ATTACHMENTS F AND G.pdf
PDF 4 MB Posted
- Attached to
- Z1NE--Well Water Supply System Preventive Maintenance and Service Contract - Northport VAMC
- Solicitation number
- 36C24225Q0988
About this file
This document is an attachment containing one-line schematic drawings and photographic documentation of water infrastructure across multiple buildings at a site. The schematics depict potable water (blue) and fire lines (red) for Buildings 30, 32, 74, 81, 94, and 220, showing water meter pits, booster pumps, well houses, and associated plumbing configurations.
The image gallery provides detailed visual documentation of various water system components, including air stripping towers, clear wells, booster pumps, water treatment plant elements, and well house plumbing setups. Specific locations documented include a water meter pit, booster pump vault, electrical panels, and multiple well houses (numbered 1-5) with their associated plumbing infrastructure. The images capture both exterior building views and interior mechanical systems, offering a comprehensive visual record of the site's water distribution and treatment infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24225Q0988 0002.docx | DOCX document | |
| 36C24225Q0988 0001.docx | DOCX document | |
| ATTACHMENT E.pdf | ||
| ATTACHMENTS A-B-C-D.pdf | ||
| 2015-4157 NY 07.08.2025.pdf | ||
| 36C24225Q0988_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F: CAMPUS ONE-LINE DRAWINGS OF POTABLE WATER (BLUE) AND FIRE
LINES (RED)
SCWA WATER METER PIT AND
BOOSTER PUMP ONE-LINE
SCHEMATIC REPRESENTATION
(NOT TO SCALE)
BUILDINGS 30, 32, 74, 81, 94 AND
220 ONE-LINE POTABLE WATER
AND FIRE LINE SCHEMATIC
REPRESENTATION
DETAILED VIEW OF BUILDINGS
30, 94 AND 220. ONE-LINE
POTABLE WATER LINES, FIRE
LINES, AND VALVES. SCHEMATIC
REPRESENTATION
ATTACHMENT G: IMAGE GALLERY
Air Stripping Tower #2
Air Stripping Tower #1
Air Stripping Tower #1
Air Stripping Tower #2 Blower
Clear Well
Cla-Valves Main Vault
Clear Well
Water Treatment Plant (Building 220)
Booster Pump A Booster Pump B
Booster Pump C
Close-up view 1
Close-up view 2
Well House #1 Well House #1 Plumbing Set-Up
BUILDING 74
Well House #2 Plumbing Set-up
Well #2R External Pump/Motor Cage Well House #2
BUILDING 30
Well House #4 and Plumbing Set-up
Well House #3 and Plumbing Set-up
BUILDING 32
BUILDING 81
Suffolk County Water Authority Booster Pump Vault and Electrical Pannel
BUILDING 94
Well House #5, Plumbing Set-up, Electrical Control Pannel.
File details come from the government source that posted it. Updated .