Attachment03-Drawings.pdf
PDF 36 MB Posted
- Attached to
- Replace HVAC at Arkansas Post National Memorial Federal contract opportunity
- Solicitation number
- 140P6223B0003
About this file
This federal contract opportunity solicitation is seeking to replace the HVAC system at the Arkansas Post National Memorial visitor center located in Gillett, Arkansas. The solicitation number is 140P6223B0003 and is being conducted as a total small business set aside with a NAICS code of 238220 and size standard of $19.0 million. The estimated price range for the replacement is between $250,000 and $500,000. The solicitation instructs offerors to refer to section L for information on an optional pre-bid site visit and bid submittal requirements. The soliciting agency is the Department of the Interior National Park Service Midwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6223B0003_Amd_0004.pdf | ||
| Sol_140P6223B0003_Amd_0003.pdf | ||
| Sol_140P6223B0003_Amd_0002.pdf | ||
| Sol_140P6223B0003_Amd_0001.pdf | ||
| Attachment05-LimitationsOnSubcontracting.xlsx | XLSX spreadsheet | |
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P6223B0003.pdf | ||
| Attachment06-AddendumToSpecifications.pdf | ||
| Attachment04-WageDetermination-AR20230018.pdf | ||
| Attachment02-Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL SERVICE
ENCLOSURE
HVAC EQUIPMENT
ENCLOSURE
CONTRACTOR STORAGE AND
PARKING. MAXIMUM OF 14
PARKING STALL MAY BE USED.
DRIVE AISLE TO REMAIN OPEN
THROUGOUT CONSTRUCTION.
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
274253
80028
ARKANSAS POST NATIONAL MEMORIAL
1741 OLD POST ROAD
GILLETT, AR 72055C
U s e rs \a p u llm a n n
\D o c u m e n ts
\0
-R
M
E C
H a p u llm a n n
L T
M M
V .r v t
ARP
ARP
JEK
02/10/2023
07310.029
COVER SHEET
VISITOR CENTER HVAC UNIT REPLACEMENT
VISITOR CENTER HVAC UNIT REPLACEMENT
ARKANSAS POST NATIONAL MEMORIAL
1741 OLD POST ROAD
GILLETT, AR 72055
CONSTRUCTION DOCUMENTS
02/10/2023
07310029- 0- 0 COVER SHEET
GENERAL
0 COVER SHEET
1 BUILDING INFORMATION
MECHANICAL
M 00 MECHANICAL INFO SHEET
M 01 SHEET SPECIFICATIONS - MECHANICAL
M 02 SHEET SPECIFICATIONS - MECHANICAL
M 03 SHEET SPECIFICATIONS - MECHANICAL
M 04 SHEET SPECIFICATIONS - MECHANICAL
M001 DEMOLITION FLOOR PLAN - MECHANICAL
M101 FLOOR PLAN - MECHANICAL
M301 ENLARGED PLAN & SECTION - MECHANICAL
M401 DETAILS - MECHANICAL
M501 SCHEDULE - MECHANICAL
M600 CONTROL SPECIFICATIONS
M601 CONTROL SPECIFICATIONS
M602 CONTROL SEQUENCES
M603 CONTROL SEQUENCES
ELECTRICAL
E 00 ELECTRICAL INFO SHEET
E 01 ELECTRICAL SPECIFICATIONS
E 02 ELECTRICAL SPECIFICATIONS
E 03 ELECTRICAL SPECIFICATIONS
E001 FLOOR PLAN - DEMOLITION
E201 FLOOR PLAN - POWER & AUXILIARY SYSTEMS
E401 ELECTRICAL DETAILS
E501 POWER RISER DIAGRAM
E601 PANELBOARD & EQUIPMENT SCHEDULES
DRAWING INDEX
SCALE: 12" = 1'-0"
PROJECT LOCATION
SCALE: 12" = 1'-0"
CONTRACTOR PARKING AND STORAGE
ARCHITECTURAL
A 00 ARCHITECTURAL INFO SHEET
A 01 SHEET SPECIFICATIONS - ARCHITECTURAL
A 02 ARCHITECTURAL SPECS
A001 DEMOLITION
A101 FLOOR PLANS, ENLARGED PLANS
A201 EXTERIOR ELEVATION, WALL SECTION
CODE SUMMARY
APPLICABLE CODES
BUILDING :
ACCESSIBILITY :
LIFE SAFETY :
ENERGY :
MECHANICAL :
PLUMBING :
ELECTRICAL :
OCCUPANCY GROUP :
TYPE OF CONSTRUCTION :
FIRE PROTECTIVE SYSTEMS
AUTO FIRE SUPPRESSION :
STANDPIPE :
FIRE ALARM SYSTEM :
AUTO FIRE DETECTION :
SMOKE DETECTION :
A-3
TYPE II
2010 ADA
N/A
N/A
NFPA 72
N/A
NFPA 72
NFPA 101
2009 IECC
2021 IMC
2018 ARKANSAS PLUMBING CODE
2020 NEC
2012 IBC
DATE INITIAL
1 31 02/10/2023
THEATER
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BREAKROOM
STOR.
WOMEN'S RR
MEN'S RR
MECH
JAN.
DISPLAY
ENTRY
EXHIBIT
EXHIBIT
EXHIBIT
MECHANICAL
ENCLOSURE
UTILITY PAD
ENCLOSURE
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
274253
80028
ARKANSAS POST NATIONAL MEMORIAL
1741 OLD POST ROAD
GILLETT, AR 72055C
U s e rs \a p u llm a n n
\D o c u m e n ts
\0
-R
M
E C
H a p u llm a n n
L T
M M
V .r v t
ARP
ARP
JEK
02/10/2023
07310.029
BUILDING INFORMATION
VISITOR CENTER HVAC UNIT REPLACEMENT
07310029- 0- 1 BUILDING INFORMATION
GENERAL BUILDING DESCRIPTION
AREA: 6,154 SQUARE FEET
STRUCTURE:
EXPOSED POURED CONCRETE COLUMN AND BEAMS
ARCHITECTURE:
EXTERIOR WALLS: 4" BRICK + 4" RIGID INSULATION + 4" BRICK
INTERIOR WALLS: TWO LAYERS OF 4" BRICK OR 4" STUD WALL WITH METAL LATH AND PLASTER.
CEILING:
OFFICE - OPEN TO STRUCTURE
EXHIBIT SPACE - 2' X 2' GRID CLOUDS BETWEEN EXPOSED POURED CONCRETE STRUCTURAL BEAMS
NORTH
NOT TO SCALE
ENTRY
NOT TO SCALE
OFFICE
NOT TO SCALE
MECH ROOM
NOT TO SCALE
EXHIBIT
NOT TO SCALE
MECH ENCLOSURE
DATE INITIAL
NOT TO SCALE
WOMEN'S RESTROOM
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
274253
80028
ARKANSAS POST NATIONAL MEMORIAL
1741 OLD POST ROAD
GILLETT, AR 72055C
U s e rs \c s w e a ri n g e n \D o c u m e n ts \0
-A R
C H
R c s w e a ri n g e n
M Z
W P
C .r v t
CKS
CKS
RJL
02/10/2023
07310.029
A 00
ARCHITECTURAL INFO
SHEET
VISITOR CENTER HVAC UNIT REPLACEMENT
07310029- 2- A 00 ARCHITECTURAL INFO SHEET
TRUE
NORTH
PLAN
NORTH
NORTH
NORTH
ARROW
NAME
ELEVATION
LEVEL
MATCHLINE
AREA A
AREA B
TITLE
MARKER
VIEW NAME
SCALE: 1/8" = 1'-0"
EXISTING
COLUMN
NEW
COLUMN
X
X
X
XX-XX
SIM
X
XX-XX
XXXX
DX
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE
NOTE
REFERENCE
DEMOLITION
NOTE
EQUIPMENT
NUMBER
ROOM NAME
150 SF
ROOM
NUMBER
LETTER INDICATES
NEW COLUMN LINE
LETTER INDICATES
EXISTING COLUMN LINE
SECTION/DETAIL
NUMBER
SHEET NUMBER
INDICATES DIRECTION
OF VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
EQUIPMENT
NUMBER
ROOM NAME
DESIGNATION
ROOM NUMBER
DESIGNATION
ROOM AREA
DESIGNATION
ROOM /
FRAMING
ELEVATION
EXTERIOR
ELEVATION
XX-XX
XX-XX
ELEVATION LETTER
DIRECTION OF VIEW
SHEET NUMBER
ELEVATION LETTER
DIRECTION OF VIEW
SHEET NUMBER
DOOR
NUMBER
DOOR NUMBER10
WINDOW
DESIGNATION
WINDOW DESIGNATION000
TA-X
TOILET
ACCESSORY
TOILET ACCESSORY
NUMBER
WALL
TYPE
LETTER
INDICATES
PARTITION OR
WALL TYPE
X
DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION
DESIGNATION
GRAPHIC AREA FOR
DRAWING
TITLE
SCALE OF THE
DRAWING
ABBREVIATIONS
REF. DEMO NOTES ( )
REFERENCE LEGEND
ARCHITECTURAL
SHEET LIST
PROJECT ARCHITECTURAL REFERENCED DEMOLITION NOTES
GENERAL NOTES
XDX
GENERAL DEMO NOTES
PROJECT ARCHITECTURAL REFERENCED NOTES
REF. NOTES ( )
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SB SECURITY BARS
SB SPLASH BLOCK
SCH SCHEDULE
SCHED SCHEDULE
SCR SCREW
SCT STRUCTURAL CLAY TILE
SCUT SCUTTLE
SCW SOFT COLD WATER
SD STORM DRAIN
SD SUBDRAIN
SDI STEEL DECK INSTITUTE
SECT SECTION
SECY SECRETARY
SEQ SEQUENCE
SF SQUARE FOOT (FEET)
SFU STRUCTURAL FACING
UNIT
SHLD SHOULDER
SHT SHEET
SHTG SHEATHING
SHW SOFT HOT WATER
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SL SNOW LOAD
SLBB SHORT LEG BACK TO
BACK
SM SPRINKLER MAIN
SOV SHUT OFF VALVE
SPA SPACE(ING)
SPEC SPECIFICATIONS
SPF SOUNDPROOF
SPH SPACE HEATER
SPKR SPEAKER
SPL SPECIAL
SQ SQUARE
SS SANITARY SEWER
SS STAINLESS STEEL
SSMR STANDING SEAM METAL
ROOFING
STA STATION
STAIR STAIRWAY
STC SOUND TRANSMISSION
COEFFICIENT
STD STANDARD
STGR STRINGER
STIFF STIFFENER
STIRR STIRRUPS
STL STEEL
STN STONE
STOR STORAGE
STR STRUCTURAL
SUB FL SUB FLOOR
SUCT SUCTION
SUSP SUSPENDED
SVF SHEET VINYL FLOORING
SW SWITCH
SWBD SWITCH BOARD
SYM SYMMETRICAL
T TREAD
T or TLT TOILET
TAN TANGENT
TBD TACK BOARD
TE TOP ELEVATION
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TERM TERMINAL
TGL TOGGLE
TH THRESHOLD
THK THICK
THRD THREAD
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOJ TOP OF JOIST
TOPO TOPOGRAPHIC
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSVERSE
TSTAT THERMOSTAT
TV TELEVISION
TW TEMPERED WATER
TWR TEMPERED WATER
RETURN
TYP TYPICAL
UC UNIT COOLER
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS
LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED
OTHERWISE
UPS UNINTERRUPTIBLE
POWER SYSTEM
UR URINAL
UT UTILITY
UV UNIT VENTILATOR
V VOLT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VD VAULT DOOR
VEL VELOCITY
VENT VENTILATOR(ION)
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY
DRIVE
VOL VOLUME
VPC VERTICAL POINT OF
CURVATURE
VPI VERTICAL POINT OF
INTERSECTION
VPT VERTICAL POINT OF
TANGENCY
VS VENT STACK
VT VINYL-TILE
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WEST
W WIDE (WIDTH)
W WIRE
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WC WATER COLUMN
WD WASTE DRAIN
WD WOOD
WD BLKG WOOD BLOCKING
WD DR WOOD DOOR
WDW WINDOW
WF WIDE FLANGE
WG WIRE GLASS
WH WALL HYDRANT
WHT WHITE
WI WROUGHT IRON
WKSH WORK SHOP
WL WIND LOAD
WNSCT WAINSCOT
WP WEATHER PROOF
WP WORK POINT
WPF WATER PROOF
WPFG WATER PROOFING
WRB WARDROBE
WS WASTE STACK
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WOVEN WIRE MESH
XFMR TRANSFORMER
YD YARD or YARD DRAIN
LBS POUNDS
LD LOAD
LDG LOADING
LE LEFT END
LG LENGTH (LONG)
LIN LINEAR
LIS LAWN IRRIGATION
SYSTEM
LL LIVE LOAD
LLBB LONG LEG BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LNTL LINTEL
LP LOW POINT
LPG LIQUIFIED PETROLEUM
GAS
LPS LOW PRESSURE STEAM
LR LIVING ROOM
LS LAWN SPRINKLER
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LVT LUXURY VINYL TILE
M MIDDLE
M THOUSAND
M & B MATCHED AND BEADED
MA MAKE-UP AIR
MACH MACHINE
MAS MASONRY
MAT or
MATL
MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBH 1000 BTUH
MC MEDICINE CABINET
MC MISCELLANEOUS
CHANNELS
MECH MECHANICAL
MER MECHANICAL EQUIPMENT
ROOM
MET METAL
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
ML METAL LATH
MLDG MOULDING
MO MASONRY OPENING
MONO MONOLITHIC
MT METAL THRESHOLD
MTD MOUNTED
N NORTH
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL
CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS
ASSOCIATION
NFPA NATIONAL FIRE
PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO NUMBER
NR NOT REQUIRED
NS NEAR SIDE
NTS NOT TO SCALE
OA OUTSIDE AIR
OB WG OBSCURE WIRE GLASS
OBGL OBSCURE GLASS
OBSC OBSCURE
OC ON CENTER(S)
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPS OPERATIONS
OS & Y OUTSIDE SCREW & YOKE
OSF OUTSIDE FACE
OV OVERFLOW VALVE
OX OXYGEN
OZ OUNCE
P PAINT
PA PUBLIC ADDRESS
PBS PUSH BUTTON STATION
PC PIECE
PC POINT OF CURVATURE
PC PRECAST
PCC PORTLAND CEMENT
CONCRETE
PCT PORCELAIN CERAMIC TILE
PD PRESSURE DROP
PE POLYETHYLENE
PEN PENETRATION
PERF PERFORATED
PH PHASE
PHAR PHARMACY
PI POINT OF INTERSECTION
PIV POST INDICATING VALVE
PL or P PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLATF PLATFORM
PLBG PLUMBING
PLG PILING
PLWD PLYWOOD
PNL PANEL
POL POLISH(ED)
PORC PORCELAIN
PPM PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PRESS PRESSURE
PROJ PROJECT
PRV PRESSURE REGULATING
VALVE
PS PRESSED STEEL
PSFT POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE
INCH
PT POINT
PT POINT OF TANGENCY
PTD PAINTED
PTN PARTITION
PVC POLYVINYL-CHLORIDE
PVMT PAVEMENT
PW PASS WINDOW
1/4 RD QUARTER ROUND
QT QUARRY TILE
QT QUART
QTRS QUARTERS
QTY QUANTITY
QTZ QUARTZ
R REGISTER
R RISER
RA RETURN AIR
RAD OR
R
RADIUS
RB RESILIENT BASE
RC REMOTE CONTROL
RCP REINFORCED CONCRETE
PIPE
RD ROOF DRAIN
RE RIGHT END
REC RECEIVER
RECP RECEPTACLE
RECR RECREATION
RECT RECTIFIER
REF REFERENCE
REFR REFRIGERANT
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCEMENT
REM REMOVE(ABLE)
REQD REQUIRED
RESIL RESILIENT
REV REVISIONS
RFG ROOFING
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RM ROOM
RND ROUND
RO ROUGH OPENING
RPM REVOLUTIONS PER
MINUTE
RT RUBBER TILE
RTU ROOF TOP UNIT
RUB RUBBER
DIAG DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DISC DISCONNECT
DIST DISTRIBUTION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DAMP PROOFING
DPT DEW POINT
DR DOOR
DRN DRAIN
DS DOWN SPOUT
DV DENTAL VACUUM
DWG DRAWING
DWLS DOWELS
DX DIRECT EXPANSION
E EAST
EA EACH
EA EXHAUST AIR
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY
RATIO
EJ EXPANSION JOINT
EL OR
ELEV
ELEVATION - GRADE OR
BUILDING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
ENT ENTERING
ENT ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE
EVAP EVAPORATOR
EW EACH WAY
EWC ELECTRIC WATER
COOLER
EXC EXCAVATE
EXD EXIT DEVICE
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXPL EXPLOSION
EXPN EXPANSION
EXT EXTERIOR
F FAHRENHEIT
F FIRE
FA FRESH AIR
FCG FACING
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER
BRACKET
FEC FIRE EXTINGUISHER
CABINET
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIX FIXTURE
FL or FLR FLOOR
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG FLOORING
FLUOR FLUORESCENT
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPRF FIRE PROOF
FR FRAME
FRG FURRING
FS FAR SIDE
FS FLOOR SINK
FS FULL SIZE
FT FEET (FOOT)
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G GRILLE
G NATURAL GAS
GA GAGE OR GAUGE
GAL GALLON
GALV GALVANIZED
GEN GENERAL
GFE GOVERNMENT FURNISHED
EQUIPMENT
GFE/CI GOVERNMENT FURNISHED
EQUIPMENT/CONTRACTOR
INSTALLED
GFI GROUND FAULT
INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GND GROUND
GOVT GOVERNMENT
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRADE
GRS GALVANIZED RIGID STEEL
CONDUIT
GRTG GRATING
GSU GLAZED STRUCTURAL
UNITS
GWB GYPSUM WALLBOARD
GWT GLAZED WALL TILE
GYP GYPSUM
H or HT HEIGHT (HIGH)
HB HOSE BIBB
HBD HARDBOARD
HC HANDICAPPED
HD HEAD
HDPE HIGH DENSITY
POLYETHYLENE
HDR HEADER
HDW HARDWARE
HIP HIGH PRESSURE
HM HOLLOW METAL
HORIZ HORIZONTAL(LY)
HP HORSE POWER
HPS HIGH PRESURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HSGYP HIGH STRENGTH GYPSUM
PLASTER
HTG HEATING
HTR HEATER
HW HEAD WALL
HW HOT WATER
HWH HOT WATER HEATER
HWR HOT WATER RETURN
(HEATING)
HWS HOT WATER SUPPLY
(HEATING)
HYD HYDRAULIC
I or FE IRON
IC INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IES ILLUMINATING
ENGINEERING SOCIETY
IN INCH
INSUL INSULATION
INT INTERIOR
INV INVERT OR INVERTER
IP IRON PIPE
ISF INSIDE FACE
JB JUNCTION BOX
JBOX JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JST JOIST
JT JOINT
K KEY
KCP KEENE'S CEMENT
PLASTER
KIP or K KILOPOUND (1000 LBS)
KIT KITCHEN
KL KEY LOCK
KP KICK PLATE
KV KILOVOLTS
KVA KILOVOLT AMPERES
KW KILOWATT
LAB LABORATORY
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
A COMPRESSED AIR
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTAD
STYRENE
AC ALTERNATING CURRENT
ACI AMERICAN CONCRETE
INSTITUTE
ACSR ALUMINUM CONDUCTOR
STEEL REINFORCED
ACST ACOUSTIC
AD ACCESS DOOR
AD AREA DRAIN
ADMIN ADMIN ADMINISTRATION
(IVE)
AFF ABOVE FINISH FLOOR
AFFF AQUEOUS FILM FORMING
FOAM
AGG AGGREGATE
AHU AIR HANDLING UNIT
AI AREA INLET
AIC AMPS INTERRUPTING
CAPACITY (SYM RMS)
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
AL ACTIVE LEAF
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL OR
ARCHITECT
ARI AMERICAN
REFRIGERATION
INSTITUTE
ASB ASBESTOS
ASPH ASPHALT
APC ACOUSTICAL PANEL
CEILING
AUTO AUTOMATIC
AV ACID VENT
AVG AVERAGE
AW ACID WASTE
AWC ACOUSTICAL WALL
COVERING
AWG AMERICAN WIRE GAUGE
L ANGLE
BATT BATT INSULATION
BB BULLETIN BOARD
BBO BOILER BLOW OFF
BC BOOKCASE
BD BOARD
BDY BOUNDARY
BEJ BRICK EXPANSION JOINT
BIT BITUMINOUS
BKR BREAKER
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BM BENCH MARK
BO BOTTOM OF
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRK BRICK
BRKT BRACKET
BS BOTH SIDES
BTU BRITISH THERMAL UNIT
BTUH BTU PER HOUR
BUR BUILT-UP ROOFING
BW BOTH WAYS
C CENTER
C OR
CND
CONDUIT (ELECTRICAL
SHEETS)
C TO C CENTER TO CENTER
CAP CAPACITY
CB CATCH BASIN (OR CIRCUIT
BREAKER)
CC CENTER TO CENTER
CCT CIRCUIT
CD CONDENSATE DRAIN
CE COVER ELEVATION
CEM CEMENT
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHIM CHIMNEY
CI CAST IRON
CI CURB INLET
CIP CAST IN PLACE
CIR CIRCULAR
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTER LINE
CL WG CLEAR WIRE GLASS
CLG CEILING
CLKG CAULKING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY
UNIT
CNTR COUNTER
CO CLEAN OUT
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION
COMB COMBUSTION
COMP COMPRESSIBLE
COMPR COMPRESSOR
CONC CONCRETE
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONSTR
JT
CONSTRUCTION JOINT
CONT CONTINUOUS
(CONTINUATION)
CONTR CONTRACTOR
COR CORNER
CORR COVERED
COV CORRIDOR
CPL CEMENT PLASTER
CPS CYCLES PER SECOND
(HERTZ)
CPT CARPET
CR CONDENSER WATER
RETURN
CRES CORROSIVE RESISTANT
STEEL
CRG CARRIAGE
CRSE COURSE
CS CONDENSER WATER
SUPPLY
CS COUNTER SINK
CSMT CASEMENT
CT CERAMIC TILE
CT CURRENT TRANSFORMER
CTL CARPET TILE
CU CONDENSING UNIT
CU YD CUBIC YARDS
CUH CABINET UNIT HEATER
CV CEILING VENT
CW COLD WATER
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CYL CYLINDER
D DEPTH (DEEP)
D DIFFUSER
d PENNY (as in nail - 10d)
D&M DRESSED AND MATCHED
DA DOUBLE ACTING
DB DRY BULB
dB DECIBEL
DBL DOUBLE
DC DIRECT CURRENT
DCJ DOWELED CONTROL
JOINT
DCJT DUMMY CONTROL JOINT
DCL DOOR CLOSER
DCW DOMESTIC COLD WATER
DEG DEGREE
DEMO DEMOLITION
DEPR DEPRESSION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DHW DOMESTIC HOT WATER
DI DEIONIZED WATER
DIA DIAMETER
CLO CLOSET
FR FIRE RATED
U/C UNDER CABINET
SYMBOL LEGEND
PLAN VIEW
SECTION / ELEVATION VIEW
SHEAR WALL
MASONRY-CMU
CONCRETE
GRAVEL
EARTH / COMPACTED
EARTH /
NONCOMPACTED
RIGID INSULATION
JOINT FILLER
STEEL
GYPSUM
MASONRY-VENEER
STUD WALL
FLEXIBLE INSULATION
GROUT
PLYWOOD
WOOD (FINISH)
MASONRY-CMU FACE
MASONRY-CMU
MASONRY-VENEER
A 00 ARCHITECTURAL INFO
SHEET
A 01 SHEET SPECIFICATIONS -
ARCHITECTURAL
A 02 ARCHITECTURAL SPECS
A001 DEMOLITION
A101 FLOOR PLANS, ENLARGED
PLANS
A201 EXTERIOR ELEVATION,
WALL SECTION
A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL
DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.
DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED
TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS FULL-TONE
DASHED LINES AND ARE LISTED IN THE REFERENCED DEMOLITION NOTES.
ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE SHOWN
HALF-TONE.
B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS BELOW OR
HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED
RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO
IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION REQUIRED AND AS LISTED
BELOW.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND
REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS,
EQUIPMENT, AND APPURTENANCES AS REQUIRED TO BUILD, ERECT,
INSTALL, OR ACCOMMODATE ALL NEW CONSTRUCTION WITH THE OWNER
HAVING FIRST RIGHT OF REFUSAL ON ALL ITEMS.
D. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE
CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND
STORED OR REINSTALLED ON THE SITE AS DIRECTED. REMOVED AND
SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE OWNER. ALL
REMOVED AND DEMOLISHED ITEMS NOT SPECIFICALLY IDENTIFIED FOR RE-
INSTALLATIO OR SALVAGED BY OWNER SHALL BE REMOVED FROM THE SITE
BY THE CONTRACTOR AND LAWFULLY DISPOSED OF.
E. WHERE EXISTING FLOOR MATERIALS AND/OR WALLS ARE TO BE REMOVED,
PREP REMAINING FLOOR AND/OR WALL SUBSTRATE AS REQUIRED PER
MANUFACTURERS RECOMMENDATIONS FOR THE NEW FLOOR/WALL FINISH
MATERIAL. REMOVE ALL FINISH FLOORING DOWN TO BASE SUBSTRATE
FLOORING AND PREP TO RECEIVE NEW FINISH.
F. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY
OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED
HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE
AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT
THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE
OWNER AND CONTRACTOR.
G. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE,
AND REMOVAL OF ALL CONSTRUCTION BARRIERS.
H. TEMPORARILY SHORE AND BRACE STRUCTURE AT ALL BEARING WALL
DEMOLITION LOCATIONS UNTIL NEW PERMANENT STRUCTURE IS
ESTABLISHED. SEE STRUCTURAL.
J. REFER TO MECHANICAL DEMOLITION PLANS FOR ADDITIONAL DEMOLITION
REQUIRED TO ACCOMMODATE NEW MECHANICAL PIPING AND ASSOCIATED
EQUIPMENT.
K. IN THE EVENT OF NECESSARY REMOVALS OR DEMOLITION TO EXISTING NOT
IDENTIFIED IN THESE CONSTRUCTION DOCUMENTS SHALL BE PROVIDED TO
THE C.O. IN WRITING FOR APPROVAL PRIOR TO COMMENCING.
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE OWNER
AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD VERIFY
ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM
THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR
SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE
SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO
REMAIN. FULL-TONE LINES INDICATE NEW OR RELOCATED CONSTRUCTION.
E. DIMENSIONS ARE TYPICALLY TO FINISH FACE OF MASONRY, CONCRETE,
GYPSUM WALL BOARD, AND METAL FRAMES; OR CENTER LINE OF COLUMN
OR BEAMS, UNLESS NOTED OTHERWISE.
1. PROVIDE POSITIVE DRAINAGE TO ALL ROOMS WITH NEW FLOOR DRAINS.
F. ALL ANGLES ON THE FLOOR PLANS ARE 45 OR 90 DEGREES UNLESS
OTHERWISE INDICATED.
G. PATCH EXISTING WALLS, FLOORS, AND CEILING SURFACES DEMOLISHED,
CUT, CORED, OR ALTERED IN ANY WAY TO ACCOMMODATE NEW
CONSTRUCTION OR TO RECEIVE NEW FINISHES. PREP ALL EXISTING
FLOORS TO RECEIVE NEW FINISHES PER ROOM FINISH SCHEDULE.
H. PATCH ALL CONCRETE SLAB LOCATIONS DEMOLISHED TO INSTALL NEW
STRUCTURAL, MECHANICAL, OR ELECTRICAL WORK.
1 REPAIR GWB CEILING TO PREVIOUS CONDITION & PAINT ENTIRE
CEILING TO MATCH EXISTING CONDITION. PROVIDE 5/8" TYPE X
GWB ATTACHED TO 7/8" FURRING CHANNEL ATTACHED TO 1 1/2"
COLD-ROLLED METAL FRAMING SUSPENDED FROM STRUCTURE
2 VERIFY CLEAR SWING PATH FOR DOOR OPENING W/ EXISTING
BRICK PAVERS TO REMAIN
3 MECH EQUIP - SEE MECH
4 PATCH AND INFILL VOID LEFT FROM MECH DEMO - PAINT TO
MATCH CURRENT
5 REPLACE WOOD PANEL TRANSOM ABOVE DOOR TO MATCH
WOMEN'S RR
6 SEE DOOR TYPES FOR EXISTING DOOR WITH NEW RETURN GRILLE
PLACEMENT - COORDINATE LOCATIONS WITH MECH
7 SEE MECH FOR NOTES REGARDING NEW DUCT WORK
PENETRATIONS THROUGH EXISTING WALLS, TYP.
8 CAULK ALL LAG SCREW HOLES FROM OVERHEAD DOOR FRAME
REMOVAL PRIOR TO NEW WALL INSTALLATION
D1 DEMO EXISTING COILING DOOR, RETURN TO OWNER
D2 DEMO GWB CEILING AS SHOWN HATCHED FOR MECH ACCESS -
SEE MECH
D3 REMOVE WOOD VENEER TRANSOM PANEL ABOVE MEN'S RR DOOR
D4 REMOVE EXISTING BRICK/MASONRY WALL AS REQUIRED FOR NEW
MECH DUCT PENETRATION
D5 REMOVE PORTION OF EXISTING EXTERIOR WALL FOR NEW MECH
LOUVER - SEE DETAIL 5/A201 & MECH
D6 COORDINATE WITH NEW MECH DUCT WORK SIZE FOR CHANGES
TO EXISTING OPENING - SEE M101
D7 COORDINATE WITH MECHANICAL (SEE M101) REGARDING NEW
RETURN GRILLE LOCATION AT EXISTING DOOR LOCATIONS PRIOR
TO DEMO
D8 PARTIAL REMOVAL OF EXISTING WALL FOR NEW MECH DUCT
PENETRATION SHALL BE NEAT AND CLEAN - SEE M101 FOR
LOCATION AND NOTES
DATE INITIAL
3 31
SECTION 076200 - SHEET METAL FLASHING AND TRIM
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Formed sheet metal fabrications - see drawings.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For sheet metal flashing and trim.
1. Include plans, elevations, sections, and attachment details.
2. Distinguish between shop- and field-assembled work.
3. Include identification of finish for each item.
4. Include pattern of seams and details of termination points, expansion joints and expansion-joint covers, direction of expansion, roof-penetration flashing, and connections to adjoining work.
1.3 WARRANTY
A. Special Warranty on Finishes: Manufacturer agrees to repair finish or replace sheet metal flashing and trim that shows evidence of deterioration of factory-applied finishes within specified warranty period.
1. Finish Warranty Period: 20 years from date of Final Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. General: Sheet metal flashing and trim assemblies shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.
B. Sheet Metal Standard for Flashing and Trim: Comply with SMACNA's "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.
2.2 SHEET METALS
A. Metallic-Coated Steel Sheet: Provide zinc-coated (galvanized) steel sheet according to ASTM A 653/A 653M, Z275G90 coating designation; prepainted by coil-coating process to comply with ASTM A 755/A 755M.
1. Exposed Coil-Coated Finish:
a. Siliconized Polyester: Epoxy primer and silicone-modified, polyester-enamel topcoat; with dry film thickness of not less than 0.2 mil for primer and 0.8 mil for topcoat.
2. Color: As selected by Owner from manufacturer's full range.
B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal or manufactured item.
1. General: Blind fasteners or self-drilling screws, gasketed, with hex-washer head.
a. Blind Fasteners: High-strength aluminum or stainless-steel rivets suitable for metal being fastened.
2. Fasteners for Zinc-Coated (Galvanized) Steel Sheet: Series 300 stainless steel or hot-dip galvanized steel according to ASTM A 153/A 153M or ASTM F 2329.
C. Elastomeric Sealant: ASTM C 920, elastomeric polyurethane polymer sealant; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.
2.3 FABRICATION, GENERAL
A. General: Custom fabricate sheet metal flashing and trim to comply with details shown and recommendations in cited sheet metal standard that apply to design, dimensions, geometry, metal thickness, and other characteristics of item required.
Fabricate sheet metal flashing and trim in shop to greatest extent possible.
1. Obtain field measurements for accurate fit before shop fabrication.
2. Form sheet metal flashing and trim to fit substrates without excessive oil canning, buckling, and tool marks; true to line, levels, and slopes; and with exposed edges folded back to form hems.
3. Conceal fasteners and expansion provisions where possible. Do not use exposed fasteners on faces exposed to view.
B. Sealant Joints: Where movable, nonexpansion-type joints are required, form metal to provide for proper installation of elastomeric sealant according to cited sheet metal standard.
C. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal.
D. Fabricate cleats and attachment devices of sizes as recommended by cited sheet metal standard for application, but not less than thickness of metal being secured.
E. Seams: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with elastomeric sealant unless otherwise recommended by sealant manufacturer for intended use.
2.4 SHEET METAL FABRICATIONS
A. Edge Flashing: Fabricate in minimum 96-inch- long, but not exceeding 12-foot- long sections. Furnish with 6-inch- wide, joint cover plates. Shop fabricate interior and exterior corners.
1. Fabricate from the Following Materials:
a. Galvanized Steel: 0.028 inch thick.
B. Counterflashing and Flashing Receivers: Fabricate from the following materials:
1. Galvanized Steel: 0.022 inch thick.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system.
1. Install sheet metal flashing and trim true to line, levels, and slopes. Provide uniform, neat seams with minimum exposure of solder, welds, and sealant.
2. Install sheet metal flashing and trim to fit substrates and to result in watertight performance. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal.
3. Space cleats not more than 12 inches apart. Attach each cleat with at least two fasteners. Bend tabs over fasteners.
4. Install exposed sheet metal flashing and trim with limited oil canning, and free of buckling and tool marks.
5. Torch cutting of sheet metal flashing and trim is not permitted.
B. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at maximum of 10 feet with no joints within 24 inches of corner or intersection.
1. Form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with sealant concealed within joints.
2. Use lapped expansion joints only where indicated on Drawings.
3.2 FLASHING INSTALLATION
A. General: Install sheet metal flashing and trim to comply with performance requirements, sheet metal manufacturer's written installation instructions, and cited sheet metal standard. Provide concealed fasteners where possible, and set units true to line, levels, and slopes. Install work with laps, joints, and seams that are permanently watertight and weather resistant.
B. Edge Flashing: Anchor to resist uplift and outward forces according to recommendations in cited sheet metal standard unless otherwise indicated. Interlock bottom edge of roof edge flashing with continuous cleat anchored to substrate.
END OF SECTION
SECTION 079200 - JOINT SEALANTS
PART 1 - GENERAL
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Nonsag Sealants:
1. Dow: www.dow.com/#sle.
2. Pecora Corporation: www.pecora.com/#sle.
3. Sika Corporation: www.usa.sika.com/#sle.
4. Tremco Commercial Sealants & Waterproofing: www.tremcosealants.com/#sle.
2.02 JOINT SEALANT APPLICATIONS
A. Scope:
1. Exterior Joints: Seal open joints, whether or not the joint is indicated on drawings, unless specifically indicated not to be sealed. Exterior joints to be sealed include, but are not limited to:
a. Joints between door, window, and other frames and adjacent construction.
b. Joints between different exposed materials.
2. Interior Joints: Do not seal interior joints unless specifically indicated to be sealed. Interior joints to be sealed include, but are not limited to, the following items.
a. Joints between door, window, and other frames and adjacent construction.
2.03 NONSAG JOINT SEALANTS
A. Nonstaining Silicone Sealant: ASTM C920, Grade NS, Uses M and A; not expected to withstand continuous water immersion or traffic.
1. Dirt Pick-Up: Reduced dirt pick-up compared to other silicone sealants.
B. Silicone Sealant: ASTM C920, Grade NS, Uses M and A; not expected to withstand continuous water immersion or traffic.
1. Movement Capability: Plus and minus 25 percent, minimum.
C. Polyurethane Sealant: ASTM C920, Grade NS, Uses M and A; single or multi-component; not expected to withstand continuous water immersion or traffic.
2.04 ACCESSORIES
A. Backer Rod: Cylindrical cellular foam rod with surface that sealant will not adhere to, compatible with specific sealant used, and recommended by backing and sealant manufacturers for specific application.
PART 3 - EXECUTION
1.01 EXAMINATION
A. Verify that joints are ready to receive work.
B. Verify that backing materials are compatible with sealants.
C. Verify that backer rods are of the correct size.
1.02 INSTALLATION
A. Install this work in accordance with sealant manufacturer's requirements for preparation of surfaces and material installation instructions.
END OF SECTION
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY
A. Exterior insulated hollow metal doors.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
C. Schedule: Prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Amweld International, LLC.
2. Ceco Door Products; an Assa Abloy Group company.
3. Curries Company; an Assa Abloy Group company.
4. Republic Doors and Frames.
5. Steelcraft; an Ingersoll-Rand company.
2.2 EXTERIOR HOLLOW-METAL DOORS AND FRAMES
A. Extra-Heavy-Duty Doors and Frames: SDI A250.8, Level 3. .
1. Physical Performance: Level A according to SDI A250.4.
2. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches.
c. Face: Metallic-coated steel sheet, minimum thickness of 0.053 inch, with minimum A40 coating.
d. Edge Construction: Model 2, Seamless.
e. Core: Manufacturer's standard material; insulation material where required at exterior wall locations.
3. Thermal-Rated Doors: Provide doors fabricated with thermal-resistance value (R-value) of not less than R=10 when tested according to ASTM C 1363.
4. Frames:
a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch, with minimum A40 coating.
b. Construction: Full profile welded.
c. Profile: Match existing frame profiles at borrowed lite framing and doors.
5. Exposed Finish: Prime.
2.3 FABRICATION
A. Hollow-Metal Doors:
1. Exterior Doors: Provide weep-hole openings in bottoms of exterior doors to permit moisture to escape. Seal joints in top edges of doors against water penetration.
B. Hollow-Metal Frames: Where frames are fabricated in sections due to shipping or handling limitations, provide alignment plates or angles at each joint, fabricated of same thickness metal as frames.
1. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers.
a. Drill stop in strike jamb to receive three door silencers.
C. Hardware Preparation: Factory prepare hollow-metal work to receive templated mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to SDI A250.6, the Door Hardware Schedule, and templates.
D. Provide an 1/8 inch integral kerf formed into the frame to receive a gasket composed of a cellular modified foam core clad in emobssed, non vinyl, paint resistant liner which is UV stablized. Gasket is to be provided as a part of this Section. Do not install until frame has been painted.
2.4 STEEL FINISHES
A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer.
1. Shop Primer: SDI A250.10.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Hollow-Metal Frames: Install hollow-metal frames of size and profile indicated. Comply with SDI A250.11 or NAAMM-HMMA 840 as required by standards specified.
1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged.
a. Where frames are fabricated in sections because of shipping or handling limitations, field splice at approved locations by welding face joint continuously; grind, fill, dress, and make splice smooth, flush, and invisible on exposed faces.
b. Remove temporary braces necessary for installation only after frames have been properly set and secured.
c. Check plumb, square, and twist of frames as walls are constructed. Shim as necessary to comply with installation tolerances.
2. Installation Tolerances: Adjust hollow-metal door frames for squareness, alignment, twist, and plumb to the following tolerances:
a. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.
b. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall.
c. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.
d. Plumbness: Plus or minus 1/16 inch, measured at jambs at floor.
B. Hollow-Metal Doors: Fit hollow-metal doors accurately in frames, within clearances specified below. Shim as necessary.
1. Non-Fire-Rated Steel Doors:
a. Between Door and Frame Jambs and Head: 1/8 inch plus or minus 1/32 inch.
b. Between Edges of Pairs of Doors: 1/8 inch to 1/4 inch plus or minus 1/32 inch.
c. At Bottom of Door: 3/4 inch plus or minus 1/32 inch.
d. Between Door Face and Stop: 1/16 inch to 1/8 inch plus or minus 1/32 inch.
END OF SECTION
SECTION 087100 - DOOR HARDWARE
1.1 SUMMARY
A. Section includes:
1. Mechanical door hardware for the following:
a. Swinging doors.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated. Include construction and installation details, material descriptions, dimensions of individual components and profiles, and finishes.
1.3 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of door hardware from a single manufacturer.
B. Means of Egress Doors: Latches do not require more than 15 lbf to release the latch. Locks do not require use of a key, tool, or special knowledge for operation.
C. Accessibility Requirements: For door hardware on doors in an accessible route, comply with the U.S. Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines and ICC/ANSI A117.1.
1. Provide operating devices that do not require tight grasping, pinching, or twisting of the wrist and that operate with a force of not more than 5 lbf .
2. Bevel raised thresholds with a slope of not more than 1:2. Provide thresholds not more than 1/2 inch high.
3. Adjust door closer sweep periods so that, from an open position of 70 degrees, the door will take at least 3 seconds to move to a point 3 inches from the latch, measured to the leading edge of the door.
1.4 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Three years from date of Final Completion, unless otherwise indicated.
a. Manual Closers: 10 years from date of Final Completion.
PART 2 - PRODUCTS
2.1 SCHEDULED DOOR HARDWARE
A. Provide door hardware for each door as scheduled in Part 3 "Door Hardware Schedule" to comply with requirements in this Section.
1. Door Hardware Sets: Provide quantity, item, size, finish or color indicated, and named manufacturers' products.
B. Coordinate all Keying requirements w/ owner. Provide a Master Key System.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine doors and frames, with Installer present, for compliance with requirements for installation tolerances, wall and floor construction, and other conditions affecting performance.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Steel Doors and Frames: For surface applied door hardware, drill and tap doors and frames according to ANSI/SDI A250.6.
3.3 INSTALLATION
A. Mounting Heights: Mount door hardware units at heights to comply with the following unless otherwise indicated or required to comply with governing regulations.
1. Standard Steel Doors and Frames: ANSI/SDI A250.8.
B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work specified in Division 09 Sections. Do not install surface-mounted items until finishes have been completed on substrates involved.
1. Set units level, plumb, and true to line and location. Adjust and reinforce attachment substrates as necessary for proper installation and operation.
2. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors according to industry standards.
3.4 LIST OF MANUFACTURERS
SPECIFIED APPROVED
HINGES MCKINNEY NO SUB
CONTINUOUS HINGES PEMKO MCKINNEY
LOCKS, EXIT DEVICES CORBIN RUSSWIN SARGENT
CLOSERS NORTON SARGENT
PLATES, STOPS, PULLS ROCKWOOD TRIMCO
THRESHOLDS, SEALS PEMKO NATIONAL GUARD
ELECTRIC STRIKES HES NO SUB
POWER SUPPLIES, SWITCHES SECURITRON NO SUB
3.5 HARDWARE SCHEDULE
HARDWARE SET NO. 1
(DOOR NO. 100 - PAIR)
4 Each Hinges, T4A3386 4.5 x 4.5 NRP, US32D 1 Storeroom Lockset, CL3357 NZD, 626 (Active Leaf - RHR) 1 Lockset (No Latching function, Inactive Leaf - LHR) 1 Flush Bolts (Inactive Leaf - LHR) 1 Each Closer, CPS7500, 689 1 Set Perimeter Seal, By Section 081113 1 Each Threshold, 2005AT 1 Each Sweep, 315N 1 Astragal (Active Leaf - RHR)
END OF SECTION
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.3 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1.4 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of selective demolition activities with starting and ending dates for each activity.
C. Predemolition photographs or video.
1.5 CLOSEOUT SUBMITTALS
A. Inventory of items that have been removed and salvaged.
1.6 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner.
Hazardous materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
G. Arrange selective demolition schedule so as not to interfere with Owner's operations.
1.7 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition.
Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
C. Inventory and record the condition of items to be removed and salvaged.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off utilities with utility companies.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
C. Remove temporary barricades and protections where hazards no longer exist.
3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations.
Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain fire watch during and after flame-cutting operations per Owner’s Safety Requirements.
5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
6. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area on-site.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.
3.5 CLEANING
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn demolished materials.
C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations.
Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION
SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Wood blocking and nailers.
2. Wood furring.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, provide lumber that complies with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Provide lumber graded by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on end or back of each piece.
B. Maximum Moisture Content of Lumber: 19 percent unless otherwise indicated.
2.2 FIRE-RETARDANT-TREATED MATERIALS
A. Fire-Retardant-Treated Lumber and Plywood by Pressure Process: Products with a flame-spread index of 25 or less when tested according to ASTM E 84, and with no evidence of significant progressive combustion when the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5 feet beyond the centerline of the burners at any time during the test.
1. Interior Type A: Treated materials shall have a moisture content of 28 percent or less when tested according to ASTM D 3201 at 92 percent relative humidity. Use where exterior type is not indicated.
2. Design Value Adjustment Factors: Treated lumber shall be tested according to ASTM D 5664, and design value adjustment factors shall be calculated according to ASTM D 6841.
B. Identify fire-retardant-treated wood with appropriate classification marking of qualified testing agency.
C. Application: Treat all miscellaneous carpentry unless otherwise indicated.
2.3 MISCELLANEOUS LUMBER
A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:
1. Blocking.
2. Nailers.
B. Dimension Lumber Items: Construction or No. 2 grade lumber of any species.
C. Concealed Boards: 19percent maximum moisture content of any of the following species and grades:
1. Mixed southern pine or southern pine, No. 2 grade; SPIB.
2. Eastern softwoods, No. 2 Common grade; NELMA.
3. Northern species, No. 2 Common grade; NLGA.
4. Western woods, Construction or No. 2 Common grade; WCLIB or WWPA.
2.4 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.
1. Where carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.
B. Screws for Fastening to Metal Framing: ASTM C 1002, length as recommended by screw manufacturer for material being fastened.
C. Power-Driven Fasteners: Fastener systems with an evaluation…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .