Attachment D - Submittal Log.pdf

PDF 640 KB Posted

Attached to
Carr-Keswick 230-kV Transmission Line Structure 4/4 Replacement Construction Project
Solicitation number
89503120BWA000025
Issued by

About this file

This document contains a submittal log and details of a federal contract opportunity for structure replacement construction work. The submittal log outlines 48 required submittals for the Carr-Keswick 230-kV Transmission Line project, including construction schedules, safety plans, material testing reports, drawings, and as-built documents. Submittal due dates range from 10 days prior to notice to proceed to after project completion.

The related federal contract opportunity is a competitive small business set-aside for structure replacement and transmission line installation work. The solicitation will be available on May 15, 2020 at http://www.beta.sam.gov and bids are due between $1-3 million. The work includes removing one lattice tower, installing a monopole structure and 0.5 miles of double circuit transmission line along with a temporary shoo-fly line. The performance location is in Whiskeytown National Recreation Area, California. The Department of Energy Western Area Power Administration is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Title: Award Date:

Contract No.: NTP:

Contractor: Completion Date:

Location Submittal Item In Date Date

# # Submittal Item Standards CSO DSW Date Due Submitted Approved COMMENTS

STANDARD 1

1 Construction Schedule 1.1.4.1. 3 (see project spec)

2 Breakdown of Contract Prices 1.1.6.1. 1 1 NLT 30 days after

NTP

3 Electrical Equipment & Steel Purchase Orders 1.2.3.1. 1 NLT 10 working days after PO award

4 Safety and Health Program 1.4.1.5. 1 NLT 10 days prior to start of construction

5 Copies of Certifications, Test Records & Technical Data 1.4.1.10. 1 Prior to use

6 - Load Performance Tests 1.4.1.10.(1) 1 Prior to use

7 - Crane & Aerial Lift Equipment Annual Inspection Records 1.4.1.10.(2) 1 Prior to use

8 - Brake Performance Test 1.4.1.10.(3) 1 Prior to use

9 - Test Results of Protective Ground Leads 1.4.1.10.(4) 1 Prior to use

10 - Material Safety Data Sheets 1.4.1.10.(5) 1 Prior to use

11 - Manufacturer's Load Rating For Hoists and Grips 1.4.1.10.(6) 1 Prior to use

12 - Certification of Fabricated Lifting and Rigging Devices 1.4.1.10.(7) & 1.4.11 1 Prior to use

13 - Medical Examiner's Certificate 1.4.1.10.(8) & 1.4.3.3 1 Prior to use

14 - Data For Excavation Protective System 1.4.1.10.(9) & 1.4.5.5 1 Prior to use

15 Assurance of Competency in Equipment Operation 1.4.3.4. 1 Prior to use

16 Structure Erection Plan 1.4.8.1. 1 Prior to structure erection

17 Suspended Work Cart Work Procedure 1.4.12 1 Prior to use

18 Protective Ground Lead Test Results & Certification 1.4.14.3. 1 Prior to use

19 Clearance, Hot Line Order & Special Work Permit Requests 1.4.15.3. 1 NLT 10 working days prior to starting work

20 Stringing Plan 1.4.17.3. 1 Prior to stringing

21 HLO/Clearance Approval or Denial From Other Utilities 1.4.17.4.(3) 1) 1 Prior to stringing

22 Transmission Line Removal Plan 1.4.18 1 Prior to removal

23 Shoo-fly work sequence plan 1 14 days after NTP

STANDARD 2

24 Earth Material Testing Laboratory 2.1.1.2.(1) & 2.7.1.2.(1) 1 20 days prior to compacting

25 Rip-ap Gradation 2.9.3 1 14 days prior to placement

26 Earth Material Compaction Test Reports 2.1.1.2.(2)& 2.7.1. 1 Immed. after test complete

27 Tree Trimmer Qualifications 2.4.4. 1 Prior to trimming

Submitted To Copies

SUBMITTAL TRACKING SHEET

89503120BWA000025

Attachment D

Location Submittal Item In Date Date

# # Submittal Item Standards CSO DSW Date Due Submitted Approved COMMENTS Submitted To

Copies

STANDARD 3

28 Concrete Testing Laboratory 3.1.1.2.(1) & 3.1.1.3. 1 NLT 20 days prior to concrete placement

29 Concrete Mix Design 3.1.1.2.(2) & 3.1.1.5. 1 NLT 10 days prior to use

30 Fly Ash For Concrete 3.1.1.2.(5) & 3.1.1.4. 1 NLT 20 days prior to use

31 Admixtures and Curing Compound 3.1.1.2.(6) & 3.1.1.4. 1 NLT 10 days prior to use

32 Batch Certificates 3.1.1.2.(7) 1 Provide at delivery

33 Test Reports 3.1.1.2.(8) 1 Immed. upon completing

34 Drawings & Data For Electrical Equip. Foundation Design 3.2.1.2. 2 T Prior to installation

STANDARD 10

35 Catalog Data Sheets of Accessories & Hardware Used In Conductor & Overhead Ground Wire Installation 10.2.2. 3

NLT 40 days prior to material installation

36 Drawings of Insulator & Overhead Groundwire Assemblies and Details 10.2.2. 3 NLT 40 days prior to material installation

37 Complete Material List 10.2.2. 1 NLT 40 days prior to material installation

38 Conductor Insulator Assembly Test Reports 10.2.3.1. & 10.3.3. 2 ASAP

39 Conductor Test Reports 10.2.3.2. & 10.6.1.2. 2 ASAP

40 Overhead Ground Wire Test Reports 10.2.3.3. & 10.6.2.2. 2 ASAP

41 Overhead Ground Wire Assemblies Test Reports 10.2.3.4. & 10.4.3. 2 ASAP

42 Ground Resistance Measurements 10.2.3.5. & 10.5.3. 2 ASAP

43 Vibration Damper Test Reports 10.2.3.6. & 10.6.4.3. 2 ASAP

44 Conductor Spacer Damper Test Reports 10.2.3.7. & 10.6.6.2. 2 ASAP

45 Assembly & Installation Instructions For Conductor Insulator Assemblies 10.3.4 2 NLT 2 weeks prior to installation

STANDARD 13

46 Recycled Materials Quantity Report 13.2.1. & 13.7.2. 1

47 Products Containing Recovered Materials Report 13.2.2. & 13.8.3. 1

48 CONCRETE Removal Silica Plan 1 2 weeks prior to use

49 Spill Prevention Notification & Cleanup Plan 13.2.5. & 13.11.2. 1

50 Cleanup Work Management Plan 13.2.16. & 13.19.2. 1

51 Post Cleanup Report 13.2.17. & 13.19.7. 1

STANDARD 15

52 As-Built Drawings 15.2.6. 1

*Submittal required if item is used in the performance of the contract.

"T"= Submit transmittal sheet only.

"NLT"= No Later Than "NTP"= Notice To Proceed "ASAP"= As Soon As Practicable