ATTACHMENT E - Mandatory Requirements Checklist - RFP 758 2700000012.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- HCM ERP System Replacement - Phase 1
- Solicitation number
- RFP 758 2700000012 3
- Issued by
- Elliott County, Kentucky
About this file
This is a Mandatory Requirements Checklist (Attachment E) for RFP 758 2700000012 related to Kentucky's HCM ERP System Replacement - Phase 1 project. The checklist establishes mandatory compliance requirements that proposals must satisfy to be deemed responsive and eligible for contract award. Proposals offering only software or only services will be considered non-responsive. The procurement requires a partnership model in which Systems Integrators (SIs) must partner with a single Software Service Provider (SSP) to submit joint proposals owned by the SSP, with each SSP partnering with only one SI and submitting a single proposal. All proposed software components must be fully integrated and provided by the same SSP, with the SSP responsible for ensuring FedRAMP compliance and providing hosting services for five instances covering sandbox, development, preview, production, and training environments for both pre-production and production infrastructure.
The SI must provide a fixed fee price for implementation and deployment services, with the Statement of Work to be finalized as part of the final Agreement with the Commonwealth. Implementation must include all relevant Business Analytics & Reporting and Mobility capabilities while ensuring security, compliance, and integration to the Commonwealth's other enterprise systems. Vendors and subcontractors must comply with the Commonwealth Office of Technology's AI Policy (CIO-126), with AI usage requiring approval from COT and the AI committee; vendors must promptly notify the Commonwealth of any known issues, risks, or incidents arising from AI use. Additionally, awarded vendors must cooperate fully with the IV&V (Independent Verification and Validation) vendor by providing timely access to project artifacts, environments, documentation, and personnel, participating in IV&V meetings and checkpoints, and responding to IV&V findings and recommendations within mutually agreed timeframes while supporting transparency in project status, risks, and issues.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mandatory
ATTACHMENT E - MANDATORY REQUIREMENTS CHECKLIST
RFP 758 2700000012
Offeror shall indicate compliance with each mandatory requirement by responding YES. Proposals that do not meet all mandatory requirements shall be deemed non responsive and shall not be considered. Attachment E should be submitted with the Technical Proposal.
| SECTION 3 MANDATORY REQUIREMENTS | YES | NO | |
| 3.1 Proposals that offer only software or only services ill be considered non-responsive and will not be eligible for contract award. | |||
| 3.1 Systems Integrators (SIs) shall not submit proposals independently. | |||
| 3.1 Each SI must partner with an SSP and submit a joint proposal that is owned by the SSP. | |||
| 3.1 An SSP must partner with only one SI. | |||
| 3.1 An SI shall partner with only one SSP. | |||
| 3.1 Each SSP must submit only one proposal. | |||
| 3.1 Each SSP proposal must include all required components identified in Section 3.0 sub sections 3.1.A.1.1 and 3.1.A.1.2. | |||
| 3.1.A.1 Section in its entirety. | |||
| 3.1.A.2 Each component of the proposed software solution must be fully integrated and must be provided by the same SSP. | |||
| 3.1.A.3 Section in its entirety. | |||
| 3.1.A.4 The SSP must ensure FedRAMP requirements are met and provide associated hosting services for at least five (5) instances for the pre-production and production infrastructure to include sandbox, development (may be considered a second sandbox), preview, production and training. | |||
| 3.1.A.5 Section in its entirety. | |||
| 3.1.A.6 Section in its entirety. | |||
| 3.1.A.7 Section in its entirety. | |||
| 3.1.A.8 Section in its entirety. | |||
| 3.1.A.9 Section in its entirety. | |||
| 3.1.A.10 Section in its entirety. | |||
| 3.1.A.11 Section in its entirety. | |||
| 3.1.A.12 Section in its entirety. | |||
| 3.1.A.13 Section in its entirety. | |||
| 3.2.3 The SSP shall respond to RFP Section 3.2.7 in one combined Excel workbook, using the Excel workbook supplied as Attachment F. | |||
| 3.3.1.1 Based on the scoping information provided in this RFP and its attachments, SIs will quote a fixed fee price for implementation and deployment services. | |||
| 3.3.1.2 The Statement of Work between the SI and the Commonwealth will be revised and finalized as part of the final Agreement between the Commonwealth and the SI. | |||
| 3.3.1.3 The SI must include all relevant Business Analytics & Reporting and Mobility, while ensuring security, compliance, and integration to the Commonwealth’s other enterprise systems as designated. | |||
| 3.3.1.4 Section in its entirety. | |||
| 3.3.1.5 The vendor and its subcontractors shall comply with the Commonwealth Office of Technology’s AI Policy - CIO-126, Artificial Intelligence Policy and usage must be approved by COT and the AI committee. (see Section 4.1 and 10.31 of this RFP) | |||
| 3.3.1.5.1 Section in its entirety. | |||
| 3.3.1.5.2 Section in its entirety. | |||
| 3.3.1.5.3 Section in its entirety. | |||
| 3.3.1.5.5 Section in its entirety. | |||
| 3.3.1.5.6 Section in its entirety. | |||
| 3.3.1.5.7 Vendor(s) shall promptly notify the Commonwealth of any known issues, risks, or incidents arising from the use of AI | |||
| 3.3.1.6 The Vendors shall meet with Cabinet personnel, or designated representatives, to resolve technical or contractual problems that may occur during the term of the Agreement. | |||
| 3.4 The awarded vendor(s) shall: | |||
| • | Cooperate fully with the IV&V vendor and provide timely access to project artifacts, environments, documentation, and personnel as reasonably requested | ||
| • | Participate in IV&V led meetings, review and checkpoints | ||
| • | Respond to IV&V findings, recommendations, and risk assessments within mutually agreed timeframes | ||
| • | Support transparency in project status, risks, and issues. |