This solicitation requests quotes for the replacement of a pool slide at Moody Air Force Base. Offerors must provide a new slide, tower, stairs, canopy, pump, motor, and any necessary electrical upgrades. Quotes are due by September 9, 2021 and the project is set aside for small businesses. The site visit will take place on September 1, 2021 and the point of contact is Kalyn Runey. The solicitation incorporates standard federal clauses for commercial items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch 1. COMBO-Synopsis.pdf | ||
| Attch 7. Moody AFB Pool Slide Photos.pdf | ||
| Attch 1. COMBO-Synopsis.pdf | ||
| Attch 6. Pool Slide Questions and Answers.pdf | ||
| Attch 2. Statement of Objectives (SOO).pdf | ||
| Attch 5. Base Map.pdf | ||
| Attch 6. Q&A Template.pdf | ||
| Attch 1. COMBO-Synopsis.pdf | ||
| Attch 4. Base Pass Request Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pool Slide Requirements
Existing structure must be demolished and removed
Type: 40’’-45’’ open body slide, centerline roughly 150’
Tower height should be roughly 19.5’-20.5’
Slide must fit in place of current slide without obstructing the path around the back side of the pool
All steel components of slide should be coated in heat-resistant powder coating to prevent rusting and deterioration from contact with chlorinated water and natural elements (or equivalent coating that provides same level of protection for slide components)
All bolts/hardware should be rust proof
Fiberglass should be coated with industrial fiberglass coating such as epoxy, acrylic, polyflouropolymer, or polycarbonate for safety and longevity
Fiberglass, powder coat and other customizable elements should be blue/best match the existing sunshades at the outdoor pool location
Canopy should be provided/installed to protect the top platform of tower as well as entry to slide. The canopy should provide at least 80% shade and 90% UV protection.
This is to prevent platform from becoming too hot. (Canopy size should be relative to size of top platform, resistant to weather including extreme ambient heat, rain, hail, wind up to 150mph)
Tower stairs should be made from a material meant to withstand high ambient heat and prolonged contact with chlorinated water
Tower stairs should be slip resistant, wide tread, and designed to prevent slip and fall accidents
Slide rule signage should be provided
Ride instruction sign should be included
Freight should be included
All relevant labor should be included
Flume should be adequately supported with materials resistant to high ambient heat and prolonged contact with chlorinated water
Flume sections should be sealed to prevent leaking
Pool slide pump and motor to be provided, shipped, and installed.
Pump and motor assembly should include strainer and any other components required for operation of pool slide
Plumbing should be completed
Electrical components upgraded to match needs of slide/motor/pump
Must include integrated emergency stop, stainless steel motor controller, and voltage test for startup (required by pump manufacturers)