Attachment - FCA Scoring Guide.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- C213--EL PASO FACILITY CONDITION ASSESSMENT Federal contract opportunity
- Solicitation number
- 36C25725Q0100
About this file
This document is a Facility Condition Assessment (FCA) Scoring Guide, which provides a rubric for assessing the condition of federal buildings. The scoring guide includes general condition grades ranging from "A" (like new condition) to "F" (critical condition needing immediate attention), as well as associated cost ratios for repair versus replacement.
The related federal contract opportunity is for an independent FCA of the Central Utility Plant (CUP) Building 7776 (approximately 14,827 SF) at the El Paso VA Health Care Center. The contractor will be required to provide all labor, material, and equipment to perform this assessment, as this is a new FCA with no prior data available for the CUP. The solicitation number is 36C25725Q0100 and the federal agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 36C25725Q0100 0001 - Cancel Solicitation.pdf | ||
| Attachment - Central Plant Drawings.pdf | ||
| Attachment - VA Seismic Design Reqs.pdf | ||
| RFQ 36C25725Q0100 El Paso Facility Condition Assessment.pdf | ||
| Attachment - Risk Criteria.xlsx | XLSX spreadsheet | |
| Attachment - FCA 101 Facility Condition Assessment Guide.pdf | ||
| Attachment - Elevator Survey_FCA.docx | DOCX document | |
| Attachment - Top Ten Deficiency List.xlsx | XLSX spreadsheet | |
| Attachment - FCA Correction Cost Estimate.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 CSS Facility Condition Assessments Scoring Guide
| General Condition Grades |
| A = Like new condition. Majority of useful life span remains. "Excellent" |
| B = Good condition. Over half of useful life span remains. "Good" or B+ "Very Good" |
| C = Average condition. Less than half of useful life span remains. "Average", "Fair", or C+ "Above Average" |
| C- = Workable Condition. May be past assigned useful life, but still working. "Keep an eye on it" |
| D = Poor condition. Past assigned useful life. Failure is not critical. "Poor" or "Problematic" |
| F = Critical condition. Needs immediate attention. "Failing" or "Critical" |
| Cost Ratios |
| Over 1.0 = Costs More to Repair than to Build New |
| .30 to .99 = Costs Less to Repair than to Build New |
| 0 to .29 = Minimal Repair Cost |
Building replacement costs include total project cost for a building of the same size and type without escalation or demolition of existing building.
Building correction costs also include total project costs with all mark-ups except for escallation to mid-point of construction, phasing and any 8A program mark-ups.
Only subsystems graded as "D" or "F" can be given correction costs.
Costs are based on like kind replacement or current industry standard.