This document contains a cost estimate for repairing and replacing the roof at the Lindenwald Mansion. The estimate provides line item costs for materials, labor, demolition, and other work required under the project. Key components include replacing wood shingles on the roof, installing new flashing, removing damaged sheathing and siding, and applying an elastomeric roof coating under one option. The estimate also includes costs for safety measures like scaffolding and fencing, as well as oversight by field personnel for safety, supervision, and quality control. Pricing is provided for two options to address the existing roof issues - installing electrical heat tape or applying a metal roof coating. However, many cost figures in the document show errors or are listed as $0 due to missing data. The related federal contract opportunity is for repairing and replacing the roof at the Lindenwald Mansion property managed by the National Park Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Cost Summary

ATTACHMENT 4 - Detailed Pricing Breakdown
Martin Van Buren N.H.S. Roof Replacement
Item No.WBSDescriptionMaterial Cost/UnitTotal Material CostInstallation Cost/UnitTotal Install CostDirect Cost/UnitTotal Direct CostsNET Cost/UnitTotal NET Costs
4B20Exterior Enclosure
5B30Roofing
16F10Special Construction
17F20Selective Building Demolition
23XXSpecial Use - 1
Subtotal Direct Construction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$0$ - 0$0
$0.00$ - 0$ - 0$0
Direct Cost Subtotal without GFP .$ - 0$ - 0$0
Remoteness Factor$0
State & Local Taxes$0
Total Direct Construction Costs$0
General & Adminstration Costs$0
Historic Preservation Factor$0
Subtotal NET Construction Cost$0
Overhead$0
Profit$0
Estimated NET Construction Cost$0
Bonds & Permits$0
$0

Total Estimated NET Cost of Construction $0

OPTION 1 - Electrical Heat TapeTotal Direct Costs
Item No.WBSDescriptionMaterial Cost/UnitTotal Material CostInstallation Cost/UnitTotal Install CostDirect Cost/UnitTotal Direct CostsNET Cost/UnitTotal NET Costs
5B30Roofing$ - 0$ - 0$ - 0ERROR:#DIV/0!ERROR:#DIV/0!
Subtotal Direct Construction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$0ERROR:#DIV/0!ERROR:#DIV/0!
$0.00$ - 0$ - 0$0
Direct Cost Subtotal without GFP .$ - 0$ - 0$0
Remoteness Factor$0
State & Local Taxes$0
Total Direct Construction Costs$0
General & Adminstration Costs$0
Historic Preservation Factor$0
Subtotal NET Construction Cost$0
Overhead$0
Profit$0
Estimated NET Construction Cost$0
Bonds & Permits$0

Total Estimated NET Cost of Construction $0

OPTION 2 - Application of Metal Roofing CoatingTotal Direct Costs
Item No.WBSDescriptionMaterial Cost/UnitTotal Material CostInstallation Cost/UnitTotal Install CostDirect Cost/UnitTotal Direct CostsNET Cost/UnitTotal NET Costs
5B30Roofing$ - 0$ - 0$ - 0ERROR:#DIV/0!ERROR:#DIV/0!
Subtotal Direct Construction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$0ERROR:#DIV/0!ERROR:#DIV/0!
$0.00$ - 0$ - 0$0
Direct Cost Subtotal without GFP .$ - 0$ - 0$0
Remoteness Factor$0
State & Local Taxes$0
Total Direct Construction Costs$0
General & Adminstration Costs$0
Historic Preservation Factor$0
Subtotal NET Construction Cost$0
Overhead$0
Profit$0
Estimated NET Construction Cost$0
Bonds & Permits$0

Total Estimated NET Cost of Construction $0

$0

&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY

&6&F &A Page &P of &N &6Print Date: &D, &T

B20 - Exterior Enclosure

Summary Item B20 Exterior Enclosure Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
B2010EXTERIOR WALLS
Basic RequirementWood connectorse
Basic RequirementSteel nails for air nailers, 2500, 16De
Basic RequirementSteel nails for air nailers, 2500, 10De
Basic RequirementSteel nails for air nailers, 2500, 8De
Basic RequirementInstallation of wood sidingLF
Basic RequirementFraming, misc, T&GLF
Basic RequirementSheathing, plywood on walls, 1/2"SF
Basic Requirementsurface prep, exterior, paintingSF
Basic RequirementShape cutters, reproduce moldingsLF
Basic RequirementRepair & Replace sill and caseworkBF
Basic RequirementRepair & Repace soffitLF
Basic RequirementDocument, remove, label sill/casework partsunit
Basic RequirementPre formed joint sealsCLF
SUBTOTALEXTERIOR WALLS00ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0
Summary ItemB20Exterior Enclosure
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

B20 Exterior Enclosure 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0

&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T

B30 - Roofing

Summary Item B30 Roofing Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
B3010ROOF COVERINGS
Basic Requirementadditional Wood Shinglessq
Basic RequirementInstallation of wood shinglessq
Basic RequirementFlashing copper 16 oz sheetsSF
Basic RequirementCut flashingsf
Basic Requirementreplace flashingsf
Basic Requirementreglet, counter flashingLF
Basic Requirementpreformed joint sealsUnit
Basic RequirementWood Sheathinglf
Option 2caulking and sealantslf
Option 2Elastomeric roofing, 2 coatssf
Basic Requirementnails, material only, vinyl coated sinkerslb
SUBTOTALROOF COVERINGS00ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
BASE CODEBASE ELEMENT
Option 1Eletrical services for heat tapeUnit
Option 1Heat tape materialUnit
Option 1Remove damaged componentsUnit
SUBTOTALBASE ELEMENT00ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0
Summary ItemB30Roofing
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

B30 Roofing 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALLABORTOTALS
Material Cost/UnitTotal Material CostLabor Cost/UnitTotal Labor CostTotal Cost/UnitTotal Cost
Basic Requirement$0$0$0
Option 1$0$0$0
Option 2$0$0$0

$0

Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T

F10 - Special Construction

Summary Item F10 Special Construction Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
F1010SPECIAL STRUCTURES
Basic RequirementScaffolding, rental, assemble, disassembleUnit
Basic Requirementaerial lift truck, 60ft boom - rentalday
Basic RequirementTemp fencing, safety fence, heavy dutyLF
Basic RequirementPortable toiletwk
SUBTOTALSPECIAL STRUCTURES00ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0
Summary ItemF10Special Construction
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

F10 Special Construction 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0

Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T

F20 - Selective Demolition

Summary Item F20 Selective Building Demolition Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
F2010BUILDING ELEMENTS DEMOLITION
Basic RequirementSelective demo, rubbish handling, dumpster, 5 ton capacitywk
Basic Requirementthermal/moisture protection, flashing, sheet metal removalSF
Basic Requirementroofing, removal of shinglesSF
Basic RequirementWood siding removalLF
Basic RequirementRemoval of selected sheathing, roof, 1xLF
SUBTOTALBUILDING ELEMENTS DEMOLITION00ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0
Summary ItemF20Selective Building Demolition
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

F20 Selective Building Demolition 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0

Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T

Special Use- 1

Summary Item XX Special Use - 1 Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
BASE CODEBASE ELEMENT
Basic RequirementField Personal, Safetywk
Basic RequirementField Personal, Superintendentwk
Basic RequirementField Personal, Quality Controlwk
SUBTOTALBASE ELEMENT00ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0
Summary ItemXXSpecial Use - 1
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

XX Special Use - 1 0 0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0 ERROR:#DIV/0! $0

Class B Construction Cost Estimate&8 (expanded)&6