Basketball & Academic Performance Center Addition - Project Manual Summary
This is a Project Manual for construction services at George Mason University in Fairfax, Virginia, prepared by the architectural firm Perkins&Will. The project involves construction of a 30,000 square foot addition and a Level 2 alteration of 14,500 square feet to an existing gymnasium and related work. The project manual, dated April 3, 2026 (Revised Working Drawings), spans four volumes containing divisions 00 through 33, including procurement and contracting requirements, general requirements, concrete, masonry, metals, wood/plastics, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. The contract documents reference standard forms including DGS-30-054 (CO-7) General Conditions, HECO-7 modifications, and HECO standard forms for performance bonds, labor and material payment bonds, change orders, and completion certificates. Work is restricted to standard business hours of 6 AM to 6 PM Monday through Friday, with noise-generating activities permitted only between 10 PM and 9 AM with prior written approval and seven days' advance notice. The project requires coordination with ongoing University operations and includes specific requirements for hazardous material notifications, geotechnical data, and compliance with LEED v4 BD+C sustainability standards.
Key contractual provisions establish that the Contractor is responsible for all labor, materials, equipment, permits, licenses, and utilities necessary for construction execution. The project manual specifies delegated design requirements for certain components and assemblies, requiring submission of engineering calculations, shop drawings, and compliance documentation signed by qualified professional engineers with minimum ten years of relevant experience. Substitution requests must be submitted electronically in PDF format with comprehensive documentation including product comparisons, test reports, cost information, and at least three similar local project references. The Architect will render decisions on substitutions within 15 days of receipt or seven days of receiving additional requested information. All materials must comply with VOC requirements and regulations of the EPA, OSHA, and applicable state and local air control districts. The project includes specific requirements for construction coordination with occupied facilities, protection of existing structures and grounds, fire watch procedures for utility outages affecting fire protection systems, and daily documentation and reporting throughout the construction period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Perkins&Will
1222 22nd Street, NW | WASHINGTON, D.C. 20037 | (202) 737-1020
SPECIFICATIONS FOR THE
BASKETBALL AND ACADEMIC
PERFORMANCE CENTER AT
GEORGE MASON UNIVERISTY
Project Number: 241927
4350 Banister Creek Court
Fairfax, Virginia 22030
VOLUME 1 OF 4 (Divisions 01 – 14)
Revised Working Drawings
April 03, 2026
Basketball and Academic Performance Center Perkins&Will George Mason University (GMU) PO#: 241927 4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 03, 2026
TABLE OF CONTENTS
00 01 10 - 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
INDEX OF ISSUES
Preliminary Design .................................................................................................................... 22 May 2025
Working Drawings ................................................................................................................ 29 January 2026
Revised Working Drawings ...................................................................................................... 03 April 2026
INDEX OF DISCIPLINES
A (Architectural) FA (Fire Alarm) P (Plumbing)
B (Building Envelope) FP (Fire Protection) S (Structural)
C (Civil) L (Landscape) SC (Security)
D (Door Hardware) LV (Low Voltage) T (Technology)
E (Electrical) M (Mechanical)
SECTION SECTION
DISC NUMBER TITLE ISSUE DATE
00 01 07 Professional Seals Pages .................................................................... 03 April 2026
A 00 01 10 Table of Contents ............................................................................... 03 April 2026
VOLUME 1 OF 4
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
A 00 31 26 Existing Hazardous Material Information ......................................... 03 April 2026
A 00 31 32 Geotechnical Data .............................................................................. 03 April 2026
A 00 72 00 General Conditions ............................................................................ 03 April 2026
BIDDING INFORMATION
All required project forms/documents can be found on Mason’s Facilities website by utilizing this link:
https://facilities.gmu.edu/resources/heco-dgs-forms/
DGS Form HECO Form
Notice of Invitation for Bids N/A N/A
Instructions to Bidders N/A HECO 7A-EB
Standard Bid Form N/A N/A
General Conditions of the Construction Contract DGS-30-054 CO-7
Contract Between George Mason University and Contractor N/A HECO-9
Workers Compensation Certificate of Coverage N/A HECO-9A
Standard Performance Bond N/A HECO-10
Standard Labor and Material Payment Bond N/A HECO-10.1
Construction Change Order and Justification N/A HECO-11 https://facilities.gmu.edu/resources/heco-dgs-forms/
00 01 10 - 2
DGS Form HECO Form
General Contractor Estimate for Change Order N/A HECO-GC-1
Subcontractor Estimate for Change Order N/A HECO-SC-1
Sub-Subcontractor Estimate for Change Order N/A HECO-SS-1
Schedule of Values and Certificate for Payment N/A HECO-12
Affidavit of Payment of Claims N/A HECO-13
Certificate of Completion by A/E of Record N/A HECO-13.1
Certificate of Partial or Substantial Completion by A/E N/A HECO-13.1a
Final Report of Structural and Special Inspections N/A HECO-13.1b
Certificate of Substantial Completion by Construction N/A HECO-13.1c
Inspector, Manger, or Administrator
Certificate of Completion by Contractor N/A HECO-13.2
Certificate of partial or Substantial Completion N/A HECO-13.2a
By Contractor
Checklist for Beneficial Occupancy N/A HECO-13.2b
Project Completion Report N/A HECO-14
Submittal Register Format DGS-30-364 N/A
Statement of Structural and Special Inspections N/A HECO-6a-6b
DIVISION 01 – GENERAL REQUIREMENTS
A 01 10 00 Summary ............................................................................................ 03 April 2026
A 01 13 00 Delegated Design Requirements ........................................................ 03 April 2026
A 01 14 00 Work Restrictions .............................................................................. 03 April 2026
A 01 25 00 Substitution Procedures ..................................................................... 03 April 2026
Substitution Request Form
A 01 26 00 Contract Modification Procedures ..................................................... 03 April 2026
A 01 26 13 Requests for Interpretation (RFI) ....................................................... 03 April 2026
A 01 29 00 Payment Procedures ................................................................................ Not Issued
A 01 31 00 Project Management and Coordination ............................................. 03 April 2026
A 01 31 06 Coordination Drawings ...................................................................... 03 April 2026
A 01 32 00 Construction Progress Documentation .............................................. 03 April 2026
A 01 32 33 Photographic Documentation ............................................................ 03 April 2026
A 01 33 00 Submittal Procedures ......................................................................... 03 April 2026
Electronic File Transfer Agreement Form (BIM)
A 01 40 00 Quality Requirements ........................................................................ 03 April 2026
A 01 42 00 References .......................................................................................... 03 April 2026
A 01 43 39 Integrated Exterior Mockups ............................................................. 03 April 2026
A 01 45 33 Code-Required Special Inspections and Procedures .......................... 03 April 2026
A 01 50 00 Temporary Facilities and Controls .................................................... 03 April 2026
C 01 56 39 Temporary Tree and Plant Protection ................................................ 03 April 2026
C 01 57 23 Temporary Storm Water Pollution Control ....................................... 03 April 2026
A 01 60 00 Product Requirements ........................................................................ 03 April 2026
A 01 67 00 Environmental Requirements for Products ........................................ 03 April 2026
A 01 67 00.13 Prohibited Content Installer Certification .......................................... 03 April 2026
A 01 73 00 Execution ........................................................................................... 03 April 2026
00 01 10 - 3
A 01 73 29 Cutting and Patching .......................................................................... 03 April 2026
A 01 73 40 Construction IAQ Management Plan ................................................. 03 April 2026
A 01 74 19 Construction Waste Management and Disposal ................................ 03 April 2026
Form CWM-1
Form CWM-2
A 01 77 00 Closeout Procedures .......................................................................... 03 April 2026
A 01 78 23 Operation and Maintenance Data....................................................... 03 April 2026
A 01 78 39 Project Record Documents ................................................................ 03 April 2026
A 01 79 00 Demonstration and Training .............................................................. 03 April 2026
A 01 81 13 Sustainable Design Requirements – LEED v4 BD+C ....................... 03 April 2026
A 01 83 16 Exterior Enclosure Performance Requirements ................................. 03 April 2026
A 01 91 13 General Commissioning Requirements ............................................. 03 April 2026
DIVISION 02 – EXISTING CONDITIONS
A 02 41 19 Selective Demolition .......................................................................... 03 April 2026
DIVISION 03 – CONCRETE
S 03 10 00 Concrete Forming and Accessories ................................................... 03 April 2026
S 03 30 00 Cast-In-Place Concrete ...................................................................... 03 April 2026
A 03 30 10 Cast-In-Place Concrete for Polishing ................................................. 03 April 2026
A 03 33 00 Architectural Cast-in-Place Concrete ................................................ 03 April 2026
A 03 35 43 Polished Concrete Finishing .............................................................. 03 April 2026
A 03 54 16 Hydraulic Cement Underlayment ...................................................... 03 April 2026
DIVISION 04 – MASONRY
A 04 20 00 Unit Masonry ..................................................................................... 03 April 2026
DIVISION 05 – METALS
S 05 05 19 Post-Installed Anchors ....................................................................... 03 April 2026
S 05 12 00 Structural Steel Framing .................................................................... 03 April 2026
S 05 21 00 Steel Joist Framing............................................................................. 03 April 2026
S 05 31 00 Steel Decking ..................................................................................... 03 April 2026
A 05 40 00 Cold-Formed Metal Framing ............................................................. 03 April 2026
A 05 50 00 Metal Fabrications ............................................................................. 03 April 2026
A 05 51 00 Metal Stairs ........................................................................................ 03 April 2026
A 05 52 13 Tube Railings ..................................................................................... 03 April 2026
A 05 73 00 Decorative Metal Railings ................................................................. 03 April 2026
A 05 75 00 Decorative Formed Metal .................................................................. 03 April 2026
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
A 06 10 53 Miscellaneous Rough Carpentry ........................................................ 03 April 2026
A 06 16 00 Sheathing ........................................................................................... 03 April 2026
A 06 40 23 Interior Architectural Woodwork ...................................................... 03 April 2026
00 01 10 - 4
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
A 07 01 50 Roof Removal .................................................................................... 03 April 2026
A 07 13 26 Self-Adhering Sheet Waterproofing .................................................. 03 April 2026
A 07 21 00 Thermal Insulation ............................................................................. 03 April 2026
A 07 26 16 Under-Slab-on-Grade Vapor Barrier ................................................. 03 April 2026
A 07 27 15 Non-Bituminous Self-Adhering Sheet Air Barriers ........................... 03 April 2026
A 07 42 13.13 Formed Metal Wall Panels ................................................................ 03 April 2026
A 07 42 13.19 Insulated Metal Wall Panels .............................................................. 03 April 2026
A 07 54 23 Thermoplastic-Polyolefin (TPO) Roofing ......................................... 03 April 2026
A 07 62 00 Sheet Metal Flashing and Trim .......................................................... 03 April 2026
A 07 71 00 Manufactured Roof Specialties .......................................................... 03 April 2026
A 07 72 00 Roof Accessories ............................................................................... 03 April 2026
A 07 81 00 Applied Fireproofing ......................................................................... 03 April 2026
A 07 81 23 Intumescent Fire Protection ............................................................... 03 April 2026
A 07 84 13 Penetration Firestopping .................................................................... 03 April 2026
A 07 84 43 Joint Firestopping .............................................................................. 03 April 2026
A 07 92 00 Joint Sealants ..................................................................................... 03 April 2026
DIVISION 08 – OPENINGS
A 08 11 13 Hollow Metal Doors and Frames ....................................................... 03 April 2026
A 08 12 19 Interior Aluminum Doors and Frames ............................................... 03 April 2026
A 08 14 16 Flush Wood Doors ............................................................................. 03 April 2026
A 08 31 13 Access Doors and Frames .................................................................. 03 April 2026
A 08 41 13 Aluminum Framed Entrances and Storefronts ................................... 03 April 2026
A 08 44 13 Glazed Aluminum Curtain Walls ...................................................... 03 April 2026
A 08 71 00 Door Hardware .................................................................................. 03 April 2026
A 08 71 13 Automatic Door Operators ................................................................. 03 April 2026
A 08 80 00 Glazing ............................................................................................... 03 April 2026
A 08 81 13 Decorative Glass Glazing .................................................................. 03 April 2026
A 08 83 00 Mirrors ............................................................................................... 03 April 2026
DIVISION 09 – FINISHES
A 09 21 16 Gypsum Board Shaft Wall Assemblies.............................................. 03 April 2026
A 09 22 16 Non-Structural Metal Framing ........................................................... 03 April 2026
A 09 29 00 Gypsum Board ................................................................................... 03 April 2026
A 09 30 00 Tiling .................................................................................................. 03 April 2026
A 09 51 13 Acoustical Panel Ceilings .................................................................. 03 April 2026
A 09 51 33 Acoustical Metal Pan Ceilings ........................................................... 03 April 2026
A 09 54 13.13 Perforated Metal Ceilings .................................................................. 03 April 2026
A 09 61 23 Concrete Flooring Treatment ............................................................. 03 April 2026
A 09 62 53 Synthetic Turf Flooring ..................................................................... 03 April 2026
A 09 64 00 Wood Flooring ................................................................................... 03 April 2026
A 09 64 66 Wood Athletic Flooring ..................................................................... 03 April 2026
A 09 65 13 Resilient Base and Accessories .......................................................... 03 April 2026
A 09 65 19 Resilient Tile Flooring ....................................................................... 03 April 2026
00 01 10 - 5
A 09 65 66 Resilient Athletic Flooring ................................................................. 03 April 2026
A 09 72 20 Felt Wall Covering............................................................................. 03 April 2026
A 09 77 00 Specialty Architectural Panel Systems with Integrated Lighting ...... 03 April 2026
A 09 77 13 Stretched-Fabric Wall Systems .......................................................... 03 April 2026
A 09 91 13 Exterior Painting ................................................................................ 03 April 2026
A 09 91 23 Interior Painting ................................................................................. 03 April 2026
A 09 96 00 Exterior High-Performance Coatings ................................................ 03 April 2026
DIVISION 10 – SPECIALTIES
A 10 11 00 Visual Display Units .......................................................................... 03 April 2026
A 10 21 13 Phenolic-Core Toilet Compartments ................................................. 03 April 2026
A 10 22 19 Demountable Glass Partitions ............................................................ 03 April 2026
A 10 26 00 Wall and Door Protection ....................................................................... Not Issued
A 10 28 13 Toilet Accessories .............................................................................. 03 April 2026
A 10 44 00 Fire Protection Specialties ............................................................. 29 January 2029
A 10 82 00 Architectural Exterior Screens ................................................................ 29 January
DIVISION 11 – EQUIPMENT
A 11 30 00 Residential Appliances ........................................................................... Not Issued
A 11 66 23 Surface Padding System ................................................................ 29 January 2029
DIVISION 12 – FURNISHINGS
A 12 24 13 Roller Window Shades .................................................................. 29 January 2029
DIVISION 13 (Not Used)
DIVISION 14 – CONVEYING EQUIPMENT
A 14 24 00 Machine Room-Less Hydraulic Passenger Elevators ........................ 03 April 2026
DIVISIONS 15 – 20 (Not Used)
VOLUME 2 OF 4
DIVISION 21 – FIRE SUPPRESSION
FP 21 00 00 Basic Fire Suppression Requirements ............................................... 03 April 2026
FP 21 05 00 Common Work Results for Fire Suppression .................................... 03 April 2026
FP 21 05 23 General-Duty Valves for Water-Based Fire Suppression Piping ....... 03 April 2026
FP 21 05 29 Hangers and Supports for Fire Suppression Piping and Eq. .............. 03 April 2026
FP 21 05 53 Identification for Fire Suppression Piping and Equipment ................ 03 April 2026
FP 21 10 00 Water-Based Fire-Suppression Systems ............................................ 03 April 2026
DIVISION 22 – PLUMBING
P 22 00 00 Basic Mechanical Requirements - Plumbing ..................................... 03 April 2026
P 22 05 00 Common Work Results for Plumbing ............................................... 03 April 2026
00 01 10 - 6
P 22 05 23 General-Duty Valves for Plumbing Piping ........................................ 03 April 2026
P 22 05 53 Identification for Plumbing Piping and Equipment ........................... 03 April 2026
P 22 05 93 Testing, Adjusting, and Balancing for Plumbing ............................... 03 April 2026
P 22 07 19 Plumbing Piping Insulation ............................................................... 03 April 2026
P 22 11 16 Domestic Water Piping ...................................................................... 03 April 2026
P 22 11 19 Domestic Water Piping Specialties .................................................... 03 April 2026
P 22 11 23.21 Inline, Domestic-Water Pumps .......................................................... 03 April 2026
P 22 13 16 Sanitary Waste and Vent Piping ........................................................ 03 April 2026
C 22 13 13 Facility Sanitary Sewers .................................................................... 03 April 2026
P 22 13 19 Sanitary Waste Piping Specialties ..................................................... 03 April 2026
P 22 13 19.13 Sanitary Drains .................................................................................. 03 April 2026
P 22 14 14 Storm Drainage Piping ....................................................................... 03 April 2026
P 22 14 23 Storm Drainage Piping Specialties .................................................... 03 April 2026
P 22 14 29 Sump Pumps ...................................................................................... 03 April 2026
P 22 35 00 Domestic-Water Heat Exchangers ..................................................... 03 April 2026
P 22 42 00 Commercial Plumbing Fixtures ......................................................... 03 April 2026
P 22 47 00 Drinking Fountains and Water Coolers ............................................. 03 April 2026
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
M 23 01 30.51 HVAC Air Duct Cleaning .................................................................. 03 April 2026
M 23 05 00 Common Work Results for Mechanical ............................................ 03 April 2026
M 23 05 13 Common Motor Requirements for HVAC Equipment ...................... 03 April 2026
M 23 05 16 Expansion Fittings and Loops for HVAC Piping .............................. 03 April 2026
M 23 05 18 Escutcheons for HVAC Piping .......................................................... 03 April 2026
M 23 05 19 Meters and Gages for HVAC Piping ................................................. 03 April 2026
M 23 05 23 General Duty Valves for HVAC Piping ............................................ 03 April 2026
M 23 05 29 Hangers and Supports for HVAC Piping and Equipment.................. 03 April 2026
M 23 05 33 Heat Tracing for HVAC Piping ......................................................... 03 April 2026
M 23 05 48.13 Vibration Controls for HVAC ........................................................... 03 April 2026
M 23 05 53 Identification for Mechanical ............................................................. 03 April 2026
M 23 05 93 Testing, Adjusting, and Balancing for HVAC .................................. 03 April 2026
M 23 07 00 HVAC Insulation ............................................................................... 03 April 2026
M 23 09 23 Direct Digital Control (DDC) System for HVAC ............................. 03 April 2026
M 23 09 23.12 Control Dampers ................................................................................ 03 April 2026
M 23 09 23.14 Flow and Pressure Instruments .......................................................... 03 April 2026
M 23 09 93.11 Sequence of Operations for HVAC DDC .......................................... 03 April 2026
M 23 21 13 Hydronic Piping ................................................................................. 03 April 2026
M 23 21 16 Hydronic Piping Specialties ............................................................... 03 April 2026
M 23 21 23 Hydronic Pumps ................................................................................ 03 April 2026
M 23 23 00 Refrigerant Piping .............................................................................. 03 April 2026
M 23 25 00 HVAC Water Treatment .................................................................... 03 April 2026
M 23 31 13 Metal Ducts ........................................................................................ 03 April 2026
M 23 31 19 HVAC Casings .................................................................................. 03 April 2026
M 23 33 00 Air Duct Accessories ......................................................................... 03 April 2026
M 23 34 23 HVAC Power Ventilators .................................................................. 03 April 2026
M 23 36 00 Air Terminal Units ............................................................................. 03 April 2026
00 01 10 - 7
M 23 37 13 Diffusers, Registers, and Grilles ........................................................ 03 April 2026
M 23 41 00 Particulate Air Filtration .................................................................... 03 April 2026
M 23 52 13 Electric Boilers .................................................................................. 03 April 2026
M 23 64 26.13 Air-Cooled, Rotary-Screw Water Chillers ......................................... 03 April 2026
M 23 73 43.16 Outdoor, Semi-Custom Air-Handling Units ...................................... 03 April 2026
M 23 81 26 Split-System Air-Conditioners ......................................................... 03 April 2026
M 23 82 16 Air Coils ............................................................................................. 03 April 2026
M 23 82 19 Fan-Coil Units ................................................................................... 03 April 2026
M 23 82 33 Convectors ......................................................................................... 03 April 2026
DIVISIONS 24 - 25 (Not Used)
VOLUME 3 OF 4
DIVISION 26 – ELECTRICAL
E 26 05 05 Selective Demolition for Electrical .................................................... 03 April 2026
E 26 05 19 Low-Voltage Electrical Power Conductors and Cables ..................... 03 April 2026
E 26 05 26 Grounding and Bonding for Electrical Systems ................................ 03 April 2026
E 26 05 33.13 Conduit for Electrical Systems .......................................................... 03 April 2026
E 26 05 33.16 Boxes for Electrical Systems ............................................................. 03 April 2026
E 26 05 43 Electrical Underground Ducts, Duct Banks, and Manholes .............. 03 April 2026
E 26 05 53 Identification for Electrical Systems .................................................. 03 April 2026
E 26 05 73 Power System Studies ........................................................................ 03 April 2026
E 26 09 23 Lighting Control Devices ................................................................... 03 April 2026
E 26 09 36 Modular Dimming Controls ............................................................... 03 April 2026
E 26 22 00 Low-Voltage Transformers ................................................................ 03 April 2026
E 26 24 16 Panelboards ........................................................................................ 03 April 2026
E 26 27 13 Electricity Metering ........................................................................... 03 April 2026
E 26 27 26 Wiring Devices .................................................................................. 03 April 2026
E 26 28 13 Fuses .................................................................................................. 03 April 2026
E 26 28 16.16 Enclosed Switches ............................................................................. 03 April 2026
E 26 29 13 Enclosed Controllers .......................................................................... 03 April 2026
E 26 29 23 Variable-Frequency Motor Controllers .............................................. 03 April 2026
E 26 43 00 Surge Protective Devices ................................................................... 03 April 2026
E 26 51 00 Interior Lighting ................................................................................. 03 April 2026
E 26 56 00 Exterior Lighting................................................................................ 03 April 2026
DIVISION 27 – COMMUNICATIONS
LV 27 05 26 Grounding and Bonding for Communications Systems .................... 03 April 2026
LV 27 05 28.36 Cable Trays for Communications Systems ........................................ 03 April 2026
LV 27 10 00 Telecommunications Structured Cabling ........................................... 03 April 2026
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
LV 28 13 00 Access Control Systems ..................................................................... 03 April 2026
00 01 10 - 8
LV 28 23 00 Video Surveillance Systems .............................................................. 03 April 2026
FP 28 46 21.11 Addressable Fire-Alarm Systems ...................................................... 03 April 2026
DIVISION 29 (Not Used)
DIVISION 31 – EARTHWORK
C 31 10 00 Site Clearing ...................................................................................... 03 April 2026
A 31 23 00 Earthwork .......................................................................................... 03 April 2026
C 31 23 19 Dewatering ......................................................................................... 03 April 2026
C 31 50 00 Excavation Support and Protection .................................................... 03 April 2026
DIVISION 32 – EXTERIOR IMPROVEMENTS
C 32 12 16 Asphalt Paving ................................................................................... 03 April 2026
L 32 12 43 Reinforced Turf.................................................................................. 03 April 2026
C 32 13 13 Concrete Paving ................................................................................. 03 April 2026
C 32 13 73 Concrete Paving Joint Sealants .......................................................... 03 April 2026
L 32 14 00 Unit Paving ........................................................................................ 03 April 2026
C 32 17 23 Pavement Markings ........................................................................... 03 April 2026
C 32 17 26 Tactile Warning Surfacing ................................................................. 03 April 2026
L 32 33 00 Site Furnishings ................................................................................. 03 April 2026
L 32 91 13 Soil Preparation.................................................................................. 03 April 2026
L 32 92 00 Turfs and Grasses............................................................................... 03 April 2026
L 32 93 00 Exterior Plants.................................................................................... 03 April 2026
L 32 94 19 Landscape Surfacing .......................................................................... 03 April 2026
DIVISION 33 – UTILITIES
C 33 05 00 Common Work Results for Utilities .................................................. 03 April 2026
C 33 14 15 Site Water Distribution Piping ........................................................... 03 April 2026
C 33 42 00 Stormwater Conveyance .................................................................... 03 April 2026
VOLUME 4 OF 4
APPENDIX
FP Appendix A Hydraulic Calculations ...................................................................... 03 April 2026
S Appendix B Structural Calculations ....................................................................... 03 April 2026
O Appendix C Geotechnical Engineering Report ...................................................... 03 April 2026
M Appendix D Mechanical Calculations .................................................................... 03 April 2026
P Appendix E Plumbing Fixture Calculations .......................................................... 03 April 2026
E Appendix F Light Fixture Cut Sheet Package ....................................................... 03 April 2026
E Appendix G Electrical Calculations ....................................................................... 03 April 2026
00 01 10 - 9
END OF TABLE OF CONTENTS
PROFESSIONAL SEALS PAGE
00 01 07 - 1
DOCUMENT 00 01 07 - PROFESSIONAL SEALS
PAGE
Architect
Civil Engineer
Structural Engineer
Mechanical Engineer
Electrical Engineer
Plumbing Engineer
PROFESSIONAL SEALS PAGE
00 01 07 - 2
Fire Protection Engineer
Stormwater Engineer
Landscape Architect
Low Voltage Designer
END OF DOCUMENT 00 01 07
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
EXISTING HAZARDOUS MATERIAL INFORMATION
00 31 26 - 1
SECTION 00 31 26
EXISTING HAZARDOUS MATERIAL INFORMATION
PART 1 GENERAL
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide University's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. Existing asbestos reports are available for viewing at the office of University. Contact the George Mason University Project Manager for access.
C. Related Requirements:
1. Section 00 31 32 - Geotechnical Data for reports and soil-boring data from geotechnical investigations that are made available to bidders.
2. Section 02 41 19 - Selective Demolition for notification requirements if materials suspected of containing hazardous materials are encountered.
END OF SECTION 00 31 26
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
GEOTECHNICAL DATA
00 31 32 - 1
SECTION 00 31 32
GEOTECHNICAL DATA
PART 1
1.1 GEOTECHNICAL DATA
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide University's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information. This Document and its attachments are not part of the Contract Documents.
B. Because subsurface conditions indicated by the soil borings are a sampling in relation to the entire construction area, and for other reasons, the University, the Architect, the Architect's consultants, and the firm reporting the subsurface conditions do not warranty the conditions below the depths of the borings or that the strata logged from the borings are necessarily typical of the entire site. Any party using the information described in the soil borings and geotechnical report shall accept full responsibility for its use.
C. A geotechnical engineering report for Project, prepared by Schnabel Engineering, dated January 10, 2025, is in Appendix C of this Project Manual.
1. The opinions expressed in this report are those of a geotechnical engineer and represent interpretations of subsoil conditions, tests, and results of analyses conducted by a geotechnical engineer. University is not responsible for interpretations or conclusions drawn from the data.
2. Any party using information described in the geotechnical report shall make additional test borings and conduct other exploratory operations that may be required to determine the character of subsurface materials that may be encountered.
1.2 RELATED DOCUMENTS:
A. Section 00 31 26 - Existing Hazardous Material Information for hazardous materials reports that are made available to bidders.
END OF SECTION 00 31 32
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
GENERAL CONDITIONS
00 72 00 - 1
SECTION 00 72 00
GENERAL CONDITIONS
PART 1 GENERAL
A. General Condition of the Construction Contract, DGS-30-054 (CO-7) and the General Conditions of the Construction Contract for Capital Outlay Projects (HECO-7) - which modifies DGS-30-054 Form CO-7, hereinafter referred to as General Conditions, are hereby made a part of this Specification.
B. The Contractor is hereby specifically directed, as a condition of the Contract, to acquaint themselves with the Articles contained herein, and to notify and apprise all Subcontractors and any other parties to the Contract of, and bind them to, its conditions.
C. No contractual adjustments shall be due as a result of failure on the part of the Contractor, Subcontractors, or other parties to the Contract to fully acquaint themselves with the General Conditions.
D. The provisions of the General Conditions and Division 01, General Requirements, apply to the Work specified in each Section of the Specifications.
E. Where conflicts occur concerning the Architect’s duties and responsibilities between the General Conditions and the Agreement between the Owner and Architect, the Agreement shall take precedence.
F. If not otherwise included in the Owner-Contractor Agreement or specifically included in the bidding documents, the Contractor shall obtain the Owner’s insurance requirements prior to submitting a bid.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION 00 72 00
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
SUMMARY
01 10 00 - 1
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Project information.
2. Work covered by Contract Documents.
3. Contractor Duties.
4. Work by University.
5. University-furnished, Contractor-installed products.
6. Contractor-furnished, University-installed products.
7. Access to site.
8. Protection of persons, work, and property.
9. Coordination with occupants.
10. Specification and Drawing conventions.
11. Provisions for electronic media.
1.2 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to the Work of all Sections in the Specifications. The Contract Documents are complementary and what is required by one shall be as binding as if required by all.
B. Conflicts or discrepancies among the Contract Documents shall be resolved in the following order of priority:
1. Contract modifications (such as Change Orders and Bulletins) of later date take precedence over those of earlier date;
2. The Agreement.
3. Addenda of later date take precedence over those of earlier date.
4. The Supplementary Conditions.
5. The General Conditions.
6. Drawings and Specifications: Drawings govern Specifications for quantity and location. Specifications govern drawings for quality and performance. In the event of ambiguity or conflicts, the greater quantity and the better quality shall govern.
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
SUMMARY
01 10 00 - 2
1.3 PROJECT INFORMATION
A. Project Identification:
1. Project Title: Basektball and Academic Performance Center (BAP
2. Project Location: George Mason university (GMU) 4350 Banister Creek Court, Fairfax, Virginia 22030.
3. Project ID Number: BCOM PC# 247-241927
B. University/Owner: George Mason University.. The words "Owner" and "University" are used interchangeably throughout the Contract Documents.
C. Architect Identification: The Contract Documents were prepared for the Project by Perkins&Will, 1222 22nd Street, NW - Washington, D.C. 20037.
D. Architect’s Consultants: The Architect has retained the following design professionals who have prepared designated portions of the Contract Documents:
1. Refer to Title Page.
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
1. Construction of a 30,000 square foot addition and a level 2 alteration of 14,500 square feet to an existing gymnasium and other Work indicated in the Contract Documents.
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.5 CONTRACTOR DUTIES
A. VOC Compliance: Ensure that all assemblies, components, and systems comply with all VOC (Volatile Organic Components) requirements and regulations of the Environmental Protection Agency (EPA), Occupational Safety Health Administration (OSHA), State, County, City, and Local Air Control District.
1. See Divisions 02 through 28 for Project VOC Restrictions.
B. Except as specifically noted, provide and pay for:
1. Labor, materials, and equipment.
2. Tools, construction equipment and machinery.
3. Water, heat, and utilities required for construction.
4. Other facilities and services necessary for proper execution and completion of work.
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
SUMMARY
01 10 00 - 3
C. Secure and pay for, as necessary for proper execution and completion of Work, and as applicable at time of receipt of bids:
1. Building Permit.
2. Licenses.
D. Give required notices.
E. Comply with all applicable local Building Codes, ordinances, rules, regulations, orders and other legal requirements of public authorities which bear on performance of Work.
F. Promptly submit written notice to Architect of observed variance of Contract Documents from requirements of authorities having jurisdiction. Assume responsibility for Work known to be contrary to code or regulatory requirements performed without such notice.
1.6 WORK BY UNIVERSITY
A. General: Cooperate fully with University so that work can be performed without interfering or delaying the work under this Contract or work by the University. Coordinate the work of this Contract with work performed by the University.
1.7 UNIVERSITY-FURNISHED, CONTRACTOR-INSTALLED PRODUCTS
A. Identified in Working Drawings.
B. Universtiy Responsibilities: For University-furnished, Contractor-installed products, the Owner will:
1. Arrange for Shop Drawings, Product Data, and Samples and deliver to the Contractor
2. Arrange and pay for delivery of Owner-furnished items according to Contractor's construction schedule
3. Inspect delivered items for damage.
4. Arrange for replacement of Owner-furnished items that are damaged, defective, or missing when delivered to Contractor.
5. Arrange for manufacturer's field services for delivery of manufacturer's warranties to the
Contractor.
6. Furnish the Contractor the earliest possible delivery date for Owner-furnished products.
C. Contractor Responsibilities: For Owner-furnished, Contractor-installed products, the Contractor shall:
1. Provide support systems to receive Owner's equipment as well as provide plumbing, HVAC, and electrical connections.
2. Be present for delivery and assist the Owner's inspection.
3. Use Owner-furnished delivery dates in Contractor's construction schedule
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
SUMMARY
01 10 00 - 4
4. Review Shop Drawings, Product Data, Samples, and other submittals, and return to the Architect, noting discrepancies or anticipated problems regarding incorporation of the product.
5. Be responsible for receiving, unloading, handling, and storing Owner-furnished items at Project site.
6. Protect Owner-furnished items from damage during storage and handling, including damage from exposure to the elements.
7. Repair or replace items damaged because of Contractor's operations with new items matching originally specified items.
8. Install and incorporate Owner-furnished items into the work, in accordance with manufacturer's installation instructions, and make building utility services connections.
1.8 CONTRACTOR FURNISHED, UNIVERSITY-INSTALLED PRODUCTS
A. Identified in Working Drawings.
1.9 ACCESS TO SITE
A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section and by Owner's right to perform work or retain other contractors on portions of the project.
1. During construction, allow for Owner occupancy and public use of, and access to, existing facilities.
2. Make each entity engaged in work on the Project aware that the existing facilities house operating functions that must remain in operation during the construction period, except as the Owner may otherwise direct. Plumbing, heating, ventilating, electrical, fire alarm, and telephone systems are to be functional throughout the construction period with a minimum of interruptions in service. Do not block any required fire exits.
3. Confine operations at Project site to areas permitted by law, ordinances, permits, and Contract Documents.
4. Do not unreasonably encumber site with materials or equipment that hinders access.
5. Protect and keep safe products stored on premises.
6. Products and materials are to be stored to not interfere with operations of Owner or other contractors.
7. Obtain and pay for use of additional storage or work areas needed for operations.
B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limit use of site for work and storage as follows:
a. Do not use completed paved areas for storage without Owner’s approval.
b. Do not store materials within 30 feet of new or existing trees.
c. Restrict Work and storage to areas indicated on Drawings or approved by Owner.
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
SUMMARY
01 10 00 - 5
d. Limit site access to locations approved by Owner.
e. Restrict parking to areas approved by Owner.
f. Do not perform operations that would interrupt or delay Owner's daily operations.
2. Limits: Limit site disturbance, including earthwork and clearing of vegetation, to 40 feet (12.2 m) beyond building perimeter; 10 feet (3 m) beyond surface walkways, patios, surface parking, and utilities less than 12 inches (300 mm) in diameter; 15 feet (4.5 m) beyond primary roadway curbs and main utility branch trenches; and 25 feet (7.6 m) beyond constructed areas with permeable surfaces (such as pervious paving areas, stormwater detention facilities, and playing fields) that require additional staging areas in order to limit compaction in the constructed area.
3. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment onsite.
C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
1.10 PROTECTION OF PERSONS, WORK, AND PROPERTY
A. Contractor shall maintain adequate protection of the Work from damage and shall protect the Owner's and adjacent property from injury or loss arising from the Work.
1. Repair damage to existing buildings, property, and site caused by employees, subcontractors, or consultants.
B. Contractor shall provide and always maintain OSHA-required danger signs, guards, and obstructions necessary to protect the public and construction personnel from any dangers inherent with or created by the construction of the Work.
1. Comply with federal, state, and city rules and requirements pertaining to safety, and all EPA standards, OSHA standards, and NESHAP regulations pertaining to asbestos and other hazardous materials.
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
SUMMARY
01 10 00 - 6
1.11 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy site, existing, and adjacent building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work to to not interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.
2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.
1.12 SPECIFICATION AND DRAWING CONVENTIONS
A. Specifications Format: The Specifications are organized into Divisions and Sections using CSI/CSC's "MasterFormat 2020" 50-Division numbering system.
1. Section Identification: The Specifications use section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence, without all numbers included in the sequence. Consult the Table of Contents at the beginning of the Project Manual to determine numbers and names of sections in the Contract Documents.
2. The order of articles, paragraphs, subparagraphs, and sub-subparagraphs within the text of any Specification section is defined by a sequence of indentations.
a. Article, paragraph and subparagraph titles, and other identifications of subject matter in the Specifications, are intended as an aid in locating and recognizing various requirements in the beginning words of a sentence.
b. Specification text shall govern over titling and shall be understood to be interpreted as a whole. Where a title establishes the subject, the titles are subordinate to and do not define, limit, or otherwise restrict the Specification text.
3. The captions and headings of various subdivisions of the Contract Documents are intended only as a matter of reference and convenience for describing the Work and in no way define, prescribe, or limit the scope or intent of the Contract Documents or any subdivision thereof.
B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
4350 Banister Creek Court | Fairfax, Virginia 22030 860900 Revised Working Drawings April 3, 2026
SUMMARY
01 10 00 - 7
1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.
Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications.
Requirements expressed in the imperative mood are to be performed by Contractor.
Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
b. Contract Documents may omit modifying words such as “all” or “any,” and articles such as “the” or “an.” The absence of a modifier or article from one statement that appears in another is not intended to affect the interpretation of either statement.
3. Specification requirements are to be performed by Contractor…