This document is a solicitation (Request for Proposal) for Scientific, Technical Research and Project Management Support Services for the U.S. Army Medical Research Institute of Infectious Diseases (USAMRIID). The competitive procurement (Solicitation Number HT942525R0005) is a 100% 8(a) Small Business set-aside with a NAICS code of 541714 and a size standard of 1,000 employees. The contract will provide comprehensive scientific and technical support services across multiple biosafety levels (BSL-2 through BSL-4) at Fort Detrick, Maryland, with a focus on supporting research in bacteriology, molecular biology, virology, diagnostics, aerobiology, and other critical scientific divisions.
The solicitation includes a base period and four option periods, with a total potential contract duration from August 2025 to March 2030. The contract will be cost-plus-fixed-fee (CPFF) with a pre-determined Not-to-Exceed amount of $80,000 annually for Other Direct Costs. Proposals are due by 1:30 PM Eastern Time on May 5, 2025, with the government intending to make a single award without discussions. Key evaluation factors include Technical Approach, Management/Staffing Approach, Experience, Past Performance, and Cost/Price, with non-cost factors being significantly more important than price. The incumbent contractor is Chenega Professional & Technical Services, LLC, and the contract will support USAMRIID's mission of protecting warfighters from biological threats and investigating potential disease outbreaks.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HT942525R0005
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
Scientific Technical Research Support
CPFF
BASE PERIOD: Non-Personal,Scientific, Technical and Project Management support services in support of USAMRIID. All services shall be performed in accordance with the Performance Work Statement. Services shall be invoiced on a monthly basis.
FOB: Destination
PSC CD: AN14
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
Other Direct Costs (ODCs)
COST
BASE PERIOD: Other Direct Costs (ODCs) shall be invoiced in accordance with the Performance Work Statement. The estimated cost is $80,000.00 per year; this amount shall be used as the plug value for proposal submission.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SURGE-Scientific Technical & Project |
CPFF
BASE PERIOD: SURGE Scientific, Technical and Project Management Support Services in accordance with the Performance Work Statement. Total value of surge shall be equal to 10% of the total value of CLIN 0001.
Maximum value of SURGE capability.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Scientific Technical Research Support |
CPFF
OPTION PERIOD 1: Non-Personal,Scientific, Technical and Project Management support services in support of USAMRIID. All services shall be performed in accordance with the Performance Work Statement. Services shall be invoiced on a monthly basis.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Other Direct Costs (ODCs) |
COST
OPTION PERIOD 1: Other Direct Costs (ODCs) shall be invoiced in accordance with the Performance Work Statement. The estimated cost is $80,000.00 per year; this amount shall be used as the plug value for proposal submission.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SURGE-Scientific Technical & Project |
CPFF
SURGE: Scientific, Technical and Project Management Support Services in accordance with the Performance Work Statement. Total value of surge shall be equal to 10% of the total value of CLIN 1001.
Maximum value of SURGE capability.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Scientific Technical Research Support |
CPFF
OPTION PERIOD 2: Non-Personal,Scientific, Technical and Project Management support services in support of USAMRIID. All services shall be performed in accordance with the Performance Work Statement. Services shall be invoiced on a monthly basis.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Other Direct Costs (ODCs) |
COST
OPTION PERIOD 2: Other Direct Costs (ODCs) shall be invoiced in accordance with the Performance Work Statement. The estimated cost is $80,000.00 per year; this amount shall be used as the plug value for proposal submission.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SURGE-Scientific Technical & Project |
CPFF
SURGE: Scientific, Technical and Project Management Support Services in accordance with the Performance Work Statement. Total value of surge shall be equal to 10% of the total value of CLIN 2001.
Maximum value of SURGE capability.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Scientific Technical Research Support |
CPFF
OPTION PERIOD 3: Non-Personal,Scientific, Technical and Project Management support services in support of USAMRIID. All services shall be performed in accordance with the Performance Work Statement. Services shall be invoiced on a monthly basis.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Other Direct Costs (ODCs) |
COST
OPTION PERIOD 3: Other Direct Costs (ODCs) shall be invoiced in accordance with the Performance Work Statement. The estimated cost is $80,000.00 per year; this amount shall be used as the plug value for proposal submission.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SURGE-Scientific Technical & Project |
CPFF
SURGE: Scientific, Technical and Project Management Support Services in accordance with the Performance Work Statement. Total value of surge shall be equal to 10% of the total value of CLIN 3001.
Maximum value of SURGE capability.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| Scientific Technical Research Support |
CPFF
OPTION PERIOD 4: Non-Personal,Scientific, Technical and Project Management support services in support of USAMRIID. All services shall be performed in accordance with the Performance Work Statement. Services shall be invoiced on a monthly basis.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Other Direct Costs (ODCs) |
COST
OPTION PERIOD 4: Other Direct Costs (ODCs) shall be invoiced in accordance with the Performance Work Statement. The estimated cost is $80,000.00 per year; this amount shall be used as the plug value for proposal submission.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SURGE-Scientific Technical & Project |
CPFF
SURGE: Scientific, Technical and Project Management Support Services in accordance with the Performance Work Statement. Total value of surge shall be equal to 10% of the total value of CLIN 4001.
Maximum value of SURGE capability.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Refer to “Attachment 01 – Performance Work Statement” and “Attachment 02 – QASP”
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 1003 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
| 2003 |
| Destination |
| Government |
| Destination |
| Government |
| 3001 |
| Destination |
| Government |
| Destination |
| Government |
| 3002 |
| Destination |
| Government |
| Destination |
| Government |
| 3003 |
| Destination |
| Government |
| Destination |
| Government |
| 4001 |
| Destination |
| Government |
| Destination |
| Government |
| 4002 |
| Destination |
| Government |
| Destination |
| Government |
| 4003 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-5 |
| Inspection Of Services Cost-Reimbursement |
| APR 1984 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| POP 01-AUG-2025 TO |
31-MAR-2026
| N/A |
| ARMY MED RES INST OF DISEASE - MM |
BLDG 1425 PORTER STREET
FORT DETRICK MD 21702-5711
HT0980
| 0002 |
| POP 01-AUG-2025 TO |
31-MAR-2026
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 0003 |
| POP 01-AUG-2025 TO |
31-MAR-2026
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 1001 |
| POP 01-APR-2026 TO |
31-MAR-2027
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 1002 |
| POP 01-APR-2026 TO |
31-MAR-2027
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 1003 |
| POP 01-APR-2026 TO |
31-MAR-2027
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 2001 |
| POP 01-APR-2027 TO |
31-MAR-2028
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 2002 |
| POP 01-APR-2027 TO |
31-MAR-2028
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 2003 |
| POP 01-APR-2027 TO |
31-MAR-2028
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 3001 |
| POP 01-APR-2028 TO |
31-MAR-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 3002 |
| POP 01-APR-2028 TO |
31-MAR-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 3003 |
| POP 01-APR-2028 TO |
31-MAR-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 4001 |
| POP 01-APR-2029 TO |
31-MAR-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 4002 |
| POP 01-APR-2029 TO |
31-MAR-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 4003 |
| POP 01-APR-2029 TO |
31-MAR-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HT0980
| 52.242-15 Alt I |
| Stop-Work Order (Aug 1989) - Alternate I |
| APR 1984 |
Section G - Contract Administration Data
INDIRECT RATES
For the term of the contract awarded as a result of this solicitation, the indirect rates shall have ceilings established. The chart below will reflect the ceiling rates for fringe and G&A. It was confirmed between USAMRAA and the contractor that should indirect rates settle higher than proposed and accepted, the government will only pay for a total annual rate escalation not to exceed 3% per category for each indirect rate category proposed on this contract.
Adherence to the below established ceilings should be followed:
| Vendor |
| Fringe |
| G&A |
To Be completed at time of award
| 252.204-7006 |
| Billing Instructions--Cost Vouchers |
| MAY 2023 |
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Not Applicable
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Cost Voucher
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| HQ0490 |
| Issue By DoDAAC |
| HT9425 |
| Admin DoDAAC** |
| HT9425 |
| Inspect By DoDAAC |
| N/A |
| Ship To Code |
| N/A |
| Ship From Code |
| N/A |
| Mark For Code |
| N/A |
| Service Approver (DoDAAC) |
| HT0980 |
| Service Acceptor (DoDAAC) |
| HT0980 |
| Accept at Other DoDAAC |
| N/A |
| LPO DoDAAC |
| N/A |
| DCAA Auditor DoDAAC |
| To be determined at time of award |
| Other DoDAAC(s) |
| N/A |
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
To be determined at time of award
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| JUN 2020 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| JUN 2020 |
| 52.203-7 |
| Anti-Kickback Procedures |
| JUN 2020 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| JUN 2020 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| NOV 2021 |
| 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements |
| JAN 2017 |
| 52.204-2 |
| Security Requirements |
| MAR 2021 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| JUN 2020 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2018 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| AUG 2020 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.204-21 |
| Basic Safeguarding of Covered Contractor Information Systems |
| NOV 2021 |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities |
| DEC 2023 |
| 52.204-25 |
| Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment |
| NOV 2021 |
| 52.204-27 |
| Prohibition on a ByteDance Covered Application |
| JUN 2023 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| NOV 2021 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| OCT 2018 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.210-1 |
| Market Research |
| NOV 2021 |
| 52.215-2 |
| Audit and Records--Negotiation |
| JUN 2020 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-15 |
| Pension Adjustments and Asset Reversions |
| OCT 2010 |
| 52.215-18 |
| Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions |
| JUL 2005 |
| 52.215-19 |
| Notification of Ownership Changes |
| OCT 1997 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| JUN 2020 |
| 52.216-8 |
| Fixed Fee |
| JUN 2011 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2020 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| FEB 2024 |
| 52.219-28 |
| Post-Award Small Business Program Rerepresentation |
| FEB 2024 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| JUN 2020 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUN 2020 |
| 52.222-37 |
| Employment Reports on Veterans |
| JUN 2020 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-41 |
| Service Contract Labor Standards |
| AUG 2018 |
| 52.222-50 |
| Combating Trafficking in Persons |
| NOV 2021 |
| 52.222-54 |
| Employment Eligibility Verification |
| MAY 2022 |
| 52.222-55 |
| Minimum Wages for Contractor Workers Under Executive Order 14026 |
| JAN 2022 |
| 52.222-62 |
| Paid Sick Leave Under Executive Order 13706 |
| JAN 2022 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2024 |
| 52.223-10 (Dev) |
| Waste Reduction Program (DEVIATION 2025-O0004) |
| MAR 2025 |
| 52.223-23 (Dev) |
| Sustainable Products and Services (DEVIATION 2025-O0004) |
| MAR 2025 |
| 52.224-3 |
| Privacy Training |
| JAN 2017 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| FEB 2021 |
| 52.226-7 |
| Drug-Free Workplace |
| MAY 2024 |
| 52.226-8 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| MAY 2024 |
| 52.227-1 |
| Authorization and Consent |
| JUN 2020 |
| 52.228-7 |
| Insurance--Liability To Third Persons |
| MAR 1996 |
| 52.229-11 |
| Tax on Certain Foreign Procurements--Notice and Representation |
| JUN 2020 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-22 |
| Limitation Of Funds |
| APR 1984 |
| 52.232-23 |
| Assignment Of Claims |
| MAY 2014 |
| 52.232-25 Alt I |
| Prompt Payment (Jan 2017) Alternate I |
| FEB 2002 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| OCT 2018 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| MAR 2023 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-3 Alt I |
| Protest After Award (Aug 1996) - Alternate I |
| JUN 1985 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.237-3 |
| Continuity Of Services |
| JAN 1991 |
| 52.240-1 |
| Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act--Covered Foreign Entities |
| NOV 2024 |
| 52.242-1 |
| Notice of Intent to Disallow Costs |
| APR 1984 |
| 52.242-3 |
| Penalties for Unallowable Costs |
| DEC 2022 |
| 52.242-4 |
| Certification of Final Indirect Costs |
| JAN 1997 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.243-2 Alt I |
| Changes--Cost-Reimbursement (Aug 1987) - Alternate I |
| APR 1984 |
| 52.244-5 |
| Competition In Subcontracting |
| AUG 2024 |
| 52.244-6 (Dev) |
| Subcontracts for Commercial Products and Commercial Services (DEVIATION 2025-O0003) |
| MAR 2025 |
| 52.245-1 |
| Government Property |
| SEP 2021 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-25 |
| Limitation Of Liability--Services |
| FEB 1997 |
| 52.249-6 |
| Termination (Cost Reimbursement) |
| MAY 2004 |
| 52.249-14 |
| Excusable Delays |
| APR 1984 |
| 52.250-1 Alt I |
| Indemnification Under Public Law 85-804 (Apr 1984) - Alternate I |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| JAN 2023 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| DEC 2022 |
| 252.203-7003 |
| Agency Office of the Inspector General |
| AUG 2019 |
| 252.203-7004 |
| Display of Hotline Posters |
| JAN 2023 |
| 252.204-7000 |
| Disclosure Of Information |
| OCT 2016 |
| 252.204-7002 |
| Payment For Contract Line or Subline Items Not Separately Priced |
| APR 2020 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 |
| Antiterrorism Awareness Training for Contractors |
| JAN 2023 |
| 252.204-7009 |
| Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information |
| JAN 2023 |
| 252.204-7012 (Dev) |
| Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2024-O0013 REVISION 1) |
| MAY 2024 |
| 252.204-7018 |
| Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services |
| JAN 2023 |
| 252.204-7020 |
| NIST SP 800-171 DoD Assessment Requirements |
| NOV 2023 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| OCT 2024 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| MAY 2019 |
| 252.219-7011 |
| Notification to Delay Performance |
| JUN 1998 |
| 252.222-7006 |
| Restrictions on the Use of Mandatory Arbitration Agreements |
| JAN 2023 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.225-7004 |
| Report of Intended Performance Outside the United States and Canada--Submission After Award |
| JUL 2024 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| APR 2022 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.225-7056 |
| Prohibition Regarding Business Operations with the Maduro Regime |
| JAN 2023 |
| 252.225-7058 |
| Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China |
| JAN 2023 |
| 252.225-7060 |
| Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region |
| JUN 2023 |
| 252.225-7966 (Dev) |
| Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (Deviation 2024-O0006). |
| MAR 2024 |
| 252.225-7967 (Dev) |
| Prohibition Regarding Russian Fossil Fuel Business Operations (Deviation 2024-O0006). |
| MAR 2024 |
| 252.226-7001 |
| Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| JAN 2023 |
| 252.226-7003 |
| Drug-Free Work Force |
| AUG 2024 |
| 252.227-7013 |
| Rights in Technical Data--Other Than Commercial Products and Commercial Services |
| MAR 2023 |
| 252.227-7015 |
| Technical Data--Commercial Products and Commercial Services |
| JAN 2025 |
| 252.227-7016 |
| Rights in Bid or Proposal Information |
| JAN 2023 |
| 252.227-7020 |
| Rights In Special Works |
| JUN 1995 |
| 252.227-7027 |
| Deferred Ordering Of Technical Data Or Computer Software |
| APR 1988 |
| 252.227-7030 |
| Technical Data--Withholding Of Payment |
| MAR 2000 |
| 252.227-7037 |
| Validation of Restrictive Markings on Technical Data |
| JAN 2023 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| DEC 2018 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.232-7011 |
| Payments in Support of Emergencies and Contingency Operations |
| MAY 2013 |
| 252.234-7002 (Dev) |
| Earned Value Management System (Deviation 2015-O0017) |
| JAN 2025 |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| JAN 2023 |
| 252.242-7005 |
| Contractor Business Systems |
| FEB 2012 |
| 252.242-7006 |
| Accounting System Administration |
| FEB 2012 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2022 |
| 252.244-7000 |
| Subcontracts for Commercial Products or Commercial Services |
| NOV 2023 |
| 252.244-7001 |
| Contractor Purchasing System Administration |
| MAY 2014 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.245-7005 |
| Management and Reporting of Government Property |
| JAN 2024 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| OCT 2024 |
52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)
(a) Invoicing.
(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
(3) The designated payment office will make interim payments for contract financing on the 30th day after the designated billing office receives a proper payment request.
In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs. (1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (b)(2) of the clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term "costs" includes only--
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for--
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made--
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government;
(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless--
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates. (1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractor's actual cost experience for that period. The appropriate Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.
(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:
(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.
(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).
(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.
(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) and expense reallocation to final indirect cost pools.
(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.
(F) Facilities capital cost of money factors computation.
(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.
(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.
(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.
(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).
(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.
(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.
(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.
(N) Certificate of final indirect costs (see 52.242-4, Certification of Final Indirect Costs).
(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).
(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:
(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.
(B) General organizational information and limitation on allowability of compensation for certain contractor personnel. See 31.205-6(p). Additional salary reference information is available at https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedBeforeJune24.pdf and https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedafterJune24.pdf.
(C) Identification of prime contracts under which the contractor performs as a subcontractor.
(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the description of the accounting system has not changed from the previous year's submission).
(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year's submission).
(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).
(G) Management letter from outside CPAs concerning any internal control weaknesses.
(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph G) of this section.
(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.
(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.
(K) Federal and State income tax returns.
(L) Securities and Exchange Commission 10-K annual report.
(M) Minutes from board of directors meetings.
(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.
(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: Contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.
(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within 60 days after settlement of final indirect cost rates.
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify (i) the agreed-upon final annual indirect cost rates, (ii) the bases to which the rates apply, (iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.
(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the Disputes clause.
(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, the Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates. The completion invoice or voucher shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice or voucher and providing status of subcontractor audits to the contracting officer upon request.
(6)(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may--
(A) Determine the amounts due to the Contractor under the contract; and
(B) Record this determination in a unilateral modification to the contract.
(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.
(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates--
(1) Shall be the anticipated final rates; and
(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.
(f) Quick-closeout procedures. Quick-closeout procedures are applicable when the conditions in FAR 42.708(a) are satisfied.
(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor's invoices or vouchers and statements of cost audited. Any payment may be (1) Reduced by amounts found by the Contracting Officer not to constitute allowable costs or (2) Adjusted for prior overpayments or underpayments.
(h) Final payment. (1) Upon approval of a completion invoice or voucher submitted by the Contractor in accordance with paragraph (d)(5) of this clause, and upon the Contractor's compliance with all terms of this contract, the Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
(2) The Contractor shall pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts shall be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment shall execute and deliver--
(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and
(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except--
(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;
(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and
(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor's indemnification of the Government against patent liability.
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days from contract expiration.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor anytime before the contract expires; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 31 March 2030; 30 September 2030 if 52.217-8 is executed.
52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2021-O0008) (FEB 2023)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. “Similarly situated entity,” as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:
(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.
(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause – XX By the end of the base term of the contract and then by the end of each subsequent option period; or ___ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protege in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION
Employee Class Monetary Wage-Fringe Benefits
| Laboratory Technician 3 | DE-2 or DB-2 |
| Laboratory Technician 4 | DE-3 or DB-2 |
| Laboratory Technician 5 | DE-3 or DB-2 |
| Technical Writer 3 | DJ-2 |
52.244-2 SUBCONTRACTS (JUN 2020)
(a) Definitions. As used in this clause--
Approved purchasing system means a Contractor's purchasing system that has been reviewed and approved in accordance with Part 44 of the Federal Acquisition Regulation (FAR).
Consent to subcontract means the Contracting Officer's written consent for the Contractor to enter into a particular subcontract.
Subcontract means any contract, as defined in FAR Subpart 2.1, entered into by a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.
(b) When this clause is included in a fixed-price type contract, consent to subcontract is required only on unpriced contract actions (including unpriced modifications or unpriced delivery orders), and only if required in accordance with paragraph (c) or (d) of this clause.
(c) If the Contractor does not have an approved purchasing system, consent to subcontract is required for any subcontract that—
(1) Is of the cost-reimbursement, time-and-materials, or labor-hour type; or
(2) Is fixed-price and exceeds—
(i) For a contract awarded by the Department of Defense, the Coast Guard, or the National Aeronautics and Space Administration, the greater of the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, or 5 percent of the total estimated cost of the contract; or
(ii) For a contract awarded by a civilian agency other than the Coast Guard and the National Aeronautics and Space Administration, either the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, or 5 percent of the total estimated cost of the contract.
(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer’s written consent before placing the following subcontracts:
To be determined at time of award
(e)(1) The Contractor shall notify the Contracting Officer reasonably in advance of placing any subcontract or modification thereof for which consent is required under paragraph (b), (c), or (d) of this clause, including the following information:
(i) A description of the supplies or services to be subcontracted.
(ii) Identification of the type of subcontract to be used.
(iii) Identification of the proposed subcontractor.
(iv) The proposed subcontract price.
(v) The subcontractor’s current, complete, and accurate certified cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract provisions.
(vi) The subcontractor’s Disclosure Statement or Certificate relating to Cost Accounting Standards when such data are required by other provisions of this contract.
(vii) A negotiation memorandum reflecting—
(A) The principal elements of the subcontract price negotiations;
(B) The most significant considerations controlling establishment of initial or revised prices;
(C) The reason certified cost or pricing data were or were not required;
(D) The extent, if any, to which the Contractor did not rely on the subcontractor’s certified cost or pricing data in determining the price objective and in negotiating the final price;
(E) The extent to which it was recognized in the negotiation that the subcontractor’s certified cost or pricing data were not accurate, complete, or current; the action taken by the Contractor and the subcontractor; and the effect of any such defective data on the total price negotiated;
(F) The reasons for any significant difference between the Contractor’s price objective and the price negotiated; and
(G) A complete explanation of the incentive fee or profit plan when incentives are used. The explanation shall identify each critical performance element, management decisions used to quantify each incentive element, reasons for the incentives, and a summary of all trade-off possibilities considered.
(2) The Contractor is not required to notify the Contracting Officer in advance of entering into any subcontract for which consent is not required under paragraph (c), (d), or (e) of this clause.
(f) Unless the consent or approval specifically provides otherwise, neither consent by the Contracting Officer to any subcontract nor approval of the Contractor’s purchasing system shall constitute a determination—
(1) Of the acceptability of any subcontract terms or conditions;
(2) Of the allowability of any cost under this contract; or
(3) To relieve the Contractor of any responsibility for performing this contract.
(g) No subcontract or modification thereof placed under this contract shall provide for payment on a cost-plus-a-percentage-of-cost basis, and any fee payable under cost-reimbursement type subcontracts shall not exceed the fee limitations in FAR 15.404-4(c)(4)(i).
(h) The Contractor shall give the Contracting Officer immediate written notice of any…