B08d_Appendix_B_-_QASP_-_East_Potomac_Maintenence.pdf
PDF 232 KB Posted
- Attached to
- Landscape and Turf Maintenance Services
- Solicitation number
- 140P3023Q0112
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for landscape and turf maintenance services in the East Potomac region of the National Mall and Memorial Parks. The National Park Service will use this QASP to monitor contract performance and ensure the contractor meets required performance standards. Key performance standards include maintaining turf at a proper height of cut without damage, timely edging and mulching of planting beds, bi-monthly leaf removal, and addressing emergencies within 90 minutes. The QASP identifies roles and responsibilities, acceptable quality levels, and methodologies for customer feedback, surveillance, documentation, and analysis of monitoring results. Attachments provide performance requirement summaries, quality assurance monitoring forms, and a form for investigating customer complaints regarding the landscape and turf maintenance services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
LANDSCAPE AND TURF MAINTENANCE SERVICES
THE EAST POTMAC PARK REGION OF THE NATIONAL MALL AND MEMORIAL
PARKS
For the National Park Service
National Mall & Memorial Parks
Contents
1.0 INTRODUCTION
1.1 PURPOSE
1.2 PERFORMANCE MANAGEMENT APPROACH
1.3 PERFORMANCE MANAGEMENT STRATEGY
2.0 ROLES AND RESPONSIBILITIES
2.1 Contracting Officer
2.2 Contracting Officer Representative
3.0 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4.0 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5.0 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
6.4 List of Attachments
ATTACHMENT A2 – PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT A3 – QUALITY ASSURANCE MONITORING FORM
ATTACHMENT A4 – CUSTOMER COMPLAINT INVESTIGATION
1.0 INTRODUCTION
This quality assurance surveillance plan (QASP) sets forth the procedures and guidelines the National Park Service (NPS), National Mall & Memorial Parks (NAMA) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 PURPOSE
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources employed. The QASP provides a means for evaluating whether the contractor is meeting required performance standards.
This QASP defines the roles and responsibilities of all members of the project team, identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance (QA) documentation requirements, and describes the analysis of the QA monitoring results.
1.2 PERFORMANCE MANAGEMENT APPROACH
This QASP will define the performance management approach taken by the NPS NAMA to monitor the contractor’s performance to ensure realization of performance standards. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether the contractor is achieving acceptable performance.
1.3 PERFORMANCE MANAGEMENT STRATEGY
The contractor is responsible for the quality of all work performed and shall measure quality through the contractor’s quality control (QC) program. QC is the output of work and includes all work performed regardless of whether the work is performed by direct employees, contractor employees, other teaming partners or subcontractors.
The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against performance standards. The contractor is responsible for making required changes in processes and practices to ensure effective performance management.
2.0 ROLES AND RESPONSIBILITIES
2.1 Contracting Officer
The contracting officer (CO) is responsible for monitoring compliance and administration, and for resolving any differences between the observations documented by the NPS/NAMA contracting officer’s representative (COR) and the contractor. The CO will designate a COR as a government authority for performance management.
2.2 Contracting Officer Representative
The contracting officer’s representative (COR), designated in writing by the CO to act as his or her authorized representative, assists in administering the contract. COR’s limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. The COR shall refer any changes that the contractor deems may affect price, terms, or conditions to the CO for action. The COR is responsible for completing the QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Attachment A3 includes the Quality Assurance Monitoring Form.
3.0 IDENTIFICATION OF REQUIRED PERFORMANCE
STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in Attachment A2, “Performance Requirements Summary.”
4.0 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
To minimize the performance management burden, the government’s evaluation of contractor performance (when appropriate) shall use simplified surveillance methods. The primary methods of surveillance are:
Documentation - Monitoring performed by the COR and to include photographic and written materials provided by the contractor. Includes monthly reporting review.
100% Inspection – Each month the COR shall review the generated documentation and enter summary results into the Quality Assurance Monitoring Forms
Periodic Inspection – The COR will perform up to three (3) inspections, virtual and/or in-person.
4.2 Customer Feedback
The contractor shall establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and is measurable through customer complaints and surveys.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor. Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Any customer complaints will be investigated by the COR using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment A4.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment A2, Performance Requirements Summary Table for contractor performance, are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls.
5.0 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
Communication of expected outcomes initiates the performance management feedback loop.
Attachment A2 expresses the performance standards expected of the contractor, and the performance monitoring techniques used to assess performance.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments A3 and A4. The forms, when completed, will document the government’s assessment of the contractor’s performance to ensure achieving the required results.
The COR will retain a copy of all completed QA surveillance forms.
6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS
6.1 Determining Performance
Government shall use the monitoring methods cited to determine whether the contractor has met performance standards, service levels, and AQLs. If the contractor has not met the minimum requirements, the government may request the contractor develop a corrective action plan to show how, and by what date, it intends to bring performance up to required levels.
6.2 Reporting
At the end of each month, the COR will prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachments A3 and A4), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards including customer satisfaction regarding Task Order cost/technical/scheduling performance.
6.3 Reviews and Resolution
The COR may require the contractor’s project manager or designated alternate, to meet with the CO and other government personnel as deemed necessary to discuss a performance evaluation. The CO or COR will define a frequency of in-depth reviews with the contractor, however, if the need arises, the contractor will meet with the CO or COR as often as required or per the contractor’s request. The agenda of the reviews may include performance assessment data, issues and concerns of both parties, the projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis, recommendations for improved efficiency and/or effectiveness, and issues arising from the performance monitoring process.
The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels require clear documentation. A modification can incorporate changes to service, procedures, and metrics.
6.4 List of Attachments
Attachment A2 – Performance Requirements Summary
Attachment A3 – Quality Assurance Monitoring Form
Attachment A4 – Customer Complaint Investigation Form
ATTACHMENT A2 – PERFORMANCE REQUIREMENTS SUMMARY
East Potomac PWS Performance Standard QAS
The Contractor establishes, implements, and maintains a safe, effective, and environmentally sound landscape maintenance program compliant with the NPS mission
All
All performance is 100% compliant with this PWS
99% of all standards are met without in-house-services intervention
No plants/turf are damaged/dead due to Contractor negligence
All deficiencies are corrected within one (1) workday
The landscape is always neat and free of extraneous materials
Contractor reports all safety hazards relating to the landscape environment to the COR as conditions are found
After hour emergencies are addressed within 90 minutes from the time of request
Periodic and/or random inspection
Landscape Aesthetics and Integrity
All All disturbed areas, sinkholes, and rodent holes are backfilled with appropriate material (Supplied by Government), and restored to original surface characteristics
No trash, garbage, debris, rocks exist in the landscaped areas; all is picked up and properly discarded, none is disposed in storm drain(s)
Limbs on the ground up to 3 inches in diameter are to be removed from parks as needed.
Report hangers in trees to the COR.
Customer complaints shall not exceed 1 per month.
Mowing I. A
Turf is maintained at proper HOC and all conditions affecting operation are taken into consideration with the COR
Turf is not damaged through mudding
Turf is not damaged from dull blades
Periodic and/or random inspection
No more than 1 patron complaint per month
Trimming I. B HOC matches surrounding turf
No visible damage to plants (trees/shrubs) or structures
Periodic and/or random inspection
No more than 1 patron complaint per month
Edging I. C Minimum of bi-monthly to keep neat and clean aesthetic appearance
Periodic and/or random inspection
No more than 1
Maintain Planting Beds/Mulch Areas
I.D
The proper type and depth of mulch is maintained for the appropriate area
Planting Beds are edged, mulched, and kept weed free as necessary
All Planting Beds are mulched by April 30th. A Fall touch up mulch of 1 inch is applied by Sept. 30th.
Mulch depth is maintained at 1 inch in herbaceous perennial beds, 2 inches in all other beds 95% of the time
There is never excessive mulch buildup in any bed or around any tree. This may mean old mulch removal before installing new mulch.
All mulched beds have a precise, established edge 98% of the time
Mulched surfaces appear uniform and neat 98% of the time
Dead, damaged, unhealthy, and/or unsafe plant branches are removed
Plant shape and size is maintained
Suckers are properly removed from trees
Pruning equipment is properly sterilized to prevent the spread of diseases.
Periodic and/or random inspection
No more than 1
Leaf Removal I.E As needed to keep neat and clean aesthetic environment
Leaves do not accumulate and diminish the health and/or appearance of the landscape
Storm drain openings are free of leaves/debris 99% of the time random inspection
No more than 1
Remove Liter and Debris
I.F
I.F
Grounds are free of trash and litter no later than 9:30 a.m. 7 days a week
No more than 1
Maintain Hardscapes
I.G Blown off by 10:30 a.m. 7 days a week
No more than 1 per month
Ropes, Posts, Signage, and Fencing
I.H Keep Secure and Straight
ATTACHMENT A3 – QUALITY ASSURANCE MONITORING FORM
CONTRACT OR TASK ORDER:
TEAM LEAD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Inspection 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
ANALYSIS OF RESULTS:
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
ATTACHMENT A4 – CUSTOMER COMPLAINT INVESTIGATION
CONTRACTOR: _______________________________________________________________
CONTRACT/TASK ORDER NUMBER: ______________________________________________
DATE/TIME COMPLAINT RECEIVED: ___________________________ ________ AM / PM
SOURCE OF COMPLAINT: ___________________________________________ (NAME)
__________________________________________ (ORGANIZATION)
__________________________________________ (PHONE NUMBER)
__________________________________________ (EMAIL ADDRESS)
NATURE OF COMPLAINT:
RESULTS OF COMPLAINT INVESTIGATION:
DATE/TIME SERVICE PROVIDER INFORMED OF COMPLAINT:
___________________ AM / PM
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:
RECEIVED AND VALIDATED BY: ____________________________________________________________________________
PREPARED BY: ___________________________________
DATE: _________________________________________
| 1.0 INTRODUCTION |
| 1.1 PURPOSE |
| 1.2 PERFORMANCE MANAGEMENT APPROACH |
| 1.3 PERFORMANCE MANAGEMENT STRATEGY |
| 2.0 ROLES AND RESPONSIBILITIES |
| 2.1 Contracting Officer |
| 2.2 Contracting Officer Representative |
| 3.0 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| 4.0 METHODOLOGIES TO MONITOR PERFORMANCE |
| 4.1 Surveillance Techniques |
| 4.2 Customer Feedback |
| 4.3 Acceptable Quality Levels |
| 5.0 QUALITY ASSURANCE DOCUMENTATION |
| 5.1 The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| 6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS |
| 6.1 Determining Performance |
| 6.2 Reporting |
| 6.3 Reviews and Resolution |
| 6.4 List of Attachments |
| ATTACHMENT A2 – PERFORMANCE REQUIREMENTS SUMMARY |
| QAS |
| Performance Standard |
| PWS |
| East Potomac |
| The Contractor establishes, implements, and maintains a safe, effective, and environmentally sound landscape maintenance program compliant with the NPS mission |
| After hour emergencies are addressed within 90 minutes from the time of request |
| Customer complaints shall not exceed 1 per month. |
| All |
| Mowing |
| No more than 1 patron complaint per month |
| Turf is not damaged from dull blades |
| I. B |
| Trimming |
| No visible damage to plants (trees/shrubs) or structures |
| Minimum of bi-monthly to keep neat and clean aesthetic appearance |
| I. C |
| Edging |
| Maintain Planting Beds/Mulch Areas |
| I.E |
| Leaf Removal |
| Storm drain openings are free of leaves/debris 99% of the time |
| I.F |
| I.F |
| No more than 1 patron complaint per month |
| I.G |
| Maintain Hardscapes |
| No more than 1 patron complaint per month |
| Keep Secure and Straight |
| I.H |
| ATTACHMENT A3 – QUALITY ASSURANCE MONITORING FORM |
| ATTACHMENT A4 – CUSTOMER COMPLAINT INVESTIGATION |
File details come from the government source that posted it. Updated .