This file contains revised working drawings (dated 04/03/2026) for the Basketball & Academic Performance Center (BAPC) Addition project at George Mason University in Fairfax, Virginia. The project involves construction services for approximately 30,000 square feet of new addition and 14,500 square feet of Level 2 alteration to the existing Recreation and Athletic Complex (RAC) gymnasium. The scope includes practice courts for women's and men's varsity basketball teams and an academic center for student athletes. The facility is designed as mixed-use occupancy classified as Type IB construction with non-separated uses including Business (B), Assembly (A-3), and Storage (S-2). The project follows the 2021 Virginia Uniform Statewide Building Code and incorporates delegated design responsibilities for specialized components including structural steel connections, sheeting and shoring, curtain wall systems, and mechanical/electrical/plumbing supports. The design team includes Perkins and Will (architecture), Hope Furrer Associates (structural), Mueller Associates (mechanical), Gordon US LLC (civil), WFT Engineering (stormwater), Sladen Feinstein (plumbing and fire protection), and Michael Vergason Landscape Architects.
The total building area comprises 145,467 square feet across three stories with a maximum height of 46 feet. The addition contains approximately 28,837 square feet distributed across Levels 2 and 3, while the alteration accounts for 14,546 square feet on Level 2. The project documents specify extensive fire-resistance ratings including 2-hour fire barriers for rated partitions, 1-hour fire-rated floor construction, and compliance with UL-listed assemblies for columns, beams, and penetrations. Interim life safety measures are detailed to maintain operational continuity of the existing RAC facility during construction, including temporary door installations, restricted access zones, and supplemental exit signage. The project includes comprehensive engineering analyses for arc flash hazards, lightning protection, stormwater management, and utility coordination, with the contractor bearing responsibility for final selection of electrical equipment and performance of arc flash analysis studies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 1
LEVEL 2
LEVEL 3
ROOF
TOTAL
EXISTING
68,780sf 47,340sf 510sf N.A.
116,630sf
ADDITION
N.A.
15,078sf 13,759sf 0sf 28,837sf
TOTAL*
68,780sf 62,418sf 14,269sf 145,467sf
ALTERATION
N.A.
14,546sf N.A.
N.A.
14,546sf
GROSS AREA
LEVEL 1
LEVEL 2
LEVEL 3
ROOF
TOTAL
EXISTING
2,694,688cf
ADDITION
271,404cf 191,626cf
465,732cf
TOTAL*
3,158,718cf
ALTERATION
494,564cf
494,564cf
BUILDING VOLUME
STORIES
HEIGHT
EXISTING
46'
ADDITION
36'-10"
CODE MAX
UNLIMITED
ALTERATION
34'
BUILDING HEIGHT
TOTAL
46'
LEVEL 1
LEVEL 2
LEVEL 3
ROOF
TOTAL
EXISTING
2,465
3,283
ADDITION
TOTAL*
2,465 1,129
3,718
ALTERATION
MAXIMUM OCCUPANCY
A-2 A-3 A-4 B S-2
EXISTING
1,260sf 35,140sf 15,170sf 38,510sf 7,080sf
ADDITION
2,880sf
27,870sf
CODE MAX
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
237,000sf
ALTERATION
14,341sf
ASSIGNABLE OCCUPANCY AREAS
TOTAL*
1,260sf 38,020sf 15,170sf 66,380sf 7,080sf
PRIMARY STRUCTURAL FRAME
BEARING WALLS (EXTERIOR)
BEARING WALLS (INTERIOR)
NONBEARING WALLS (EXTERIOR)
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
2hr 2hr 2hr 0hr 2hr 1hr
02 41 19 SELECTIVE DEMOLITION SHORING, UNDERPINNING CONTRACTOR IS RESPONSIBLE FOR ENGINEERING DESIGN AND CALCULATIONS FOR ALL
MEASURES REQUIRED TO TEMPORARILY SUPPORT, STABILIZE, OR BRACE EXISTING BUILDING
ELEMENTS INTENDED TO REMAIN THAT ARE ADJACENT TO ELEMENTS TO BE DEMOLISHED.
DIVISION DESCRIPTION SUBSECTION REMARKS
03 10 00 CONCRETE FORMING AND ACCESORIES SHEETING, SHORING, SANDWICH PANELS CONTRACTOR IS RESPONSIBLE FOR DETERMINING WHICH METHODS OF SHEETING AND
SHORING ARE APPROPRIATE FOR THIS WORK. SANDWICH PANELS ARE A PROPRIETARY
SYSTEM.
05 12 00 STRUCTURAL STEEL FRAMING CONNECTIONS FABRICATORS AND ERECTORS HAVE PREFERRED DETAILS FOR CONNECTION DESIGN THAT
LEAN TOWARD COST SAVINGS.
05 21 00 STRUCTURAL JOIST FRAMING STEEL JOISTS ARE A PROPRIETARY SYSTEM.
05 40 00
METAL STAIRS05 51 00
PIPE AND TUBE RAILINGS05 51 00
DECORATIVE RAILINGS
COLD-FORMED METAL FRAMING
05 52 13
STOREFRONTS08 43 00
CURTAIN WALL08 44 00
IDENTIFICATION FOR ELECTRICAL SYSTEMS26 05 53 ARC FLASH ANALYSIS LABELS WILL BE DEVELOPED BASED ON RESULTS OF ARC FLASH
ANALYSIS. ARC FLASH ANALYSIS WILL BE DONE BY CONTRACTOR.
ARC FLASH HAZARD LABELS
SHORT CIRCUIT STUDIES26 05 73.13 THE CONTRACTOR IS RESPONSIBLE FOR SELECTING AND PROCURING THE FINAL ELECTRICAL
EQUIPMENT USED IN THE PROJECT. THE SHORT CIRCUIT STUDY IS DEPENDENT ON THE
SUBMITTED EQUIPMENT.
COORDINATION STUDIES26 05 73.16 THE CONTRACTOR IS RESPONSIBLE FOR SELECTING AND PROCURING THE FINAL ELECTRICAL
EQUIPMENT USED IN THE PROJECT. THE SHORT CIRCUIT STUDY IS DEPENDENT ON THE
SUBMITTED EQUIPMENT.
ARC FLASH ANALYSIS26 05 73.19 THE CONTRACTOR IS RESPONSIBLE FOR SELECTING AND PROCURING THE FINAL ELECTRICAL
EQUIPMENT USED IN THE PROJECT. THE SHORT CIRCUIT STUDY IS DEPENDENT ON THE
SUBMITTED EQUIPMENT.
LIGHTNING PROTECTION FOR STRUCTURES26 41 13 LIGHTNING PROTECTION SYSTEMS DESIGN REQUIRES SPECIALIZED EXPERTISE AND
COMPLIANCE WITH NFPA 780
STOREFRONTS ARE A PROPRIETARY SYSTEM AND SPECIFIC ENGINEERING NEEDS TO BE
ACCOUNTED FOR IN THE UNIQUE SYSTEM CONFIGURATION FOR THIS PROJECT
ARCHITECTURAL EXTERIOR SCREENS10 82 00
SUBCONTRACTOR IS BEST SUITED TO DETERMINE FRAMING MEMBER GAUGE, SPACING, AND
CONNECTIONS.
SUBCONTRACTOR WILL DETAIL PREFERRED CONNECTIONS TO STRUCTURAL STEEL
SUBCONTRACTOR WILL DETAIL PREFERRED CONNECTIONS TO STRUCTURAL STEEL
SUBCONTRACTOR WILL DETAIL PREFERRED CONNECTIONS TO STRUCTURAL STEEL
ENVELOPE SUBCONTRACTOR IS BEST SUITED TO DESIGN CONNECTIONS TO INSULATED
METAL WALL PANELS
CURTAIN WALLS ARE A PROPRIETARY SYSTEM AND SPECIFIC ENGINEERING NEEDS TO BE
ACCOUNTED FOR IN THE UNIQUE SYSTEM CONFIGURATION FOR THIS PROJECT
LEVEL 1
LEVEL 2
LEVEL 3
ROOF
TOTAL
EXISTING
90,387sf 90,387sf 510sf N.A.
181,284sf
ADDITION
0sf*** 17,087sf 17,087sf 304sf 34,478sf
TOTAL*
90,387sf 107,474sf 17,597sf 304sf 215,762sf
BUILDING AREA PER VCC DEFINITION
PERIMETER AT LEVEL 2
EXISTING
1,529'
ADDITION**
464'
TOTAL*
1,725'
BUILDING PERIMETER
SHEET NUMBER
TITLE
Job Number
ISSUE CHART
KEY PLAN
PROJECT
/1
/2
:5 :5
A
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0000
COVER
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
OWNER PROJECT #241927
PROJECT INFORMATIONOVERALL MAP
SITE
PROJECT DESCRIPTION
THIS PROJECT IS AN ADDITION AND A LEVEL 2 ALTERATION TO GEORGE MASON UNIVERSITY'S RECREATION AND ATHLETIC COMPLEX (RAC). IT CONSISTS OF APPROXIMATELY 30,000sf OF NEW CONSTRUCTION AND 14,500sf ALTERATION OF A GYMNASIUM.
THE BASKETBALL AND ACADEMIC PERFORMANCE CENTER (BAPC) INTEGRATES TRAINING
FACILITIES FOR THE UNIVERSITY'S WOMEN'S AND MEN'S VARSITY BASKETBALL TEAMS AND
AN ACADEMIC CENTER FOR THE ENTIRE STUDENT ATHLETE BODY. PRACTICE COURTS FOR
BASKETBALL TEAMS WILL NOT HOST COMPETITION EVENTS AND ARE NOT DESIGNATED FOR
SPECTATOR USE.
APPLICABLE CODES
2021 VUSBC
2021 VIRGINIA CONSTRUCTION CODE
2021 STATEWIDE FIRE PREVENTION CODE
2021 VIRGINIA ENERGY CONSERVATION CODE
2021 VIRGINIA MECHANICAL CODE
2021 VIRGINIA PLUMBING CODE
2021 VIRGINIA EXISTING BUILDING CODE
2020 NATIONAL ELECTRICAL CODE
2017 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, PART II
VEBC ALTERATION CLASSIFICATION
LEVEL 2
RISK CATEGORY
II; NON-ESSENTIAL FACILITY
OCCUPANCY CLASSIFICATION
NON-SEPARATED MIXED-USE B, A-3, AND S-2
CONSTRUCTION TYPE
TYPE IB
ENERGY PERFORMANCE
IN ACCORDANCE WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE BUILDING SHALL
COMPLY WITH THE VIRGINIA ENERGY CONSERVATION AND ENVIRONMENTAL STANDARDS
(VEES) AS DETAILED IN APPENDIX V OF THE CONSTRUCTION & PROFESSIONAL SERVICES
MANUAL.
COMPLIANCE PATH: IN ACCORDANCE WITH THE VIRGINIA ENERGY CONSERVATION CODE
(VECC), THE BUILDING SHALL COMPLY WITH ASHRAE 90.1-2019 SECTION 11.
ASBESTOS DISCLOSURE STATEMENT*
THE RAC WAS INSPECTED IN 1988, 1992, AND 2006 TO IDENTIFY LOCATIONS IN WHICH
ASBESTOS WAS PRESENT. THOSE INSPECTIONS IDENTIFIED ASBESTOS-CONTAINING
BUILDING MATERIALS IN MULTIPLE LOCATIONS; THE CAGE GYM IS NOT LISTED AS A SITE OF
ASBESTOS DETECTION.
A 2007 REMEDIATION REPORT STATES THAT THE ABATEMENT CONTRACTOR COMPLETED
REMOVAL OF ASBESTOS-CONTAINING MATERIAL IN THEIR ENTIRETY FROM SUBJECT
LOCATIONS.
LEAD DISCLOSURE STATEMENT*
THE RAC WAS INSPECTED IN 2006 TO IDENTIFY LOCATIONS IN WHICH LEAD-BASED PAINT WAS
PRESENT. THAT INSPECTION YIELDED NEGATIVE RESULTS FOR THE PRESENCE OF LEAD-
BASED PAINT.
*REFER TO THE PROJECT MANUAL FOR THE EXISTING HAZARDOUS MATERIAL INFORMATION
REPORT.
PUBLIC SAFETY WIRELESS COMMUNICATIONS
REFER TO THE SEPARATE MASS NOTIFICATION SYSTEM REPORT FOR ANALYSIS AND
RECOMMENDATIONS BASED ON IDENTIFIED RISKS AT GEORGE MASON UNIVERSITY.
OWNER DESIGN STANDARDS - REFERENCE
THE CONTRACT DOCUMENTS HAVE BEEN DEVELOPED IN ALIGNMENT WITH THE GEORGE
MASON UNIVERSITY DESIGN MANUAL, DATED JUNE 28, 2013.
THE DESIGN MANUAL IS REFERENCED FOR CLARIFICATION OF DESIGN INTENT, MATERIAL
QUALITY, PERFORMANCE EXPECTATIONS, AND COORDINATION REQUIREMENTS. IN THE
EVENT OF CONFLICT, THE CONTRACT DOCUMENTS SHALL GOVERN
DIG NOTICE
CONTACT MISS UTILITY AT 811, 1-800-552-7001 OR http://www.missutilityofvirginia.com NO LESS
THAN 72 HOURS PRIOR TO EXCAVATION AND DO NOT DISTURB THE SOIL UNTIL DIG TICKET
HAS BEEN PROCESSED.
DESIGN LOADS, STRUCTURAL OBSERVATIONS, AND SEISMIC CRITERIA
REFER TO STRUCTURAL DRAWINGS AND CALCULATIONS
FIRE PROTECTION AND FIRE ALARM SYSTEMS
REFER TO FIRE PROTECTION AND FIRE ALARM DRAWINGS AND SPECIFICATIONS
DESIGN COORDINATION
DRAWING SET COORDINATION FALLS UNDER THE RESPONSIBILITY OF THE REGISTERED
DESIGN PROFESSIONAL (RDP) PER GMU HECO REQUIREMENTS. INDIVIDUAL DISCIPLINES
WITHIN THE DRAWING SET ARE STAMPED, SEALED, AND DATED BY THEIR RESPECTIVE
REGISTERED DESIGN PROFESSIONAL AS RECOGNIZED BY THE COMMONWEALTH OF VIRGINIA.
WHERE THE COMMONWEALTH DOES NOR PROVIDE A LICENSING PROGRAM FOR A
DISCIPLINE, THE PROJECT TEAM HAS ENGAGED A QUALIFIED DESIGNER FOR THAT
RESPECTIVE DISCIPLINE AND THE COORDINATION OF THAT SCOPE WITH THE REST OF THE
PROJECT IS THE RESPONSIBILITY OF THE RDP CONTRACTED TO GEORGE MASON
UNIVERSITY.
1222 22nd Street NW Suite 200
Washington, D.C. 20037 t 202.737.1020 f 202.223.1570 www.perkinswill.com
..CIVILMEPSTRUCTURALARCHITECTOWNERFACILITY
George Mason University
BASKETBALL & ACADEMIC PERFORMANCE CENTER
(RAC ADDITION)
4350-B Banister Creek Ct., Fairfax, VA 22030
OWNER PROJECT #241927
PW PROJECT #860900
REVISED WORKING DRAWINGS
04/03/2026
Recreation and Athletic Complex 4350 Bannister Creek Ct., Fairfax, VA, 22030
George Mason University 4400 University Dr., Fairfax, VA, 22030 Stacy A. Natoli: snatoli@gmu.edu;
571-423-8624 (TEL)
Perkins&Will 1222 22nd Street NW, #200, Washington DC, 20037 Jon Penndor: jon.penndorf@perkinswill.com;
202-454-3177 (TEL)
Hope Furrer Associates 501 Fairmount Avenue, Suite 205, Towson MD, 21286 Amy Barabas: abarabas@hfurrer.com;
410-583-4874 x1101 (TEL)
Mueller Associates 1306 Concourse Drive, Suite 100, Linthicum MD, 21090 Karen Schulte: kschulte@muellerassoc.com 410-646-4500 x118 (TEL)
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151 Chris Kingsland, PE, Civil Engineer:
ckingsland@gordon.us.com 703-263-7989 Kelsey Ryan, PE, Stormwater Engineer, kryan@gordon.us.com
WFT Engineering 1801 Research Blvd., Suite 100, Rockville MD, 20850 Bob Fagg; bobf@wfteng.com;
301-803-0694 (TEL)
Sladen Feinstein 434 Massachusetts Ave., Suite 506, Boston MA, 02118 Melissa Mattes: mel@sladenfeinstein.com;
574-485-4467 (TEL)
PLUMBING & FP LIGHTING
Map data © 2024 Google Image retrieved 09/25/2024
BUILDING DIMENSIONS
OCCUPANCY
VICINITY MAP
SITE
Map data © 2024 Google Image retrieved 09/25/2024
SITE MAP
ADDITION
Map data © 2024 Google Image retrieved 09/25/2024
*AVOIDS DOUBLE-COUNTING OF ALTERATION
FIRE RESISTANCE RATINGS
PROJECT INFORMATION
*AVOIDS DOUBLE-COUNTING OF ALTERATION
**EXTERIOR WALLS ONLY
***BELOW-GRADE PROJECTION EXCLUDED
PROJECT INFORMATION
SPECIFICATIONS THAT REQUIRE THE RESPONSIBLE TRADE SUBCONTRACTORS OR
MANUFACTURERS TO PERFORM FINAL DETAILED ENGINEERING OF CERTAIN COMPONENTS BASED
ON SPECIFIED PERFORMANCE CRITERIA (COMMONLY REFERRED TO AS 'DELEGATED DESIGN') IS
ACCEPTABLE WITHIN NORMAL INDUSTRY STANDARDS IN SO FAR AS THE DESIGN CAN BE
REASONABLY AND COMPETITIVELY BID IN ACCORDANCE WITH THE PROCUREMENT LAWS AS SET
FORTH FOR THIS PROJECT
EXAMPLES OF SUCH COMPONENTS INCLUDE SHEETING AND SHORING, UNDERPINNING, LATERAL
SHORING OF THE BUILDING PRIOR TO THE DEMOLITION OF THE EXISTING CMU WALLS, STEEL
FRAMING CONNECTIONS, STEEL FRAMING ERECTION SEQUENCES, STEEL JOISTS, CONCRETE
SANDWICH PANELS AND ASSOCIATED SUPPORTS, COLD-FORMED METAL FRAMING, EQUIPMENT
SUPPORT ASSEMBLIES, STEEL CHAIR AND RAILING ASSEMBLIES, CURTAIN WALL AND/OR SKYLIGHT
SYSTEMS, AND SUPPORTS, RESTRAINTS, BRACING, AND CONNECTIONS OF MECHANICAL
ELECTRICAL, AND PLUMBING SYSTEMS TO PRIMARY BUILDING STRUCTURE
SPECIFICATION SECTIONS THAT ARE EXPECTED TO REQUIRE DELEGATED DESIGN ARE LISTED
BELOW
DELEGATED DESIGN
MARK ISSUE DATE
1 SCHEMATIC DESIGN 10/04/24
2 PRELIMINARY DESIGN 05/22/25
3 50% WORKING DRAWINGS 12/16/25
4 WORKING DRAWINGS 01/29/26
5 REVISED WORKING DRAWINGS 04/03/26
PROFESSIONAL SEALS
ARCHITECT STRUCTURAL ENGINEER MECHANICAL ENGINEER
ELECTRICAL ENGINEER PLUMBING ENGINEER FIRE PROTECTION ENGINEER
CIVIL ENGINEER
STORMWATER ENGINEER LANDSCAPE ARCHITECT
LOW VOLTAGE DESIGNER
SHEET NUMBER
TITLE
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/9
/2
:2 :1
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0001
INDEX OF DRAWINGS
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
1222 22nd Street NW Suite 200
Washington, D.C. 20037 t 202.737.1020 f 202.223.1570 www.perkinswill.com
Sheet Index
S H
E E
T N
U M
B E
R
SHEET NAME S
C
H E
M A
T
IC
D E
S
IG
N
0/
4/
P R
E L
IM
IN
A R
Y D
E S
IG
N
5/
/2
W O
R K
IN
G
D R
A W
IN
G
S
2/
/2
W O
R K
IN
G
D R
A W
IN
G
S
1/
/2
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
01-GENERAL
G-0000 COVER ● ● ● ● ●
G-0001 INDEX OF DRAWINGS ● ● ●
G-0101 CODE COMPLIANCE PLANS ● ● ● ● ●
G-0201 RAC INTERIM LIFE SAFETY PLANS ● ● ● ●
G-0300 FIRE RESISTANCE PLANS ● ●
G-0301 FIRE RESISTANCE DETAILS AND DIAGRAMS ● ●
G-0302 UL LISTED ASSEMBLIES - COLUMNS ● ●
G-0303 UL LISTED ASSEMBLIES - BEAMS & FLOOR CONSTRUCTION ● ●
G-0304 UL LISTED ASSEMBLIES - FLOOR CONSTRUCTION ● ●
G-0305 UL LISTED ASSEMBLIES - RATED PARTITIONS ● ●
G-0306 UL LISTED ASSEMBLIES - RATED PARTITIONS & SHAFT WALL ● ●
G-0307 UL LISTED ASSEMBLIES - SHAFT WALL & HEAD OF WALL ●
G-0308 UL LISTED ASSEMBLIES - HEAD OF WALL ●
G-0309 UL LISTED ASSEMBLIES - HEAD OF WALL ●
G-0310 UL LISTED ASSEMBLIES - HEAD OF WALL ●
G-0311 UL LISTED ASSEMBLIES - HEAD OF WALL ●
G-0312 UL LISTED ASSEMBLIES - PENETRATIONS ●
G-0313 UL LISTED ASSEMBLIES - PENETRATIONS ●
G-0314 UL LISTED ASSEMBLIES - PENETRATIONS ●
G-0500 SUSTAINABILITY CHECKLISTS ● ●
02-CIVIL
C-0001 GENERAL NOTES AND LEGEND ● ● ● ●
C-0101 EXISTING CONDITIONS PLAN ● ● ● ● ●
C-0102 DEMOLITION PLAN ● ● ● ●
C-0103 SITE LAYOUT PLAN ● ● ● ● ●
C-0104 SITE DIMENSION AND LIGHTING PLAN ● ● ● ●
C-0105 PAVEMENT RESTORATION PLAN ● ● ●
C-0106 GRADING PLAN ● ● ● ●
C-0107 GRADING ENLARGEMENT ● ● ● ●
C-0108 GRADING ENLARGEMENT ● ● ●
C-0109 GRADING ENLARGEMENT ● ●
C-0110 UTILITY PLAN ● ● ● ●
C-0301 UTILITY PROFILES ● ● ● ●
C-0302 UTILITY PROFILES ● ● ● ●
C-0303 UTILITY PROFILES ● ●
C-0304 UTILITY PROFILES ● ●
C-0305 STORM COMPUTATIONS ● ● ● ●
C-0311 STRUCTURE TABLES ● ●
C-0400 PRE-DEVELOPMENT LAND COVER AND DRAINAGE DIVIDE MAP ● ● ● ●
C-0410 POST-DEVELOPMENT LAND COVER AND DRAINAGE DIVIDE MAP ● ● ● ●
C-0450 WATER QUALITY COMPUTATIONS ● ● ● ●
C-0460 WATER QUANTITY COMPUTATIONS ● ● ● ●
C-0461 WATER QUANTITY COMPUTATIONS ● ● ● ●
C-0470 DETENTION DESIGN DETAILS ● ● ● ●
C-0471 OUTLET CONTROL STRUCTURE DESIGN DETAILS ● ● ● ●
C-0472 DETENTION DESIGN SPECIFICATIONS ● ● ● ●
C-0480 SWM GENERAL NOTES ● ● ● ●
C-0501 E&S CONTROL NOTES AND LEGEND ● ● ● ●
C-0502 E&S CONTROL AND CIRCULATION PLAN PHASE 1 ● ● ● ●
C-0503 E&S CONTROL AND CIRCULATION PLAN PHASE 2 ● ● ● ●
C-0601 E&S DETAILS ● ● ● ●
C-0602 E&S DETAILS ● ● ● ●
C-0611 SITE DETAILS ● ● ● ●
C-0612 SITE DETAILS ● ● ● ●
C-0621 UTILITY DETAILS ● ● ● ●
C-0622 UTILITY DETAILS ● ● ● ●
C-0623 UTILITY DETAILS ● ● ●
03-LANDSCAPE
L-100 MATERIAL MATRIX ● ● ● ●
L-110 MATERIALS PLAN ● ● ● ●
L-120 SITE KEY PLAN ● ● ● ●
L-300 GENERAL SECTIONS 1 ● ● ● ●
L-301 GENERAL SECTIONS 2 ● ● ● ●
L-400 KEY PLAN ● ●
L-401 ENLARGED MATERIAL PLAN NORTH ● ● ● ●
L-402 ENLARGED MATERIAL PLANS SOUTH ● ● ● ●
L-403 ENLARGED PLAN SITE WALLS ● ●
L-404 ENLARGED LAYOUT PLAN PAVING ● ●
L-500 PAVING DETAILS 1 ● ● ● ●
L-502 WALL DETAILS 1 ● ● ● ●
L-503 WALL DETAILS 2 ● ● ● ●
L-504 FURNISHING DETAILS ● ● ● ●
L-505 FURNISHING DETAILS 2 ● ● ●
L-510 SITE WALL ELEVATIONS ● ● ● ●
L-600 PLANTING PLAN - CANOPY ● ● ● ●
L-601 PLANTING PLAN - GROUND ● ● ● ●
L-610 PLANTING SCHEDULE ● ● ● ●
L-620 SOILS PLAN ● ● ● ●
L-630 PLANTING DETAILS ● ● ● ●
L-700 SITE LIGHTING PLAN ● ●
04-ARCHITECTURAL
A-0001 MOUNTING HEIGHTS, SYMBOLS, & ABBREVIATIONS ● ● ●
A-0101 ARCHITECTURAL SITE PLAN ● ● ● ● ●
A-0402 DEMOLITION PLAN - LEVEL 2 ● ● ● ● ●
A-0403 DEMOLITION PLAN - ROOF ● ● ● ●
A-1001 OVERALL FLOOR PLANS ● ● ● ● ●
A-1002 GROSS AREA PLANS ● ●
A-1101 FLOOR PLAN LEVEL 1 (LINN) ●
A-1102 FLOOR PLAN LEVEL 2 (CAGE) ● ● ● ● ●
A-1103 FLOOR PLAN LEVEL 3 ● ● ● ● ●
A-1104 ROOF PLAN ● ● ● ● ●
A-1202 REFLECTED CEILING PLAN LEVEL 2 (CAGE) ● ● ● ●
A-1203 REFLECTED CEILING PLAN LEVEL 3 ● ● ● ●
A-1302 INTERIOR FINISH PLAN LEVEL 2 (CAGE) ● ● ● ●
A-1303 INTERIOR FINISH PLAN LEVEL 3 ● ● ● ●
A-1502 FF&E PLAN LEVEL 2 (CAGE) ● ● ● ●
A-1503 FF&E PLAN LEVEL 3 ● ● ● ●
A-2001 EXTERIOR ELEVATIONS - NORTH & WEST ● ● ● ● ●
A-2002 EXTERIOR ELEVATIONS - SOUTH & EAST ● ● ● ● ●
A-2101 BUILDING SECTIONS - N-S ● ● ● ● ●
A-2102 BUILDING SECTIONS - E-W ● ● ● ● ●
A-3101 WALL SECTIONS - N-S ● ● ● ●
A-3102 WALL SECTIONS - N-S ● ● ● ●
A-3103 WALL SECTIONS - E-W ● ● ● ●
A-3200 ENVELOPE ASSEMBLIES ● ● ● ●
A-3200.1 SCREEN ASSEMBLIES ● ●
A-3201 SECTION DETAILS ● ● ●
A-3202 SECTION DETAILS ● ● ●
A-3203 SECTION DETAILS ● ● ●
A-3301 PLAN DETAILS ● ●
A-3302 PLAN DETAILS ● ●
A-3303 CLERESTORY PLAN DETAILS ● ●
A-3304 PLAN DETAILS ● ●
A-3401 GLAZING ELEVATIONS ● ●
A-4101 STAIR PLANS & SECTIONS ● ● ●
A-4102 STAIR PLANS & SECTIONS ● ● ●
A-4110 STAIR DETAILS - LOBBY ● ●
A-4111 STAIR DETAILS - LOBBY ● ●
A-4112 STAIR DETAILS - EGRESS ● ●
A-4113 STAIR DETAILS - ROOF ACCESS ● ●
A-4201 ELEVATOR SECTIONS & DETAILS ● ●
A-4301 ENLARGED MEN'S SUITE PLANS AND ELEVATIONS - L02 ● ● ● ●
A-4302 ENLARGED MEN'S SUITE PLANS AND ELEVATIONS - L02 ● ● ● ●
A-4303 ENLARGED WOMEN'S SUITE PLANS AND ELEVATIONS - L02 ● ● ● ●
A-4304 ENLARGED WOMEN'S SUITE PLANS AND ELEVATIONS - L02 ● ● ●
A-4305 ENLARGED STRENGTH & CONDITIONING PLANS AND
ELEVATIONS - L02
A-4307 ENLARGED ATHLETIC TRAINING PLANS AND ELEVATIONS - L02 ● ● ● ●
Sheet Index
S H
E E
T N
U M
B E
R
SHEET NAME S
C
H E
M A
T
IC
D E
S
IG
N
0/
4/
P R
E L
IM
IN
A R
Y D
E S
IG
N
5/
/2
W O
R K
IN
G
D R
A W
IN
G
S
2/
/2
W O
R K
IN
G
D R
A W
IN
G
S
1/
/2
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
A-4308 ENLARGED MEN'S COACHING SUITE PLANS AND ELEVATIONS -
L03
A-4309 ENLARGED WOMEN'S COACHING SUITE PLANS AND
ELEVATIONS - L03
A-4310 ENLARGED ACADEMIC SERVICES PLANS AND ELEVATIONS - L03 ● ● ● ●
A-4311 ENLARGED RESTROOM PLANS AND ELEVATIONS ● ● ●
A-4501 INTERIOR ELEVATIONS COURT 1 NORTH & SOUTH ● ● ● ●
A-4502 INTERIOR ELEVATIONS COURT 1 EAST & WEST ● ● ● ●
A-4503 INTERIOR ELEVATIONS COURT 2 NORTH & SOUTH ● ● ● ●
A-4504 INTERIOR ELEVATIONS COURT 2 EAST & WEST ● ● ● ●
A-4505 INTERIOR ELEVATIONS LOBBY ● ● ● ●
A-4506 INTERIOR ELEVATIONS CORRIDORS LEVEL 2 & 3 ● ● ● ●
A-5000 MILLWORK ELEVATIONS ● ●
A-5001 MILLWORK DETAILS ● ● ●
A-5002 MILLWORK DETAILS - SPECIALTY ● ● ● ●
A-5101 CEILING DETAILS ● ● ●
A-5201 INTERIOR SECTION DETAILS ● ●
A-5202 INTERIOR DETAILS ● ●
A-5203 INTERIOR DETAILS ● ●
A-5204 INTERIOR DETAILS - FLOORING TRANSITIONS ● ●
A-6101 INTERIOR PARTITION TYPE CHARTS ● ● ●
A-6150 PARTITION DETAILS ● ● ●
A-6201 DOOR & HARDWARE SCHEDULES ● ● ● ●
A-6202 DOOR DETAILS ● ● ● ●
A-6203 DOOR DETAILS ● ●
A-6401 FINISH SCHEDULE AND LEGEND ● ● ● ●
A-6601 EQUIPMENT SCHEDULES ● ● ● ●
05-STRUCTURAL
S-0001 GENERAL NOTES ● ● ● ●
S-0002 GENERAL NOTES ● ● ● ●
S-0003 BORING LOCATION PLAN ● ● ● ●
S-0004 TEST BORING LOGS ● ● ● ●
S-0005 TEST BORING LOGS ● ● ● ●
S-0006 2021 VUSBC SPECIAL INSPECTIONS ●
S-0101 PARTIAL SCHEMATIC FRAMING PLAN ●
S-1102 FOUNDATION PLAN LEVEL 2 (CAGE) ● ● ● ●
S-1103 FRAMING PLAN LEVEL 3 ● ● ● ●
S-1104 CAGE ROOF FRAMING PLAN ● ● ● ●
S-1105 DUNNAGE FRAMING PLANS ● ●
S-3001 VERTICAL TRUSS ELEVATIONS ●
S-3002 VERTICAL TRUSS DETAILS ●
S-3003 SHEAR WALL ELEVATIONS ● ● ● ●
S-3004 SHEAR WALL ELEVATIONS CONCRETE ● ● ●
S-4001 FOUNDATION TYPICAL DETAILS ● ● ● ●
S-4002 FOUNDATION TYPICAL DETAILS ● ● ● ●
S-4003 FOUNDATION TYPICAL DETAILS ● ● ● ●
S-4004 FOUNDATION TYPICAL DETAILS ● ● ● ●
S-4005 MASONRY TYPICAL DETAILS ● ● ● ●
S-4006 MASONRY TYPICAL DETAILS ● ● ● ●
S-4007 FOUNDATION SECTIONS ● ● ● ●
S-4008 FOUNDATION SECTIONS ● ● ● ●
S-4009 PARTIAL PLANS AND LANDSCAPE RETAINING WALLS ● ● ● ●
S-4010 PARTIAL PLANS AND LANDSCAPING RETAINING WALLS ● ●
S-4011 LANDSCAPING RETAIN WALL SECTIONS ● ●
S-5001 SUPERSTRUCTURE TYPICAL DETAILS ● ● ● ●
S-5002 SUPERSTRUCTURE TYPICAL DETAILS ● ● ● ●
S-5003 SUPERSTRUCTURE TYPICAL DETAILS ● ● ● ●
S-5004 SUPERSTRUCTURE SECTIONS ● ● ● ●
S-5005 SUPERSTRUCTURE SECTIONS ● ● ● ●
S-5006 SUPERSTRUCTURE SECTIONS ● ● ● ●
S-5007 SUPERSTRUCTURE SECTIONS ● ● ● ●
S-5008 SUPERSTRUCTURE SECTIONS ● ● ●
S-5009 SUPERSTRUCTURE SECTIONS ● ● ●
S-5010 SUPERSTRUCTURE SECTIONS ● ●
S-5011 SUPERSTRUCTURE SECTIONS ● ●
S-5012 SUPERSTRUCTURE SECTIONS ● ●
S-6001 COLUMN SCHEDULE & DETAILS ● ● ● ●
06-FIRE ALARM
FA-0001 SYMBOLS, ABBREVIATIONS AND NOTES ● ● ● ●
FA-1102 FLOOR PLAN LEVEL 2 - FIRE ALARM ● ● ● ●
FA-1103 FLOOR PLAN LEVEL 3 - FIRE ALARM ● ● ● ●
07-FIRE PROTECTION
FX-0001 SYMBOLS, ABBREVIATIONS AND NOTES ● ● ● ●
FX-1102 FLOOR PLAN LEVEL 2 - FIRE PROTECTION ● ● ● ●
FX-1103 FLOOR PLAN LEVEL 3 - FIRE PROTECTION ● ● ● ●
FX-3001 SECTIONS ● ● ● ●
FX-6001 RISERS, DIAGRAMS AND SCHEDULES ● ● ● ●
FX-7001 FLOOR PLAN LEVEL 3 - FIRE PROTECTION CALCULATIONS ● ● ● ●
FX-9001 ISOMETRICS ● ● ● ●
08-PLUMBING
P-0001 SYMBOLS, ABBREVIATIONS AND NOTES ● ● ● ●
P-1101 UNDERSLAB FLOOR PLAN ● ● ● ●
P-1102 FLOOR PLAN LEVEL 2 ● ● ● ●
P-1103 FLOOR PLAN LEVEL 3 ● ● ● ●
P-1104 ROOF PLAN ● ● ● ●
P-5001 DETAILS ● ●
P-5002 DETAILS ● ●
P-6001 SCHEDULES ● ● ●
P-9001 ISOMETRICS - DOMESTIC ● ● ●
P-9002 ISOMETRICS - SANITARY & VENT ● ● ●
P-9003 ISOMETRICS - STORM ● ● ●
09-MECHANICAL
M-0000 MECHANICAL LEGEND ● ● ● ●
M-1102 LEVEL 2 - HVAC DUCTWORK ● ● ● ●
M-1103 LEVEL 3 - HVAC DUCTWORK ● ● ● ●
M-1104 ROOF PLAN - HVAC DUCTWORK ● ● ● ●
M-1201 LEVEL 1 - HVAC PIPING ● ● ●
M-1202 LEVEL 2 - HVAC PIPING ● ● ● ●
M-1203 LEVEL 3 - HVAC PIPING ● ● ● ●
M-1204 ROOF PLAN - HVAC PIPING ● ● ● ●
M-2000 MECHANICAL PART PLAN ● ● ● ●
M-3001 MECHANICAL SECTIONS ● ●
M-3002 MECHANICAL SECTIONS ●
M-5001 CHILLED WATER SYSTEM SCHEMATIC ● ● ● ●
M-5002 HEATING WATER SYSTEM SCHEMATIC ● ● ● ●
M-5003 AIR HANDLING UNIT SCHEMATICS ● ● ● ●
M-5004 ATC SCHEMATICS ● ● ● ●
M-6001 MECHANICAL DETAILS ● ● ● ●
M-6002 MECHANICAL DETAILS ● ● ● ●
M-6003 MECHANICAL DETAILS ● ●
M-6004 AIR HANDLING UNIT DETAILS ● ●
M-6005 AIR HANDLING UNIT DETAILS ● ●
M-7001 MECHANICAL SCHEDULES ● ● ● ●
M-7002 MECHANICAL SCHEDULES ● ● ● ●
M-7003 MECHANICAL SCHEDULES ●
MD-1103 LEVEL 3 - HVAC DUCTWORK - DEMOLITION ● ● ● ●
Sheet Index
S H
E E
T N
U M
B E
R
SHEET NAME S
C
H E
M A
T
IC
D E
S
IG
N
0/
4/
P R
E L
IM
IN
A R
Y D
E S
IG
N
5/
/2
W O
R K
IN
G
D R
A W
IN
G
S
2/
/2
W O
R K
IN
G
D R
A W
IN
G
S
1/
/2
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
10-ELECTRICAL
E-0000 ELECTRICAL LEGEND ● ● ● ●
E-0001 ELECTRICAL SITE PLAN ● ●
E-1101 LEVEL 1 - FEEDER ROUTING ● ● ● ●
E-1102 LEVEL 2 - POWER ● ● ● ●
E-1103 LEVEL 3 - POWER ● ● ● ●
E-1104 ROOF PLAN - POWER ● ● ● ●
E-1202 LEVEL 2 - LIGHTING ● ● ● ●
E-1203 LEVEL 3 - LIGHTING ● ● ● ●
E-1204 ROOF - LIGHTING ●
E-2001 PART PLANS - ELECTRICAL ● ●
E-5001 ELECTRICAL DETAILS ● ● ● ●
E-6001 ELECTRICAL ONE-LINE DIAGRAM ● ● ● ●
E-7001 ELECTRICAL SCHEDULES ● ● ● ●
E-7002 ELECTRICAL SCHEDULES ● ● ● ●
E-7011 PANELBOARD SCHEDULES ● ● ● ●
E-7012 PANELBOARD SCHEDULES ● ● ● ●
ED-1102 ELECTRICAL DEMOLITION PLAN ● ● ● ●
11-LIGHTING
AL-0101 SITE PLAN ●
AL-1202 REFLECTED CEILING PLAN LEVEL 2 (CAGE) ●
AL-1203 REFLECTED CEILING PLANS LEVEL 3 ●
12-TELECOMMUNICATIONS
AC-5000 ACCESS CONTROL DETAILS ● ●
T-0001 LOW VOLTAGE SYSTEMS TITLESHEET ● ● ● ●
T-0010 TELECOM RISER DIAGRAM ● ● ● ●
T-1102 FLOOR PLAN LEVEL 2 (CAGE) ● ● ● ●
T-1103 FLOOR PLAN LEVEL 3 ● ● ● ●
T-1104 ROOF PLAN ● ●
T-1202 REFLECTED CEILING PLAN LEVEL 2 (CAGE) ● ● ● ●
T-1203 REFLECTED CEILING PLAN LEVEL 3 ● ● ● ●
T-3201 LOW VOLTAGE SYSTEMS INFRASTRUCTURE DETAILS (1 OF 3) ● ● ● ●
T-3202 LOW VOLTAGE SYSTEMS INFRASTRUCTURE DETAILS (2 OF 3) ● ● ● ●
T-3203 LOW VOLTAGE SYSTEMS INFRASTRUCTURE DETAILS (3 OF 3) ● ●
T-4301 ENLARGED TR PLANS AND ELEVATIONS - L02 ● ● ● ●
T-4302 ENLARGED TR PLANS AND ELEVATIONS - L03 ● ● ● ●
T-4303 TELECOM RACK ELEVATIONS ● ● ● ●
MARK ISSUE DATE
1 50% WORKING DRAWINGS 12/16/25
2 WORKING DRAWINGS 01/29/26
3 REVISED WORKING DRAWINGS 04/03/26
3 3
CODE COMPLIANCE PLAN
GENERAL NOTES
1. ALL WORK IS TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES.
2. FINAL LOCATIONS OF ALL LIFE SAFETY DEVICES AND FIXTURES ARE
SUBJECT TO APPROVAL BY THE AUTHORITY HAVING JURISDICTION.
OCCUPANTS
OCCUPANT LOAD FACTOR
FUNCTION OF SPACE
AREA
ASSEMBLY -
UNCONC.
TABLES &
CHAIRS
5550 SF
### OCC
### SF/OC
AREA TAG
EGRESS
COMPONENTS
NOT IN CONTRACT
(EXCEPT WHERE OTHERWISE NOTED)
EGRESS COMPONENTS - PATH OF TRAVEL
RENOVATION
SCOPE
PRIMARY EXIT ACCESS
SECONDARY EXIT ACCESS
COMMON PATH OF TRAVEL
A C
T R
E
Q 150 OCC
30"
220 MAX
3' - 8"
DOOR
# IDENTICAL COMPONENTS - OPTIONAL
x 3
EGRESS COMPONENT
OCCUPANT LOAD
MINIMUM REQUIRED WIDTH FOR OCCUPANT LOAD
PROVIDED EGRESS CAPACITY
ACTUAL WIDTH PROVIDED
FIRE EXTINGUISHER & CABINET
EXIT SIGN
EXISTING CONSTRUCTION
TO REMAIN
NEW NON-RATED CONSTRUCTION
NEW 2HR FIRE BARRIER
-90
PARTITION FIRE RATING
DOOR FIRE RATING
FIRE AND SMOKE RATING LEGEND
RATED DOOR (RED)
NON-RATED DOOR
NEW 1HR FIRE BARRIER
BUSINESS
4,143 SF
28 OCC
150 SF/OC
EXERCISE
ROOM
3,161 SF
64 OCC
50 SF/OC
EXERCISE
ROOM
5,937 SF
119 OCC
50 SF/OC
EXERCISE
ROOM
8,404 SF
169 OCC
50 SF/OC
ASSEMBLY -
FIXED SEATS
508 SF
20 OCC
20 SEATS
ASSEMBLY -
FIXED SEATS
585 SF
20 OCC
20 SEATS
LOCKER
ROOM
1,145 SF
23 OCC
50 SF/OC
EXERCISE
ROOM
2,478 SF
50 OCC
50 SF/OC
(EXISTING) (EXISTING)
71406 SF
ASSEMBLY -
UNCONC.
TABLES &
CHAIRS
622 SF
42 OCC
15 SF/OC
LOCKER
ROOM
1,106 SF
23 OCC
50 SF/OC
ASSEMBLY -
UNCONC.
TABLES &
CHAIRS
594 SF
40 OCC
15 SF/OC
COMMON PATH
OF EGRESS = 56'-9"56'-9"
= PRIMARY EXIT ACCESS 79'-8"
= COMMON PATH OF EGRESS31'-4"31'-4"
32.0" REQ
67.3" ACT
336 MAX
57 OCC
DOOR
71406 SF
STAIR
R E
Q A
C T
156 OCC
12.4"
225 OCC
3' - 9"
DOOR
A C
T R
E
Q 217 OCC
2' - 9"
500 MAX
5' - 6"
BUSINESS
143 SF
1 OCC
150 SF/OC
02O01A
PRACTICE COURT 1
02N08
PRACTICE COURT 2
02O08
02N0EA 02N08D 02O08E
02O08F
DOOR
A C
T R
E
Q 131 OCC
2'-7"
340 MAX
5' - 8"
DOOR
A C
T R
E
Q 131 OCC
2'-7"
340 MAX
5' - 8"
DOOR
A C
T R
E
Q 131 OCC
2'-7"
340 MAX
5' - 8"
DOOR
A C
T R
E
Q 131 OCC
2'-7"
340 MAX
5' - 8"
EXIT ACCESS = SECONDARY EXIT ACCESS = 209'-8"
= SECONDARY EXIT ACCESS 198'-2"
EXIT ACCESS = PRIMARY EXIT ACCESS = 110'-3"
ASSEMBLY -
UNCONC.
TABLES &
CHAIRS
280 SF
19 OCC
15 SF/OC
ASSEMBLY -
UNCONC.
TABLES &
CHAIRS
309 SF
21 OCC
15 SF/OC
MECH/EQUIP/STOR.
651 SF
3 OCC
300 SF/OC
BUSINESS
11,315 SF
76 OCC
150 SF/OC
COMMON PATH
OF EGRESS = 93'-11"93'-11"
= COMMON PATH OF EGRESS30'-8"30'-8"
STAIR
A C
T R
E
Q 62 OCC
12.4"
225 MAX
3' - 9"
STAIR
A C
T R
E
Q 62 OCC
12.4"
335 MAX
5' - 7"
DOOR
A C
T R
E
Q 217 OCC
2' - 9"
220 MAX
3' - 0"
03D08A
= PRIMARY EXIT ACCESS 184'-4"
= SECONDARY EXIT ACCESS 193'-3"
EXIT ACCESS = PRIMARY EXIT ACCESS = 121'-4"
EXIT ACCESS = SECONDARY EXIT ACCESS = 238'-3"
ASSEMBLY -
UNCONC.
TABLES &
CHAIRS
189 SF
13 OCC
15 SF/OC
ASSEMBLY -
UNCONC.
TABLES &
CHAIRS
645 SF
43 OCC
15 SF/OC
IPC DESCRIPTION LEVEL IBC SECONDARY USE
REQUIRED NUMBER OF PLUMBING FIXTURES
MALEIPC CLASSIFICATION
THEATERS ETC.ASSEMBLY
ASSEMBLY - FIXED SEATS2
OCCUPANCY
ASSEMBLY - FIXED SEATS 10
FEMALE
MALE FEMALE
GENDER
NEUTRALT0TAL
WATER CLOSETS
AUDITORIUMS ETC
2 ASSEMBLY - UNCONC. TABLES & CHAIRS
1 PER 125 1 PER 65
LAVATORIES
MALE FEMALE
1 PER 200 1 PER 2001 PER 85.5
0.16 0.31 0.47 0.10 0.10
2 ASSEMBLY - UNCONC. TABLES & CHAIRS
2 EXERCISE ROOM
2 EXERCISE ROOM
2 LOCKER ROOM
3 ASSEMBLY - UNCONC. TABLES & CHAIRS
ASSEMBLY - UNCONC. TABLES & CHAIRS3
2 LOCKER ROOM
DRINKING FOUNTAIN
1 PER 500
10.5
11.5
11.5
10.5
11.5
11.5
338 1.35 2.60 3.95 0.85 0.85
0.08
0.68
EDUCATIONAL FACILITY
BUSINESS2
BUSINESS2
BUSINESS3
MECH/EQUIP/STOR.3
14 14 28
0.5 0.5 1
38 38 82
1.5 1.5 3
54 54 108 1.08 1.08
1 PER 50 1 PER 50 1 PER 50 1 PER 100
1.08 1.08
2.59 3.99 2.03 1.844.42 2.03
2*
SUB-TOTAL
# FIXTURES REQUIRED
*SUMMATION AND ROUNDING OF FRACTIONAL NUMBERS FOR MULTIPLE
OCCUPANCIES PER IPC SECTION 403.1.1. TOTAL NUMBER OF REQUIRED
FIXTURES DETERMINED BY THE AGGREGATE NUMBER OF REQUIRED
FIXTURES PER SECTION 403.1.2
**REQUIRED SERVICE SINK QUANTITY TAKES THE MAXIMUM VALUE (i.e. 1) OF
SERVICE SINK REQUIREMENTS WITHOUT SUMMATION
PLUMBING FIXTURE REQUIREMENTS BASED ON OCCUPANCY OF ADDITION
ONLY. FIXTURES FOR EXISTING OCCUPANCY ARE ACCOUNTED FOR IN
EXISTING BUILDING.
1 PER 50
1 PER 125 1 PER 65 1 PER 200 1 PER 2001 PER 85.5 1 PER 500
10# FIXTURES PROVIDED 2
SERVICE SINK
1**
TOTAL - THEATERS ETC
TOTAL - AUDITORIUMS ETC
TOTAL - EDUCATIONAL FACILITY
3 ASSEMBLY - UNCONC. TABLES & CHAIRS
ASSEMBLY - UNCONC. TABLES & CHAIRS3
21.5
6.5
21.5
6.5
1.08
TOTAL TOTAL
11.00
11*
4.06
5*
LEVEL 2 ADDITION OCCUPANCY
PRACTICE COURT 1 EXISTING OCCUPANCY
PRACTICE COURT 1 ADDITION OCCUPANCY
PRACTICE COURT 1 TOTAL OCCUPANCY
PRACTICE COURT 2 OCCUPANCY
LEVEL 2 ADDITION EXCL. PRACTICE COURT 1 ADDITION OCCUPANCY
LEVEL 3 OCCUPANCY
EGRESS STAIR CALCULATIONS
LOBBY STAIR EGRESS LOAD
LOBBY STAIR EGRESS CAPACITY
STAIR 2 (LOWER RUN) EGRESS LOAD
STAIR 2 (LOWER RUN) EGRESS CAPACITY
STAIR 2 (UPPER RUN) EGRESS LOAD
STAIR 2 (UPPER RUN) EGRESS CAPACITY
EGRESS DOOR CALCULATIONS
DOOR 02O01A CLEAR WIDTH
DOOR 02O01A EGRESS CAPACITY
DOOR 02O01A EGRESS LOAD
DOOR 03D08A CLEAR WIDTH
DOOR 03D08A EGRESS CAPACITY
DOOR 03D08A EGRESS LOAD
DOOR 02N0EA CLEAR WIDTH
DOOR 02N0EA EGRESS CAPACITY
DOOR 02N0EA EGRESS LOAD
DOOR 02N08D CLEAR WIDTH
DOOR 02N08D EGRESS CAPACITY
DOOR 02N08D EGRESS LOAD
DOOR 02O08F CLEAR WIDTH
DOOR 02O08F EGRESS CAPACITY
DOOR 02O08F EGRESS LOAD
a2 = 311 b1 = 119 b2 = 50 c1 = 169 c2 = 169 d2 = a2 - b2 = 261 d3 = 175 s1 = d3/2 = 88 r1 = 67/0.2 = 335 s2 = d2/2 = 131 r2 = 45/0.2 = 225 s3 = d3/2 = 88 r3 = 45/0.2 = 225 w1 = 66 e1 = w1/0.2 = 330 f1 = d2/2 + s1 = 193 w2 = 45 e2 = w2/0.2 = 225 f2 = d2/2 + s3 = 261/2 + 88 = 219 w3 = 68 e3 = w3/0.2 = 340 f3 = c1/2 = 131 w4 = 68 e4 = w4/0.2 = 340 f4 = c2/2 = 131 w5 = 68 e5 = w5/0.2 = 340 f5 = c2/2 = 131
EGRESS CAPACITY CALCULATIONS
OCCUPANT LOAD CALCULATIONS - ADDITION
NAME AREA (SF)
OCC LOAD
FACTOR
OCC
LOAD
LEVEL 2
ASSEMBLY - FIXED SEATS 585 0 20
ASSEMBLY - FIXED SEATS 508 0 20
ASSEMBLY - UNCONC. TABLES & CHAIRS 622 15 42
ASSEMBLY - UNCONC. TABLES & CHAIRS 594 15 40
BUSINESS 4,143 150 28
BUSINESS 143 150 1
EXERCISE ROOM 3,161 50 64
EXERCISE ROOM 2,478 50 50
LOCKER ROOM 1,145 50 23
LOCKER ROOM 1,106 50 23
LEVEL 2: 10 14,483 311
LEVEL 3
ASSEMBLY - UNCONC. TABLES & CHAIRS 280 15 19
ASSEMBLY - UNCONC. TABLES & CHAIRS 309 15 21
ASSEMBLY - UNCONC. TABLES & CHAIRS 645 15 43
ASSEMBLY - UNCONC. TABLES & CHAIRS 189 15 13
BUSINESS 11,315 150 76
MECH/EQUIP/STOR. 651 300 3
LEVEL 3: 6 13,387 175
Grand total 27,870 486
PRIMARY USE CLASSIFICATION BY LEVEL
USE CLASSIFICATION AREA % OF LEVEL
B 28,824 SF 100%
LEVEL 2: 12 28,824 SF
B 13,387 SF 100%
LEVEL 3: 6 13,387 SF
Grand total: 18 42,211 SF
SHEET NUMBER
TITLE
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/2
/2
:4
:3
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0101
CODE COMPLIANCE
PLANS
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
1222 22nd Street NW Suite 200
Washington, D.C. 20037 t 202.737.1020 f 202.223.1570 www.perkinswill.com
SCALE 1/32" = 1'-0"2 OCCUPANCY & EGRESS - LEVEL 2
SCALE 1/32" = 1'-0"3 OCCUPANCY & EGRESS LEVEL 3
OCCUPANT LOAD CALCULATIONS - ALTERATION
NAME AREA (SF)
OCC LOAD
FACTOR
OCC
LOAD
EXERCISE ROOM 5,937 50.00 SF 119
EXERCISE ROOM 8,404 50.00 SF 169
LEVEL 2: 2 14,341 288
Grand total 14,341 288
MARK ISSUE DATE
1 SCHEMATIC DESIGN 10/04/24
2 PRELIMINARY DESIGN 05/22/25
3 50% WORKING DRAWINGS 12/16/25
4 WORKING DRAWINGS 01/29/26
5 REVISED WORKING DRAWINGS 04/03/26
5.00.04.05.0 5
5.00.04.05.05 5.00.04.05.05
5.00.04.05.05 5.00.04.05.05
5.00.04.05.05 5.00.04.05.05
5.00.04.05.05 5.00.04.05.05
W
W
D
D
T
14,219
C O
O L
IN
G T
O W
E R
C O
O L
IN
G T
O W
E R
14,219
C O
O L
IN
G T
O W
E R
C O
O L
IN
G T
O W
E R
CONSTRUCTION ZONE
MAINTAIN ACCESS TO PUBLIC
WAY FROM EXISTING EGRESS
DOORS
CONSTRUCTION ZONE CLOSE THIS AREA DURING
CONSTRUCTION TO REDUCE
OCCUPANT LOAD IN THIS
SUITE TO LESS THAN 50
ADD TEMPORARY
DOOR TO ELIMINATE
DEAD-END CORRIDOR
ADD TEMPORARY
ILLUMINATED EXIT
SIGN AT EXISTING
OPEN STAIR
CLOSE NORTH EXIT DOORS
A-2001 G-0201
4 = COMMON PATH OF EGRESS95'-9"95'-9"
CONTRACTOR TO PROVIDE BARRIER
AT THIS LOCATION TO RESTRICT
ACCESS TO CLOSED AREA
EXISTING CLUB TEAM
LOCKER ROOM OCCUPANCY:
EXISTING CLUB TEAM LOCKER ROOM
OCCUPANCY: 21
ORIGINAL 268 OL REDUCED
BY 2x68, SINCE CAGE GYM
WILL NOW EXIT DIRECTLY
TO EXTERIOR
REMOVE TEMPORARY DOOR AND
INFILL WALL, AND RESTORE THIS
AREA TO ITS ORIGINAL CONDITION
REMOVE TEMPORARY
ILLUMINATED EXIT
SIGN
INTERIM LIFE SAFETY PLANS
GENERAL NOTES
The existing RAC facility (other than the Cage Gym, which will be renovated as part of the new project) must remain fully operational during the construction of the Basketball & Academic Performance Center. To eliminate any need for exit discharge through an active construction site, the project will require several mitigations to ensure continuity of life-safety until the project is fully complete.
The following mitigations were negotiated with the Office of the University Building Official.
Level 1
• Preserve existing egress from the existing Linn Gym, exiting north of the building.
• Maintain all other Level 1 exits to the exterior for the RAC.
Level 2
• Temporarily close north exit doors
• Temporarily close Visitors Locker Room and adjacent corridor
• Provide temporary door at entrance to Corridor 2206
• Provide temporary illuminated exit sign at open stair in lobby
The above-described interim conditions will be removed upon completion of the new Addition and renovation of the Cage Gym.
LIFE SAFETY
CORRIDOR
000001
A32
SHEET NUMBER
TITLE
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/2
/2
:4
:3
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0201
RAC INTERIM LIFE
SAFETY PLANS
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
1222 22nd Street NW Suite 200
Washington, D.C. 20037 t 202.737.1020 f 202.223.1570 www.perkinswill.com
SCALE 1/32" = 1'-0"1 LEVEL 1 INTERIM LIFE SAFETY PLAN
SCALE 1/32" = 1'-0"2 LEVEL 2 INTERIM LIFE SAFETY PLAN
SCALE 1/32" = 1'-0"3 LEVEL 2 FINAL CONDITIONS
SCALE 1/8" = 1'-0"4 TEMPORARY DOOR PLAN
TO BE IMPLEMENTED FOLLOWING COMPLETION OF THE ADDITION
MARK ISSUE DATE
1 PRELIMINARY DESIGN 05/22/25
2 50% WORKING DRAWINGS 12/16/25
3 WORKING DRAWINGS 01/29/26
4 REVISED WORKING DRAWINGS 04/03/26
x9 a5 a7 a1 aU a4 a2 a3 a6
OPEN TO ABOVE OPEN TO ABOVE
OPEN TO
ABOVE
OPEN TO
ABOVE
UL-3
UL-2
UL-4
UL-1
UL-3
UL-1
UL-4
G-0300 G-0300
UL-2
UL-3
UL-4
cS cR cQ cP cNcT x9 a5 a7 a1 aU aQ aPaT a4 aR a2 a3 aM a6 cO
G-0300 G-0300
G-0300 G-0300
ROOF DECK AND ASSOCIATED
FRAMING UNPRTECTED PER VCC
TABLE 601, FOOTNOTE b
ROOF DECK AND ASSOCIATED
FRAMING UNPRTECTED PER VCC
TABLE 601, FOOTNOTE b
UL-3
UL-4
UL-2
UL-3
UL-4
UL-2
UL-3
UL-4
UL-2
aO
UL LISTED DETAILS
ASSEMBLY RATING DESIGN
LOCATION
COLUMNS 2HR
FIRE-RESISTANT STRUCTURAL ASSEMBLIES PER VCC TABLE 601
UL LISTED
DETAIL
SPRAYED FIRE RESISTIVE
MATERIAL (SFRM)
2HR
X790
X649INTUMESCENT FIRE
RESISTIVE MATERIAL (IFRM)
BEAMS
3/G-0300
SFRM ON PRIMARY &
SECONDARY FRAMING
1HR,
2HR
N708
ASSEMBLY RATING DESIGN
LOCATION
FIRE-RESISTANT INTERIOR WALL ASSEMBLIES
UL LISTED
DETAIL
INTERIOR NON-
BEARING WALLS
GYPSUM BOARD ON METAL
STUD PARTITIONS, 3 5/8"
STUDS OR LARGER
2HR U411
GYPSUM BOARD SHAFTWALL
PARTITION
2HR U415
C/A-6101
K/A-6101
4/G-0300
5/G-0300
FLOOR
CONSTRUCTION
CONCRETE-FILLED METAL
DECK
2HR D902 5/G-0300
TAG
UL-1
ROOF
CONSTRUCTION
CONCRETE-FILLED METAL
DECK
1HR D902 5/G-0300
UL-2
UL-3
UL-4
UL-4
TAG
UL-10
UL-11
ASSEMBLY RATING
HEAD-OF-WALL DETAILS
UL LISTED DETAIL
GYPSUM BOARD &
CFMF ASSEMBLY
TO UNDERSIDE OF
COMPOSITE SLAB
2HR HW-D-0633
TAG
UL-20
PARALLEL WITH BEAM AND
OFFSET FROM BEAM
FLANGE
2HR HW-D-0635
PARALLEL WITH BEAM AND
BENEATH BEAM FLANGE
2HR HW-D-0267 UL-21
PERPENDICULAR TO BEAM 2HR HW-D-0299
SHAFTWALL
PARTITIONS
TO UNDERSIDE OF
COMPOSITE SLAB
2HR HW-D-0372 UL-30
UL-23
UL-22
UL-31PARALLEL WITH BEAM AND
BENEATH BEAM FLANGE
2HR HW-D-0609
PARALLEL WITH BEAM AND
OFFSET FROM BEAM
FLANGE
2HR HW-D-0636
PERPENDICULAR TO BEAM 2HR HW-D-0299
UL-32
UL-33
ASSEMBLY RATING
BASE-OF-WALL DETAILS
UL LISTED DETAIL
GYPSUM BOARD &
CFMF ASSEMBLY
AT CONCRETE SLAB /
COMPOSITE SLAB
2HR BW-S-0055
TAG
UL-40
2HR BW-S-0054 UL-41AT CONCRETE SLAB /
COMPOSITE SLAB
SHAFTWALL
PARTITIONS
ASSEMBLY RATING
THROUGH PENETRATION FIRESTOP ASSEMBLIES
UL LISTED DETAIL
ALL FIRE PENETRATION ASSEMBLIES TO BE REVIEWED AND APPROVED BY A/E, THEN SUBMITTED TO
OUBO FOR FINAL APPROVAL PRIOR TO PERFORMING ANY WORK
PIPE PENETRATION THROUGH CONCRETE
FLOOR OR WALL ASSEMBLY
2HR C-AJ-5001
PIPE, CONDUIT, OR TUBING PENETRATION
THROUGH CONCRETE FLOOR OR WALL
ASSEMBLY
2HR F-A-1028
CABLE TRAY PENETRATION THROUGH RATED
DRYWALL PARTITION
W-L-40111 & 2HR
PIPE, CONDUIT, OR TUBING PENETRATION
THROUGH RATED DRYWALL PARTITION
W-L-12961 & 2HR
PIPE OR TUBING PENETRATION THROUGH
RATED DRYWALL PARTITION
W-L-50291, 2, & 3
HR
W-L-7040DUCT PENETRATION THROUGH RATED
DRYWALL PARTITION
1 & 2HR
W-L-7130STRUT, CABLE, ROD, OR STEEL ANGLE
PENETRATION THROUGH RATED DRYWALL
PARTITION
1 & 2HR
FIREPROOFING LEGEND
UL-1: SPRAYED FIRE RESISTIVE
MATERIAL ON COLUMN
UL2: INTUMESCENT FIRE RESISTIVE
MATERIAL ON COLUMN
NOT IN CONTRACT
RENOVATION
SCOPE
UL-3: SPRAYED FIRE RESISTIVE MATERIAL ON
SECONDARY FRAMING, 1hr
UL-3: SPRAYED FIRE RESISTIVE MATERIAL ON
PRIMARY FRAMING, 2hr
UNPROTECTED STRUCTURAL STEEL
FRAMING
UL-5 1hr FIRE-RATED HORIZONTAL
ASSEMBLY
UL-4: 2hr FIRE-RATED HORIZONTAL
ASSEMBLY
UNRATED HORIZONTAL ASSEMBLY
UL-10/UL-11: NEW 2hr FIRE
BARRIER
UNRATED PARTITION
05 12 00.A1
STRUCTURAL STEEL W-SHAPE
07 81 23
INTUMESCENT FIREPROOFING
05 12 00.A1
STRUCTURAL STEEL W-SHAPE
07 81 00.A
SPRAYED FIRE RESISTIVE MATERIAL
05 12 00.A1
STRUCTURAL STEEL W-SHAPE
07 81 00.A
SPRAYED FIRE RESISTIVE MATERIAL
FIRE RATING
2hr 1hr
UL-3: SFRM (in) 15/16 1/2
BEAM FIRE PROTECTION - MINIMUM THICKNESS
a5 aR a6
UL-20
UL-20
UL-22
UL-32
UL-31
UL-32
UL-32
UL-23
UL-23
UL-23
UL-22
UL-11
UL-41
UL-10
UL-40
UL-10
UL-40
UL-10
UL-40
UL-11
UL-41
UL-11
UL-41
UL-11
UL-41
cQ a5 aR a6
UL-20
UL-20
UL-21
UL-30 UL-32
UL-32
UL-23
UL-23
UL-31
UL-22
UL-32
UL-30
UL-11
UL-41
UL-10
UL-40
UL-10
UL-40
UL-10
UL-40
UL-11
UL-41
UL-10
UL-40
UL-11
UL-41
UL-11
UL-41
UL-11
UL-41
UL-11
UL-41
UL-31
UL-11
UL-41
UL-32
UL-32
UL-32
UL-41
UL-11
UL-30
UL-41
UL-11
UL-41
UL-11
UL-41
UL-11
SHEET NUMBER
TITLE
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/9
/2
:2 :2
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0300
FIRE RESISTANCE
PLANS
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
Address 1 Address 2 Address 3
City, State ZIP t 987.654.3210 f 012.345.6789 www.perkinswill.com
SCALE 1/16" = 1'-0"1 LEVEL 2 FIREPROOFING RCP
SCALE 1/16" = 1'-0"2 LEVEL 3 RCP FIREPROOFING RCP
SCALE 1 1/2" = 1'-0"4 IFRM ON COLUMN
SCALE 1 1/2" = 1'-0"3 SFRM ON COLUMN
SCALE 1 1/2" = 1'-0"5 SFRM ON BEAM
MARK ISSUE DATE
1 WORKING DRAWINGS 01/29/26
2 REVISED WORKING DRAWINGS 04/03/26
COLUMN FIRE PROTECTION - MINIMUM THICKNESS
Type UL-1: SFRM (in) UL-2: IFRM (in)
W10X39 1 5/8 0.191
W12X40 1 11/16 0.202
W12X45 1 9/16 0.180
W12X50 1 7/16 0.164
W12X53 1 1/2 0.175
W12X58 1 7/16 0.161
W12X65 1 7/16 0.161
W12X72 1 5/16 0.146
W12X79 1 3/16 0.134
W12X85 1 1/8 0.125
W12X96 1 1/16 0.111
SCALE 1/8" = 1'-0"6 RATED ASSEMBLIES - LEVEL 2 CORE
SCALE 1/8" = 1'-0"7 RATED ASSEMBLIES - LEVEL 3 CORE
SCALE 1/8" = 1'-0"8 RATED ASSEMBLIES - LEVEL 3 SHAFT
cQ a5 aR a6
UL-20
UL-20
UL-21
UL-30 UL-32
UL-32
UL-23
UL-23
UL-31
UL-22
UL-32
UL-30
UL-11
UL-41
UL-10
UL-40
UL-10
UL-40
UL-10
UL-40
UL-11
UL-41
UL-10
UL-40
UL-11
UL-41
UL-11
UL-41
UL-11
UL-41
UL-11
UL-41
UL-31
UL-11
UL-41
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/2
/2
:4
:4
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0302
UL LISTED ASSEMBLIES
- COLUMNS
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
Address 1 Address 2 Address 3
City, State ZIP t 987.654.3210 f 012.345.6789 www.perkinswill.com
UL-1 | UL DESIGN NO X790 UL-2 | UL DESIGN NO X649
REPRINTED FROM THE ONLINE CERTIFICATIONS DIRECTORY WITH PERMISSION FROM UL REPRINTED FROM THE ONLINE CERTIFICATIONS DIRECTORY WITH PERMISSION FROM UL
MARK ISSUE DATE
1 WORKING DRAWINGS 01/29/26
2 REVISED WORKING DRAWINGS 04/03/26
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/2
/2
:4
:4
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0303
UL LISTED ASSEMBLIES
- BEAMS & FLOOR
CONSTRUCTION
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
Address 1 Address 2 Address 3
City, State ZIP t 987.654.3210 f 012.345.6789 www.perkinswill.com
UL-3 | UL DESIGN NO N708
REPRINTED FROM THE ONLINE CERTIFICATIONS DIRECTORY WITH PERMISSION FROM UL
MARK ISSUE DATE
1 WORKING DRAWINGS 01/29/26
2 REVISED WORKING DRAWINGS 04/03/26
UL-4 | UL DESIGN NO N902
REPRINTED FROM THE ONLINE CERTIFICATIONS DIRECTORY WITH PERMISSION FROM UL
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/2
/2
:4
:4
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0304
UL LISTED ASSEMBLIES
- FLOOR
CONSTRUCTION
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
Address 1 Address 2 Address 3
City, State ZIP t 987.654.3210 f 012.345.6789 www.perkinswill.com
MARK ISSUE DATE
1 WORKING DRAWINGS 01/29/26
2 REVISED WORKING DRAWINGS 04/03/26
UL-4 | UL DESIGN NO D902 (CONTINUED)
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/2
/2
:4
:4
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0305
UL LISTED ASSEMBLIES
- RATED PARTITIONS
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
Address 1 Address 2 Address 3
City, State ZIP t 987.654.3210 f 012.345.6789 www.perkinswill.com
MARK ISSUE DATE
1 WORKING DRAWINGS 01/29/26
2 REVISED WORKING DRAWINGS 04/03/26
UL-10 | UL DESIGN NO U411
Job Number
ISSUE CHART
CONSULTANTS
KEY PLAN
PROJECT
STRUCTURAL
CIVIL
MECHANICAL & ELECTRICAL
LANDSCAPE
OUBO
DESIGN PROFESSIONAL
STAMPS
/2
/2
:4
:4
P
M A u to d e s k D o c s /G
M U
R A
C A d d it io n /A
R C
H -G e o rg e M a s o n U n iv e rs it y
R A
C A
D D
IT
IO
N .r v t
G-0306
UL LISTED ASSEMBLIES
- RATED PARTITIONS &
SHAFT WALL
860900
BASKETBALL &
ACADEMIC
PERFORMANCE CENTER
(RAC ADDITION)
© 2025 Perkins and Will
4400 University Dr., Fairfax, VA
4350-B Banister Creek Ct., Fairfax, VA 22030
GEORGE MASON
UNIVERSITY
R E
V
IS
E D
W O
R K
IN
G
D R
A W
IN
G
S
4/
/2
Hope Furrer Associates
GORDON US LLC.
4501 Daly Drive, Suite 200, Chantilly, VA 20151
501 Fairmount Avenue, Suite 205, Towson MD, 21286
Mueller Associates
1306 Concourse Drive, Suite 100, Linthicum
MD, 21090
WFT Engineering
1801 Research Blvd., Suite 100, Rockville MD, 20850
Sladen Feinstein
434 Massachusetts Ave., Suite 506, Boston
MA, 02118
Michael Vergason Landscape Architects
907 King Street, Suite 200, Alexandria VA
LIGHTING
PLUMBING & FP
OWNER PROJECT #241927
Address 1 Address 2 Address 3
City, State ZIP t 987.654.3210 f 012.345.6789 www.perkinswill.com
MARK ISSUE DATE
1 WORKING DRAWINGS 01/29/26
2 REVISED WORKING DRAWINGS 04/03/26
UL-10 | UL DESIGN NO U411 (CONTINUED)
REPRINTED FROM THE ONLINE CERTIFICATIONS DIRECTORY WITH PERMISSION FROM UL
UL-11 | UL DESIGN NO U415
| 01 - General |
| G-0000 - COVER |
| G-0001 - INDEX OF DRAWINGS |
| G-0101 - CODE COMPLIANCE PLANS |
| G-0201 - RAC INTERIM LIFE SAFETY PLANS |
| G-0302 - UL LISTED ASSEMBLIES -COLUMNS |
| G-0303 - UL LISTED ASSEMBLIES -BEAMS & FLOOR CONSTRUCTION |
| G-0304 - UL LISTED ASSEMBLIES -FLOOR CONSTRUCTION |
| G-0305 - UL LISTED ASSEMBLIES -RATED PARTITIONS |
| G-0306 - UL LISTED ASSEMBLIES -RATED PARTITIONS & SHAFT WALL |
| G-0307 - UL LISTED ASSEMBLIES -SHAFT WALL & HEAD OF WALL |
| G-0308 - UL LISTED ASSEMBLIES -HEAD OF WALL |
| G-0309 - UL LISTED ASSEMBLIES -HEAD OF WALL |
| G-0310 - UL LISTED ASSEMBLIES -HEAD OF WALL |
| G-0311 - UL LISTED ASSEMBLIES -HEAD OF WALL |
| G-0312 - UL LISTED ASSEMBLIES -PENETRATIONS |
| G-0313 - UL LISTED ASSEMBLIES -PENETRATIONS |
| G-0314 - UL LISTED ASSEMBLIES -PENETRATIONS |
| G-0500 - SUSTAINABILITY CHECKLISTS |
| 02 - Civil |
| C-0001 - GENERAL NOTES AND LEGEND |
| C-0101 - EXISTING CONDITIONS PLAN |
| C-0102 - DEMOLITION PLAN |
| C-0103 - SITE LAYOUT PLAN |
| C-0104 - SITE DIMENSION AND LIGHTING PLAN 4 |
| C-0105 - PAVEMENT RESTORATION PLAN |
| C-0106 - GRADING PLAN |
| C-0107 - GRADING ENLARGEMENT |
| C-0108 - GRADING ENLARGEMENT |
File details come from the government source that posted it. Updated .