Attch 1_Salient Characteristics_Tube Bending Machine.pdf

PDF 783 KB Posted

Attached to
Electric Tube-bending Machine Federal contract opportunity
Solicitation number
FA4690-20-Q-0049
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a solicitation for an electric tube-bending machine and related training and installation options. The Air Force seeks one electric CNC tube bending machine with specific capabilities including a maximum outer diameter bending capability of at least 2.5 inches, bending radius capability from 1/2 to 10 inches, and electrical requirements of 480V 60Hz 3-phase. The solicitation also includes options for installation and training services to be provided. Quotes for the tube bending machine, and separately priced options for installation and training, are due by August 28, 2020 to the 28th Contracting Squadron at Ellsworth Air Force Base in South Dakota. This is a small business set-aside solicited under NAICS code 333318 with a size standard of 1,000 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Electric Tube-bending Machine, newest first.
File Type Posted
Attch 1_Salient Characteristics_Tube Bending Machine_Rev 1_18 Aug 20.pdf PDF
Attch 4_Questions and Answers_13 Aug 2020.pdf PDF
Solicitation Amendment FA469020Q00490001 SF 30.pdf PDF
Solicitation - FA469020Q0049_.pdf PDF
Attch 2_CNC Tube Bender SOW 2 Jul 20.pdf PDF
Attch 3_WD 15-5367 (Rev 13).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electric CNC Tube Bending Machine

Salient Characteristics

25 June 2020

1) 1 EA Electric CNC Tube Bending Machine. Machine must include the following features, meet the following specifications and be compatible with existing tooling and laser scanning equipment to include:

a) Tooling: The existing tooling, manufactured by Eaton Leonard, has the capabilities to integrate with the specifications as listed under the specifications portion of this document.

b) Scanning Equipment: Eaton Leonard 3 “ Laser Probe Model Number:S5XP

2) Familiarization and Operation Training must be provided to the operators of this machinery post installation.

Features

Industrial finish

RH Rotation Ability

High Speed Data Processing

Multiple User Login (Up to 3 personnel)

USB port for backup/restoration capabilities

Programmable retractable mandrel extractor

Allow horizontal movements

Capture alarm history

3 jawed Chuck style assembly

DRO (Digital Readout)

Automatic Mandrel Lubricator with Lubrication Recycling Capability

Machine Leveling Pads

3’-4’ X 4’-5’ Safety Mat, at least 2 Emergency Stops

Digital/Analog programming and maintenance manuals

Allowance for final bend being near to end of tubing material

Integrated Work Cell capability

Automatic Springback Compensation

Wiper Die Holder

Must be compliant with OSHA/ANSI/CSA standards

Must provide Third Party UL Certification

Power Transformer

Remote Start Foot-Switch

Collet Foot-Switch

Electrical Cabinet Air Conditioner

On Site Installation and Personnel Training Option needs to be provided with pricing.

Specifications

Maximum OD Bending Capability At least 2.5”

Maximum Wall Thickness Bending Capability

Titanium – up to .090” Aluminum – up to .090” Steel – up to .090”

Bending Radius Capability

1/2" ≤ CLR ≤ 10"

Tube over Mandrel Capability

8’

Electrical requirements Voltage 480V, 60HZ, 3-Phase

Installation Option:

Installation is being requested as an option to the Government and must be priced. See Attachment 2, Statement of Work, for full installation details.

Training Option:

Training is being requested as an option to the Government and must be priced. Training shall consist of the following:

1) Familiarization Training:

a. Shall include the necessary information regarding the features, functions, devices, limitations, and operating characteristics as defined by the manufacturer in the operator’s manual.

b. Set-Up of the machine

c. Programming of the machine to include the features and, limitations, and system error handling specific to the machine

d. Purpose and function of all controls of the machine

2) Schedule: Due to the current state of COVID-19, there will need to be an adherence to the CDC guidelines as well as the 28th Bomb Wing procedures and policies. In order to fulfill the training requirements, there will need to be a minimum of 2 day time training opportunities to a maximum of 4 day time training opportunities to accommodate the trainees and their schedule in COVID-19. For each training opportunity there will need to seats for a minimum of 2 trainees and a maximum of 8 per training opportunity to accommodate for COVID-19.

File details come from the government source that posted it. Updated .