT

HT HEIGHT

HTG HEATING

HTR HEATER

HU HUMIDIFIER SECTION

HW HOT WATER

HWC HOT WATER CIRCULATOR

HWP HOT WATER PUMP

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

HZ HERTZ

ID INSIDE DIAMTER

IE INVERT ELEVATION

IH INFRARED HEATER

IN INCH

IN WC INCH, WATER COLUMN

INSUL INSULATION

INT INTERNAL

INTERIOR

INITIAL

IPLV INTEGRATED PART LOAD

VALUE

ISOL ISOLATOR

IW INDIRECT WASTE

JB JUNCTION BOX

JP JOCKEY PUMP

KEC KITCHEN EQUIPMENT

CONTRACTOR

KO KNOCKOUT

KVA KILOVOLT AMPS

KW KILOWATT

L LENGTH

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LBS POUNDS

LBS/HR POUNDS PER HOUR

LF LINEAR FEET

LP LOW PRESSURE

LRA LOCKED ROTOR AMPS

LVG LEAVING

MA MAKE-UP AIR

MAT MIXED AIR TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTUH

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MERV MINIMUM EFFICIENCY

REPORTING VALUE

MFR MANUFACTURER

MH MANHOLE

MI MALLEABLE IRON

MIN MINIMUM

MOCP MAXIMUM OVER CURRENT

PROTECTION

MP MEDIUM PRESSURE

MS MOP SINK

MTD MOUNTED

MTL METAL

MU MAKE-UP

MUA MAKE-UP AIR UNIT

MVD MANUAL VOLUME DAMPER

(N) NEW

NC NORMALLY CLOSED

NOISE CRITERIA

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NUMBER

NPLV NON-STANDARD PART LOAD

VALUE

NPSHA NET POSITIVE SUCTION HEAD

AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD

REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAF OUTSIDE AIR FAN

OAHU OUTSIDE AIR HANDLING UNIT

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OVERFLOW DRAIN

OFCU OUTSIDE AIR FAN COIL UNIT

OPG OPENING

OS&Y OPEN STEM AND YOLK

P PUMP

PLUMBING EQUIPMENT

PC PLUMBING CONTRACTOR

PCR PUMPED CONDENSATE

RETURN

PD PRESSURE DROP

PLANTER DRAIN

PF PRE-FILTER

PH PHASE

POST HYDRANT

PIV POST INDICATOR VALVE

PLBG PLUMBING

PLEV PART LOAD EFFICIENCY VALUE

PNEU PNEUMATIC

PNL PANEL

PNTH PENTHOUSE

PP POLYPROPYLENE

PPM PARTS PER MILLION

PRESS PRESSURE

PRI PRIMARY

PRS PRIMARY REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH,

GAUGE

PT PLUMBING TRIM

PV PLUG VALVE

PVC POLYVINYL CHLORIDE

PWL SOUND POWER LEVEL

QTY QUANTITY

(R) REMOVE

RELOCATE

RA RETURN AIR

RAD REFRIGERATED AIR DRYER

RAF RETURN AIR FAN

RAG RETURN AIR GRILLE

RAT RETURN AIR TEMPERATURE

RCP REFLECTED CEILING PLAN

REINFORCED CONCRETE PIPE

RD ROOF DRAIN

RE REFERENCE

REFER

RECIRC RECIRCULATE

RED REDUCER

REFR REFRIGERATOR

REG REGISTER

REINF REINFORCING

REQD REQUIRED

REV REVISION

REVISE

RF RETURN FAN

RELIEF FAN

RH RELATIVE HUMIDITY

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RLA RUNNING LOAD AMPS

RM ROOM

REFRIGERANT MACHINE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOFTOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAF SUPPLY AIR FAN

SAG SUPPLY AIR GRILLE

SAN SANITARY SEWER

SAR SUPPLY AIR REGISTER

SCHED SCHEDULE

SCFM STANDARD AIR CUBIC FEET

PER MINUTE

SCR SILICON CONTROLLED

RECTIFIER

SD STORM DRAIN

SE SEWAGE EJECTOR

SEC SECONDARY

SECT SECTION

SEER SEASONAL ENERGY

EFFICIENCY RATIO

SENS SENSIBLE

SF SQUARE FEET

SUPPLY FAN

SH SHOWER

SHT SHEET

SIM SIMILAR

SJ SEISMIC JOINT

SK SINK

SM SHEET METAL

SP STATIC PRESSURE

SUMP PUMP

SPA STAIR PRESSURIZATION AIR

SPEC SPECIFICATION

SPR SPRINKLER

SQ SQUARE

SS STAINLESS STEEL

SERVICE SINK

SSD SUBSURFACE DRAIN

SSFU SANITARY SEWER FIXTURE

UNITS

SSSC SOLID STATE SPEED

CONTROL

STD STANDARD

STL STEEL

STR STRAINER

SURF SURFACE

SUSP SUSPEND

SV SANITARY VENT

ST SOUND TRAP

TA TRANSFER AIR

TC TEMPERATURE CONTROL

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TER TOTAL ENERGY RATIO

TF TRANSFER FAN

TG TRANSFER GRILLE

TH BLK THRUST BLOCK

TOD TOP OF DUCT (AFF)

TOP TOP OF PIPE (AFF)

TP TRAP PRIMER

TPD TRAP PRIMER DEVICE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TYP TYPICAL

U URINAL

U/F UNDERFLOOR

U/S UNDERSLAB

UCD UNDERCUT DOOR

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS

LABORATORIES

UNO UNLESS NOTED OTHERWISE

UTR UP THROUGH ROOF

V VOLT, VENT

VA VOLT-AMPERE

VAC VACUUM

VAV VARIABLE AIR VOLUME

VB VALVE BOX

VACUUM BREAKER

VCP VITRIFIED CLAY PIPE

VD VOLUME DAMPER

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREUENCY DRIVE

VIB VALVE IN BOX

VOV VALVE ON VERTICAL

VP VACUUM PUMP

VR VARIABLE AIR VOLUME

REHEAT

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W WATT

WASTE

WIDTH

W/ WITH

W/O WITHOUT

WB WETBULB

WC WATER CLOSET

WCO WALL CLEANOUT

WF WATER FILTER

WH WALL HYDRANT

WM WATER METER

WMS WELDED WIRE MESH SCREEN

WP WEATHERPROOF

WPD WATER PRESSURE DROP

WWF WELDED WIRE FABRIC

WT WATER TIGHT

WEIGHT

Y YARD HYDRANT

Z ZONE

APPLICABLE CODES

DESIGNED UNDER THE FOLLOWING CODES AND STANDARDS:

2023 FLORIDA BUILDING CODE (8TH EDITION): BUILDING

2023 FLORIDA BUILDING CODE (8TH EDITION): ENERGY CONSERVATION

2023 FLORIDA BUILDING CODE (8TH EDITION): PLUMBING

2023 FLORIDA BUILDING CODE (8TH EDITION): MECHANICAL

2023 FLORIDA BUILDING CODE (8TH EDITION): FUEL GAS

FLORIDA ELECTRIC CODE 2020

2023 (8TH EDITION) FLORIDA FIRE PREVENTION CODE

NFPA 13

NFPA 72

SUPPLY AIR OR

OUTSIDE AIR UP

SEISMIC JOINTSJ

SJ

PIPE ANCHORANCH

PIPE GUIDEGD

LVL LEVEL

LWB LEAVING WET BULB

LWCO LOW WATER CUT OFF

LWT LEAVING WATER

TEMPERATURE

A

EXHAUST

DIFFUSER

RETURN

DIFFUSER

SUPPLY SLOT DIFFUSER

LOW PRESSURE

FLEXIBLE DUCT

CONICAL SPIN-IN FITTING

W/ MANUAL VOLUME DAMPER

DIFFUSER

TYPE

SUPPLY

DIFFUSER

ROUND DUCT

DOWN

(QTY)A

SIZE

CFM

D e n v e r W e st

P k w y

S u it e

G o ld e n

C O

.4

.6 w w .m e -e n g in e e rs

.c o m

SHEET TITLE:

ISSUANCE

ISSUE DATE:

PROJECT #:

KEY PLAN

TRUE NORTHPLAN NORTH

/1

/2

:2

:1

P

M C

R e v it P ro je c ts

\2

\R J S

C o n c F a n s M

E

R a u s ti n

.k ip p Y

Q C

C D

.r v t

04/02/2025

MECHANICAL

LEGEND

M0-0

DV25036

R A

Y M

O N

D J

A M

E S

S T

A D

IU

M

M A

IN

C

O N

C O

U R

S E

F A

N S

N

D A

L E

M A

B R

Y H

W Y

T

A M

P A

F

L O

R

ID

A

ISSUE FOR PERMIT

REVISIONS

NO. DATE DESCRIPTION

This item has been digitally signed and sealed by Jeremy Keiling, PE, on 4/11/2025.

Printed copies of this document are not considered signed an sealed . The signature must be verified on electronic copies.

GENERAL MECHANICAL CONTRACT REQUIREMENTS:

GENERAL:

1. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE PLANS AND

SPECIFICATIONS SHALL INCLUDE THE FURNISHING AND INSTALLATION OF

ALL LABOR AND MATERIALS NECESSARY FOR COMPLETE AND

OPERATIONAL HVAC, FIRE PROTECTION AND PLUMBING SYSTEMS.

CONTRACTOR SHALL FURNISH THESE EVEN IF ITEMS REQUIRED TO

ACHIEVE THIS (I.E. OFFSETS, ISOLATION AND BALANCING DEVICES,

MAINTENANCE CLEARANCES, ETC.) ARE NOT SPECIFICALLY SHOWN.

2. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED.

ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE CONTRACTOR

SHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS, LEVELS,

SPACE REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER TRADES,

ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HIS WORK TO THE

ACTUAL CONDITIONS OF THE JOB.

3. THE DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND SHALL NOT BE

SCALED. THEY SHOW CERTAIN PHYSICAL RELATIONSHIPS WHICH MUST BE

ESTABLISHED WITHIN THE DIVISION 21,22 AND 23 WORK AND ITS

INTERFACE WITH OTHER WORK. ESTABLISHING THIS RELATIONSHIP IN THE

FIELD IS THE EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR. THIS

DIVISION SHALL COORDINATE ITS WORK WITH ALL DIVISIONS OF THE

WORK AND ADJUST ITS WORK AS REQUIRED BY THE ACTUAL CONDITIONS

OF THE PROJECT.

A. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING A

BID TO BECOME THOROUGHLY FAMILIAR WITH THE ACTUAL

CONDITIONS OF THE PROJECT. NO EXTRAS WILL BE ALLOWED DUE

TO LACK OF KNOWLEDGE OF EXISTING CONDITIONS.

B. CERTAIN SYSTEMS REQUIRE ENGINEERING OF INSTALLATION

DETAILS BY CONTRACTOR. UNLESS FULLY DETAILED IN THE

CONTRACT DOCUMENTS, SUCH ENGINEERING IS THE EXCLUSIVE

RESPONSIBILITY OF THE CONTRACTOR.

C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE WHERE

CLEARANCES ARE LIMITED, AND WHERE INSTALLATION DRAWINGS

OR SCHEMATICS, "CONSTRUCTION DRAWINGS", OR COORDINATION

DRAWINGS MAY BE REQUIRED IN EXCESS OF THOSE REQUIRED BY

THE SPECIFICATIONS. THE CONTRACTOR SHALL PREPARE ALL

SUCH COORDINATION DRAWINGS AS PART OF THE BASE

CONTRACT. SUCH DRAWINGS MAY BE SUBMITTED TO THE

ARCHITECT/ENGINEER FOR RECORD AND COMMENT. ANY WORK

INSTALLED WITHOUT APPROVED COORDINATION DRAWINGS IS

DONE AT THE CONTRACTOR'S RISK.

EXISTING BUILDING:

1. EXISTING CONDITIONS REPRESENTED ON MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS HAVE BEEN DEVELOPED USING VARIOUS EXISTING

DESIGN DRAWINGS AND SITE OBSERVATIONS. EXISTING DESIGN

DRAWINGS MAY OR MAY NOT REFLECT THE ACTUAL INSTALLED

CONDITION FOR SYSTEMS INDICATED. SITE OBSERVATIONS MAY BE

INCOMPLETE AS CONCEALED CONDITIONS CANNOT BE VISUALLY

VERIFIED. WHILE SITE INVESTIGATION HAS BEEN CONDUCTED, THE

ENGINEER CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE

EXISTING DESIGN DRAWINGS AND INFORMATION GATHERED DURING SITE

INVESTIGATION COMPLETELY AND ACCURATELY REFLECT EXISTING

CONDITIONS. FOR THIS REASON, THE SCOPE INCLUDED IN THIS DRAWING

PACKAGE CANNOT BE ASSURED TO INCLUDE ALL CONTINGENCIES. FIELD

COORDINATION DURING CONSTRUCTION IS REQUIRED TO FULLY

UNDERSTAND AND EXECUTE THE PROJECT SCOPE OF WORK.

REASONABLE CONTINGENCIES SHALL BE INCLUDED FOR UNFORESEEN

SCOPE ITEMS.

2. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THE

EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING

CONSTRUCTION. CONTINUED OPERATION OF THE FACILITY SHALL NOT BE

HINDERED BY THIS WORK. THE CONTRACTOR SHALL ACCOUNT FOR ALL

ADDITIONAL COSTS WHICH MAY BE INCURRED BY THE CONTRACTOR DUE

TO THE DIFFICULTY OF WORKING OVER AND AROUND EMPLOYEES, DESKS,

EQUIPMENT, ETC.; AND DUE TO THE HOURS OF THE DAY IN WHICH AN

AREA MAY BE AVAILABLE. CONTRACTOR'S BID SHALL TAKE THESE

FACTORS INTO ACCOUNT.

3. MAINTAIN A MARK-UP SET OF DRAWINGS WHICH INDICATE VARIATIONS IN

THE ACTUAL INSTALLATION FROM THE ORIGINAL DESIGN. SURRENDER

DRAWINGS TO OWNER UPON COMPLETION.

4. COORDINATE ALL PENETRATIONS OF FLOOR SLABS, CONCRETE WALLS,

AND OTHER STRUCTURAL ELEMENTS WITH ARCHITECT AND STRUCTURAL

ENGINEER PRIOR TO COMMENCING WORK. UTILIZE X-RAY AND VISUAL

INVESTIGATION OF EXISTING CONDITIONS AS REQUIRED TO DETERMINE

PENETRATION LOCATIONS. SUBMIT PENETRATION SHOP DRAWINGS TO

ARCHITECT AND ENGINEER FOR REVIEW PRIOR TO DRILLING OR CUTTING.

COORDINATE ALL NEW PENETRATIONS WITH OTHER DIVISIONS OF THE

WORK. ALL CONTRACTORS ARE INDIVIDUALLY RESPONSIBLE FOR ALL

PENETRATIONS REQUIRED BY THEIR DIVISIONS.

ELECTRICAL/FIRE ALARM COORDINATION:

1. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE ELECTRICAL

CONTRACTOR BEFORE ORDERING ANY MECHANICAL EQUIPMENT

REQUIRING ELECTRICAL CONNECTIONS.

GENERAL INSTALLATION:

1. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE

SUPPORT FOR ALL DIVISION 23 WORK. SUSPEND EACH TRADE'S WORK

SEPARATELY FROM THE STRUCTURE. DO NOT SHARE HANGERS BETWEEN

PIPING, DUCTWORK, CONDUIT, AND EQUIPMENT. DUCTWORK, PIPING, AND

CONDUIT SHALL BE HELD TIGHT TO STRUCTURE EXCEPT WHERE

OTHERWISE SHOWN.

2. EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE INDICATED OR

LOCAL CODE TAKES PRECEDENCE, COMPLY WITH THE PRODUCT

MANUFACTURER'S INSTALLATION INSTRUCTIONS AND

RECOMMENDATIONS.

3. PROVIDE MANUFACTURER'S RECOMMENDED SERVICE CLEARANCE

AROUND ALL EQUIPMENT REQUIRING SAME. PROVIDE A MEANS OF

ACCESS (ACCESS PANELS, ACCESS DOORS, REMOVABLE CEILING TILES,

ETC.) WHERE REQUIRED FOR ADEQUATE MAINTENANCE AND

EQUIPMENT/COMPONENT REPLACEMENT. WHERE EQUIPMENT IS

INSTALLED ABOVE CEILINGS, INSTALL SUCH EQUIPMENT AT A HEIGHT

READILY ACCESSIBLE THROUGH THE CEILING.

CUTTING, PATCHING AND DEMOLITION:

1. KEEP DEMOLITION & CUTTING TO MINIMUM REQUIRED FOR PROPER

EXECUTION OF WORK.

2. BE RESPONSIBLE FOR ALL CUTTING AND PATCHING NECESSARY FOR THE

COMPLETION OF THE WORK.

3. NO CUTTING (NOT SHOWN ON THE CONTRACT DOCUMENTS) SHALL BE

DONE WITHOUT THE APPROVAL OF THE ARCHITECT AS TO LOCATIONS,

METHOD AND EXTENT OF THE CUTTING.

4. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH EXISTING

CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN CONTINUITY,

APPEARANCE OR FUNCTION.

FIRE STOPPING:

1. PENETRATIONS THROUGH FIRE RATED WALLS AND FIRE RATED

HORIZONTAL ASSEMBLIES SHALL BE PROVIDED WITH AN APPROVED FIRE

STOPPING SYSTEM.

2. PENETRATIONS THROUGH NON-FIRE RATED FLOOR OR FLOOR/CEILING

ASSEMBLIES SHALL BE PROVIDED WITH AN APPROVED FIRE STOPPING

SYSTEM.

3. INSTALL FIRE STOPPING MATERIALS IN ACCORDANCE WITH THEIR UL AND

ASTM TESTED METHODS.

GENERAL SYSTEM DESCRIPTION:

1. ADDING (14) HVLS FANS TO CLUB CONCOURSE LEVEL FOR ADDITIONAL

OCCUPANT COMFORT IN EXTERIOR AREA.

ENERGY CODE COMPLIANCE:

1. THE PROJECT HAS BEEN DESIGNED UNDER THE ENERGY CODE INDICATED

ON THE LEGEND SHEET.

2. THE PROJECT IS UTILIZING THE PRESCRIPTIVE PATH OF THE

INTERNATIONAL ENERGY CONSERVATION CODE INCLUDING ALL

APPLICABLE MANDATORY AND PRESCRIPTIVE CODE PROVISIONS.

D e n v e r W e st

P k w y

S u it e

G o ld e n

C O

.4

.6 w .m e -e n g in e e rs

.c o m

SHEET TITLE:

ISSUANCE

ISSUE DATE:

PROJECT #:

KEY PLAN

TRUE NORTHPLAN NORTH

/1

/2

:2

:1

P

M C

R e v it P ro je c ts

\2

\R J S

C o n c F a n s M

E

R a u s ti n

.k ip p Y

Q C

C D

.r v t

04/02/2025

MECHANICAL

NOTES &

SCHEDULES

M0-1

DV25036

R A

Y M

O N

D J

A M

E S

S T

A D

IU

M

M A

IN

C

O N

C O

U R

S E

F A

N S

N

D A

L E

M A

B R

Y H

W Y

T

A M

P A

F

L O

R

ID

A

ISSUE FOR PERMIT

I. PROVIDE MANUFACTURER BAFCON RTC 0-10V CONTROLLER KIT TO CONTROL (7) FANS PER SIDE. CONTROLLERS TO BE MOUNTED IN MAIN CONCOURSE CENTER ELECTRICAL ROOMS 02.07.04 & 02.40.04. COORDINATE EXACT MOUNTING LOCATION WITH ARCHITECT AND OWNER. CONTROLLERS TO BE INTEGRATED INTO BMS VIA BACNET TO ALLOW FOR SCHEDULING AND CONTROL. INTEGRATED FAN CONTROL TO ALLOW THE FANS TO RAMP UP UPON INCREASED OUTDOOR TEMPERATURE. FANS SHALL BE PROVIDED WITH A FIRE RELAY TO DE-ENERGIZE FANS UPON ACTIVATION OF THE FIRE

ALARM SYSTEM.

1. PROVIDE MANUFACTURER UNIVERSAL MOUNT, 4' EXTENSION TUBE, AND CONCRETE MOUNT KIT FOR SUPPORTING FROM CONCRETE BEAM STRUCTURE ABOVE. MAINTAIN MANUFACTURER REQUIRED CLEARANCES. COORDINATE STRUT OR GUY CABLES (TO PREVENT LATERAL MOVEMENT) WITH STRUCTURAL. SET FAN FOR DOWNFLOW OPERATION.

CONTROL(CTRL): MOUNTING (MTG):

1. VSD=VARIABLE SPEED DRIVE.

2. PROVIDE PREMIUM EFFICIENCY MOTORS FOR MOTORS 1 HP AND OVER PER MENA STANDARD MG1-2003, TABLES 12-12

AND 12-13.

3. COORDINATE AIRFOIL AND HARDWARE COLORS WITH ARCHITECT.

4. PROVIDE BLACK HEAT SINK.

GENERAL NOTES: REMARK NOTES:

DESTRATIFICATION FAN SCHEDULE

TYPE MARK MANUFACTURER MODEL NO. AREA SERVED CFM MAX RPM NO. OF BLADES DIAMETER (FT) DRIVE

ELECTRICAL

MTG CTRL WEIGHT (LBS) REMARKSMOTOR (W) VOLT PH FLA DISC. FEEDER FUSE

DSF CA01 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CA02 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CA03 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CA04 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CB01 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CB02 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CB03 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CB04 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CC01 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CC02 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CC03 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CD01 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CD02 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

DSF CD03 BIG ASS FANS ESSENCE CLUB LEVEL CONCOURSE 54135 56 8 12 VSD 338 208 1 0.0 T.O. SWITCH (3#12,#12G)3/4"C - 1 I 100

H-W

30.7

27.1

40 37.4

33.9

E

D

F-W

A

C

B

G-W

CA01

DSF

CA02

DSF

CA03

DSF

CA04

DSF

D e n v e r W e st

P k w y

S u it e

G o ld e n

C O

.4

.6 w .m e -e n g in e e rs

.c o m

SHEET TITLE:

ISSUANCE

ISSUE DATE:

PROJECT #:

KEY PLAN

TRUE NORTHPLAN NORTH

/1

/2

:2

:1

P

M C

R e v it P ro je c ts

\2

\R J S

C o n c F a n s M

E

R a u s ti n

.k ip p Y

Q C

C D

.r v t

04/02/2025

MAIN CONCOURSE

ROOF LEVEL

MECHANICAL PLAN

QUAD A

M2-3A

DV25036

R A

Y M

O N

D J

A M

E S

S T

A D

IU

M

M A

IN

C

O N

C O

U R

S E

F A

N S

N

D A

L E

M A

B R

Y H

W Y

T

A M

P A

F

L O

R

ID

A

ISSUE FOR PERMIT

1/16" = 1'-0"

MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN QUAD A

KEYNOTES

1. THE DRAWINGS ARE DIAGRAMMATIC IN

NATURE. THE CONTRACTOR IS

RESPONSIBLE FOR ALL OFFSETS,

TRANSITIONS, ELBOWS, ETC. AS

REQUIRED IN DUCTWORK, PIPING,

SUPPORTS, ETC. TO COMPLETE THE

WORK IN A CLEAN FUNCTIONAL

INSTALLATION THAT IS FULLY

COORDINATED WITH ALL OTHER

TRADES. ANY PRICING EFFORT SHALL

TAKE THESE FACTORS INTO ACCOUNT.

2. COORDINATE SPACE TEMPERATURE

SENSORS AND THERMOSTAT

LOCATIONS TO ALIGN VERTICALLY WITH

LIGHT SWITCHES.

3. TEMPERATURE CONTROLS

CONTRACTOR SHALL SUBMIT PLANS

INDICATING ALL SPACE TEMPERATURE

SENSORS, T-STATS, HUMIDITY

SENSORS, ETC. AS PART OF SUBMITTAL

PROCESS FOR A/E REVIEW PRIOR TO

ROUGH-IN.

4. ALL DUCT/PIPE PENETRATIONS

THROUGH FIRE RATED/SMOKE RATED

PARTITIONS SHALL BE CAULKED AND

SEALED TO MEET THE RATING

REQUIRED. REFER TO LIFE SAFETY

DRAWINGS FOR FIRE/SMOKE RATING

REQUIREMENTS.

MECH GENERAL NOTES:

H-E

23.3

16.8

27.1

10 15

F-E

E

D

A

C

B

G-E

CB01

DSF

CB02

DSF

CB03

DSF

CB04

DSF

D e n v e r W e st

P k w y

S u it e

G o ld e n

C O

.4

.6 w .m e -e n g in e e rs

.c o m

SHEET TITLE:

ISSUANCE

ISSUE DATE:

PROJECT #:

KEY PLAN

TRUE NORTHPLAN NORTH

/1

/2

:2

:1

P

M C

R e v it P ro je c ts

\2

\R J S

C o n c F a n s M

E

R a u s ti n

.k ip p Y

Q C

C D

.r v t

04/02/2025

MAIN CONCOURSE

ROOF LEVEL

MECHANICAL PLAN

QUAD B

M2-3B

DV25036

R A

Y M

O N

D J

A M

E S

S T

A D

IU

M

M A

IN

C

O N

C O

U R

S E

F A

N S

N

D A

L E

M A

B R

Y H

W Y

T

A M

P A

F

L O

R

ID

A

ISSUE FOR PERMIT

1. THE DRAWINGS ARE DIAGRAMMATIC IN

NATURE. THE CONTRACTOR IS

RESPONSIBLE FOR ALL OFFSETS,

TRANSITIONS, ELBOWS, ETC. AS

REQUIRED IN DUCTWORK, PIPING,

SUPPORTS, ETC. TO COMPLETE THE

WORK IN A CLEAN FUNCTIONAL

INSTALLATION THAT IS FULLY

COORDINATED WITH ALL OTHER

TRADES. ANY PRICING EFFORT SHALL

TAKE THESE FACTORS INTO ACCOUNT.

2. COORDINATE SPACE TEMPERATURE

SENSORS AND THERMOSTAT

LOCATIONS TO ALIGN VERTICALLY WITH

LIGHT SWITCHES.

3. TEMPERATURE CONTROLS

CONTRACTOR SHALL SUBMIT PLANS

INDICATING ALL SPACE TEMPERATURE

SENSORS, T-STATS, HUMIDITY

SENSORS, ETC. AS PART OF SUBMITTAL

PROCESS FOR A/E REVIEW PRIOR TO

ROUGH-IN.

4. ALL DUCT/PIPE PENETRATIONS

THROUGH FIRE RATED/SMOKE RATED

PARTITIONS SHALL BE CAULKED AND

SEALED TO MEET THE RATING

REQUIRED. REFER TO LIFE SAFETY

DRAWINGS FOR FIRE/SMOKE RATING

REQUIREMENTS.

MECH GENERAL NOTES:

KEYNOTES

1/16" = 1'-0"

MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN QUAD B

63.7

H-E

54 76

66.9

4.4

62.6

59.9

F-E

E

D

A

C

B

G-E

CC01

DSF

CC02

DSF

CC03

DSF

CB01

DSF

D e n v e r W e st

P k w y

S u it e

G o ld e n

C O

.4

.6 w .m e -e n g in e e rs

.c o m

SHEET TITLE:

ISSUANCE

ISSUE DATE:

PROJECT #:

KEY PLAN

TRUE NORTHPLAN NORTH

/1

/2

:2

:1

P

M C

R e v it P ro je c ts

\2

\R J S

C o n c F a n s M

E

R a u s ti n

.k ip p Y

Q C

C D

.r v t

04/02/2025

MAIN CONCOURSE

ROOF LEVEL

MECHANICAL PLAN

QUAD C

M2-3C

DV25036

R A

Y M

O N

D J

A M

E S

S T

A D

IU

M

M A

IN

C

O N

C O

U R

S E

F A

N S

N

D A

L E

M A

B R

Y H

W Y

T

A M

P A

F

L O

R

ID

A

ISSUE FOR PERMIT

1. THE DRAWINGS ARE DIAGRAMMATIC IN

NATURE. THE CONTRACTOR IS

RESPONSIBLE FOR ALL OFFSETS,

TRANSITIONS, ELBOWS, ETC. AS

REQUIRED IN DUCTWORK, PIPING,

SUPPORTS, ETC. TO COMPLETE THE

WORK IN A CLEAN FUNCTIONAL

INSTALLATION THAT IS FULLY

COORDINATED WITH ALL OTHER

TRADES. ANY PRICING EFFORT SHALL

TAKE THESE FACTORS INTO ACCOUNT.

2. COORDINATE SPACE TEMPERATURE

SENSORS AND THERMOSTAT

LOCATIONS TO ALIGN VERTICALLY WITH

LIGHT SWITCHES.

3. TEMPERATURE CONTROLS

CONTRACTOR SHALL SUBMIT PLANS

INDICATING ALL SPACE TEMPERATURE

SENSORS, T-STATS, HUMIDITY

SENSORS, ETC. AS PART OF SUBMITTAL

PROCESS FOR A/E REVIEW PRIOR TO

ROUGH-IN.

4. ALL DUCT/PIPE PENETRATIONS

THROUGH FIRE RATED/SMOKE RATED

PARTITIONS SHALL BE CAULKED AND

SEALED TO MEET THE RATING

REQUIRED. REFER TO LIFE SAFETY

DRAWINGS FOR FIRE/SMOKE RATING

REQUIREMENTS.

MECH GENERAL NOTES:

KEYNOTES

1/16" = 1'-0"

MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN QUAD C

49.8 46

H-W

57.5

53.1

48 4450

56.3

59.9

EE DD

F-W

A

CC

B

G-W

CD01

DSF

CD02

DSF

CD03

DSF

CA01

DSF

D e n v e r W e st

P k w y

S u it e

G o ld e n

C O

.4

.6 w .m e -e n g in e e rs

.c o m

SHEET TITLE:

ISSUANCE

ISSUE DATE:

PROJECT #:

KEY PLAN

TRUE NORTHPLAN NORTH

/1

/2

:2

:1

P

M C

R e v it P ro je c ts

\2

\R J S

C o n c F a n s M

E

R a u s ti n

.k ip p Y

Q C

C D

.r v t

04/02/2025

MAIN CONCOURSE

ROOF LEVEL

MECHANICAL PLAN

QUAD D

M2-3D

DV25036

R A

Y M

O N

D J

A M

E S

S T

A D

IU

M

M A

IN

C

O N

C O

U R

S E

F A

N S

N

D A

L E

M A

B R

Y H

W Y

T

A M

P A

F

L O

R

ID

A

ISSUE FOR PERMIT

1. THE DRAWINGS ARE DIAGRAMMATIC IN

NATURE. THE CONTRACTOR IS

RESPONSIBLE FOR ALL OFFSETS,

TRANSITIONS, ELBOWS, ETC. AS

REQUIRED IN DUCTWORK, PIPING,

SUPPORTS, ETC. TO COMPLETE THE

WORK IN A CLEAN FUNCTIONAL

INSTALLATION THAT IS FULLY

COORDINATED WITH ALL OTHER

TRADES. ANY PRICING EFFORT SHALL

TAKE THESE FACTORS INTO ACCOUNT.

2. COORDINATE SPACE TEMPERATURE

SENSORS AND THERMOSTAT

LOCATIONS TO ALIGN VERTICALLY WITH

LIGHT SWITCHES.

3. TEMPERATURE CONTROLS

CONTRACTOR SHALL SUBMIT PLANS

INDICATING ALL SPACE TEMPERATURE

SENSORS, T-STATS, HUMIDITY

SENSORS, ETC. AS PART OF SUBMITTAL

PROCESS FOR A/E REVIEW PRIOR TO

ROUGH-IN.

4. ALL DUCT/PIPE PENETRATIONS

THROUGH FIRE RATED/SMOKE RATED

PARTITIONS SHALL BE CAULKED AND

SEALED TO MEET THE RATING

REQUIRED. REFER TO LIFE SAFETY

DRAWINGS FOR FIRE/SMOKE RATING

REQUIREMENTS.

MECH GENERAL NOTES:

KEYNOTES

1/16" = 1'-0"

MAIN CONCOURSE ROOF LEVEL MECHANICAL PLAN QUAD D

CITY OF TAMPA REQUIREMENTS

NO ELECTRICAL MATERIALS, APPARATUS, DEVICES, APPLIANCES, FIXTURES OR EQUIPMENT SHALL BE SOLD OR INSTALLED IN THE CITY UNLESS THEY ARE IN CONFORMANCE WITH PROVISIONS OF THIS CODE, THE LAWS OF THE STATE OF FLORIDA AND ANY APPLICABLE RULES AND REGULATIONS ISSUED UNDER THE AUTHORITY OF THE STATE STATUTES. THE MAKER'S NAME, TRADEMARK, OR OTHER IDENTIFICATION SYMBOL SHALL BE PLACED ON ALL ELECTRICAL MATERIALS, APPARATUS, DEVICES, APPLIANCES, FIXTURES AND EQUIPMENT USED OR INSTALLED UNDER THE PROVISIONS OF THIS CODE. ALL ELECTRICAL MATERIAL AND EQUIPMENT SHALL BE LISTED AND LABELED FOR THE INTENDED USE AND SHALL BE INCLUDED IN A LIST PUBLISHED BY AN APPROVED AGENCY.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

ALL EXPOSED RACEWAYS ARE TO BE INSTALLED PARALLEL OR PERPENDICULAR TO WALLS OR STRUCTURAL MEMBERS SUCH THAT THEY FOLLOW STRUCTURAL SURFACE CONTOURS AND SHALL BE INSTALLED SUCH THAT THEY DO NOT OBSTRUCT PASSAGEWAYS OR ACCESS TO EQUIPMENT. MULTIPLE RACEWAYS SHOULD BE INSTALLED GROUPED TOGETHER. THE LOCATION OF PUBLICLY VISIBLE RACEWAYS SHALL BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. (EXTRA TIME SHOULD BE ALLOWED FOR THIS REVIEW AND

APPROVAL.)

THE DISCONNECTING MEANS FOR ALL MECHANICAL EQUIPMENT SHALL BE ACCESSIBLE AND HAVE THE

CLEARANCE IN FRONT AS REQUIRED BY NEC AMENDMENTS.

ALL CEILING ATTACHED OBJECTS AND FLOOR ATTACHED EQUIPMENT INCLUDING BUT NOT LIMITED TO PENDANT LIGHTING FIXTURES, GENERAL LIGHTING, MULTIPLE RACEWAYS, GENERATOR, TRANSFORMER ELECTRICAL SWITCHGEAR, AND SWITCHBOARDS SHALL BE INSTALLED IN ACCORDANCE WITH SUPPORTING

OBJECTS FOR SEISMIC ZONE AS REQUIRED BY STATE AND LOCAL CODES.

ALL SWITCHGEAR, SWITCHBOARDS AND TRANSFORMERS SHALL HAVE A 4 INCH HOUSE KEEPING PAD. UNDER

NO CONDITION SHALL THE HIGHEST SWITCH OR BREAKER EXCEED 6'-6" AFF.

DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED. ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE CONTRACTOR SHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS, LEVELS, SPACE REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER TRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HIS WORK TO ACTUAL CONDITIONS AT THE BUILDINGS. THE DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND SHALL NOT BE SCALED. HOWEVER THIS DOES NOT RELIEVE ANY SUB- CONTRACTOR FROM COORDINATING HIS WORK WITH ALL OTHER TRADES AND FROM ADJUSTING HIS WORK AS REQUIRED BY THE ACTUAL CONDITIONS OF THE PROJECT. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING COSTS TO BECOME THOROUGHLY FAMILIAR WITH THE ACTUAL CONDITIONS OF THE PROJECT.

COORDINATE AND ADJUST ALL WORK BETWEEN TRADES AND EXISTING CONDITIONS IN ORDER TO ACCOMPLISH A NEAT, INTEGRATED AND EFFICIENT INSTALLATION WHICH INCLUDE BUT ARE NOT LIMITED TO:

a. EXAMINE THE CONTRACT DOCUMENTS OF ALL TRADES (IE. THE ARCHITECTURAL REFLECTED CEILING PLAN, MECHANICAL HVAC DRAWINGS, ELECTRICAL LIGHTING PLAN, FIRE PROTECTION PLAN, ETC.).

b. COORDINATE NECESSARY EQUIPMENT, FIXTURES, ETC. SO THAT THE FINAL INSTALLATION IS COMPATIBLE

WITH THE MATERIALS AND EQUIPMENT OF THE OTHER TRADES.

c. THIS CONTRACTOR SHALL ASSIST THE DIVISION 23 CONTRACTOR IN PREPARING SHOP DRAWINGS FOR COORDINATING INSTALLATION OF ALL WORK (IE. LOCATING ALL LIGHTING FIXTURES IN CEILING WITH CEILING

CLEARANCES, RACEWAYS, PIPING, EQUIPMENT FOR CLEARANCE THROUGHOUT).

d. THE ELECTRICAL DRAWINGS INDICATE THE ELECTRICAL REQUIREMENTS FOR A SIGNIFICANT PORTION OF THE MECHANICAL AND PLUMBING SYSTEMS. ADDITIONAL MECHANICAL AND PLUMBING EQUIPMENT IS INDICATED ON THE DIVISION 23 DRAWINGS. REFER TO MECHANICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. PROVIDE COMPLETE WIRING AND FUSIBLE DISCONNECTING MEANS FOR ALL

MECHANICAL AND PLUMBING EQUIPMENT.

DEFINITIONS:

a. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS TO AN ITEM OF EQUIPMENT.

b. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND PLACE IN FULL OPERATIONAL ORDER".

c. "PROVIDE" MEANS TO "FURNISH AND INSTALL".

d. "EQUIVALENT" MEANS "MEETS THE SPECIFICATIONS OF THE REFERENCE PRODUCT OR ITEM IN ALL

SIGNIFICANT ASPECTS." SIGNIFICANT ASPECTS SHALL BE DETERMINED BY THE ENGINEER.

e. "RE: DIVISION", AND SIMILAR EXPRESSIONS MEANS WORK TO BE PERFORMED UNDER THE CONTRACT DOCUMENTS, BUT NOT NECESSARILY UNDER THE DIVISION OR SECTION OF THE WORK ON WHICH THE NOTE APPEARS. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO COORDINATE THE WORK OF THE CONTRACT BETWEEN HIS/HER SUPPLIERS, SUBCONTRACTORS, AND EMPLOYEES. IF CLARIFICATION IS REQUIRED, CONSULT ARCHITECT.

"FIRESTOPPING" REQUIREMENT. ALL PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SEALED WITH MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASSES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE STOPS ASTM-E-814. ALL PENETRATIONS

SHALL MEET F AND T RATINGS AS REQUIRED BY THE BUILDING CODE.

WHERE DISCONNECTS ARE INDICATED ON DRAWINGS CONTRACTOR SHALL PROVIDE FINAL CONNECTION

FROM DISCONNECT TO EQUIPMENT BEING SERVED.

CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTS AS REQUIRED FOR A COMPLETE OPERABLE ELECTRICAL INSTALLATION INCLUDING MISCELLANEOUS STEEL, UNI-STRUT, ALL-THREAD, AIRCRAFT CABLE, ETC.

PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR ALL SINGLE PHASE CIRCUITS. A SHARED NEUTRAL

CONDUCTOR IS NOT ACCEPTABLE ON SINGLE PHASE CIRCUITS.

EQUIPMENT INTERRUPTING RATINGS INDICATED ON THE DRAWINGS ARE BASED ON PRELIMINARY INFORMATION AND ARE SHOWN FOR BIDDING PURPOSES ONLY. VERIFY EQUIPMENT INTERRUPTING CAPACITY

REQUIREMENTS PRIOR TO ORDERING ANY RELATED ELECTRICAL DISTRIBUTION EQUIPMENT.

PROVIDE NEW TYPE WRITTEN DIRECTORIES FOR ALL PANELBOARDS INSTALLED OR MODIFIED UNDER THIS

CONTRACT.

ALL CIRCUIT BREAKER LUGS SHALL BE RATED FOR A MINIMUM OF 75 DEGREES CELSIUS.

ALL MATERIALS IN CEILING PLENUMS NOT ENCLOSED IN METALLIC CONDUIT SHALL HAVE CLASS, FLAME

SPREAD AND SMOKE DEVELOPMENT RATINGS AS REQUIRED FOR USE IN OPEN PLENUMS.

VOLTAGE DROP: THE ELECTRICAL CONTRACTOR SHALL ENSURE THAT VOLTAGE DROP FOR FEEDERS TO DISTRIBUTION EQUIPMENT DOES NOT EXCEED 2% AND VOLTAGE DROP IN BRANCH CIRCUITING DOES NOT EXCEED 3% FOR OVERALL VOLTAGE DROP OF 5% (MAXIMUM). FEEDERS LISTED ON SCHEDULES AND THE ELECTRICAL ONE-LINE DIAGRAM ARE A BASE FEEDER/BRANCH CIRCUIT SIZE AND SHALL BE ADJUSTED AS

NEEDED BASED ON ACTUAL LENGTH OF CONDUCTORS.

REFER TO GENERAL NOTES FOR NUMBER OF PANEL SECTIONS AND QUANTITY OF CIRCUIT BREAKERS PANEL

SCHEDULES SUPERCEDE ALL NOTES.

REFER TO SPECIFICATIONS FOR ADDITIONAL PROJECT REQUIREMENTS.

NOTES

NOTES:

1.

2.

3.

4.

5.

6.

7.

MOUNTING HEIGHTS SHOWN ON ARCHITECTURAL ELEVATIONS SHALL GOVERN OVER THOSE SHOWN ABOVE.

CONTRACTOR SHALL ENSURE THAT ALL MOUNTING HEIGHTS COMPLY WITH CURRENT

ADA AND A117.1 REQUIREMENTS.

WHERE EVER DEVICES ARE INDICATED TO BE ABOVE DOORS, DEVICE SHALL BE CENTERED BETWEEN TOP OF

DOOR TRIM AND CEILING LINE.

ALL ABOVE COUNTER (DESIGNATED BY "AC") SHALL BE MOUNTED 8" ABOVE COUNTER OR MAXIMUM HEIGHT OF

44" TO TOP OF DEVICE. VERIFY HEIGHTS WITH ARCHITECT.

FOR CEILINGS BELOW 7'-4", FIRE ALARM STROBE OR HORN/STROBES SHALL BE WALL MOUNTED 6" BELOW

FINISHED CEILING.

SWITCH TO BE MOUNTED ON LATCH SIDE OF THE DOOR WITHIN 12" OF THE DOOR.

DEVICES AT SAME HEIGHT LOCATED NEXT TO EACH OTHER TO BE ALIGNED VERTICALLY TO THE BOTTOM OF

THE DEVICE.

FACP

FAAP

CONTROL

PANELS

TH

E

EN

TI

R E

LE

N

SE

N

O T

LE

SS

T H

AN

0" A

N D

N O

T G

R

EA

TE

R

T H

AN

6" A

FF

6' -6

U

.N .O

6' -0

U

.N .O

5' -4

U

.N .O

4' -0

U

.N .O

TOP OF PANEL

TOP OF CABINET

TOP OF CABINET

TO

P

O F

D

EV

IC

E

BO

TT

O M

O F

D

EV

IC

E

" A

FF

U

.N .O

-G

YP

-B

LO

C

K

"A

FF

U .N

.O

-B

LO

C K

(6

NOTE:

ALL DEVICES INDICATED

TO BE INSTALLED AT

DIFFERENT MOUNTING

HEIGHTS AND LOCATED

WITHIN ONE STUD SPACE

FROM EACH OTHER

SHALL ALIGN VERTICALLY,

ON THE SAME SIDE OF

THE STUD. WHERE WALL

MOUNTED TELEPHONES

OCCUR OVER LIGHT

SWITCHES, VOLUME

CONTROLS, ETC. OFFSET

ONE STUD SPACE.

FINISHED FLOORNOT TO SCALE

TOP OF DEVICE

TYPICAL DEVICE MOUNTING HEIGHTS

CODES AND STANDARDS

DESIGNED UNDER THE FOLLOWING CODES AND STANDARDS:

2020 NATIONAL ELECTRICAL CODE

2023 FLORIDA BUILDING CODES

2023 FLORIDA ENERGY CONSERVATION CODE

2023 FLORIDA FIRE CODE

NFPA 72 NATIONAL FIRE ALARM CODE

A

TAG OUTLET RATING NEMA/CAT NO FEEDER (NOTE 1) WIRING NOTES

B NON-LOCKING, 30A, 125V, 1PH 5-30R 2#10,#10G,3/4"C (60FT) HOT-NEUT-GND

C NON-LOCKING, 20A, 250V, 1PH 6-20R 2#12,#12G,3/4"C (100FT) HOT-HOT-GND

D NON-LOCKING, 30A, 250V, 1PH 6-30R 2#10,#10G,3/4"C (120FT) HOT-HOT-GND

E NON-LOCKING, 50A, 250V, 1PH 6-50R 2#6,#10G,3/4"C (150FT) HOT-HOT-GND

F NOT USED - - -

G NON-LOCKING, 20A, 125/250V, 1PH 14-20R 3#12,#12G,3/4"C (100FT) HOT-HOT-NEUT-GND

H NON-LOCKING, 50A, 125/250V, 1PH 14-50R 3#6,#10G,1"C (100FT) HOT-HOT-NEUT-GND

I NOT USED - - -

J LOCKING, 20A, 125V, 1PH L5-20R 2#12,#12G,3/4"C (50FT) HOT-NEUT-GND

K LOCKING, 30A, 125V, 1PH L5-30R 2#10,#10G,3/4"C (60FT) HOT-NEUT-GND

L LOCKING, 20A, 250V, 1PH L6-20R 2#12,#12G,3/4"C (100FT) HOT-HOT-GND

M LOCKING, 30A, 250V, 1PH L6-30R 2#10,#10G,3/4"C (120FT)

N NOT USED - - -

O NOT USED - - -

P LOCKING, 20A, 125/250V, 1PH L14-20R 3#12,#12G,3/4"C (100FT) HOT-HOT-NEUT-GND

Q LOCKING, 30A, 125/250V, 1PH L14-30R 3#10,#10G,3/4"C (120FT)

R NOT USED - - -

S LOCKING, 20A, 208Y/120V, 3PH L21-20R 4#12,#12G,3/4"C (120FT) HOT-HOT-HOT-NEUT-GND

T LOCKING, 30A, 208Y/120V, 3PH L21-30R 4#10,#10G,3/4"C (130FT)

V LOCKING, 50A, 250V, 3PH HBL CS8369 3#6,#10G,1"C (175FT) HOT-HOT-HOT-GND

W PIN & SLEEVE, 60A, 208Y/120V, 3PH HBL 560R9W 4#4,#10G,1-1/4"C (200FT) HOT-HOT-HOT-NEUT-GND

X PIN & SLEEVE, 100A, 208Y/120V, 3PH HBL 5100R9W 4#1,#8G,1-1/2"C (250FT)

Y NOT USED - - -

Z NOT USED - - -

HOT-HOT-GND

HOT-HOT-NEUT-GND

HOT-HOT-HOT-NEUT-GND

HOT-HOT-HOT-NEUT-GND

NOTE: DISTANCE NOTED IS MAXIMUM RUN LENGTH FOR WIRE SIZE.

INCREASE PER NEC, INCLUDING GROUND, FOR LONGER RUNS OR FOR DERATING FACTORS (AMB TEMP, EXTERIOR, ETC.)

SYMBOLS

RECEPTACLE MODIFIER TAGS

MOTOR

MOTOR AND DISCONNECT

MOTOR AND FUSED DISCONNECT

NON-FUSED DISCONNECT

CIRCUIT BREAKER

BRANCH CIRCUIT OR POWER PANEL

FUSED DISCONNECT

LIGHTING CONTROL PANEL

VARIABLE FREQUENCY DRIVE/MOTOR CONTROLLER

MOTOR AND CIRCUIT BREAKER DISCONNECT

METER

CURRENT TRANSFORMER

GROUND

POWER TRANSFORMER

DELTA/WYE WITH GROUND

FUSE & SWITCH

CIRCUIT BREAKER

DRAWOUT CIRCUIT BREAKER

KIRK-KEY INTERLOCK

GROUND FAULT INTERRUPTER BREAKER

CIRCUIT MONITORING DEVICE

MECHANICAL EQUIPMENT IDENTIFICATION TAG

SURGE PROTECTION DEVICE

THERMAL OVERLOAD

MOTOR AND THERMAL OVERLOAD

AUTOMATIC TRANSFER SWITCH

M

K

G

D

SPD

TO

TO

T

SHORT CIRCUIT FAULT CALCULATION TAG

REFER TO TABLE ON ONE-LINE DIAGRAMX

EQUIPMENT IDENTIFICATION TAG

REFER TO ELECTRICAL EQUIPMENT SCHEDULEEQ-#

ELECTRICAL PANEL

NAME

EQUIPMENT

ELECTRICAL EQUIPMENT

FREESTANDING OR WALL MOUNT

POWER

WALL SIMPLEX RECEPTACLE

WALL DUPLEX RECEPTACLE

WALL FOURPLEX RECEPTACLE

WALL DUPLEX RECEPTACLE (EMERGENCY)

WALL FOURPLEX RECEPTACLE (EMERGENCY)

WALL SPECIAL RECEPTACLE

(FOR "X" SEE RECEPTACLE MODIFER TAGS TABLE)

X

EMERGENCY POWER OFF

X

TV

J

FLOOR DUPLEX RECEPTACLE

CEILING / FLOOR SPECIAL RECEPTACLE

(FOR "X" SEE RECEPTACLE MODIFER TAGS TABLE)

CEILING DUPLEX RECEPTACLE

CEILING FOURPLEX RECEPTACLE

CEILING RECEPTACLE

WALL CLOCK RECEPTACLE

WALL COMBINATION TV / POWER OUTLET

WALL JUNCTION BOX

FLOOR FURNITURE FEED

CEILING JUNCTION BOX

POWER POLE

SINGLE TOGGLE SWITCH

PLUGMOLD

SINGLE PUSH BUTTON

DUPLEX PUSH BUTTON

CEILING TV OUTLET

JUNCTION BOX

AV

J

WALL FURNITURE FEEDJ

J

TV

J

FLOOR FOURPLEX RECEPTACLE (POWER/DATA/COMBO

DEVICE. REFER TO TECHNOLOGY DRAWINGS)

FLOOR FOURPLEX RECEPTACLE WITH AV

(POWER/DATA/AV COMBO DEVICE.

REFER TO TECH. DRAWINGS)

CONVENTION CENTER FLOOR BOX.

EPO

WALL SPECIAL RECEPTACLE (EMERGENCY)

(FOR "X" SEE RECEPTACLE MODIFER TAGS TABLE)

X

WALL DUPLEX WITH CONTROL OF ONE OUTLET

FP FLAT PANEL BACK BOX - POWER MOUNTED WITHIN

AV BACK BOX

POWER DEVICE GENERAL NOTES:

1.

2.

3.

4.

REFER TO SPECIFICATION SECTION 26 27 26 FOR SPECIFIC

FLOOR DEVICE PRODUCT INFORMATION.

REFER TO TECHNOLOGY AND/OR AV LEGEND AND FLOOR PLANS

TO CONFIRM ALL LOCATIONS THAT HAVE DATA OR DATA/AV

REQUIREMENTS COMBINED WITH POWER IN FLOOR BOXES.

REFER TO TECHNOLOGY (AND/OR AV) DRAWINGS FOR

DEDICATED LOW VOLTAGE CONDUIT AND FLOOR BOX DEVICE

MOUNTING PLATE REQUIREMENTS. LOW VOLTAGE CONDUIT

REQUIREMENTS ARE NOT DOCUMENTED ON POWER DRAWINGS.

REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNTING

HEIGHTS OF TVS. MOUNT BEHIND TV DISPLAY OR ON TV

MOUNTING BRACKET/SUPPORT"

WALL DUPLEX WITH USBU

RACEWAY LEGEND

BRANCH CIRCUIT HOMERUN TO PANELBOARD.

PANEL NAME : CIRCUIT NUMBER(S)

BRANCH CIRCUIT HOMERUN CONTROLLED BY LIGHTING CONTROL SYSTEM. FIRST HEXAGON LETTER CORRESPONDS TO FIRST CIRCUIT NUMBER. (ie. CIRCUIT #2 IS ON ZONE A). REFER TO LIGHTING CONTROL MATRIX FOR LIGHTING ZONES.

UNDERGROUND FEEDER

UNDERGROUND BRANCH CIRCUIT HOMERUN

CONDUIT UP

CONDUIT DOWN

CONDUIT RUNS UNDERFLOOR OR BELOW GRADE

CONDUIT RUN CONCEALED IN WALLS OR CEILING, OR EXPOSED WHEN CEILING ARE NOT PRESENT.

A:2

A:2,4 A

MOTOR CONNECTION

STRIP LIGHT

WALL MOUNTED LINEAR

RECESSED LINEAR

SURFACE MOUNTED 2'X4'

SURFACE MOUNTED 2'X2'

SURFACE MOUNTED 1'X4'

RECESSED WALL / STEP LIGHT

WALL MOUNTED FLOODLIGHT

WALL MOUNTED SCONCE

SURFACE MOUNTED WALL WASH

SURFACE MOUNTED DOWN LIGHT

RECESSED DOWN LIGHT

RECESSED WALL WASH

RECESSED 1X4 WALL WASH

PENDANT LIGHT

MONOPOINT TRACKHEAD

LINEAR LIGHT

TRACK WITH TRACKHEADS

POLE MOUNTED LIGHT WITH ARM

POLE MOUNTED LIGHT POST TOP MOUNTING/BOLLARD

EMERGENCY LIGHTING UNIT

TOUCH SCREEN CONTROL STATION

OCCUPANCY SENSOR - CEILING MOUNTED

OCCUPANCY SENSOR - WALL BOX 180°

SWITCH - SINGLE POLE

SWITCH - 3 WAY

SWITCH - 4 WAY

POWER SUPPLY

DAYLIGHT SENSOR - CEILING MOUNTED

TS

BURIAL FIXTURE

SCENE CONTROL STATION

S

DIMMER/OCCUPANCY SENSOR COMBINATION SWITCH

OS

RECESSED 2'X4'

RECESSED 2'X2'

WALL MOUNTED STRIP LIGHT

DIMMER SWITCH

LIGHTING

PS

ABBREVIATIONS

V

VFD

VM

V VOLT

VARIABLE FREQUENCY DRIVE

VOLTMETER

VAV VARIABLE AIR VOLUME

VA VOLT-AMPERE

W W W/

WATT

WITH

W/O WITHOUT

WLAN WIRELESS-LOCAL AREA NETWORK

XFMR

WPL

WHM

WP

XP

WT

WH

WEATHER PROOF LOCKABLE ENCLOSURE.

WATT HOUR METER

EXPLOSION PROOF

WEATHERPROOF

WATERTIGHT

TRANSFORMER

WATT HOUR

X

MAIN BREAKERS

MILLIAMPERE

MAXIMUMMAX

MB

MA

MTGB

OD

NTS

NIC

NEC

OC

NO

NC

NF

N

MV

MAIN TELECOMMUNICATIONS GROUND BUS

OUTSIDE DIAMETER

NORMALLY CLOSED

NATIONAL ELECTRICAL CODE

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

ON CENTER

MEDIUM VOLTAGE

NEUTRAL

NON FUSED

MPOE

MDF

MTG

MSB

MTD

MOV

MTG

MLO

MIN

MFR

MECH

MDP

MCC

MCP

MS

MH

MC

MAIN POINT OF ENTRY

MAIN SWITCHBOARD

MANHOLE

MOTOR OPERATED VALVE

MOUNTING HEIGHT

MOTOR STARTER

MOUNTED

MOUNTING

MAIN LUGS ONLY

MINIMUM

MAIN DISTRIBUTION FRAME

MAIN DISTRIBUTION PANEL

MOTOR CIRCUIT PROTECTOR

MOTOR CONTROL CENTER

MECHANICAL CONTRACTOR OR METAL CLAD

MANUFACTURER

MECHANICAL

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

M

MOCP MAXIMUM OVERCURRENT PROTECTION

MTS MANUAL TRANSFER SWITCH

N

NL NIGHT LIGHT

O

OCP OVERCURRENT PROTECTION

OH OVERHEAD

SERVICE PROVIDERSP

SECURITY CONTROL PANELSCP

SMPOE

SWBD

STD

SHT

SPDT

SECT

SEC

RPM

REC

RGS

PRI

PVC

PWR

PNL

PR

SW

ST

RM

R

P

PT

PH

PF

PE

PA

PB

SECONDARY MAIN POINT OF ENTRY

SINGLE POLE, DOUBLE THROW

SWITCHBOARD

STANDARD

SWITCH

SHUNT TRIP

SECONDARY/SECOND

RIGID GALVANIZED STEEL

REVOLUTIONS PER MINUTE

SHEET

SECTION

ROOM

RECEPTACLE

POWER

EXISTING TO RELOCATE

POLE

POLYVINYL CHLORIDE

POTENTIAL TRANSFORMER

PUBLIC ADDRESS

PRIMARY

PANEL

PHASE

PAIR

POWER FACTOR

PUSH BUTTON

PHOTOELECTRIC

SURGE PROTECTIVE DEVICESPD

P

R

S

SWGR SWITCHEAR

T

TELCOM

TGB

UNO

UPS

UG

TEMP

TELCO

UL

UH

UC

TELECOMMUNICATIONS

TELECOMMUNICATIONS GROUND BUS

UNINTERRUPTIBLE POWER SUPPLY

UNDERWRITER LABORATORIES

UNLESS NOTED OTHERWISE

TELEPHONE COMPANY

UNDERGROUND

UNIT HEATER

TEMPERATURE

UNDER COUNTER

TBB

TEL

TC

T

TELECOMMUNICATIONS BONDING BACKBONE

TIME CLOCK

TWIST LOCK

TELEPHONE

TR TAMPER RESISTANT

TBD TO BE DETERMINED

TO THERMAL OVERLOAD

TYP TYPICAL

USB UNIVERSAL SERIAL BUS

U

UGP UNDERGROUND PRIMARY

UGS UNDERGROUND SECONDARY

ABOVE COUNTER

ANNUNCIATOR

ABOVE FINISHED GRADE

ABOVE FINISHED FLOOR

AUTOMATIC TRANSFER SWITCH

AMPERE FUSE/FRAME

AMERICAN WIRE GAUGE

ANTENNA

AUTOMATIC

AUXILIARY

AWG

AUX

ANT

AUTO

ATS

ALUMINUM

AMMETER

ANN

AM

AL

AFG

AF

AFF

AMPERE

AC

A/AMP

AIR HANDLING UNITAHU

AMPERE INTERRUPTING CAPACITYAIC

AVAILABLE SHORT-CIRCUIT CURRENTASC

A

EXISTING TO BE REMOVED/RELOCATED

FOOTCANDLES

ELECTRIC WATER HEATER

FURNISHED BY OTHERS

FIRE ALARM CONTROL PANEL

ELECTRIC WATER COOLER

FLEXIBLE

FLOOR

FAN COIL UNIT

FLEX

FLR

FCU

FC

FBO

EXHAUST

FIRE ALARM

FUSE

F/A

FACP

F

EWH

EXH

EQUIPMENTEQP

ER

EWC

FIRE ALARM TERMINAL CABINETFATC

FEEDERFDR

F

FIRE ALARM POWER SUPPLYFAPS

FULL LOAD AMPSFLA

FAN POWERED BOXFPB

FUTUREFUT

INTERMEDIATE CROSS CONNECTIC

HC HORIZONTAL CROSS CONNECT

INTERMEDIATE DISTRIBUTION FRAME

HORSEPOWER

HAND-OFF-AUTO

INSIDE DIAMETER

INTERMEDIATE GRADE METALLIC CONDUIT

HIGH POWER FACTOR

HEATERHTR

IDF

ID

IMC

HAND HOLE

HOA

HP

HPF

HH

GROUND FAULT CIRCUIT INTERRUPTER

GALVANIZED

GENERATOR

HEAVY DUTY

GROUND

HD

GFCI

GND

GEN

GALV

GROUNDING BUSGB

G

H

I

KILOVOLT AMPERE

KILOWATT HOUR

JUNCTION BOX

THOUSAND OF CIRCULAR MILLSKCMIL/MCM

KILOWATT

KWH

KVA

KW

J-BOX

AUDIO CONNECTION BOXJBA

COACHES JUNCTION BOXJBC

ENG BROADCAST BOXJBE

NETWORK BROADCAST CONNECTION BOXJBT

K

J

L

LOCAL AREA NETWORKLAN

LIGHTNING ARRESTORLA

LIGHTING CONTROL PANELLCP

LIGHT EMITTING DIODELED

LIQUID TIGHT FLEXIBLE CONDUITLFC

LOW VOLTAGE

LOW TEMPERATURE RATED DEVICES OR SIMILARLT

LV

LIGHTINGLTG

ELECTRIC VEHICLEEV

PV PHOTOVOLTAIC

SEC SECONDARY CONNECTION CABINET

AUTOMATIC LOAD CONTROL RELAY (UL924)EM

OCCUPANCY SENSOR - CEILING/WALL MOUNTED 180°

DIMMER SWITCH - LOW VOLTAGE

LV

MTR MAIN TELECOM ROOM

Q

QE QUADRANT ELECTRICAL (ARENA SPECIFIC)

QT QUADRANT TELECOM (ARENA SPECIFIC)

COMPANY SWITCH OR CAM-LOK PANEL

B OR

GENERATOR DOCKING STATION

NOT USED - - -

LINEAR PENDANT

RECESSED LIGHTING FIXTURE W/DOWNLIGHTS

LINEAR PENDANT W/DOWNLIGHTS

CAMERACAM

CIRCUIT BREAKER

CONDUIT ONLY

CLOSED CIRCUIT TELEVISION

COMBINATION

CURRENT TRANSFORMER

COMPUTERCOMP

COPPER

CONDUCTOR

CU

CT

COND

CIRCUITCKT

COMB

CO

CB

CCTV

BELOW FINISHED CEILING

BELOW FINISHED GRADE

CONDUIT

CABINET

BREAKER

CAB

C

BFC

BFG

BKR

BACK OF HOUSEBOH

C

BUS-WAYBW

DIGITAL VIDEO RECORDERDVR

F/A END OF LINE RESISTOR

ELECTRONIC NEWS GATHERINGENG

EOL

DEMARCATION

ELECTRIC HEATING COIL

ELECTRIC OR ELECTRICAL

ELECTRIC METALLIC TUBING

DAMP LABEL

ELECTRICAL CONTRACTOR

EXHAUST FAN

EQUIPMENT GROUND

DISCONNECTDISC

ELEVATOR

EMERGENCY

EHC

EM

EMT

ELEC

ELEV

EG

DRAWING

EACH

EF

EA

EC

DWG

DL

DECIBEL

DEMARC

dB

EXISTINGE/EX

DEMOLISHD

DISTRIBUTION PANELDP

D

E

DOUBLE POLE, DOUBLE THROWDPDT

DISTRIBUTED ANTENNA SYSTEMDAS

EMERGENCY POWER OFFEPO

LV SWITCH - LOW VOLTAGE

LIGHTING CONTROL

ROOM CONTROLLERRC

CEILING MOUNTED EXIT SIGN

EXIT SIGN WITH ARROWS

WALL MOUNTED EXIT SIGN

SHADED PORTION

DENOTES

FACE LOCATION(S)

GENERAL NOTES:

226-350 FT

151-225 FT

101-150 FT

0-100 FT

LENGTH (2) WIRE SIZE CONDUIT

120V CIRCUITS:

SINGLE-PHASE 20-AMP CIRCUIT CONDUCTOR SIZING DUE TO VOLTAGE DROP

376-600 FT

251-375 FT

176-250 FT

0-175 FT

LENGTH (2) WIRE SIZE CONDUIT

208V/240V/277V CIRCUITS:

676-1000 FT #6 (1) 1-1/4"

451-675 FT #8 1"

276-450 FT #10 3/4"

0-275 FT #12 3/4"

LENGTH (2) WIRE SIZE CONDUIT

480V CIRCUITS:

#6 (1) 1-1/4"

#8 1"

#10 3/4"

#12 3/4"

#6 (1) 1-1/4"

#8 1"

#10 3/4"

#12 3/4"

(1) FOR TERMINATING IN PANELBOARDS, PROVIDE A UL486A/B LISTED, HYDRAULICALLY-APPLIED COMPRESSION PIN ADAPTER TERMINAL WITH INSULATED COVER THAT IS DESIGNED FOR #6 AWG COPPER

CONDUCTOR TO #8 PIN SIZE.

(2) CIRCUIT LENGTH IS MEASURED ONE-WAY TO THE THEORETICAL CENTER OF THE ELECTRICAL LOAD.

(3) GROUND CONDUCTOR TO BE UPSIZED BY THE SAME PERCENTAGE AS PHASE CONDUCTORS.

(4) WHERE SPECIFIC CONDUCTOR SIZES ARE INDICATED ON PLANS OR SCHEDULES, CONDUCTORS MUST STILL BE UPSIZED FOR VOLTAGE DROP ACCORDING TO THE CIRCUIT LENGTH PER THIS SCHEDULE.

FIRE ALARM

SMOKE DETECTOR

HEAT DETECTOR

DUCT DETECTOR

BEAM DETECTOR RECEIVER

BEAM DETECTOR TRANSMITTER

VOICE EVAC PANEL

ELEVATOR STATUS PANEL

FIRE SERVICE PHONE

ROTATING BEACON

MANUAL PULL STATION

TAMPER SWITCH

FLOW SWITCH

CEILING MOUNTED REMOTE INDICATOR LIGHT

WALL MOUNTED REMOTE INDICATOR LIGHT

WALL MOUNTED ADA STROBE

FIRE SMOKE DAMPER

CEILING MOUNTED STROBE

FIREMAN'S PHONE JACK

MAGNETIC DOOR HOLD OPEN DEVICE

ADDRESSABLE INPUT MODULE

FIRE ALARM ADDRESSABLE RELAY

ALARM BELL

SMOKE CONTROL DAMPER

CARBON MONOXIDE DETECTOR

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

WALL MOUNTED SILENTONE

WALL SMOKE DETECTOR

SMOKE/CARBON MONOXIDE DETECTOR

WALL SMOKE/CARBON MONOXIDE DETECTOR

TWO-WAY COMMUNICATION / AREA OF RESCUE

ASSISTANCE CALL BUTTON

TWO-WAY COMMUNICATION / AREA OF RESCUE

ASSISTANCE (BASE STATION)

BR

BT

CO

CO

EVAC

ESR

S

H

J

DH

RTS

RTS

IM

FR

FR

FAAP

FACP

TWC

TWCP

CO

CEILING MOUNTED

WALL MOUNTED

CEILING MOUNTED

WALL MOUNTED

SPEAKER

SPEAKER/STROBE

SPEAKER

SPEAKER/STROBE

1.

2.

SOME LIGHTING FIXTURE SYMBOLS APPEAR AS A 2D

PROJECTION OF A 3D ELEMENT AND MAY NOT APPEAR IN THIS

LEGEND. REFER TO FIXTURE TYPE AND LIGHTING FIXTURE

SCHEDULES FOR ADDITIONAL INFORMATION.

SHADED SYMBOLS DENOTE EMERGENCY FIXTURES

LIGHTING DEVICE GENERAL NOTES:

De nv er

W es t P kw y, S ui te

, G ol de n, C O

3.

1.

w

.m e-en gi ne er s.

co m

SHEET TITLE:

ISSUANCE

ISSUE DATE:

PROJECT #:

KEY PLAN

TRUE NORTHPLAN NORTH

4/

/2

:4 5:

A

M C

:\R ev it Pr oj ec ts \2

3\

R

JS

C on c Fa ns M

E_ R

_T ay lo r.W or le y.

rv t

04/02/2025

ELECTRICAL

LEGEND

E0-0

DV2503…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .