This document contains a past performance questionnaire template for a federal solicitation. The solicitation seeks guardrail repair services along the George Washington Memorial Parkway. Offerors must provide a minimum of three and a maximum of five completed past performance questionnaires from former or current customers demonstrating experience on similar projects. The National Park Service National Office is the contracting agency. The questionnaires evaluate offerors on quality, schedule, customer satisfaction, management, cost and financial controls, safety, and general performance. Responses will be used to assess customer satisfaction on complex projects and technical acceptability.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME 1, TAB C - FACTOR 3 – Past Performance.

A. Submission Requirements

Provide in the proposal, a minimum of three and maximum of five completed attached questionnaires from former or current customers of whom you have provided services for that meet criteria set forth in Volume 1, Tab A and Volume 1, Tab B. Questionnaires will be considered technically acceptable if the Offeror provides a minimum of three and maximum of five completed questionnaires from three to five different customers. Below is the required form:

NPS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information:

Firm Name:

Address:

Phone Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Title:

Location:

Award Date (mm/dd/yy):

Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is the project relevant to project submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed:

8. Client’s Signature:

NOTE: THE CONTRACTOR MAY COLLECT AND RETAIN COMPLETED QUESTIONNAIRES

FROM CLIENTS FOR SUBMITTAL TO THE GOVERNMENT. AFTER COMPLETION OF THIS

FORM, THIS FORM MAY BE DUPLICATED BY THE CONTRACTOR. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION.

TO BE COMPLETED BY CLIENT

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

E (EXCELLENT) – Performance meets contractual requirements and exceeds the Client’s/Government’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

V (VERY GOOD) – Performance meets contractual requirements and exceeds some of the Client’s/Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S (SATISFACTORY) – Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective action taken by the contractor appear or were satisfactory.

M (MARGINAL) –Performance does not meet some contractual requirements. The contractual performance of the element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

The contractor’s proposed actions appear only marginally effective or were not fully implemented.

U (UNSATISFACTORY) – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N (NOT APPLICABLE) – No information or did not apply to your contract

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. Quality

a. Quality of technical data/report preparation efforts E VG S M U N

b. Ability to meet quality standards specified for technical performance. E VG S M U N

c. Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements.

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE

a. Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b. Rate the contractor’s use of available resources to accomplish tasks identified in the contract.

E VG S M U N

3. CUSTOMER SATISFACTION

a. To what extent were the end users satisfied with the project?

E VG S M U N

b. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication).

E VG S M U N

c. To what extent were the end users satisfied with the project?

E VG S M U N

d. Overall customer satisfaction. E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a. Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b. Ability to hire/apply a qualified workforce to this effort. E VG S M U N

c. Government Property Control E VG S M U N

d. Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e. Utilization of Small Business Concerns E VG S M U N

f. Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U N

g. Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h. Effectiveness of overall management (including ability to effectively lead, manage and control the program).

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a. Ability to meet the terms and conditions within the contractually agreed price (s)?

E VG S M U N

b. Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

E VG S M U N

c. If this is/was a Government cost type contract, the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d. Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

E VG S M U N

e. If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

E VG S M U N

f. Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

E VG S M U N

6. SAFETY/SECURITY

a. To what extent was the contractor able to maintain and environment of safety, adhere to its approved safety plan, and respond to safety issues? (includes: following the user rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b. Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a. Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b. Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U N

c. Would you hire or work with the firm again? (If no, please explain below).

E VG S M U N

d. In summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional page if necessary):

If an Offeror cannot meet this requirement, the Offeror must adequately demonstrate why they were unable to obtain the minimal amount of requested questionnaires.

B. Evaluation Criteria

The Government will evaluate the information to determine how well the Offeror provides customer satisfaction for complex projects. The Offeror’s failure to demonstrate the ability to work with customers and within their specifications and will be deemed technically unacceptable and will not be considered for award.