Attachment L6-PPQ.pdf

PDF 790 KB Posted

Attached to
Eglin AFB - Replace Fire Alarm and Fire Suppression Building 1206 Federal contract opportunity
Solicitation number
FA2823-21-R-0022
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains a past performance questionnaire and details of a federal contract opportunity for replacing fire alarm and fire suppression systems at Building 1206 at Eglin Air Force Base in Florida. The opportunity involves installing a new ultra high speed fire suppression system in seven explosive production bays and an overhead wet pipe sprinkler system in eight additional bays. The project includes a new remotely located fire pump and associated piping and electrical upgrades. The performance period is 180 days from notice to proceed. The NAICS code is 238210 and the estimated value is between $1,000,000 to $5,000,000. This is a 100% small business set-aside and requests for site visits must be arranged by May 5, 2021. The solicitation will be available on SAM.gov and the issuing agency is the Department of the Air Force Materiel Command Test Center.

View the file

Other files for this federal contract opportunity

Other files attached to Eglin AFB - Replace Fire Alarm and Fire Suppression Building 1206, newest first.
File Type Posted
Solicitation - Amendment 6 - FA282321R00220006.pdf PDF
Attachment 2 Drawing v2.pdf PDF
Solicitation - Amendment 5 - FA282321R00220005.pdf PDF
FA282321R0022 Q and As_07 June 2021.xlsx XLSX spreadsheet
Attachment 5 Section L June 7 Amended.pdf PDF
Solicitation Amendment 4 FA282321R00220004 SF 30.pdf PDF
FA282321R0022 Q and As_02 June 2021.xlsx XLSX spreadsheet
Attachment 5 Section L v4 - 24 May 2021.pdf PDF
FA282321R0022 Q and As_24 May 2021.xlsx XLSX spreadsheet
FA282321R0022 Q and As_24 May 2021.xlsx XLSX spreadsheet
Attachment 5 Section L v4 - 24 May 2021.pdf PDF
Solicitation - Amendment 3 - FA282321R00220003.pdf PDF
Solicitation - Amendment 2 - FA282321R00220002.pdf PDF
Attachment 6 Section M (rev 18 May 2021).pdf PDF
Attachment 5 Section L v3 - 18 May 2021.pdf PDF
FA282321R0022 Q and As (18 May 2021).pdf PDF
Solicitation - Amendment 1 - FA282321R00220001.pdf PDF
Attachment 5 Section L v2 - 12 May 2021.pdf PDF
FA282321R0022 - Bldg 1206 Confirmed Attendance List.pdf PDF
BASE ACCESS MEMO Template.doc DOC document
Attachment 5 Section L.pdf PDF
Attachment 3 Specification.pdf PDF
Attachment 6 Section M.pdf PDF
Attachment L2 Bonds Checklist.pdf PDF
Attachment L1-50DC.xls XLS spreadsheet
Attachment L4 Information Sheets.pdf PDF
Attachment L7 Cover Letter.pdf PDF
Attachment L5 Consent Form.pdf PDF
Attachment 2 Drawing.pdf PDF
Solicitation - FA282321R0022.pdf PDF
Attachment L3-FRQ.pdf PDF
Attachment 4 Wage Determination.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT L6

PAST PERFORMANCE QUESTIONNAIRE

Request for Proposal: FA2823-21-R-0022 Replace Fire Alarm and Fire Suppression, Bldg. 1206, Eglin AFB, FL 32542

FTFA 15-1112

1. Name of Contractor:

Contract or Identifying Number:

Title/Description of Contract:

2. Brief description of scope of work:

EVALUATION: Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.

A. Did the contractor have any non-conformance issues? If so, what kind?

B. Did the contractor have adequate resources to complete the required performance?

C. Were there issues with the subcontractor’s testing lab and/or material suppliers?

D. Did the contractor submit required documents on time and answer questions in a timely manner?

FA2823-21-R-0022 FTFA 15-1112

Assessment Definition Substantial Confidence

(SC)

Based on the Offeror’s recent/relevant performance record, this customer has a high expectation that the Offeror will successfully perform the required effort for us again.

Satisfactory Confidence

(SAT)

Based on the Offeror’s recent/relevant performance record, this customer has a reasonable expectation that the Offeror will successfully perform the required effort for us again.

Limited Confidence

(LC)

Based on the Offeror’s recent/relevant performance record, this customer has a low expectation that the Offeror will successfully perform the required effort for us again.

No Confidence

(NC)

Based on the Offeror’s recent/relevant performance record, this customer has no expectation that the Offeror will successfully perform the required effort for us again.

Unknown Confidence (Neutral) (UC)

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Based upon the assessment definitions above, indicate your assessment of the contractor’s performance on your contract described on Attachment A. Your assessment should consider the contractor’s performance in accordance with the contractual requirements. Circle all that apply.

CONTRACTOR’S NAME: __________________________ CONTRACT NO.: _______________________

01 Contractor developed realistic progress schedules & completed the project within the established schedule.

SC SAT LC NC UC

02 Contractor provided submittals in a timely manner. Submittals were well researched and clearly identified the proposed item.

SC SAT LC NC UC

03 Contractor provided timely and accurate payrolls with no known labor violations (Davis-Bacon Act) or labor claims.

SC SAT LC NC UC

04 Contractor provided experienced managers and supervisors, with the technical and administrative abilities needed to meet contract requirements.

SC SAT LC NC UC

05 Contractor hired quality subcontractors and effectively managed them.

SC SAT LC NC UC

06 Contractor identified problems as they occurred. Suggested approaches to problems. Displayed initiative and cooperation to solve problems. Provided adequate information and pricing for change orders and negotiated them in good faith.

SC SAT LC NC UC

07 Contractor provided effective quality control, which resulted in a quality-finished product.

SC SAT LC NC UC

08 Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain in comments section, SC SAT LC NC UC

09 Would you hire this contractor again? If no, explain in comments section

SC SAT LC NC UC

OVERALL RATING: ______________________________

BRIEF EXPLANATION OF OVERALL RATING GIVEN:

ADDITIONAL COMMENTS

Name of Person Completing Evaluation:

Base/Company: Date:

Position Title/Grade: Phone:

Email: Fax:

File details come from the government source that posted it. Updated .