BAA_Proposal_Content_Checklist_(Atch_2).doc

DOC document 71 KB Posted

Attached to
Power Generation and Storage for Future Space Applications Federal contract opportunity
Solicitation number
BAA-RV-2013-0003
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

BAA-RV-2013-0003 - Proposal Content Checklist (Attachment 2)

View the file

Other files for this federal contract opportunity

Other files attached to Power Generation and Storage for Future Space Applications, newest first.
File Type Posted
Cost_Proposal_Instructions_(Atch_3).docx DOCX document
BAA_Proposal_Content_Checklist_(Atch_2).doc DOC document
BAA-RV-2013-0003_Amd_2_-_8_Aug_13.docx DOCX document
BAA_Reps_and_Certs_(Atch_1).docx DOCX document
CDRLs_(Atch_4).docx DOCX document
Responses_to_Questions_BAA-RV-2013-0003.docx DOCX document
BAA-RVKV-2013-0003_Amendment_1 1 .docx DOCX document
BAA-RV-2013-0003.docx DOCX document
CDRL_POWER_CALL(Atch_5).docx DOCX document
AFPAC_2_Nov_10_(Atch_4).docx DOCX document
CPI_-_FAR-Nov_10_(Atch_3).docx DOCX document
BAA_Reps_and_Certs_(Atch_1).docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR FORCE RESEARCH LABORATORY

DIRECTED ENERGY AND SPACE VEHICLES DIRECTORATES

Broad Agency Announcement Number BAA-RV-2013-0003 Proposal Content Checklist

You may be ineligible for award if all requirements of this announcement are not met on the proposal due date. At a minimum, incomplete proposals will be given lower priority and, although technically acceptable, may not be awarded because of funding limitations. Offerors are required to complete the following checklist and submit with your proposal.

Proposal Checklist – BAA-RV-2013-0003

Item Description
BAA Page Ref
Prop Page Ref
1. Business Section
7.C.3.b.

Cost/Business Proposal Business Section Section 2, Page 13

a. ORCA FAR and DFARS Certifications completed
7. B.3. Proposal Submission
Attachment G-1
b. Section K Certifications and Representations have been fully completed and included.
7.C.3.b. (1)

Cost/Business Proposal Business Section Attachment G-1

c. Subcontracting plan (as applicable) that meet AF goals and IAW FAR 19.704.
7.C.3.b. (3)

Cost/Business Proposal Business Section Attachment C-1

2. Cost Proposal

a. All proposed cost/price elements are fully supported
7.C.3.a.

Cost/Business Proposal Cost Section Section 1.1 Cost Detail

b. Strictly complies with proposal preparation instructions
7. B. Proposal Submission 7. C. Specific Proposal Preparation Instructions
All content
c. Subcontractor cost/price analysis performed IAW FAR 15.404-3(b)
7.C.3.a.

Cost/Business Proposal Cost Section Attachment D

d. FPRA or FPRR (if applicable)
9. G Other Information

And Cost Proposal Instructions 1.f.

FPRP – Attachment A-1 FPRR – Attachment B-1 Section 1.4.1

3. Technical Proposal

a. Non-proprietary Contractor Statement of Work (CSOW)
7. C. 2. (4) C-SOW
Technical Volume CD

b. Approach consistent with costs identified in cost proposal

All Content

c. Includes Program Plan
7. C.2.(3) Program Plan
Section 3.0, Page 9
d. Does not exceed page limit
7. C. 2. (4) (B) (9) b. Page Limitations
39 pages with 5 numbered but blank
4. Cover letter
7. C. 1.Specific Proposal Preparation Instructions

Cover Letter Cost/ Business, Volume Page i

BAA-RV-2013-0003

Attachment 2

Proposal Content Checklist

Pg. 1 of 1

File details come from the government source that posted it. Updated .