ATTACHMENT F - PRICE SCHEDULE_09_01_2026.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Commonwealth Wastewater Infrastructure Needs Assessment (CWNA) and Clean Watersheds Needs Survey (CWNS) Data Collection, Analysis and Reporting Services
Solicitation number
RFP-128282
Issued by
Virginia

About this file

This file is a Price Schedule Attachment (Attachment F) for RFP #27-02-CH issued by the Commonwealth of Virginia for Commonwealth Wastewater Infrastructure Needs Assessment (CWNA) and Clean Watersheds Needs Survey (CWNS) Data Collection, Analysis and Reporting Services. The RFP requests firms to provide comprehensive wastewater infrastructure assessment and clean watershed survey services, including data collection, analysis, and reporting. The scope of work is organized into six distinct tasks: Task 1 (Review, 15 calendar days), Task 2 (Methodology Development, 30 calendar days), Task 3 (Implementation of Approved Methodology, 90 calendar days), Task 4 (CWNA Report Development, 45 calendar days), Task 5 (CWNS Data Entry, 189 calendar days), and Task 6 (Project Completion and Final Activities). Offerors must specify a firm delivery timeline measured in calendar days after receipt of order (ARO), with delivery time potentially being a factor in the award decision.

Pricing for this procurement must be submitted as firm fixed prices or lump sum amounts for all six tasks, with a calculated Grand Total that reflects the sum of individual task costs. The price schedule template requires fully loaded hourly rates for ancillary/special projects services, with offerors required to provide equivalent job classifications (such as Senior Analyst or Data Engineer) and include all overhead, travel, materials, and administrative costs within the quoted rates. A separate attachment listing maximum fee caps for optional and additional services not included in the base RFP scope must be submitted. Offerors must complete the eVA Excel template exactly as provided, including all decimal point formatting and numeric entries; submitting $0.00 values or leaving pricing fields blank may result in non-responsiveness, though "NO CHARGE" designations are acceptable where applicable. Common submission errors to avoid include providing hourly rates instead of firm fixed prices for the six main tasks, adding separate travel or overhead charges, submitting alternative formats or ranges, and failing to complete all required fields with firm numbers.

View the file

Other files

File Type Posted
RFP# 27-02-CH-CWNA_CWNS_Data_Services_09-10-2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Checklist Checklist for Completing Attachment F – Price Schedule

RFP#27-02-CH Commonwealth Wastewater Infrastructure Needs Assessment (CWNA) and Clean Watersheds Needs Survey (CWNS) Data Collection, Analysis and Reporting Services

Before submitting your proposal, please verify the following:

A. Hypothetical Pricing (Scored Pricing)
• All six Task lines (Task 1 through Task 6) are completed with a Firm Fixed Price/Lump Sum.
• Decimal points and dollar formatting are used correctly (e.g., 15,000.00).
• The “Grand Total” correctly reflects the sum of all six Tasks.
• No additional fees or add‑ons are included beyond the fixed price.
• Pricing aligns with the RFP requirements and includes all labor, materials, supplies, travel, and incidentals.
B.. Special Projects Hourly Rates
• Each job classification has an “Offeror Equivalent Job Classification” clearly identified (e.g., Senior Analyst, Data Engineer).
• Hourly rates are fully loaded (all overhead included).
• No separate travel, admin, or materials fees are added.
• All rates include decimal points.
C Optional / Additional Services (Non‑Scored Pricing)
• A separate attachment is included listing the “Maximum Fee Cap” for optional/additional services.
• The attachment is clearly labeled and corresponds to Section 3 of Attachment F.
• Only optional services not included in the RFP scope are listed here.
D. Performance Section
• Calendar Days After Receipt of Order (ARO) is completed with a firm number (e.g., “10 calendar days”).
• The timeframe reflects your actual capacity to begin work.
E. General Formatting & Submission Requirements
• The price schedule is completed using the eVA Excel template.
• All required fields are filled—no blank pricing lines unless clearly marked “N/A” where allowed.
• Attachment F is included in the final proposal package.
• All entries are numeric, formatted correctly, and legible.
• No alternative pricing formats or modifications to the template.

Common Mistakes to Avoid

To reduce clarification requests and prevent disqualification, please avoid the following common errors:
• Leaving any Task line blank (Tasks 1–6 must all have a price).
• Submitting hourly rates instead of Firm Fixed Price/Lump Sum for Tasks 1–6.
• Adding travel, overhead, or miscellaneous charges separately. All pricing must be fully loaded.
• Failing to provide the “Offeror Equivalent Job Classification” for Special Projects.
• Not including a separate attachment for Optional/Additional Services.
• Incorrectly calculating the Grand Total or altering formulas in the Excel template.
• Providing ranges instead of fixed numbers (e.g., “85–105/hour” is not acceptable).
• Leaving the Performance (Calendar Days ARO) section blank.
• Submitting PDFs or alternate documents instead of the eVA Excel template.
• Not including decimal points (eVA requires numeric formatting for scoring).

Price Schedule

ATTACHMENT F- PRICE SCHEDULE
RFP#27-02-CH/ Commonwealth Wastewater Infrastructure Needs Assessment (CWNA) and Clean Watersheds Needs Survey (CWNS) Data Collection, Analysis and Reporting Services
Complete all Fields and upload the completed form with your proposal.
A. GENERAL REQUIREMENTS:

1. Offerors shall complete the:

a. "Firm Fixed Price"/ "Lump Sum"

b. "Grand Total"".

Note: Any Offeror who enters a "$0.00 on a pricing field / space or leaves a pricing field / space blank, may be considered NONRESPONSIVE; "NO CHARGE", as applicable, is acceptable.

2. All proposal prices (i.e. the "Total Firm Fixed Price"/ "Lump Sum"/ "GRAND TOTAL") must be shown (to include decimal points); in case of arithmetic errors, the "Total Firm Fixed Price"will govern.

3. Any Offeror who enters a "$0.00 on a pricing field / space or leaves a pricing field / space blank, may considered NONRESPONSIVE; "NO CHARGE", as applicable, is acceptable.

DELIVERY: "Delivery” shall be defined as the FIRM number of calendar days after receipt of order (ARO), that your company can start the project.
Enter Delivery Time:_________ Calendar Days ARO (The number of Calendar Days ARO shall result in delivery may be a factor in the award).
B. Hypothetical Price Schedule Total Fixed Pricing – COMPLETE TASK 1-6
Example:
Description of ServicesFirm Fixed /Lump Sum
Task 1: Review (to be completed within 15 calendar days of the contract effective date)$ 15,000.00(Example change this to your cost amount)
Task 2: Methodology Development (to be completed within 30 calendar days after completion of Task 1)
Task 3: Implementation of Approved Methodology (to be completed within 90 calendar days after completion of Task 2)
Task 4: CWNA Report Development (to be completed within 45 calendar days after completion of Task 3)
Task 5: CWNS Data Entry (to be completed within 189 calendar days after completion of Task 4)
Task 6: Project Completion and Final Activities (to be completed in alignment with the established project schedule and deadlines)
Grand Total Firm Fixed Price$ 15,000.00
C. Ancillary Services Total Fixed Hourly Rate Per Person (Non-Scored Pricing):
Example:
Job ClassificationHourly RateOT Hourly RateRegular HoursOT HoursExtended Price
Project Manager – Senior Project Lead$ 125.001752510$ 4,875.00(Example change this to your cost amount)
Mid-Level Professional – Analyst II
Grand Total$ 4,875.00
D. OPTIONAL / ADDITIONAL SERVICES (Non-Scored Pricing):
Example:
Job ClassificationMaximum Fee Cap
QA/QC specialist$ 5,000.00(Example change this to your cost amount)
Stakeholder engagement specialist
Data entry specialist
Grand Total$ 5,000.00