BAA_Proposal_Content_Checklist_(Atch_2).doc
DOC document 71 KB Posted
- Attached to
- Power Generation and Storage for Future Space Applications Federal contract opportunity
- Solicitation number
- BAA-RV-2013-0003
About this file
BAA-RV-2013-0003 - Proposal Content Checklist (Attachment 2)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Cost_Proposal_Instructions_(Atch_3).docx | DOCX document | |
| BAA-RV-2013-0003_Amd_2_-_8_Aug_13.docx | DOCX document | |
| BAA_Reps_and_Certs_(Atch_1).docx | DOCX document | |
| CDRLs_(Atch_4).docx | DOCX document | |
| Responses_to_Questions_BAA-RV-2013-0003.docx | DOCX document | |
| BAA-RVKV-2013-0003_Amendment_1 1 .docx | DOCX document | |
| BAA_Proposal_Content_Checklist_(Atch_2).doc | DOC document | |
| BAA-RV-2013-0003.docx | DOCX document | |
| CDRL_POWER_CALL(Atch_5).docx | DOCX document | |
| AFPAC_2_Nov_10_(Atch_4).docx | DOCX document | |
| CPI_-_FAR-Nov_10_(Atch_3).docx | DOCX document | |
| BAA_Reps_and_Certs_(Atch_1).docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR FORCE RESEARCH LABORATORY
DIRECTED ENERGY AND SPACE VEHICLES DIRECTORATES
Broad Agency Announcement Number BAA-RV-2013-0003 Proposal Content Checklist
You may be ineligible for award if all requirements of this announcement are not met on the proposal due date. At a minimum, incomplete proposals will be given lower priority and, although technically acceptable, may not be awarded because of funding limitations. Offerors are required to complete the following checklist and submit with your proposal.
Proposal Checklist – BAA-RV-2013-0003
| Item Description |
| BAA Page Ref |
| Prop Page Ref |
| 1. Business Section |
| 7.C.3.b. |
Cost/Business Proposal Business Section Section 2, Page 13
| a. ORCA FAR and DFARS Certifications completed |
| 7. B.3. Proposal Submission |
| Attachment G-1 |
| b. Section K Certifications and Representations have been fully completed and included. |
| 7.C.3.b. (1) |
Cost/Business Proposal Business Section Attachment G-1
| c. Subcontracting plan (as applicable) that meet AF goals and IAW FAR 19.704. |
| 7.C.3.b. (3) |
Cost/Business Proposal Business Section Attachment C-1
2. Cost Proposal
| a. All proposed cost/price elements are fully supported |
| 7.C.3.a. |
Cost/Business Proposal Cost Section Section 1.1 Cost Detail
| b. Strictly complies with proposal preparation instructions |
| 7. B. Proposal Submission 7. C. Specific Proposal Preparation Instructions |
| All content |
| c. Subcontractor cost/price analysis performed IAW FAR 15.404-3(b) |
| 7.C.3.a. |
Cost/Business Proposal Cost Section Attachment D
| d. FPRA or FPRR (if applicable) |
| 9. G Other Information |
And Cost Proposal Instructions 1.f.
FPRP – Attachment A-1 FPRR – Attachment B-1 Section 1.4.1
3. Technical Proposal
| a. Non-proprietary Contractor Statement of Work (CSOW) |
| 7. C. 2. (4) C-SOW |
| Technical Volume CD |
b. Approach consistent with costs identified in cost proposal
All Content
| c. Includes Program Plan |
| 7. C.2.(3) Program Plan |
| Section 3.0, Page 9 |
| d. Does not exceed page limit |
| 7. C. 2. (4) (B) (9) b. Page Limitations |
| 39 pages with 5 numbered but blank |
| 4. Cover letter |
| 7. C. 1.Specific Proposal Preparation Instructions |
Cover Letter Cost/ Business, Volume Page i
BAA-RV-2013-0003
Attachment 2
Proposal Content Checklist
Pg. 1 of 1
File details come from the government source that posted it. Updated .