__BAFO-Exhibit_A-_Pricing_Sheet.xlsx
XLSX spreadsheet 93 KB Posted
- Attached to
- Master Agreement AZ|CTR065799
- Contract number
- CTR065799
- Issued by
- Arizona
About this file
This document appears to be a Best and Final Offer (BAFO) pricing sheet for a state or local government solicitation (BPM004287) covering environmental consultant and abatement services related to asbestos, lead, and mold. The pricing document provides comprehensive labor rates, consultant services, abatement services, and equipment rental pricing across multiple professional and technical categories.
The contract includes detailed pricing structures for consultant and abatement labor across support, field, and professional levels, with standard and premium rate options. Services encompass various technical analyses including microscopy, air sampling, paint chip analysis, and soil testing. Equipment pricing is extensively itemized, covering everything from respirators and personal protective equipment to heavy machinery like backhoes and trailers. Rates are provided on daily, weekly, and monthly bases, with some items priced per unit. The solicitation requires specific training certifications for different labor levels, such as AHERA and EPA training for various positions, and mandates minimum employee requirements for certain job classifications.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A1-Asbestos Consultant Labor Note: Offeror may add additional line items or Rate Categories
| PRICE SCHEDULE (SOW 2A) BAFO | ||
| ASBESTOS CONSULTIANT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, copying, general administration No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Support | Support Level II - Drafting, project manager's assistant, graphics |
No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Support | Support Level III - Drafting supervisor, senior word processor, supervisor |
No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Field Level I - Air monitoring, project assistant, site technician: closely supervised |
6+ months of direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Field | Field Level II - AHERA Building Inspector/Management Planner: independent collection and analysis of data, report writing; 1+ years of direct experience; | |||
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Field | Field Level III - AHERA Contractor/Supervisor: independent site management, air bulk sample data analysis, report preparation; 2+ years of direct experience; | |||
| Minimum 2 employees required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Field Level IV - Project Designer: planning and design of asbestos abatement projects and field activities;2+ years direct experience. AHERA Project Designer training required; Minimum 1 employee required | Standard Rate | ||
| Level IV | Premium Rate | |||
| Professional | Professional Level I - Project Manager: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super required; Minimum 1 employee required | Standard Rate | ||
| Level I | Premium Rate | |||
| Professional | Professional Level II -Program Manager/IH: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super/Proj Design required; No employee requirements | Standard Rate | ||
| Level II | Premium Rate | |||
| Professional | Professional Level III - Principal/PE/CIH: 5+ years of direct experience; AHERA Contractor Supervisor Training Required; | |||
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate |
Sheet1
Sheet2
Sheet3
Sheet4
Sheet5
Sheet6
Sheet7
Sheet8
Sheet9
Sheet10
Sheet11
Sheet12
Sheet13
Sheet14
Sheet15
A2-Lead Consultant Labor Note: Offeror may add additional line items or Rate Categories
| PRICE SCHEDULE (SOW 2A) BAFO | ||
| LEAD CONSULTANT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Clerical, word processing, filing, copying, general administration;
No direct experience required;
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Support | Drafting, project manager's assistant, graphics; |
No direct experience required;
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Support | Drafting supervisor, senior word processor, supervisor; |
No direct experience required;
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Project assistant, site technician: closely supervised. |
3+ months of direct experience
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Field | Inspector: Inspections, post-abatement clearance activities; |
6+ months direct experience, EPA Lead Inspector training required
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Field | Risk Assessor: Inspections, post abatement clearance, lead hazard screening, risk assessments; 6+ months direct experience; EPA Lead Risk Assessor training required. Minimum 1 employee required | Standard Rate | ||
| Level III | Premium Rate | |||
| Field | Supervisor Abatement project oversight, occupant protection plans, abatement reports; 6+ months direct experience, EPA Lead Supervisor training required | |||
| Minimum 1 employee required | Standard Rate | |||
| Level IV | Premium Rate | |||
| Field | Project Designer: Occupant protection plans, abatement reports |
6+ mos. of direct experience, EPA Lead Project Designer training required
| Minimum 1 employee required | Standard Rate | |||
| Level V | Premium Rate | |||
| Professional | Project Manager: Supervision of abatement projects, oversees field services; |
2+ years direct experience; AHERA Insp/MP/Cont/Super required;
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Professional | Project Manager/IH: Supervision of abatement projects, oversees field services; |
2+ years direct experience; AHERA Insp/MP/Cont/Super/Proj Design required;
| No staffing requirement for this position | Standard Rate | |||
| Level II | Premium Rate | |||
| Professional | Principal/PE/CIH: |
5+ years direct experience
| Minimum 1 employee required | Standard Rate | ||
| Level III | Premium Rate |
A3-Mold Consultant Labor Note: Offeror may add additional line items or Rate Categories
| PRICE SCHEDULE (SOW 2A) BAFO | ||
| Mold CONSULTANT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, copying, general administration No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Support | Support Level II - Drafting, project manager's assistant, graphics |
No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Support | Support Level III - Drafting supervisor, senior word processor, supervisor |
No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Field Level I - Air monitoring, project assistant, site technician: closely supervised |
6+ months of direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Field | Field Level II - AHERA Building Inspector/Management Planner: independent collection and analysis of data, report writing; 1+ years of direct experience; | |||
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Field | Field Level III - AHERA Contractor/Supervisor: independent site management, air bulk sample data analysis, report preparation; 2+ years of direct experience; | |||
| Minimum 2 employees required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Field Level IV - Project Designer: planning and design of asbestos abatement projects and field activities;2+ years direct experience. AHERA Project Designer training required; Minimum 1 employee required | Standard Rate | ||
| Level IV | Premium Rate | |||
| Professional | Professional Level I - Project Manager: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super required; Minimum 1 employee required | Standard Rate | ||
| Level I | Premium Rate | |||
| Professional | Professional Level II -Program Manager/IH: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super/Proj Design required; No employee requirements | Standard Rate | ||
| Level II | Premium Rate | |||
| Professional | Professional Level III - Principal/PE/CIH: 5+ years of direct experience; AHERA Contractor Supervisor Training Required; | |||
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate |
A4-Asbestos Consultant Services
| Note: Offeror may add additional line items or Rate Categories | |||||
| PRICE SCHEDULE (SOW 2A) BAFO | |||||
| ASBESTOS CONSULTANT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| DESCRIPTION | PRICE | ||||
| UOM | Non Rush | Rush | |||
| Polarized Light Microscopy (PLM) Bulk Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Polarized Light Microscopy (PLM) Point Count Bulk Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Transmission Electron Microscopy (TEM) Bulk Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Phase Contrast Microscopy (PCM) Air Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Transmission Electron Microscopy (TEM) Air Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 |
A5-Lead Consultant Services
| Note: Offeror may add additional line items or Rate Categories | |||||
| PRICE SCHEDULE (SOW 2A) BAFO | |||||
| LEAD CONSULTANT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| DESCRIPTION | PRICE | ||||
| Unit | Non Rush | Rush | |||
| Atomic Absorption Spectroscope (AAS) Paint Chip Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Toxicity Characteristic Leaching Procedure (TCLP) Test | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Atomic Absorption Spectroscope (AAS) Soil Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Atomic Absorption Spectroscope (AAS) Air Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 |
A6-Mold Consultant Services Note: Offeror may add additional line items or Rate Categories
| PRICE SCHEDULE (SOW 2A) BAFO | |||||
| LEAD CONSULTANT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| DESCRIPTION | PRICE | ||||
| Unit | Non Rush | Rush | |||
| Atomic Absorption Spectroscope (AAS) Paint Chip Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Toxicity Characteristic Leaching Procedure (TCLP) Test | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Atomic Absorption Spectroscope (AAS) Soil Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 | ||
| Atomic Absorption Spectroscope (AAS) Air Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ - 0 | $ - 0 |
B1-Asbestos Abatement Labor
| Note: Offeror may add additional line items or Rate Categories | ||
| PRICE SCHEDULE (SOW 2B) BAFO | ||
| ASBESTOS ABATEMENT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, general administration; entry level;
No direct experience required.
| 1 employee required | Standard Rate | $29.00 | ||||
| Level I | Premium Rate | $31.00 | ||||
| Support | Support Level II - Drafting, project manager’s assistant, graphics |
No direct experience required
| 1 employee required | Standard Rate | $31.00 | ||||
| Level II | Premium Rate | $33.00 | ||||
| Support | Support Level III - Drafting supervisor, Senior Word Processor |
No direct experience required
| 1 employee required | Standard Rate | $31.00 | ||||
| Level III | Premium Rate | $33.00 | ||||
| Field | Field Level I - Worker/laborer, closely supervised |
6+ months direct abatement experience; AHERA worker training required
| Minimum 5 employees required | Standard Rate | $36.00 | ||||
| Level I | Premium Rate | $38.00 | ||||
| Field | Field Level II - Site supervisor: oversees and directs abatement contractor work activities; 2+ years of direct experience AHERA Contractor/Supervisor training required | |||||
| Minimum 2 AHERA-trained employee required | Standard Rate | $45.00 | ||||
| Level II | Premium Rate | $47.00 | ||||
| Field | Field Level III - Field supervisor or superintendent: oversees and directs multiple abatement contractor projects; 2+ years of direct experience AHERA Contractor/Supervisor training required. None Required | Standard Rate | $47.00 | |||
| Level III | Premium Rate | $49.00 | ||||
| Professional | Professional Level I - Project manager: management of abatement projects, oversees field services, provides bids; 2+ years of direct experience, AHERA Contractor/Supervisor training required; 1 AHERA-trained employee required | Standard Rate | $45.00 | |||
| Level I | Premium Rate | $47.00 | ||||
| Professional | Professional Level II -Estimator: provides bids and pricing for abatement jobs; |
2+ years of direct experience AHERA Contractor/Supervisor training required
| 1 Employee Required | Standard Rate | $49.00 | ||||
| Level II | Premium Rate | $51.00 | ||||
| Professional | Professional Level III - Principal |
5+ years of direct experience;AHERA Contractor/Supervisor training required
| 1 Employee Required | Standard Rate | $57.00 | |||
| Level III | Premium Rate | $58.00 |
B2-Lead Abatement Labor
| Note: Offeror may add additional line items or Rate Categories | ||
| PRICE SCHEDULE (SOW 2B) BAFO | ||
| LEAD ABATEMENT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, general administration, entry level No direct experience required;
| 1 employee required | Standard Rate | $29.00 | ||||
| Level I | Premium Rate | $31.00 | ||||
| Support | Support Level II - Drafting, project manager’s assistant, graphics |
No direct experience required;
| 1 employee required | Standard Rate | $31.00 | ||||
| Level II | Premium Rate | $33.00 | ||||
| Support | Support Level III - Drafting supervisor, Senior Word Processor; |
No direct experience required;
| 1 employee required | Standard Rate | $31.00 | ||||
| Level III | Premium Rate | $33.00 | ||||
| Field | Worker/laborer closely supervised. |
6+ months abatement experience; EPA Lead worker training required
| Minimum 5 employees required | Standard Rate | $36.00 | ||||
| Level I | Premium Rate | $38.00 | ||||
| Field | Field Level II -Site supervisor: oversees and directs abatement contractor work activities; |
2+ years direct experience; EPA Lead Supervisor training required
| Minimum 2 EPA-trained employee required | Standard Rate | $45.00 | ||||
| Level II | Premium Rate | $47.00 | ||||
| Field | Field Level III - Field supervisor or superintendent: oversees and directs multiple abatement contractor projects; 2+ years of direct experience EPA Lead Supervisor training required. No Employee requirements | Standard Rate | $47.00 | |||
| Level III | Premium Rate | $49.00 | ||||
| Professional | Professional Level I - Project manager: management of abatement projects, oversees field services, provides bids 2+ years of direct experience, EPA Lead Supervisor training required; 1 EPA-trained employee required | Standard Rate | $45.00 | |||
| Level I | Premium Rate | $47.00 | ||||
| Professional | Professional Level II - Estimator: provides bids and pricing for abatement jobs; |
2+ years of direct experience, EPA Lead Supervisor training required
| 1 EPA-trained employee required | Standard Rate | $49.00 | ||||
| Level II | Premium Rate | $51.00 | ||||
| Professional | Professional Level III - Principal |
5 years of direct experience;
| 1 employee required | Standard Rate | $57.00 | |||
| Level III | Premium Rate | $58.00 |
B3-Mold Abatement Labor Note: Offeror may add additional line items or Rate Categories
| PRICE SCHEDULE (SOW 2B) BAFO | ||
| MOLD ABATEMENT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, general administration; entry level;
No direct experience required.
| 1 employee required | Standard Rate | $29.00 | ||||
| Level I | Premium Rate | $31.00 | ||||
| Support | Support Level II - Drafting, project manager’s assistant, graphics |
No direct experience required
| 1 employee required | Standard Rate | $31.00 | ||||
| Level II | Premium Rate | $33.00 | ||||
| Support | Support Level III - Drafting supervisor, Senior Word Processor |
No direct experience required
| 1 employee required | Standard Rate | $31.00 | ||||
| Level III | Premium Rate | $33.00 | ||||
| Field | Field Level I - Worker/laborer, closely supervised |
6+ months direct abatement experience; AHERA worker training required
| Minimum 5 employees required | Standard Rate | $36.00 | ||||
| Level I | Premium Rate | $38.00 | ||||
| Field | Field Level II - Site supervisor: oversees and directs abatement contractor work activities; 2+ years of direct experience AHERA Contractor/Supervisor training required | |||||
| Minimum 2 AHERA-trained employee required | Standard Rate | $45.00 | ||||
| Level II | Premium Rate | $47.00 | ||||
| Field | Field Level III - Field supervisor or superintendent: oversees and directs multiple abatement contractor projects; 2+ years of direct experience AHERA Contractor/Supervisor training required. None Required | Standard Rate | $47.00 | |||
| Level III | Premium Rate | $49.00 | ||||
| Professional | Professional Level I - Project manager: management of abatement projects, oversees field services, provides bids; 2+ years of direct experience, AHERA Contractor/Supervisor training required; 1 AHERA-trained employee required | Standard Rate | $45.00 | |||
| Level I | Premium Rate | $47.00 | ||||
| Professional | Professional Level II -Estimator: provides bids and pricing for abatement jobs; |
2+ years of direct experience AHERA Contractor/Supervisor training required
| 1 Employee Required | Standard Rate | $49.00 | ||||
| Level II | Premium Rate | $51.00 | ||||
| Professional | Professional Level III - Principal |
5+ years of direct experience;AHERA Contractor/Supervisor training required
| 1 Employee Required | Standard Rate | $57.00 | |||
| Level III | Premium Rate | $58.00 |
B4-Asbestos Abatement Services
| Note: Offeror may add additional line items or Rate Categories | |||||
| PRICE SCHEDULE (SOW 2B) BAFO | |||||
| ASBESTOS ABATEMENT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| SERVICES | PRICE | ||||
| Non-Rush | Rush | ||||
| Phase Contrast Microscopy (PCM) Air Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 15.00 | $ 21.50 | ||
| Transmission Electron Microscopy (TEM) Air Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 120.00 | $ 170.00 |
B5-Lead Abatement Services
| Note: Offeror may add additional line items or Rate Categories | |||||
| PRICE SCHEDULE (SOW 2B) BAFO | |||||
| LEAD ABATEMENT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| SERVICES | PRICE | ||||
| Non-Rush | Rush | ||||
| Atomic Absorption Spectroscope (AAS) Paint Chip Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 32.00 | $ 45.00 | ||
| Atomic Absorption Spectroscope (AAS) Soil Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 32.00 | $ 45.00 | ||
| Atomic Absorption Spectroscope (AAS) Air Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 27.00 | $ 38.00 |
B6-Mold Abatement Services Note: Offeror may add additional line items or Rate Categories
| PRICE SCHEDULE (SOW 2B) BAFO | |||||
| MOLD ABATEMENT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| SERVICES | PRICE | ||||
| Non-Rush | Rush | ||||
| Atomic Absorption Spectroscope (AAS) Paint Chip Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | N/A | N/A | ||
| Atomic Absorption Spectroscope (AAS) Soil Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | N/A | N/A | ||
| Atomic Absorption Spectroscope (AAS) Air Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | N/A | N/A | ||
| Air-O-Cell Air Monitoring Sample - Air Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 32.00 | $ 46.25 | ||
| Mold Bulk Sample Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 30.00 | $ 42.00 | ||
| Mold Tape/Swab Sample Analysis | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 30.00 | $ 42.00 |
B7-Abatement Equipment Pricing
| Note: Offeror may add additional line items or Rate Categories | ||||
| PRICE SCHEDULE (SOW 2B) BAFO | ||||
| ABATEMENT EQUIPMENT PRICING | ||||
| SOLICITATION BPM004287 | ||||
| Equipment Name | Price Per Day | Price Per Week | Price Per Month | Price Per Each |
| Vehicle | $ 118.00 | $ 570.00 | $ 1,900.00 | N/A |
| Trailer Landscaping | $ 80.00 | $ 320.00 | $ 1,140.00 | N/A |
| Trailer Flatbed | $ 80.00 | $ 320.00 | $ 1,140.00 | N/A |
| Trailer Enclosed | $ 95.00 | $ 380.00 | $ 1,150.00 | N/A |
| Manometer | $ 23.00 | $ 95.00 | $ 285.00 | N/A |
| Floor Grinder Small | $ 33.00 | $ 133.00 | $ 400.00 | N/A |
| Floor Buffer | $ 33.00 | $ 133.00 | $ 400.00 | N/A |
| Generator 4,000 Watt | $ 47.00 | $ 190.00 | $ 570.00 | N/A |
| Generator 5,000 Watt | $ 47.00 | $ 190.00 | $ 570.00 | N/A |
| Generator 8,000 Watt | $ 95.00 | $ 380.00 | $ 1,150.00 | N/A |
| Generator 12 KW | $ 175.00 | $ 703.00 | $ 2,100.00 | N/A |
| Generator 20 KW | $ 235.00 | $ 950.00 | $ 2,850.00 | N/A |
| Power Sprayer/Airless | $ 23.00 | $ 95.00 | $ 285.00 | N/A |
| Water Filtration Unit | $ 23.00 | $ 95.00 | $ 285.00 | N/A |
| Half-Mask Respirator | $ 9.00 | $ 28.00 | $ 85.00 | N/A |
| Full-Face Respirator | $ 14.00 | $ 57.00 | $ 170.00 | N/A |
| PAPR Respirator | $ 23.00 | $ 71.00 | $ 213.00 | N/A |
| Hepa Vacuum | $ 42.00 | $ 170.00 | $ 513.00 | N/A |
| Negative Air Unit - 500/1000 CFM | $ 42.00 | $ 170.00 | $ 570.00 | N/A |
| Negative Air Unit - 2000 CFM | $ 47.00 | $ 190.00 | $ 285.00 | N/A |
| Decontamination Unit/Poly w/ Poles | $ 47.00 | $ 190.00 | $ 285.00 | N/A |
| Shower | $ 23.00 | $ 71.00 | $ 213.00 | N/A |
| Bead Blaster | N/A | N/A | N/A | N/A |
| Water Blaster | $ 2,375.00 | $ 9,500.00 | $ 28,500.00 | N/A |
| Dehumidifier Small | $ 25.00 | $ 75.00 | $ 225.00 | N/A |
| Dehumidifier Large | $ 35.00 | $ 140.00 | $ 420.00 | N/A |
| Drying Fans | $ 15.00 | $ 45.00 | $ 225.00 | N/A |
| Lay Flat 10' Section (Each) | N/A | N/A | N/A | $ 7.50 |
| Floor Dry - 25 lb Bag (Each) | N/A | N/A | N/A | $ 20.00 |
| Biocide Solution - 1 Gal | N/A | N/A | N/A | $ 60.00 |
| Degreaser - 1 Gal | N/A | N/A | N/A | $ 60.00 |
| Bleach - 1 Gal | N/A | N/A | N/A | $ 10.00 |
| Mastic Remover - 5 Gal | N/A | N/A | N/A | $ 180.00 |
| Plastic 5 Gallon Buckets | N/A | N/A | N/A | $ 5.00 |
| Hudson Sprayers - 2 Gal | $ 2.00 | $ 8.00 | $ 12.00 | N/A |
| Mop Buckets | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Mop Heads (Each) | N/A | N/A | N/A | $ 11.00 |
| Mop Poles | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Rags, Bag | N/A | N/A | N/A | $ 75.00 |
| Doodlebug Style Scub Pads (Box) | N/A | N/A | N/A | $ 8.00 |
| Duct Tape Teal/Roll | N/A | N/A | N/A | $ 8.00 |
| Masking Tape Blue/Roll | N/A | N/A | N/A | $ 8.00 |
| Aluminum Duct Tape/Roll | N/A | N/A | N/A | $ 14.00 |
| Asbestos Caution Tape/Roll | N/A | N/A | N/A | $ 10.00 |
| Danger Tape | N/A | N/A | N/A | $ 10.00 |
| Caution Tape | N/A | N/A | N/A | $ 10.00 |
| Lead Caution Tape | N/A | N/A | N/A | $ 10.00 |
| Extension Cord | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| 32 Oz - Spray bottle | N/A | N/A | N/A | $ 2.50 |
| Sponge | N/A | N/A | N/A | |
| GFCI 3 Way Plugs | $ 2.00 | $ 8.00 | $ 24.00 | N/A |
| Broom | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Scoop Shovel | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Metal Shovel | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| 30 Gallon Drum (Poly) (Each) | N/A | N/A | N/A | $ 81.00 |
| 55 Gallon Drum Metal (Each) | N/A | N/A | N/A | $ 75.00 |
| Cubic Yard Boxes | N/A | N/A | N/A | $ 85.00 |
| Case of Water (24) | N/A | N/A | N/A | $ 5.00 |
| Hand Tools (Per Job) | N/A | N/A | N/A | $ 50.00 |
| 20 x100 x4 Mil Poly Sheeting | N/A | N/A | N/A | $ 125.00 |
| 20 x100 x6 Mil Poly Sheeting | N/A | N/A | N/A | $ 125.00 |
| 20 x100 x6 Mil Reinforced Poly Sheeting | N/A | N/A | N/A | $ 135.00 |
| 20 x100 x4 Mil Fire Retard Poly Sheeting | N/A | N/A | N/A | $ 120.00 |
| 20 x100 x6 Mil Fire Retard Poly Sheeting | N/A | N/A | N/A | $ 135.00 |
| Asbestos Bags 30x40, 6 mil Printed Roll | N/A | N/A | N/A | $ 120.00 |
| Asbestos Bags 30x40, 4 mil Printed Roll | N/A | N/A | N/A | $ 120.00 |
| Clear Bags 30x40, 6 Mil Printed Roll | N/A | N/A | N/A | $ 112.00 |
| Clear Bags 30x40, 4 Mil Printed Roll | N/A | N/A | N/A | $ 112.00 |
| Drum Liners Clear 30x60 6 Mil Roll | N/A | N/A | N/A | $ 120.00 |
| 40 Yard Roll Off Liners | N/A | N/A | N/A | $ 332.00 |
| 20 Yard Roll Off Liners | N/A | N/A | N/A | $ 260.00 |
| Level A PPE (Per Day/Per Person) | $ 160.00 | $ 640.00 | $ 1,920.00 | N/A |
| Level B PPE (Per Day/Per Person) | $ 160.00 | $ 640.00 | $ 1,920.00 | N/A |
| Level C PPE (Per Day/Per Person | $ 38.00 | $ 160.00 | $ 480.00 | N/A |
| Level D PPE (Per Day/Per Person) | $ 5.00 | $ 20.00 | $ 60.00 | N/A |
| Gloves, Work (Each) | N/A | N/A | N/A | $ 4.75 |
| Gloves, Nitrile (Box) | N/A | N/A | N/A | $ 1.00 |
| Gloves, Neoprene (Each) | N/A | N/A | N/A | $ 4.00 |
| Faceshield (Each) | $ 2.00 | $ 8.00 | $ 24.00 | N/A |
| P-100 Respirator Cartridges (Pair) | N/A | N/A | N/A | $ 4.75 |
| Organic Vapor Respirator Cartridges (Pair) | N/A | N/A | N/A | $ 12.35 |
| Acid Mist Respirator Cartridges (Pair) | N/A | N/A | N/A | $ 4.75 |
| Combo respirator Cartidges (Pair) | N/A | N/A | N/A | $ 14.25 |
| Ear Plugs (Each) | N/A | N/A | N/A | $ 0.50 |
| Fall Restraint Harness | $ 10.00 | $ 40.00 | $ 120.00 | N/A |
| Fall Restraint Tie Offs (Roof) | $ 2.00 | $ 8.00 | $ 24.00 | N/A |
| Fall Restraint Tie Offs (Concrete) | $ 15.00 | $ 60.00 | $ 60.00 | N/A |
| Fall Restraint Yo Yo's | $ 5.00 | $ 20.00 | $ 60.00 | N/A |
| Tack Mats (Each) | N/A | N/A | N/A | $ 2.00 |
| Black Bars | $ 5.00 | $ 20.00 | $ 80.00 | N/A |
| Kimodo Tile Scrapers | $ 4.00 | $ 16.00 | $ 64.00 | N/A |
| Terminator Tile Machine | $ 850.00 | $ 3,400.00 | $ 10,200.00 | N/A |
| 4" Razor Scrapers | $ 2.00 | $ 8.00 | $ 8.00 | N/A |
| 8" Razor Scrapers | $ 4.00 | $ 16.00 | $ 32.00 | N/A |
| Razor Scraper Blades ( 10 Pack) | N/A | N/A | N/A | $ 11.40 |
| Wire Brushes, Large (Each) | N/A | N/A | N/A | $ 3.80 |
| Wire Brushes, Small (Each) | N/A | N/A | N/A | $ 2.85 |
| Asbestos Signs (Each) | N/A | N/A | N/A | $ 2.85 |
| Sawzall | $ 9.50 | $ 40.00 | $ 120.00 | |
| Sawzall Blades (Each) | N/A | N/A | N/A | $ 2.00 |
| Standard Drill | $ 9.00 | $ 40.00 | $ 120.00 | N/A |
| Hammer Drill | $ 14.00 | $ 60.00 | $ 240.00 | N/A |
| Jack Hammer up to 25 Lb | $ 13.00 | $ 60.00 | $ 240.00 | N/A |
| Jack Hammer Over 25 lb | $ 38.00 | $ 160.00 | $ 480.00 | N/A |
| Chipping Hammer | $ 9.00 | $ 40.00 | $ 120.00 | N/A |
| Circular Saw | $ 9.00 | $ 40.00 | $ 120.00 | N/A |
| Prep Knives (Each) | N/A | N/A | N/A | $ 3.00 |
| Prep Knife Blades (10 Pack) | N/A | N/A | N/A | $ 14.00 |
| Metal Decontamination Shower | $ 23.00 | $ 75.00 | $ 225.00 | N/A |
| Wheel Barrow | $ 14.00 | $ 60.00 | $ 180.00 | N/A |
| Flat Cart | $ 19.00 | $ 80.00 | $ 240.00 | N/A |
| Gray Utility Cart | $ 19.00 | $ 80.00 | $ 240.00 | N/A |
| Roofing Shovel | $ 4.75 | $ 20.00 | $ 60.00 | N/A |
| Scissor Lift - 19' | $ 150.00 | $ 450.00 | $ 1,350.00 | N/A |
| Backhoe | $ 500.00 | $ 1,500.00 | $ 4,500.00 | N/A |
| Air Compressor, Small | $ 45.00 | $ 180.00 | $ 540.00 | N/A |
| Air Compressor, Towable | $ 150.00 | $ 450.00 | $ 1,350.00 | N/A |
| Personnal Air Monitoring Pump | ||||
| Cutoff Saw | $ 20.00 | $ 80.00 | $ 240.00 | N/A |
| Scaffolding (2' x 8' sections) | $ 10.00 | $ 40.00 | $ 120.00 | N/A |
| Box Truck/Van | $ 350.00 | $ 1,000.00 | $ 4,000.00 | N/A |
| Trash Pump | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Vactor Truck and Operator (Per Hour) | N/A | N/A | N/A | $ 250.00 |
| Hand Truck | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Light Hologen/LED | $ 5.00 | $ 20.00 | $ 60.00 | N/A |
| Light Tower | $ 10.00 | $ 40.00 | $ 120.00 | N/A |
| Neg Air Machine Secondary Filters (Ea.) | N/A | N/A | N/A | $ 3.00 |
| Neg Air Machine Pre Filters (Each) | N/A | N/A | N/A | $ 1.50 |
| Vacuum Bags (Hepa)(Each) | N/A | N/A | N/A | $ 4.00 |
| Bobcat | $ 350.00 | $ 1,350.00 | $ 4,000.00 | N/A |
| Air Monitoring Cassettes | N/A | N/A | N/A | $ 2.00 |
| Waste Disposal/Trans | Cost Plus 5% | N/A | N/A | |
| Rentals | Cost Plus 5% | N/A | N/A | |
| Floor Buffer Strpper Pads (Each) | N/A | N/A | N/A | $ 6.00 |
| Floor Buffer Scrape Away Blades | $ 10.00 | $ 40.00 | $ 120.00 | N/A |
| Squeegees | $ 2.00 | $ 8.00 | $ 24.00 | N/A |
| Sledge Hammer | $ 4.00 | $ 16.00 | $ 48.00 | N/A |
| 90 Degree Drywall Removal Tool | $ 4.00 | $ 16.00 | $ 48.00 | N/A |
| Flir Camera | $ 45.00 | $ 180.00 | $ 540.00 | N/A |
| Moisture Meter | $ 15.00 | $ 60.00 | $ 180.00 | N/A |
| Plywood 4'x 8' 1/2/ Inch Sheet (Each) | N/A | N/A | N/A | $ 35.00 |
| 8 ft 2"x4" Framing Stud (Each) | N/A | N/A | N/A | $ 12.00 |
| Ladder 6 ft. Step | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Ladder 8 ft. Step | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Ladder 10 ft. Step | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Ladder 12 ft. Step | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
| Ladder Extension | $ 1.00 | $ 1.00 | $ 1.00 | N/A |
File details come from the government source that posted it. Updated .