Attch 1_Salient Characteristics_Tube Bending Machine.pdf
PDF 783 KB Posted
- Attached to
- Electric Tube-bending Machine Federal contract opportunity
- Solicitation number
- FA4690-20-Q-0049
About this file
This document contains a solicitation for an electric tube-bending machine and related training and installation options. The Air Force seeks one electric CNC tube bending machine with specific capabilities including a maximum outer diameter bending capability of at least 2.5 inches, bending radius capability from 1/2 to 10 inches, and electrical requirements of 480V 60Hz 3-phase. The solicitation also includes options for installation and training services to be provided. Quotes for the tube bending machine, and separately priced options for installation and training, are due by August 28, 2020 to the 28th Contracting Squadron at Ellsworth Air Force Base in South Dakota. This is a small business set-aside solicited under NAICS code 333318 with a size standard of 1,000 employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch 1_Salient Characteristics_Tube Bending Machine_Rev 1_18 Aug 20.pdf | ||
| Attch 4_Questions and Answers_13 Aug 2020.pdf | ||
| Solicitation Amendment FA469020Q00490001 SF 30.pdf | ||
| Solicitation - FA469020Q0049_.pdf | ||
| Attch 2_CNC Tube Bender SOW 2 Jul 20.pdf | ||
| Attch 3_WD 15-5367 (Rev 13).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electric CNC Tube Bending Machine
Salient Characteristics
25 June 2020
1) 1 EA Electric CNC Tube Bending Machine. Machine must include the following features, meet the following specifications and be compatible with existing tooling and laser scanning equipment to include:
a) Tooling: The existing tooling, manufactured by Eaton Leonard, has the capabilities to integrate with the specifications as listed under the specifications portion of this document.
b) Scanning Equipment: Eaton Leonard 3 “ Laser Probe Model Number:S5XP
2) Familiarization and Operation Training must be provided to the operators of this machinery post installation.
Features
Industrial finish
RH Rotation Ability
High Speed Data Processing
Multiple User Login (Up to 3 personnel)
USB port for backup/restoration capabilities
Programmable retractable mandrel extractor
Allow horizontal movements
Capture alarm history
3 jawed Chuck style assembly
DRO (Digital Readout)
Automatic Mandrel Lubricator with Lubrication Recycling Capability
Machine Leveling Pads
3’-4’ X 4’-5’ Safety Mat, at least 2 Emergency Stops
Digital/Analog programming and maintenance manuals
Allowance for final bend being near to end of tubing material
Integrated Work Cell capability
Automatic Springback Compensation
Wiper Die Holder
Must be compliant with OSHA/ANSI/CSA standards
Must provide Third Party UL Certification
Power Transformer
Remote Start Foot-Switch
Collet Foot-Switch
Electrical Cabinet Air Conditioner
On Site Installation and Personnel Training Option needs to be provided with pricing.
Specifications
Maximum OD Bending Capability At least 2.5”
Maximum Wall Thickness Bending Capability
Titanium – up to .090” Aluminum – up to .090” Steel – up to .090”
Bending Radius Capability
1/2" ≤ CLR ≤ 10"
Tube over Mandrel Capability
8’
Electrical requirements Voltage 480V, 60HZ, 3-Phase
Installation Option:
Installation is being requested as an option to the Government and must be priced. See Attachment 2, Statement of Work, for full installation details.
Training Option:
Training is being requested as an option to the Government and must be priced. Training shall consist of the following:
1) Familiarization Training:
a. Shall include the necessary information regarding the features, functions, devices, limitations, and operating characteristics as defined by the manufacturer in the operator’s manual.
b. Set-Up of the machine
c. Programming of the machine to include the features and, limitations, and system error handling specific to the machine
d. Purpose and function of all controls of the machine
2) Schedule: Due to the current state of COVID-19, there will need to be an adherence to the CDC guidelines as well as the 28th Bomb Wing procedures and policies. In order to fulfill the training requirements, there will need to be a minimum of 2 day time training opportunities to a maximum of 4 day time training opportunities to accommodate the trainees and their schedule in COVID-19. For each training opportunity there will need to seats for a minimum of 2 trainees and a maximum of 8 per training opportunity to accommodate for COVID-19.