B08_-_Attachment_4_-_Detailed_Cost_Breakdown.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- REPAIR/REPLACE ROOF-LINDENWALD MANSION
- Solicitation number
- 140P2122R0042
About this file
This document contains a cost estimate for repairing and replacing the roof at the Lindenwald Mansion. The estimate provides line item costs for materials, labor, demolition, and other work required under the project. Key components include replacing wood shingles on the roof, installing new flashing, removing damaged sheathing and siding, and applying an elastomeric roof coating under one option. The estimate also includes costs for safety measures like scaffolding and fencing, as well as oversight by field personnel for safety, supervision, and quality control. Pricing is provided for two options to address the existing roof issues - installing electrical heat tape or applying a metal roof coating. However, many cost figures in the document show errors or are listed as $0 due to missing data. The related federal contract opportunity is for repairing and replacing the roof at the Lindenwald Mansion property managed by the National Park Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Cost Summary
| ATTACHMENT 4 - Detailed Pricing Breakdown |
| Martin Van Buren N.H.S. Roof Replacement |
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Installation Cost/Unit | Total Install Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 4 | B20 | Exterior Enclosure | ||||||||
| 5 | B30 | Roofing | ||||||||
| 16 | F10 | Special Construction | ||||||||
| 17 | F20 | Selective Building Demolition | ||||||||
| 23 | XX | Special Use - 1 |
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0 | $ - 0 | $0 |
| $0.00 | $ - 0 | $ - 0 | $0 | |||||
| Direct Cost Subtotal without GFP . | $ - 0 | $ - 0 | $0 | |||||
| Remoteness Factor | $0 | |||||||
| State & Local Taxes | $0 | |||||||
| Total Direct Construction Costs | $0 | |||||||
| General & Adminstration Costs | $0 | |||||||
| Historic Preservation Factor | $0 | |||||||
| Subtotal NET Construction Cost | $0 | |||||||
| Overhead | $0 | |||||||
| Profit | $0 | |||||||
| Estimated NET Construction Cost | $0 | |||||||
| Bonds & Permits | $0 | |||||||
| $0 |
Total Estimated NET Cost of Construction $0
| OPTION 1 - Electrical Heat Tape | Total Direct Costs | |||||||||
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Installation Cost/Unit | Total Install Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 5 | B30 | Roofing | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| $0.00 | $ - 0 | $ - 0 | $0 | |||||
| Direct Cost Subtotal without GFP . | $ - 0 | $ - 0 | $0 | |||||
| Remoteness Factor | $0 | |||||||
| State & Local Taxes | $0 | |||||||
| Total Direct Construction Costs | $0 | |||||||
| General & Adminstration Costs | $0 | |||||||
| Historic Preservation Factor | $0 | |||||||
| Subtotal NET Construction Cost | $0 | |||||||
| Overhead | $0 | |||||||
| Profit | $0 | |||||||
| Estimated NET Construction Cost | $0 | |||||||
| Bonds & Permits | $0 |
Total Estimated NET Cost of Construction $0
| OPTION 2 - Application of Metal Roofing Coating | Total Direct Costs | |||||||||
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Installation Cost/Unit | Total Install Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 5 | B30 | Roofing | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| $0.00 | $ - 0 | $ - 0 | $0 | |||||
| Direct Cost Subtotal without GFP . | $ - 0 | $ - 0 | $0 | |||||
| Remoteness Factor | $0 | |||||||
| State & Local Taxes | $0 | |||||||
| Total Direct Construction Costs | $0 | |||||||
| General & Adminstration Costs | $0 | |||||||
| Historic Preservation Factor | $0 | |||||||
| Subtotal NET Construction Cost | $0 | |||||||
| Overhead | $0 | |||||||
| Profit | $0 | |||||||
| Estimated NET Construction Cost | $0 | |||||||
| Bonds & Permits | $0 |
Total Estimated NET Cost of Construction $0
$0
&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY
&6&F &A Page &P of &N &6Print Date: &D, &T
B20 - Exterior Enclosure
Summary Item B20 Exterior Enclosure Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B2010 | EXTERIOR WALLS | |||||||||
| Basic Requirement | Wood connectors | e | ||||||||
| Basic Requirement | Steel nails for air nailers, 2500, 16D | e | ||||||||
| Basic Requirement | Steel nails for air nailers, 2500, 10D | e | ||||||||
| Basic Requirement | Steel nails for air nailers, 2500, 8D | e | ||||||||
| Basic Requirement | Installation of wood siding | LF | ||||||||
| Basic Requirement | Framing, misc, T&G | LF | ||||||||
| Basic Requirement | Sheathing, plywood on walls, 1/2" | SF | ||||||||
| Basic Requirement | surface prep, exterior, painting | SF | ||||||||
| Basic Requirement | Shape cutters, reproduce moldings | LF | ||||||||
| Basic Requirement | Repair & Replace sill and casework | BF | ||||||||
| Basic Requirement | Repair & Repace soffit | LF | ||||||||
| Basic Requirement | Document, remove, label sill/casework parts | unit | ||||||||
| Basic Requirement | Pre formed joint seals | CLF | ||||||||
| SUBTOTAL | EXTERIOR WALLS | 0 | 0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 |
| Summary Item | B20 | Exterior Enclosure | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
B20 Exterior Enclosure 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0
&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
B30 - Roofing
Summary Item B30 Roofing Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B3010 | ROOF COVERINGS | |||||||||
| Basic Requirement | additional Wood Shingles | sq | ||||||||
| Basic Requirement | Installation of wood shingles | sq | ||||||||
| Basic Requirement | Flashing copper 16 oz sheets | SF | ||||||||
| Basic Requirement | Cut flashing | sf | ||||||||
| Basic Requirement | replace flashing | sf | ||||||||
| Basic Requirement | reglet, counter flashing | LF | ||||||||
| Basic Requirement | preformed joint seals | Unit | ||||||||
| Basic Requirement | Wood Sheathing | lf | ||||||||
| Option 2 | caulking and sealants | lf | ||||||||
| Option 2 | Elastomeric roofing, 2 coats | sf | ||||||||
| Basic Requirement | nails, material only, vinyl coated sinkers | lb | ||||||||
| SUBTOTAL | ROOF COVERINGS | 0 | 0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Option 1 | Eletrical services for heat tape | Unit | ||||||||
| Option 1 | Heat tape material | Unit | ||||||||
| Option 1 | Remove damaged components | Unit | ||||||||
| SUBTOTAL | BASE ELEMENT | 0 | 0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 |
| Summary Item | B30 | Roofing | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
B30 Roofing 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | TOTALS | |||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Total Cost/Unit | Total Cost | ||||
| Basic Requirement | $0 | $0 | $0 | ||||||
| Option 1 | $0 | $0 | $0 | ||||||
| Option 2 | $0 | $0 | $0 |
$0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
F10 - Special Construction
Summary Item F10 Special Construction Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| F1010 | SPECIAL STRUCTURES | |||||||||
| Basic Requirement | Scaffolding, rental, assemble, disassemble | Unit | ||||||||
| Basic Requirement | aerial lift truck, 60ft boom - rental | day | ||||||||
| Basic Requirement | Temp fencing, safety fence, heavy duty | LF | ||||||||
| Basic Requirement | Portable toilet | wk | ||||||||
| SUBTOTAL | SPECIAL STRUCTURES | 0 | 0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 |
| Summary Item | F10 | Special Construction | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
F10 Special Construction 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
F20 - Selective Demolition
Summary Item F20 Selective Building Demolition Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| F2010 | BUILDING ELEMENTS DEMOLITION | |||||||||
| Basic Requirement | Selective demo, rubbish handling, dumpster, 5 ton capacity | wk | ||||||||
| Basic Requirement | thermal/moisture protection, flashing, sheet metal removal | SF | ||||||||
| Basic Requirement | roofing, removal of shingles | SF | ||||||||
| Basic Requirement | Wood siding removal | LF | ||||||||
| Basic Requirement | Removal of selected sheathing, roof, 1x | LF | ||||||||
| SUBTOTAL | BUILDING ELEMENTS DEMOLITION | 0 | 0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 |
| Summary Item | F20 | Selective Building Demolition | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
F20 Selective Building Demolition 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
Special Use- 1
Summary Item XX Special Use - 1 Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Basic Requirement | Field Personal, Safety | wk | ||||||||
| Basic Requirement | Field Personal, Superintendent | wk | ||||||||
| Basic Requirement | Field Personal, Quality Control | wk | ||||||||
| SUBTOTAL | BASE ELEMENT | 0 | 0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 | ERROR:#DIV/0! | $0 |
| Summary Item | XX | Special Use - 1 | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
XX Special Use - 1 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T