B08_Contract_Bid_Schedule.pdf
PDF 100 KB Posted
- Attached to
- Tree Trimming at Zzyzx, Mojave National Preserve
- Solicitation number
- 140P8121Q0077
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8121Q0077.pdf | ||
| B03_Wage_Determination.pdf | ||
| A04_Scope_of_Work.pdf | ||
| B08_Release_of_Claims.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT BID SCHEDULE
Mojave National Preserve 2021 Tree Trimming at Zzyzx, CA
The trimming of trees in Priority Area #1 will be the Base Bid for this contract. The remaining 8 sites are options that will be exercised only if the funds are available.
ITEM NO. ITEM QUANTITY & UNIT AMOUNT OF
UNIT OF MEASURE PRICE BID
BASE BID
1.) Priority Area #1 Tree trimming 37 trees Lump Sum $____________
OPTIONAL BIDS
2.) Priority Area #2 Tree trimming 41 trees Lump Sum $____________ 3.) Priority Area #3 Tree trimming 12 trees Lump Sum $____________ 4.) Priority Area #4 Tree trimming 38 trees Lump Sum $____________ 5.) Priority Area #5 Tree trimming 31 trees Lump Sum $____________ 6.) Priority Area #6 Tree trimming 32 trees Lump Sum $____________ 7.) Priority Area #7 Tree trimming 35 trees Lump Sum $____________ 8.) Priority Area #8 Tree trimming 11 trees Lump Sum $____________ 9.) Priority Area #9 Tree trimming 26 trees Lump Sum $____________
Total Bid $____________
Award will be made to one bidder in accordance with the Instructions to Bidders.
Per FAR Part 52.217-5 Evaluation of Options, price reasonableness will be based on the total sum of the task prices (1through 9)
| 1.3 CONTRACTOR’S USE OF PREMISES: |
| A. Construction Camp: Establishment of a camp within the park will not be permitted. |
| B. The immediate work area will be closed to the public during tree trimming. |
| C. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public. Road closures will be permitted, when required, upon specific approval of Contracting Officer. |
| D. Confine storage of materials to a designated on-site storage area, located within 100 yards of the work-site. |
| E. Waste Disposal: The Contractor is fully responsible for containing all waste generated by the Work, removing all waste from the Project Site and the Park, and disposing of it in a legal manner outside of the park. No Government waste containers sha... |
| F. Preservation of Natural and Manmade Features: Confine all operations to work limits of the project area. Prevent damage to natural surroundings. Restore damaged areas at no additional expense to the Government. |
| 1. Do not remove, injure, or destroy trees or other plants not identified for trimming without prior approval. |
| 2. Carefully supervise construction operations near buildings or other trees to prevent damage. |
| G. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation. (USA Locate). |
| 1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. Contact the site manager (Jason Wallace) for information on utility locations. |
| 2. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the General Provisions. |
| 3. Interruption of Existing Utility Service: There should not be any need to interrupt existing utilities. If there is a need, notify the Contracting Officer prior to interruption. |
| 1 .4 SPECIAL CONSTRUCTION REQUIREMENTS |
| A. Protection of Historic Resources: There are a number of historic objects within the project area, including historic curbing and rock walls. Extreme care must be taken to protect the historic resources from damage while performing the work. |
| B. Buildings adjacent to the worksite may be occupied by staff and students during the work period. It will be necessary to schedule work that does not interfere with classroom activities. |
| C. The contractors work hours are between 6:30 AM and 6:00 PM, Monday through Fridays. Weekend, Holiday work, or alternate schedules may be approved in advance by the Contracting Officer. |
| D. The Period of Performance will be 30 days from the Notice to Proceed. |
| 1 .5 FIELD VERIFICATION & EXAMINATION OF SITE |
| A. All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. |
| 1 .6 CONSTRUCTION MATERIALS |
| A. No construction materials will be Government furnished. |
| B. The Government will furnish restroom facilities. |
| C. All other materials shall be Contractor-furnished from outside the park. |
File details come from the government source that posted it. Updated .