Attachment - FCA Correction Cost Estimate.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
C213--EL PASO FACILITY CONDITION ASSESSMENT Federal contract opportunity
Solicitation number
36C25725Q0100
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

The provided document is an Attachment - FCA Correction Cost Estimate.xlsx, which contains a detailed assessment of the facility condition for the El Paso VA Health Care Center. The assessment covers various building systems, including architectural, IT, mechanical, and more, and provides information on the current condition, remaining useful life, and estimated correction costs. It identifies several issues that need to be addressed, such as undersized telecommunications rooms, inactive refrigerant monitoring systems, and the need for additional return air ducts. The document also references a related federal contract opportunity, "C213--El Paso Facility Condition Assessment," which is a solicitation for an independent Facility Condition Assessment (FCA) of the Central Utility Plant Building 7776 to support the El Paso VA Health Care Center. The solicitation is being issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 17.

View the file

Other files for this federal contract opportunity

Other files attached to C213--EL PASO FACILITY CONDITION ASSESSMENT, newest first.
File Type Posted
Amendment 36C25725Q0100 0001 - Cancel Solicitation.pdf PDF
Attachment - VA Seismic Design Reqs.pdf PDF
RFQ 36C25725Q0100 El Paso Facility Condition Assessment.pdf PDF
Attachment - Central Plant Drawings.pdf PDF
Attachment - Top Ten Deficiency List.xlsx XLSX spreadsheet
Attachment - Risk Criteria.xlsx XLSX spreadsheet
Attachment - FCA Scoring Guide.xlsx XLSX spreadsheet
Attachment - FCA 101 Facility Condition Assessment Guide.pdf PDF
Attachment - Elevator Survey_FCA.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FCA Correction Cost Estimate

District NameVISNStation NumberStation NameFCA_IDBuilding NoFunction TitleGSFSystemSubsystemUseful LifespanRemaining LifeCorrection CostConditionDescriptionProject ListRisk LevelPending Useful LifespanPending Remaining LifePending Correction CostPending ConditionDescription
4-VHA - Continental17756El Paso3149751Outpatient Health Care CenterArchitecturalRoofs**$ 1,380DFCA record added by Contractor - see detail/pending. Install fall protection at northwest corner at unprotected exhaust fan; approx. 12 lf.520exceeds$ 105,492D* Install fall protection at northwest and southwest corners at unprotected exhaust fan; approximately 24 LF.
4-VHA - Continental17756El Paso3075071Outpatient Health Care CenterInformation TechnologyTelecommunications Rooms15$ 251,636FTelecommunications rooms 103, 231, 356, 445, A304, A401, E402, A214, E202,E 303 and E118 are too small, expand rooms or relocate to locations that conform to requirements outlined in VA Space Planning Criteria Chapter 232 and OIT Design Guide Section 4 - 84.320exceeds$ 49,304D* Telecommunications Rooms have multiple deficiencies in size, condition, or bedrock VA criteria such as fire suppression, HVAC and UPS equipment support, and physical security. Installed environment is unacceptable, for example, in a mechanical room or unsecure area. Provide a study to determine cost-effective solution to either expanding rooms or relocate to locations that conform to requirements outlined in VA Space Planning Criteria Chapter 232 and OIT Design Guide Section 4 - 84.
4-VHA - Continental17756El Paso2452311Outpatient Health Care CenterMechanicalRefrigeration Equip2311$ 1,432F2019 UPDATE Refrigerant monitor system is inactive and disconnected. Must be reconnected.5257$ 69,273D* Scherlock refrigerant leak monitoring system, model: 60-0036 is not in operation. Install new refrigerant monitoring system.
4-VHA - Continental17756El Paso3174821Outpatient Health Care CenterMechanicalRefrigeration Equip2311$ 38,890D2019 UPDATE Confirmed two return ducts are undersized. Needs third return air duct, sized same as existing two ducts, routed from server room into CRAC equipment room. Each CRAC unit (2007): Liebert VH199, one 7.5 hp evaporator fan, two 14 amp compressors, R-22, 26 kW electric heat 3 stage. Outside remote condenser units are Liebert DCDF308, three 0.75 hp fans.3257$ 30,757D* Associated project is not currently funded. Project under design to retrofit all sixteen units and other mechanical upgrades 756-22-200 and 756-22-208.

* Two return ducts are undersized. Needs third return air duct, sized same as existing two ducts, routed from server room into CRAC equipment room. Each CRAC unit (2007): Liebert VH199, one 7.5 HP evaporator fan, two 14 amp compressors, R-22, 26 kW electric heat 3 stage. Outside remote condenser units are Liebert DCDF308, three 0.75 HP fans. Recommend engineering study to determine path/cost to solution.

Cost est.

1. Engineer/study: 60 hours

Accessibility
Air Compressor
Air Handling Equip
Archeology
Archeology
Asbestos
Blowoff Pit
Blowoff Tank
Blr. Feed Pumps
Blr. Stacks
Boiler
Bridge/Overpass
Building Frame-Seismic
Building Frame-Wind
Burner
Burner Controls
Chemical Pumps
Comb. Controls
Cond. Hot Well
Cond. Stor. Tank
Cond. Trans. Pumps
Condnste Wtr Sys
Condenser Water
Cooling twr
Covered Walks
Curb & Gutter
Data Processing
Deaerator
Demarcation
Ducts & Water Dist
Economizer
Elec/Tele Closets
Elevators
Emerg Elec Sys.
Emergency Electrical Systems
Engr. Control syst.
Exhaust Fans
Exterior Walls
Fencing
Fire Alarm
Fire Protection
Fire Sprinkler / Pump
Fixed Equipment
Fixed Research Equipment
Fixtures / Piping
Floor Systems
Foundations
Fuel Comtamination
Fuel Oil Pump Set
Fuel Oil Tank
Hazardous Waste
Heating & Ventilation
Heating Oil System
Heating System
Hot Water Heater
Incineration
Inlets
Inside Cable Plant (ICP)
Instruments
Interior Finish/Door
Irrigation System
Landscaping
Laundry Equipment
Life Safety
Lighting & Power
Lightning Protection
Main Computer Room
Mains
Material Handling
Medical Gases
Medical Waste
Mold Remediation
Natural Gas Systems
Non Structural
Nuclear Waste
Nurse Call / Intercom / TV
Nurse Call/Int/TV
Outflow
Outside Cable Plant (OCP)
Parking
Perimeter Walls
Piping
Primary chilled sys.
Primary Service
Primary Switchgear
Refrigeration Equip
Renewable Energy
Roads
Roofs
Room Air Dist/Term
Sea Wall
Secndry chill Wtr Sys
Secondary Distribution
Signage / Wayfindg
Signage / Wayfinding
Site Lighting
Site Planters
Site Security
Sources
Steam Distribution
Storage Tank
Structures
Structures
Tele/Voice Service and Switch
Telecommunications Rooms
Telephone Service
Telephone/Data Systems
Transformer
Vacuum Heating Pumps
Vehicle Fuel Station
Ventil (O.A. & Exh)
Vertical Members
Walks
Waste Removal
Water Feature
Water Softeners
Water Tower
Wayfinding
Windows

E X A M P L E

File details come from the government source that posted it. Updated .