Attachment06-AddendumToSpecifications.pdf
PDF 69 KB Posted
- Attached to
- Replace HVAC at Arkansas Post National Memorial
- Solicitation number
- 140P6223B0003
About this file
This addendum to specifications pertains to the replacement of an HVAC system at Arkansas Post National Memorial. The project includes demolishing the existing HVAC system only after the new equipment has been delivered and received by the contractor. Work must be completed within 270 calendar days from the notice to proceed to account for extended equipment lead times. The related federal contract opportunity is a total small business set-aside solicitation issued by the Department of the Interior National Park Service Midwest Region. It involves replacing the HVAC system in the visitor center at an estimated price between $250,000 and $500,000. Bidders must attend a pre-bid site visit, and submittal requirements are defined in section L of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6223B0003_Amd_0004.pdf | ||
| Sol_140P6223B0003_Amd_0003.pdf | ||
| Sol_140P6223B0003_Amd_0002.pdf | ||
| Sol_140P6223B0003_Amd_0001.pdf | ||
| Attachment03-Drawings.pdf | ||
| Attachment05-LimitationsOnSubcontracting.xlsx | XLSX spreadsheet | |
| Attachment04-WageDetermination-AR20230018.pdf | ||
| Attachment02-Specifications.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P6223B0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM TO SPECIFICATIONS
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
1.2 Work Covered by the Contract Documents:
D. Period of performance: Work shall be completed within 270 calendar days of the start date provided on the Notice to Proceed. This timeframe is intended to account for extended equipment and material lead times to delivery. Demolition work for the HVAC system must not commence until the new equipment has been delivered and received by the contractor.