B08_40581251_Bid_Schedule.docx

DOCX document 17 KB Posted

Attached to
Asphalt Paving - Arches National Park
Solicitation number
140P1222Q0076
Issued by

View the file

Other files

File Type Posted
Sol_140P1222Q0076.pdf PDF
B08_40581251_Statement_of_Work.pdf PDF
B08_40581251_Attachments.pdf PDF
B08_40581251_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WINDOWS ASPHALT PAVING

ARCHES NATIONAL PARK

BID SCHEDULE

All or None

Explanation of bid line items is included in Section 012700 of the project specifications

Mobilization costs to be included in applicable bid line

ITEM QTY UNIT PRICE TOTAL

1. General Requirements 1 LS $____________ $_____________ (bonds, temp controls, accident plan (const. schedule, Prime’s project superintendent)

2. Quality Control 1 LS $____________ $_____________ (plan, survey control, inspection testing)

3. Demo, Remove, and Recycle Asphalt 20 TON $____________ $_____________ (125 SY, approx. thickness 3”)

4. Excavate, Remove & Compact Existing 185 CY $____________ $_____________ Base (haul to NPS Boneyard)

5. Finish Grading 2,018 SY $____________ $_____________ (2,018 SY existing)

6. Hot Mix Asphalt 330 TON $____________ $_____________ (3” lift)

GRAND TOTAL $______________