SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | | N6264925RA038 | CLIN 0001(35 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| SHIP NAME: | | PSNS Barge YR85 | | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| AVAILABILITY: | | FY25 SUMMER AVAILABILITY | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
Total TGIs (Specify Total) 35 Total Evaluated Price ¥0
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | | | | | | | | | |
| No. | TGI No. | DESCRIPTION | Proposed Labor | | | | Material/ODCs | | Proposed Price (JPY) |
| | | In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | |
| 1 | 38HVA16702A01 | F/O - REPAIR WATERTIGHT HATCH 01-33-0 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38HVA17902A03 | F/O – REPLACE STAPLE ON BROW AND PRESERVE PLATFORM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38HVA51404A01 | *F/O - ACCOMPLISH REPLACEMENT OF INSULATION AND LAGGING FOR CHW PPG IN 02 LEVEL | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38HVA51406T01 | CHILL WATER SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38HVA51406A01 | *F/O – REPLACE CHILLED WATER VALVE 02 LEVEL WEATHER | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38HVA51407T01 | CHILL WATER SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38HVA51407A01 | F/O - ACCOMPLISH PLANNED MAINTENANCE OF CHILLED WATER EXPANSION JOINT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 38HVA53301T01 | POTABLE WATER SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 38HVA53301A01 | *F/O – MODIFY CPW PIPING AND PUMBING VENT PIPING FOR WATER FOUNTAIN IN 01-25-1-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 38HVA58202A01 | F/O - INSTALL STAPLE ON SECURING PIN FOR SPUD MOORING COLLOR NO. ONE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 38HVA61202A01 | F/O – ACCOMPLISH SHIPALT YR-1173D, LIFERAIL MOD AND PSVTN OF MONORAIL HOIST | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 38HVA63101A01 | F/O – REPAIR DK COAMING AND PP HANGER MD WEA FR59 AND FR88 PORT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 38HVA16701A01 | F/O - ACCOMPLISH NDT INSPECTION OF QUICK ACTING WATERTIGHT SCUTTLE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 38HVA17901A01 | F/O - ACCOMPLISH NDT INSPECTION OF MATL HNDLG RAMP SYS, BROW AND PLATFORM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | 38HVA32101A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF SHORE POWER SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 16 | 38HVA32102A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF 1S, 2S AND SHORE POWER SWITCHBOARD | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 17 | 38HVA32402A01 | *F/O - ACCOMPLISH PLANED MAINTENANCE OF ELECTRIC HEATERS | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 18 | 38HVA43601A01 | *F/O - ACCOMPLISH PLANED MAINTENANCE OF 1J SHORELINE CONNECTION BOX | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 19 | 38HVA43602A01 | *F/O - ACCOMPLISH PLANED MAINTENANCE OF FLOODING ALARM SWITCH | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 38HVA43603A01 | *F/O - ACCOMPLISH PLANED MAINTENANCE OF DIGITAL AIRFLOW MONITORING SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | 38HVA51201A01 | F/O - CLEAN AND INSPECT COOLING COIL AND DRAIN | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 22 | 38HVA51202A01 | F/O - CLEAN, INSPECT, AND PRESERVE WEATHER OPENING OF HVAC SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 23 | 38HVA51203A01 | F/O - INSPECT AND CLEAN HOUSING AND IMPELLER OF VENTILATION FAN | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 24 | 38HVA51204A01 | F/O - INSPECT AND CLEAN MARLO FAN COIL UNIT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 25 | 38HVA51401A01 | *F/O - ACCOMPLISH PM OF RESILIENT MOUNT FOR CHW PUMP AND A/C PLANT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 26 | 38HVA51402A01 | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED CHILLED WATER VALVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 27 | 38HVA52801A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF DECK DRAINS | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 28 | 38HVA52802A01 | F/O - ASSESS ASBESTOS SHOWER DRAIN SUMP TANK IN 1-69-0-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 29 | 38HVA55102A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF LP AIR PIPING | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 30 | 38HVA55301A01 | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED FRESHWATER VALVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 31 | 38HVA55302A02 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF BACKFLOW PREVENTER | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 32 | 38HVA55502A01 | *F/O - ACCOMPLISH PLANNED MAINT OF TEST FOR FRESH WTR FIREMAIN SYS, PP AND CMPNT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 33 | 38HVA58201A01 | F/O - ACCOMPLISH VISUAL INSPECTION OF MOORING SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 34 | 38HVA61201A01 | F/O - ACCOMPLISH VISUAL INSPECTION OF LIFERAIL AND GUARDLINE SYS | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 35 | 38HVA62301A01 | F/O - ACCOMPLISH VISUAL INSPECTION OF INCLINED LAD, VERT LAD, AND STEP | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 36 | | | | | | | | | |
| 37 | | | | | | | | | |
| 38 | | | | | | | | | |
| 39 | | | | | | | | | |
| 40 | | | | | | | | | |
| 41 | | | | | | | | | |
| 42 | | | | | | | | | |
| 43 | | | | | | | | | |
| 44 | | | | | | | | | |
| 45 | | | | | | | | | |
| 46 | | | | | | | | | |
| 47 | | | | | | | | | |
| 48 | | | | | | | | | |
| 49 | | | | | | | | | |
| 50 | | | | | | | | | |
| 51 | | | | | | | | | |
| 52 | | | | | | | | | |
| 53 | | | | | | | | | |
| 54 | | | | | | | | | |
| 55 | | | | | | | | | |
| 56 | | | | | | | | | |
| 57 | | | | | | | | | |
| 58 | | | | | | | | | |
| 59 | | | | | | | | | |
| 60 | | | | | | | | | |
| 61 | | | | | | | | | |
| 62 | | | | | | | | | |
| 63 | | | | | | | | | |
| 64 | | | | | | | | | |
| 65 | | | | | | | | | |
| 66 | | | | | | | | | |
| 67 | | | | | | | | | |
| 68 | | | | | | | | | |
| 69 | | | | | | | | | |
| 70 | | | | | | | | | |
| 71 | | | | | | | | | |
| 72 | | | | | | | | | |
| 73 | | | | | | | | | |
| 74 | | | | | | | | | |
| 75 | | | | | | | | | |
| 76 | | | | | | | | | |
| 77 | | | | | | | | | |
| 78 | | | | | | | | | |
| 79 | | | | | | | | | |
| 80 | | | | | | | | | |
| 81 | | | | | | | | | |
| 82 | | | | | | | | | |
| 83 | | | | | | | | | |
| 84 | | | | | | | | | |
| 85 | | | | | | | | | |
| 86 | | | | | | | | | |
| 87 | | | | | | | | | |
| 88 | | | | | | | | | |
| 89 | | | | | | | | | |
| 90 | | | | | | | | | |
| 91 | | | | | | | | | |
| 92 | | | | | | | | | |
| 93 | | | | | | | | | |
| 94 | | | | | | | | | |
| 95 | | | | | | | | | |
| 96 | | | | | | | | | |
| 97 | | | | | | | | | |
| 98 | | | | | | | | | |
| 99 | | | | | | | | | |
| 100 | | | | | | | | | |
| 101 | | | | | | | | | |
| 102 | | | | | | | | | |
| 103 | | | | | | | | | |
| 104 | | | | | | | | | |
| 105 | | | | | | | | | |
| 106 | | | | | | | | | |
| 107 | | | | | | | | | |
| 108 | | | | | | | | | |
| 109 | | | | | | | | | |
| 110 | | | | | | | | | |
| 111 | | | | | | | | | |
| 112 | | | | | | | | | |
| 113 | | | | | | | | | |
| 114 | | | | | | | | | |
| 115 | | | | | | | | | |
| 116 | | | | | | | | | |
| 117 | | | | | | | | | |
| 118 | | | | | | | | | |
| 119 | | | | | | | | | |
| 120 | | | | | | | | | |
| 121 | | | | | | | | | |
| 122 | | | | | | | | | |
| 123 | | | | | | | | | |
| 124 | | | | | | | | | |
| 125 | | | | | | | | | |
| 126 | | | | | | | | | |
| 127 | | | | | | | | | |
| 128 | | | | | | | | | |
| 129 | | | | | | | | | |
| 130 | | | | | | | | | |
| 131 | | | | | | | | | |
| 132 | | | | | | | | | |
| 133 | | | | | | | | | |
| 134 | | | | | | | | | |
| 135 | | | | | | | | | |
| 136 | | | | | | | | | |
| 137 | | | | | | | | | |
| 138 | | | | | | | | | |
| 139 | | | | | | | | | |
| 140 | | | | | | | | | |
| 141 | | | | | | | | | |
| 142 | | | | | | | | | |
| 143 | | | | | | | | | |
| 144 | | | | | | | | | |
| 145 | | | | | | | | | |
| 146 | | | | | | | | | |
| 147 | | | | | | | | | |
| 148 | | | | | | | | | |
| 149 | | | | | | | | | |
| 150 | | | | | | | | | |
| 151 | | | | | | | | | |
| 152 | | | | | | | | | |
| 153 | | | | | | | | | |
| 154 | | | | | | | | | |
| 155 | | | | | | | | | |
| 156 | | | | | | | | | |
| 157 | | | | | | | | | |
| 158 | | | | | | | | | |
| 159 | | | | | | | | | |
| 160 | | | | | | | | | |
| 161 | | | | | | | | | |
| 162 | | | | | | | | | |
| 163 | | | | | | | | | |
| 164 | | | | | | | | | |
| 165 | | | | | | | | | |
| 166 | | | | | | | | | |
| 167 | | | | | | | | | |
| 168 | | | | | | | | | |
| 169 | | | | | | | | | |
| 170 | | | | | | | | | |
| 171 | | | | | | | | | |
| 172 | | | | | | | | | |
| 173 | | | | | | | | | |
| 174 | | | | | | | | | |
| 175 | | | | | | | | | |
| 176 | | | | | | | | | |
| 177 | | | | | | | | | |
| 178 | | | | | | | | | |
| 179 | | | | | | | | | |
| 180 | | | | | | | | | |
| 181 | | | | | | | | | |
| 182 | | | | | | | | | |
| 183 | | | | | | | | | |
| 184 | | | | | | | | | |
| 185 | | | | | | | | | |
| 186 | | | | | | | | | |
| 187 | | | | | | | | | |
| 188 | | | | | | | | | |
| 189 | | | | | | | | | |
| 190 | | | | | | | | | |
| 191 | | | | | | | | | |
| 192 | | | | | | | | | |
| 193 | | | | | | | | | |
| 194 | | | | | | | | | |
| 195 | | | | | | | | | |
| 196 | | | | | | | | | |
| 197 | | | | | | | | | |
| 198 | | | | | | | | | |
| 199 | | | | | | | | | |
| 200 | | | | | | | | | |
1_38HVA16702A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 1_38HVA16702A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 1_38HVA16702A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - REPAIR WATERTIGHT HATCH 01-33-0 | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
HOURS
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38HVA17902A03
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 2_38HVA17902A03 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 2_38HVA17902A03 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – REPLACE STAPLE ON BROW AND PRESERVE PLATFORM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38HVA51404A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 3_38HVA51404A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 3_38HVA51404A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH REPLACEMENT OF INSULATION AND LAGGING FOR CHW PPG IN 02 LEVEL | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38HVA51406T01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 4_38HVA51406T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 4_38HVA51406T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CHILL WATER SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38HVA51406A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 5_38HVA51406A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 5_38HVA51406A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O – REPLACE CHILLED WATER VALVE 02 LEVEL WEATHER | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_38HVA51407T01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 6_38HVA51407T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 6_38HVA51407T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CHILL WATER SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_38HVA51407A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 7_38HVA51407A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 7_38HVA51407A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - ACCOMPLISH PLANNED MAINTENANCE OF CHILLED WATER EXPANSION JOINT | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_38HVA53301T01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 8_38HVA53301T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 8_38HVA53301T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | POTABLE WATER SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_38HVA53301A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 9_38HVA53301A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 9_38HVA53301A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O – MODIFY CPW PIPING AND PUMBING VENT PIPING FOR WATER FOUNTAIN IN 01-25-1-Q | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_38HVA58202A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 10_38HVA58202A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 10_38HVA58202A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - INSTALL STAPLE ON SECURING PIN FOR SPUD MOORING COLLOR NO. ONE | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_38HVA61202A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 11_38HVA61202A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 11_38HVA61202A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – ACCOMPLISH SHIPALT YR-1173D, LIFERAIL MOD AND PSVTN OF MONORAIL HOIST | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_38HVA63101A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 12_38HVA63101A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 12_38HVA63101A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – REPAIR DK COAMING AND PP HANGER MD WEA FR59 AND FR88 PORT | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_38HVA16701A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 13_38HVA16701A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 13_38HVA16701A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - ACCOMPLISH NDT INSPECTION OF QUICK ACTING WATERTIGHT SCUTTLE | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_38HVA17901A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 14_38HVA17901A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 14_38HVA17901A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - ACCOMPLISH NDT INSPECTION OF MATL HNDLG RAMP SYS, BROW AND PLATFORM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_38HVA32101A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 15_38HVA32101A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 15_38HVA32101A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF SHORE POWER SYSTEM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_38HVA32102A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 16_38HVA32102A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 16_38HVA32102A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF 1S, 2S AND SHORE POWER SWITCHBOARD | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_38HVA32402A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 17_38HVA32402A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 17_38HVA32402A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANED MAINTENANCE OF ELECTRIC HEATERS | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_38HVA43601A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 18_38HVA43601A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 18_38HVA43601A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANED MAINTENANCE OF 1J SHORELINE CONNECTION BOX | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_38HVA43602A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 19_38HVA43602A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 19_38HVA43602A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANED MAINTENANCE OF FLOODING ALARM SWITCH | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_38HVA43603A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 20_38HVA43603A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 20_38HVA43603A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANED MAINTENANCE OF DIGITAL AIRFLOW MONITORING SYSTEM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
21_38HVA51201A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 21_38HVA51201A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 21_38HVA51201A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - CLEAN AND INSPECT COOLING COIL AND DRAIN | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
22_38HVA51202A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 22_38HVA51202A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 22_38HVA51202A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - CLEAN, INSPECT, AND PRESERVE WEATHER OPENING OF HVAC SYSTEM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
23_38HVA51203A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 23_38HVA51203A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 23_38HVA51203A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - INSPECT AND CLEAN HOUSING AND IMPELLER OF VENTILATION FAN | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
24_38HVA51204A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 24_38HVA51204A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 24_38HVA51204A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - INSPECT AND CLEAN MARLO FAN COIL UNIT | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
25_38HVA51401A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 25_38HVA51401A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 25_38HVA51401A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PM OF RESILIENT MOUNT FOR CHW PUMP AND A/C PLANT | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
26_38HVA51402A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 26_38HVA51402A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 26_38HVA51402A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED CHILLED WATER VALVE | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
27_38HVA52801A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 27_38HVA52801A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 27_38HVA52801A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF DECK DRAINS | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
28_38HVA52802A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR85 - FY25 SUMMER AVAILABILITY | | | | | TGI 28_38HVA52802A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA038 | | | | | | | | | | |
| SRF-JRMC TGI #: | 28_38HVA52802A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - ASSESS ASBESTOS SHOWER DRAIN SUMP TANK IN 1-69-0-Q | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |