B08_WOTR_146606_Solit - Solit Attach 07 - Equals.doc

DOC document 58 KB Posted

Attached to
WOTR 146606 - Renovate Exterior Shell
Solicitation number
140P2020R0049
Issued by

About this file

This document outlines proposed equals for a federal contract solicitation to renovate the exterior shell of the Filene Center at Wolf Trap National Park for the Performing Arts. The contractor proposes alternate products that are equal or superior to the specified items in all respects, and certifies that the proposed equals will provide the same warranties and be compatible with interfacing items. The contractor also agrees to coordinate installation and make any necessary changes resulting from the substitution, waiving claims for additional expenses. The government encourages proposing sustainable or environmentally responsible materials made from recycled content and will make every effort to approve such alternatives.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No.
Paragraph No.
Product/Model No.
Proposed Product/Model No.

A.

By submitting the proposed equal, the contractor certifies that it:

1.

Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2.

Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3.

Has determined that the proposed item is compatible with interfacing items.

4.

Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5.

Waives all claims for additional expenses that may be incurred as a result of the substitution.

B.

The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

File details come from the government source that posted it. Updated .