B08_Pricing_Worksheet.docx
DOCX document 25 KB Posted
- Attached to
- Annual Barge Service KALA Federal contract opportunity
- Solicitation number
- 140P8226R0001
About this file
This is a Pricing Worksheet for the Annual Barge Service solicitation (140P8226R0001) for Kalaupapa National Historic Park, Molokai, Hawaii, issued by the Department of the Interior National Park Service. The worksheet establishes mandatory cost breakdown requirements for offerors providing annual barge transportation and cargo handling services.
Offerors must submit fully burdened, detailed cost proposals for the Base Year with final pricing (no placeholders) supported by detailed worksheets. Required cost elements include: vessel charter costs (daily rates, mobilization, transit, and standby days); crew costs (captain, engineer, deckhands, and dive team with labor rates and hours); equipment rental (forklifts, containers, ramps, winches, and spill kits); fuel and consumables (diesel for tug and assist tug); loading/unloading labor (forklift operators, stevedores, and supervision); spill plan and compliance costs; overhead, G&A, and profit (separately identified); and miscellaneous costs (insurance, port fees, mobilization, and permits). The pricing summary consolidates all eight cost categories into a Total Base Year amount. Contract Line Items (CLINs) include CLIN 10 (Annual Barge Base Year, Lump Sum), CLIN 20 (Option Year 1), CLIN 30 (Option Year 2), and CLIN 40 (Option Year 3). Supporting documentation must include detailed cost worksheets, basis of estimates, historical pricing data, assumptions regarding transit duration and fuel burn rates, and identification of fixed versus variable costs and subcontractor expenses. The Government will evaluate all proposed cost elements for reasonableness and cost realism.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8226R0001.pdf | ||
| A05_PWS_KALA_Barge_01302026_Final.docx | DOCX document | |
| Appx_C_Harbor_Drawings.pdf | ||
| Appx_B_Harbor_Depth.doc | DOC document | |
| Appx_D_Sample_Manifest.xlsx | XLSX spreadsheet | |
| Appx_E_Kalaupapa_Visitor_Rules.pdf | ||
| Appx_A_Harbor_Bathymetry.xlsx | XLSX spreadsheet | |
| B08_Att_3_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING WORKSHEET
1. GENERAL PRICING REQUIREMENTS
Offeror shall submit a fully burdened, detailed cost breakdown for the Base Year. Pricing shall reflect final proposed pricing (no placeholders).
Pricing must:
· Be fully loaded (labor includes wages, fringe, G&A, etc.)
· Clearly identify rates, quantities, and assumptions
· Be supported by detailed worksheets
· Align with the PWS tasks (loading, transport, offload, spill plan, etc.)
2. REQUIRED COST BREAKDOWN (MANDATORY)
A. Vessel Charter Provide:
· Daily charter rate
· Number of days (by phase if applicable)
· Any minimum charges or mobilization days
Format:
Tug & Barge Charter:
Mobilization: ___ days @ $___/day = $___ Transit (Honolulu–Kalaupapa–Return): ___ days @ $___/day = $___ Standby / Weather Delay (if included): ___ days @ $___/day = $___
Subtotal: $___
B. Crew (Separate from Charter if possible) Break out:
· Crew composition (e.g., captain, engineer, deckhands)
· Labor category rates
· Hours or days per position
Format:
Crew (8-person, 24/7 operations):
Captain: $___/day × ___ days Engineer: $___/day × ___ days Deckhands (x__): $___/day × ___ days Dive Team (is it subcontracted?):
___ divers × ___ days × $___/day
Total Crew Cost: $___
C. Equipment Rental (PWS 1.2.1, 1.2.2, 1.2.5 requirements ) Break out:
· Forklifts (2–3 required)
· Containers (closed, open-deck, dump)
· Ramps, winches, spill kits
Format:
Forklifts: ___ units × ___ days × $___/day = $___ Closed Containers (10’/20’): ___ units × $___ = $___ Dump Containers: ___ units × $___ = $___ Other Equipment: $___
Subtotal: $___
D. Fuel & Consumables Break out separately for:
· Tug
· Assist tug (if used)
Format:
Diesel Fuel:
Tug: ___ gallons × $___/gallon = $___ Assist Tug: ___ gallons × $___/gallon = $___ Lubricants / Other Consumables: $___
Subtotal: $___
E. Loading / Unloading Labor (Directly tied to PWS Tasks 1–3 )
Break out:
Forklift Operators: $___/hr × ___ hrs Stevedores: $___/hr × ___ hrs Supervision: $___
Subtotal: $___
F. Spill Plan & Compliance (PWS 1.2.4 requirement ) Break out:
Spill Plan Development: $___ Equipment / Materials: $___ Permits / Compliance: $___
Subtotal: $___
G. Overhead, G&A, and Profit Must be explicitly stated, not hidden.
Direct Costs Subtotal: $___ Overhead: ___% = $___ G&A: ___% = $___ Profit/Fee: ___% = $___
Total Burden: $___
H. Miscellaneous / Other Costs Examples:
· Mobilization / demobilization
· Insurance (P&I, hull, pollution)
· Permits & port fees
· Travel/logistics (Kalaupapa access constraints noted in PWS )
Require itemization:
| Insurance: | $___ | |
| Port Fees: | $___ | |
| Mobilization: | $___ | |
| Other: | $___ |
Subtotal: $___
3. PRICING SUMMARY (REQUIRED)
Offeror shall provide:
| A. Vessel Charter: | $___ | |
| B. Crew: | $___ | |
| C. Equipment: | $___ | |
| D. Fuel: | $___ | |
| E. Labor (Load/Unload): | $___ | |
| F. Spill/Compliance: | $___ | |
| G. Overhead/Profit: | $___ | |
| H. Miscellaneous: | $___ |
TOTAL BASE YEAR: $___
4. SUPPORTING DATA
The offer must include:
· Detailed cost worksheets
· Basis of estimate for each category
· Historical pricing (if available)
· Assumptions:
· Transit duration
· Fuel burn rate
· Crew size justification
· Identification of:
· Fixed vs variable costs
· Subcontractor costs
Note: The Government will evaluate the reasonableness of all proposed cost elements. The Offeror shall provide sufficient cost detail to support cost realism analysis and potential negotiation of individual line items.
| CLIN |
| Description |
| Unit: |
| Unit Cost |
| 10 |
| Annual Barge Base year |
| LS |
| $ |
| 20 |
| Annual Barge Option year 1 |
| LS |
| $ |
| 30 |
| Annual Barge Option year 2 |
| LS |
| $ |
| 40 |
| Annual Barge Option year 3 |
| LS |
| $ |
| Total Evaluated Price |
| $ |
File details come from the government source that posted it. Updated .