Attachment L5 Past Performance Customer Questionnaire.pdf

PDF 189 KB Posted

Attached to
Upgrade the Emergency Power System at Building 104
Solicitation number
FA282322R0014
Issued by

About this file

This document contains a past performance questionnaire and details of a federal contract opportunity. The past performance questionnaire requests a contractor's name, contract number, project description, and seeks ratings and narratives on the contractor's performance in areas such as conformance issues, resource adequacy, subcontractor management, and timeliness. It defines ratings of substantial confidence, satisfactory confidence, limited confidence, no confidence, and unknown confidence.

The federal contract opportunity involves upgrading the emergency power system at Building 104 at Eglin Air Force Base in Florida. The project includes providing a new emergency power system to consolidate all critical electrical loads, replacing distribution panels and transformers, installing a new generator and fuel storage, and updating emergency distribution. The work must comply with DOD, Air Force, and base standards. The estimated value is between $1,000,000 and $5,000,000. This opportunity is a small business set-aside using best value selection and is issued by the Department of the Air Force Materiel Command Test Center.

View the file

Other files

File Type Posted
A0290026.pdf PDF
A0290161.pdf PDF
Bldg 104 Questions and Answers.pdf PDF
Bldg 104 Sign in Sheet.pdf PDF
a0290076.pdf PDF
041858_E2.pdf PDF
A0290162.pdf PDF
Building 104 As Builts REV_3 50.pdf PDF
041858_E4.pdf PDF
Solicitation Amendment FA282322R00140002 SF 30.pdf PDF
A0290157.pdf PDF
Attachment L1 50 Division Cost Estimate Worksheet 1.xls XLS spreadsheet
a0290073.pdf PDF
A0290028.pdf PDF
___SHEET 29.pdf PDF
Solicitation Amendment FA282322R00140001 SF 30 (1).pdf PDF
FTFA 21 VP05 Section L Instr to Offerors Rep Em Power Sys 28 June 22.pdf PDF
FTFA 21 VP05 Section M Eval Rep Em Power System Bldg 104 28 June 22.pdf PDF
Attachment L6 Example Release Cover Letter.pdf PDF
Attachment L1 50 Division Cost Estimate Worksheet.xls XLS spreadsheet
Attachment 2 Okaloosa Wage Determination_FL20220127_25 Feb 2022.pdf PDF
Attachment L3 Past Performance Information.pdf PDF
Attachment L4 Consent Letter for the Release of Past Performance.pdf PDF
FTFA 21 VP05 Section M Eval Repair Emergency Power System Bldg 104.pdf PDF
Solicitation - FA282322R0014.pdf PDF
Attachment L2-Financial Responsibility Questionnaire.pdf PDF
FTFA 21 VP05 Section L Instr to Offerors Repair Emergency Power.pdf PDF
Attachment 1 FTFA 21-VP05 SOW Upgrade Emergency Power System Bldg 104_25 Mar 2022.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT L5

PAST PERFORMANCE QUESTIONNAIRE

Request for Proposal: FA2823-22-R-0014 Upgrade Emergency Power System Bldg 104, Eglin AFB, FL 32542 FTFA 21-VP05

1. Name of Contractor:

Contract or Identifying Number:

Title/Description of Contract:

2. Brief description of scope of work:

EVALUATION: Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.

A. Did the contractor have any non-conformance issues? If so, what kind?

B. Did the contractor have adequate resources to complete the required performance?

C. Were there issues with the subcontractor’s testing lab and/or material suppliers?

D. Did the contractor submit required documents on time and answer questions in a timely manner?

FA2823-22-R-0014 FTFA 21-VP05

Assessment Definition Substantial Confidence

(SC)

Based on the Offeror’s recent/relevant performance record, this customer has a high expectation that the Offeror will successfully perform the required effort for us again.

Satisfactory Confidence

(SAT)

Based on the Offeror’s recent/relevant performance record, this customer has a reasonable expectation that the Offeror will successfully perform the required effort for us again.

Limited Confidence

(LC)

Based on the Offeror’s recent/relevant performance record, this customer has a low expectation that the Offeror will successfully perform the required effort for us again.

No Confidence

(NC)

Based on the Offeror’s recent/relevant performance record, this customer has no expectation that the Offeror will successfully perform the required effort for us again.

Unknown Confidence (Neutral) (UC)

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Based upon the assessment definitions above, indicate your assessment of the contractor’s performance on your contract described on Attachment A. Your assessment should consider the contractor’s performance in accordance with the contractual requirements. Circle all that apply.

CONTRACTOR’S NAME: __________________________ CONTRACT NO.: _______________________

01 Contractor developed realistic progress schedules & completed the project within the established schedule.

SC SAT LC NC UC

02 Contractor provided submittals in a timely manner. Submittals were well researched and clearly identified the proposed item.

SC SAT LC NC UC

03 Contractor provided timely and accurate payrolls with no known labor violations (Davis-Bacon Act) or labor claims.

SC SAT LC NC UC

04 Contractor provided experienced managers and supervisors, with the technical and administrative abilities needed to meet contract requirements.

SC SAT LC NC UC

05 Contractor hired quality subcontractors and effectively managed them.

SC SAT LC NC UC

06 Contractor identified problems as they occurred. Suggested approaches to problems. Displayed initiative and cooperation to solve problems. Provided adequate information and pricing for change orders and negotiated them in good faith.

SC SAT LC NC UC

07 Contractor provided effective quality control, which resulted in a quality-finished product.

SC SAT LC NC UC

08 Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain in comments section, SC SAT LC NC UC

09 Would you hire this contractor again? If no, explain in comments section

SC SAT LC NC UC

OVERALL RATING: ______________________________

BRIEF EXPLANATION OF OVERALL RATING GIVEN:

ADDITIONAL COMMENTS

Name of Person Completing Evaluation:

Base/Company: Date:

Position Title/Grade: Phone:

Email: Fax:

File details come from the government source that posted it. Updated .