89503120BWA000025.pdf

PDF 335 KB Posted

Attached to
Carr-Keswick 230-kV Transmission Line Structure 4/4 Replacement Construction Project
Solicitation number
89503120BWA000025
Issued by

About this file

This is a solicitation for a competitive 100% Small Business Set-aside Invitation for Bid to replace one latticed steel tower with one engineered steel monopole structure and install 0.5 miles of 230-kV double-circuit transmission line and 0.5 miles of temporary 230-kV transmission line. The project magnitude is estimated between $1,000,000 to $3,000,000 under North American Industry Classification System code 237130 with a size standard of $39.5 million. The place of performance will be Whiskeytown National Recreation Area west of Redding, California. Interested parties can download the solicitation, specifications and drawings from the System for Award Management on or about May 15, 2020. Any questions shall be submitted in writing by the specified date referencing the solicitation number. Bids will not be accepted electronically or by facsimile. Prospective contractors must register in SAM to be eligible for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

20WA135467

WAPA (DSW)

US DOE/WESTERN AREA POWER

DESERT SOUTHWEST REGIONAL OFFICE

PO BOX 6457

DSW

PHOENIX AZ 85005-6457

WESTERN AREA POWER ADMINISTRATION - DSW

ATTN: TIM MODJESKI - 89503120BWA000025

615 S. 43rd AVE

PHOENIX AZ 85009-5313

Timothy Modjeski 602-605-2650 x

05/15/2020

89503120BWA000025

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Carr-Keswick 4/4 Tower Replacement

This is a competitive 100% Small Business Set-aside Invitation for Bid (IFB).

The project magnitude is estimated between $1,000,000 and $3,000,000. The North American Industry Classification System (NAICS) code is 237130.

All work shall be in strict compliance with the specification and drawings.

Site Visit: To be held on May 27, 2020. See Provision DOE-L-2019 for meeting location and date/time. Although not mandatory, a site visit by interested parties is encouraged. If you attend the site visit, due to the mountainous terrain, a 4x4 vehicle will be required to drive to the job site. NOTE: Only 4x4 vehicles will be allowed to the site. Also, all attendees are required to wear hard hats and steel toed boots. WAPA will not issue safety gear. The bidders may perform investigation of the complete project on their own.

***Social distancing measures will be in effect. All attendees must stay apart at a minimum of 6 feet from each other. Due to social distancing measures, only two (2) Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ calendar days after receiving

Section F, Clause 52.211-10

06/24/2020

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

WAPA (DSW)

US DOE/WESTERN AREA POWER

DESERT SOUTHWEST REGIONAL OFFICE

PO BOX 6457

DSW

PHOENIX AZ 85005-6457

Eric W. Jordan

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 39

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

89503120BWA000025

representatives per potential offeror will be allowed at the site visit. Personal protective equipment will not be issued.***

00001 Carr-Keswick 4/4 Tower Replacement Construction

Project

***Do not complete, for financial purposes only***

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

89503120BWA000025

Section B - Supplies or Services/Prices The bid schedule is listed as attachment A in Section J Section C - Description/Specifications The specification and drawings as attachments B and C in Section J Section D - Packaging and Marking Reserved Section E - Inspection and Acceptance

52.246-12 INSPECTION OF CONSTRUCTION. (AUG 1996)

DOE-E-2001 INSPECTION AND ACCEPTANCE (OCT 2014)

Section F - Deliveries or Performance

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. (APR 1984)

52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION. (SEP 2000)

52.211-18 VARIATION IN ESTIMATED QUANTITY. (APR 1984)

Section G - Contract Administration Data

DOE-G-2001 CONTRACTING OFFICER AUTHORITY (OCT 2014)

DOE-G-2002 CONTRACTING OFFICER’S REPRESENTATIVE (OCT 2014)

DOE-G-2007 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING (JUL 2018)

WES-G-2001 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA, JAN 2008)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

Section H - Special Contract Requirements

DOE-H-2013 CONSECUTIVE NUMBERING (OCT 2014)

DOE-H-2033 ALTERNATIVE DISPUTE RESOLUTION (OCT 2014)

DOE-H-2034 CONTRACTOR INTERFACE WITH OTHER CONTRACTORS AND/OR GOVERNMENT EMPLOYEES (OCT 2014)

DOE-H-2044 MATERIAL SAFETY DATA SHEET AVAILABILITY (OCT 2014)

DOE-H-2049 INSURANCE REQUIREMENTS (OCT 2014)

DOE-H-2055 GOVERNMENT FURNISHED PROPERTY (OCT 2014)

DOE-H-2059 PRESERVATION OF ANTIQUITIES, WILDLIFE AND LAND AREAS (OCT 2014)

DOE-H-2065 REPORTING OF FRAUD, WASTE, ABUSE, CORRUPTION, OR MISMANAGEMENT (OCT 2014)

DOE-H-2076 LOBBYING RESTRICTIONS (NOV 2018)

WES-H-2001 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA (WAPA, APR 2009)

WES-H-2007 MOBILIZATION AND PREPARATORY WORK (WAPA, MAY 2018)

WES-H-2011 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2018)

WES-H-2015 SAFETY AND HEALTH – HIGH RISK (WAPA, MAY 2018)

Section I - Contract Clauses

52.202-1 DEFINITIONS. (NOV 2013)

52.203-3 GRATUITIES. (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)

52.203-7 ANTI-KICKBACK PROCEDURES. (MAY 2014)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY.

(MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY. (MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS. (OCT 2010) 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS. (APR 2014)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS. (JAN 2017)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER. (MAY 2011) 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS. (OCT 2018)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (OCT 2018)

52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS. (OCT 2016)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE. (JUL 2016)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS. (DEC 2014) 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR

PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES. (JUL 2018)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT. (AUG 2019)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT. (OCT 2015)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS. (OCT 2018) 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS. (NOV 2015)

52.214-26 AUDIT AND RECORDS – SEALED BIDDING (OCT 2010)

52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA - MODIFICATIONS - SEALED

BIDDING. (AUG 2011)

52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS - SEALED BIDDING. (OCT 2010)

52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING. (JAN 1986)

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV 2011)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (OCT 2018)

52.219-14 LIMITATIONS ON SUBCONTRACTING. (JAN 2017)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (JUL 2013)

52.222-3 CONVICT LABOR. (JUN 2003)

52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME COMPENSATION. (MAY 2018)

52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS. (AUG 2018)

52.222-7 WITHHOLDING OF FUNDS. (MAY 2014)

52.222-8 PAYROLLS AND BASIC RECORDS. (AUG 2018)

52.222-9 APPRENTICES AND TRAINEES. (JUL 2005)

52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS. (FEB 1988)

52.222-11 SUBCONTRACTS (LABOR STANDARDS). (MAY 2014)

52.222-12 CONTRACT TERMINATION - DEBARMENT. (MAY 2014)

52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS.

(MAY 2014)

52.222-14 DISPUTES CONCERNING LABOR STANDARDS. (FEB 1988)

52.222-15 CERTIFICATION OF ELIGIBILITY. (MAY 2014)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES. (APR 2015)

52.222-26 EQUAL OPPORTUNITY. (SEP 2016)

52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION. (APR 2015)

52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (OCT 2015)

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUL 2014)

52.222-37 EMPLOYMENT REPORTS ON VETERANS. (FEB 2016)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT. (DEC 2010) ...20

52.222-50 COMBATING TRAFFICKING IN PERSONS. (JAN 2019)

52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658. (DEC 2015)

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706. (JAN 2017)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS. (SEP 2013)

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA. (JAN 1997)

52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. (MAY 2011)

52.223-6 DRUG-FREE WORKPLACE. (MAY 2001)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING. (AUG 2011)

52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS. (MAY 2014)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES. (JUN 2008)

52.227-1 AUTHORIZATION AND CONSENT. (DEC 2007)

52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS. (DEC 2007)

52.228-1 BID GUARANTEE. (SEP 1996)

52.228-2 ADDITIONAL BOND SECURITY. (OCT 1997)

52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION. (JAN 1997)

52.228-11 PLEDGES OF ASSETS. (AUG 2018)

52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)

52.228-14 IRREVOCABLE LETTER OF CREDIT. (NOV 2014)

52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION. (OCT 2010)

52.229-3 FEDERAL, STATE, AND LOCAL TAXES. (FEB 2013)

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS. (MAY 2014)

52.232-17 INTEREST. (MAY 2014)

52.232-23 ASSIGNMENT OF CLAIMS. (MAY 2014)

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS. (JAN 2017)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD MANAGEMENT. (OCT 2018)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS. (DEC 2013)

52.233-1 DISPUTES. (MAY 2014) - ALTERNATE I (DEC 1991)

52.233-3 PROTEST AFTER AWARD. (AUG 1996)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT 2004)

52.236-2 DIFFERING SITE CONDITIONS. (APR 1984)

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK. (APR 1984)

52.236-5 MATERIAL AND WORKMANSHIP. (APR 1984)

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR. (APR 1984)

52.236-7 PERMITS AND RESPONSIBILITIES. (NOV 1991)

52.236-8 OTHER CONTRACTS. (APR 1984)

52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS.

(APR 1984)

52.236-10 OPERATIONS AND STORAGE AREAS. (APR 1984)

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION. (APR 1984)

52.236-12 CLEANING UP. (APR 1984)

52.236-13 ACCIDENT PREVENTION. (NOV 1991)

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. (APR 1984)

52.236-17 LAYOUT OF WORK. (APR 1984)

52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION. (FEB 1997)

52.236-26 PRECONSTRUCTION CONFERENCE. (FEB 1995)

52.242-13 BANKRUPTCY. (JUL 1995)

52.242-14 SUSPENSION OF WORK. (APR 1984)

52.243-4 CHANGES. (JUN 2007)

52.243-6 CHANGE ORDER ACCOUNTING. (APR 1984)

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS. (AUG 2019)

52.245-1 GOVERNMENT PROPERTY. (JAN 2017)

52.245-9 USE AND CHARGES. (APR 2012)

52.246-21 WARRANTY OF CONSTRUCTION. (MAR 1994)

52.248-3 VALUE ENGINEERING - CONSTRUCTION. (OCT 2015)

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE). (APR 2012)

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION). (APR 1984)

52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)

52.253-1 COMPUTER GENERATED FORMS. (JAN 1991)

952.202-1 DEFINITIONS

Section J - List of Documents, Exhibits and Other Attachments Section K - Representations, Certifications, and Other Statements of Bidders

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (JAN 2020)

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT. (DEC 2019)

52.209-5 CERTIFICATION A FELONY CONVICTION UNDER ANY FEDERAL LAW OR AN UNPAID FEDERAL TAX

LIABILITY. (APR 2012) DEVIATION

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS. (OCT 2018)

52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS-CERTIFICATION. (JUN 2018)

Section L - Instructions,Conditions, and Notices to Bidders

52.204-7 SYSTEM FOR AWARD MANAGEMENT. (OCT 2018)

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING. (JUL 2016)

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS. (DEC 2016)

52.214-4 FALSE STATEMENTS IN BIDS. (APR 1984)

52.214-5 SUBMISSION OF BIDS. (DEC 2016)

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS. (APR 1984)

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS. (NOV 1999)

52.214-18 PREPARATION OF BIDS - CONSTRUCTION. (APR 1984)

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE. (APR 1991)

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY. (APR 1991)

52.216-1 TYPE OF CONTRACT. (APR 1984)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF THE WORK. (MAY 2014) 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY FOR CONSTRUCTION. (FEB 1999)

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT - CONSTRUCTION MATERIALS. (MAY 2014)

52.233-2 SERVICE OF PROTEST. (SEP 2006)

52.236-27 SITE VISIT (CONSTRUCTION). (FEB 1995)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE. (FEB 1998)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS. (APR 1984)

952.233-2 SERVICE OF PROTEST

952.233-4 NOTICE OF PROTEST FILE AVAILABILITY. (AUG 2009)

952.233-5 AGENCY PROTEST REVIEW. (SEP 1996)

DOE-L-2016 NUMBER OF AWARDS (OCT 2015)

DOE-L-2017 EXPENSES RELATED TO OFFEROR SUBMISSIONS (OCT 2015)

DOE-L-2019 SITE VISIT (OCT 2015)

DOE-L-2021 GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING ARRANGEMENTS ON SMALL

BUSINESS STATUS (OCT 2015)

DOE-L-2022 ALTERNATE BID/PROPOSAL INFORMATION – NONE (OCT 2015)

DOE-L-2026 SERVICE OF PROTEST (OCT 2015)

DOE-L-2027 NOTICE OF PROTEST FILE AVAILABILITY (OCT 2015)

DOE-L-2028 AGENCY PROTEST REVIEW (OCT 2015 )

WES-L-2002 MAILED OR HANDCARRIED BID INSTRUCTIONS (WAPA, MAY 2018)

WES-L-2003 QUESTIONS CONCERNING THE SOLICITATION (WAPA, MAR 2002)

WES-L-2004 CONTRACTOR'S CONTRACT ADMINISTRATION (WAPA, FEB 2008)

Section M - Evaluation Factors for Award

52.214-19 CONTRACT AWARD - SEALED BIDDING - CONSTRUCTION. (AUG 1996)

WES-M-2001 AWARD ON AN ALL OR NONE BASIS (WAPA, NOV 1995)

Section B - Supplies or Services/Prices

The bid schedule is listed as attachment A in Section J

Section C - Description/Specifications

The specification and drawings as attachments B and C in Section J

Section D - Packaging and Marking

Reserved

Section E - Inspection and Acceptance

52.246-12 INSPECTION OF CONSTRUCTION. (AUG 1996)

DOE-E-2001 INSPECTION AND ACCEPTANCE (OCT 2014)

Inspection and acceptance of all items under this contract shall be accomplished by the Contracting Officer in accordance with the clause entitled 52.246-12, Inspection of Construction. If the Contracting Officer assigns this responsibility to the Contracting Officer’s Representative or another representative of the Government, the Contracting Officer shall notify the Contractor in writing.

(End of Clause)

Section F - Deliveries or Performance

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than November 6, 2020. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION. (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,187.36 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.211-18 VARIATION IN ESTIMATED QUANTITY. (APR 1984)

Section G - Contract Administration Data

DOE-G-2001 CONTRACTING OFFICER AUTHORITY (OCT 2014)

The Contracting Officer is responsible for administration of the contract. The Contracting Officer may appoint a Contracting Officer’s Representative (COR), in accordance with the clause entitled Contracting Officer’s Representative, to perform specifically delegated functions. The Contracting Officer is the only individual who has the authority on behalf of the Government, among other things, to take the following actions under the contract:

(a) Assign additional work within the general scope of the contract.

(b) Issue a change in accordance with the clause entitled Changes.

(c) Change the cost or price of the contract.

(d) Change any of the terms, conditions, specifications, or services required by the contract.

(e) Accept non-conforming work.

(f) Waive any requirement of the contract.

(End of Clause)

DOE-G-2002 CONTRACTING OFFICER’S REPRESENTATIVE (OCT 2014)

Pursuant to the clause at DEAR 952.242-70, Technical Direction, the Contracting Officer shall designate in writing a Contracting Officer’s Representative (COR) for this contract, and provide a copy of such designation to the contractor, including the delegated responsibilities and functions. The COR does not have authority to perform those functions reserved exclusively for the Contracting Officer.

DOE-G-2007 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING (JUL 2018)

(a) The Contracting Officer will document the Contractor’s performance under this contract (including any task orders placed against it, if applicable) by using the Contractor Performance Assessment Reporting System (CPARS). CPARS information is handled as “Source Selection Information,” available to authorized Government personnel seeking past performance information when evaluating proposals for award.

(b) Contractor performance will be evaluated at least annually at the contract or task-order level, as determined by the Contracting Officer. Evaluation categories may include any or all of the following at the Government’s discretion: (1) technical/quality, (2) cost control, (3) schedule, (4) management or business relations, and (5) small business subcontracting. Past performance information is available at http://www.cpars.gov. It is recommended that the Contractor take the overview training found on the CPARS website. The Contractor shall acknowledge receipt of the Government’s request for comments on CPARS assessments at the time it is received and shall respond to such requests within fourteen (14) calendar days of the request.

(c) Joint Ventures. Performance assessments shall be prepared on contracts with joint ventures. When the joint venture has a unique Commercial and Government Entity (CAGE) code and Data Universal Numbering System (DUNS) number, a single assessment will be prepared for the joint venture using its CAGE code and DUNS number. If the joint venture does not have a unique CAGE code and DUNS number, separate assessments, containing identical narrative, will be prepared for each participating contractor and will state that the evaluation is based on performance under a joint venture and will identify the contractors that were part of the joint venture.

(d) In addition to the performance assessments addressed above, the Government will perform other performance assessments necessary for administration of the contract in accordance with other applicable clauses in this contract.

(End of Clause)

WES-G-2001 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA, JAN 2008)

a. The contractor is authorized up to 60 calendar days after the contract completion date to complete and submit final drawings, operation and maintenance manuals, and any other data required by the contract.

b. This period noted above is strictly for administrative purposes and is not an extension of the actual performance period of the contract. Liquidated damages are not applicable to this period.

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

In accordance with Office of Management and Budget Memorandum M-15-19, effective April 1, 2018, all payment requests must be submitted electronically. Western Area Power Administration (WAPA) has selected the U. S. Department of the Treasury's Invoice Processing Platform System (IPP) as its electronic processing platform.

"Payment request" means any Contractor request for contract financing payment or invoice payment. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the Contractor shall upload relevant back-up documentation as an attachment to the electronic invoice when requesting payment through IPP.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Accounts Receivable (AR) Point of Contact as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

Section H - Special Contract Requirements

DOE-H-2013 CONSECUTIVE NUMBERING (OCT 2014)

Due to automated procedures employed in formulating this document, clauses and provisions contained within may not always be consecutively numbered.

(End of clause)

DOE-H-2033 ALTERNATIVE DISPUTE RESOLUTION (OCT 2014)

(a) The DOE and the Contractor both recognize that methods for fair and efficient resolution of contractual issues in controversy by mutual agreement are essential to the successful and timely completion of contract requirements. Accordingly, DOE and the Contractor shall use their best efforts to informally resolve any contractual issue in controversy by mutual agreement. Issues of controversy may include a dispute, claim, question, or other disagreement. The parties agree to negotiate with each other in good faith, recognizing their mutual interests, and attempt to reach a just and equitable solution satisfactory to both parties.

(b) If a mutual agreement cannot be reached through negotiations within a reasonable period of time, the parties may use a process of alternate dispute resolution (ADR) in accordance with the clause at FAR 52.233-1, Disputes. The ADR process may involve mediation, facilitation, fact-finding, group conflict management, and conflict coaching by a neutral party. The neutral party may be an individual, a board comprised of independent experts, or a company with specific expertise in conflict resolution or expertise in the specific area of controversy. The neutral party will not render a binding decision, but will assist the parties in reaching a mutually satisfactory agreement. Any opinions of the neutral party shall not be admissible in evidence in any subsequent litigation proceedings.

(c) Either party may request that the ADR process be used. The Contractor shall make a written request to the Contracting Officer, and the Contracting Officer shall make a written request to the appropriate official of the Contractor. A voluntary election by both parties is required to participate in the ADR process. The parties must agree on the procedures and terms of the process, and officials of both parties who have the authority to resolve the issue must participate in the agreed upon process.

(d) ADR procedures may be used at any time that the Contracting Officer has the authority to resolve the issue in controversy. If a claim has been submitted by the Contractor, ADR procedures may be applied to all or a portion of the claim. If ADR procedures are used subsequent to issuance of a Contracting Officer’s final decision under the clause at FAR 52.233-1, Disputes, their use does not alter any of the time limitations or procedural requirements for filing an appeal of the Contracting Officer’s final decision and does not constitute reconsideration of the final decision.

(e) If the Contracting Officer rejects the Contractor’s request for ADR proceedings, the Contracting Officer shall provide the Contractor with a written explanation of the specific reasons the ADR process is not appropriate for the resolution of the dispute. If the Contractor rejects the Contracting Officer’s request to use ADR procedures, the Contractor shall provide the Contracting Officer with the reasons for rejecting the request.

(End of Clause)

DOE-H-2034 CONTRACTOR INTERFACE WITH OTHER CONTRACTORS AND/OR GOVERNMENT EMPLOYEES

(OCT 2014)

The Government may award contracts to other contractors for work to be performed at a DOE-owned or –controlled site or facility.

The Contractor shall cooperate fully with all other on-site DOE contractors and Government employees. The Contractor shall coordinate its own work with such other work as may be directed by the Contracting Officer or a duly authorized representative. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by a Government employee.

DOE-H-2044 MATERIAL SAFETY DATA SHEET AVAILABILITY (OCT 2014)

In implementation of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall obtain, review and maintain a Material Safety Data Sheet (MSDS) in a readily accessible manner for each hazardous material (or mixture containing a hazardous material) ordered, delivered, stored or used; and maintain an accurate inventory and history of use of hazardous materials at each use and storage location. The MSDS shall conform to the requirements of 29 CFR 1910.1200(g).

(End of Clause)

DOE-H-2049 INSURANCE REQUIREMENTS (OCT 2014)

(a) In accordance with the clause 52.228-5, the following types and minimum amounts of insurance shall be maintained by the Contractor:

(1) Workers’ compensation – Amount in accordance with applicable Federal and State workers’ compensation and occupational disease statutes.

(2) Employer’s liability - $100,000 (except in States with exclusive or monopolistic funds that do not permit worker’s compensation to be written by private carriers).

(3) Comprehensive bodily injury liability - $500,000.

(4) Property damage liability – $500,000 per incident

(5) Comprehensive automobile bodily injury liability - $200,000 per person and $500,000 per occurrence.

(6) Comprehensive automobile property damage - $20,000 per occurrence.

(b) The Contractor shall provide evidence of such insurance, if requested by the Contracting Officer; and the Contracting Officer may require such evidence to be provided prior to the commencement of work under the contract.

(End of Clause)

DOE-H-2055 GOVERNMENT FURNISHED PROPERTY (OCT 2014)

In accordance with the clause 52.245-1, the Government will provide the property listed in Division 1 of the specification.

(End of Clause)

DOE-H-2059 PRESERVATION OF ANTIQUITIES, WILDLIFE AND LAND AREAS (OCT 2014)

(a) Federal Law provides for the protection of antiquities located on land owned or controlled by the Government. Antiquities include Indian graves or campsites, relics and artifacts. The Contractor shall control the movements of its personnel and its subcontractor's personnel at the job site to ensure that any existing antiquities discovered thereon will not be disturbed or destroyed by such personnel.

It shall be the duty of the Contractor to report to the Contracting Officer the existence of any antiquities so discovered.

(b) The Contractor shall also preserve all vegetation (including wetlands) except where such vegetation must be removed for survey or construction purposes. Any removal of vegetation shall be in accordance with the terms of applicable habitat mitigation plans and permits. Furthermore, all wildlife must be protected consistent with programs approved by the Contacting Officer.

(c) Except as required by or specifically provided for in other provisions of this contract, the Contractor shall not perform any excavations, earth borrow, preparation of borrow areas, or otherwise disturb the surface soils within the job site without the prior approval of DOE or its designee.

DOE-H-2065 REPORTING OF FRAUD, WASTE, ABUSE, CORRUPTION, OR MISMANAGEMENT (OCT 2014)

The Contractor shall comply with the following:

(a) Notify employees annually of their duty to report allegations of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement relating to DOE programs, operations, facilities, contracts, or information technology systems to an appropriate authority (e.g., OIG, other law enforcement, supervisor, employee concerns office, security officials). Examples of violations to be reported include, but are not limited to, allegations of false statements; false claims; bribery; kickbacks; fraud; DOE environment, safety, and health violations; theft; computer crimes; contractor mischarging; conflicts of interest; and conspiracy to commit any of these acts. Contractors must also ensure that their employees are aware that they may always report incidents or information directly to the Office of Inspector General (OIG).

(b) Display the OIG hotline telephone number in buildings and common areas such as cafeterias, public telephone areas, official bulletin boards, reception rooms, and building lobbies.

(c) Publish the OIG hotline telephone number in telephone books and newsletters under the Contractor’s cognizance.

(d) Ensure that its employees report to the OIG within a reasonable period of time, but not later than 24 hours after discovery, all alleged violations of law, regulations, or policy, including incidents of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement, that have been referred to Federal, State, or local law enforcement entities.

(e) Ensure that its employees report to the OIG any allegations of reprisals taken against employees who have reported to the OIG fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.

(f) Ensure that its managers do not retaliate against DOE contractor employees who report fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.

(g) Ensure that all their employees understand that they must –

(1) Comply with requests for interviews and briefings and must provide affidavits or sworn statements, if so requested by an employee of the OIG so designated to take affidavits or sworn statements;

(2) Not impede or hinder another employee's cooperation with the OIG; and

(3) Not take reprisals against DOE contractor employees who cooperate with or disclose information to the OIG or other lawful appropriate authority.

(h) Seek more specific guidance concerning reporting of fraud, waste, abuse, corruption, or mismanagement, and cooperation with the Inspector General, in DOE directives.

(End of Clause)

DOE-H-2076 LOBBYING RESTRICTIONS (NOV 2018)

In accordance with 18 U.S.C. § 1913, the Contractor agrees that none of the funds obligated on this award shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress. This restriction is in addition to those prescribed elsewhere in statute and regulation.

(End of clause)

WES-H-2001 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA (WAPA, APR 2009)

The Government may retain/holdback up to ten (10) percent of total amount and final payment will not be made until all final drawings, as-builts, operation and maintenance manuals, and any other data required under the contract have been delivered to and accepted by the Government.

WES-H-2007 MOBILIZATION AND PREPARATORY WORK (WAPA, MAY 2018)

a. General. Mobilization and preparatory work may include movement of personnel, equipment, supplies, and incidentals to the project site; establishment of offices, buildings, plants and other facilities at the project site; necessary costs for acquisition of equipment; and for any other work which must be performed incident to the start of construction at the site.

b. Facilities, plants, and equipment required for this project that are established at, or brought to, the worksite are subject to the provisions of this clause unless the Contracting Officer specifically excludes, in writing, a particular item or items. The contractor is solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all its facilities, plants, and equipment. The facilities, plants, and equipment covered by this paragraph shall not be dismantled or removed from the worksite prior to completion of the work specified in the contract without the written permission of the Contracting Officer.

c. Payment. Payment for mobilization and preparatory work will be made at the lump sum price specified in Section B of the contract.

Progress payments for mobilization and preparatory work will be made as follows:

(1) When five (5)__percent of the total amount of the original contract is earned from other schedule items, fifty (50)__percent of the amount agreed upon for mobilization and preparatory work will be paid.

(2) When ten (10)__percent of the total amount of the original contract is earned from other schedule items, the balance of the amount agreed upon for mobilization and preparatory work will be paid.

d. Progress payments for mobilization and preparatory work shall be subject to retainage as provided by FAR 52.232-5, “Payments Under Fixed-Price Construction Contracts.” In addition, the line item for mobilization and preparatory work will not be considered to be a separate division of the work, completion of which would permit the payment of the complete item price without retention.

WES-H-2011 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2018)

The Contractor must receive prior, written approval from WAPA’S Personnel Security Office before any non-U.S. Citizens (Foreign Nationals) visit or work at any Western Area Power Administration (WAPA) facility. WAPA’s Personnel Security Office will verify that:

(1) Each of the contractors working under this contract that may visit or be assigned to work at any WAPA facility is a U.S. Citizen, or;

(2) The Contractor shall provide an accurately completed Foreign National Data Card, WAPA Form 3000-72, Attached to the WAPA’s Standard Operating Procedures (SOP), found at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx, for each of their Foreign National employees that may visit or work at any WAPA facility. The Contractor shall forward the completed form to the COR at least 45 days in advance of each Foreign National employee's visit or their beginning work.

Foreign National employees shall not be allowed on-site at any WAPA facility without prior approval of the cognizant WAPA Personnel Security Office. Circumstances which do not allow a 45 day notification require prior, written approval of the cognizant WAPA Personnel Security Office. The Contractor shall include this requirement in any subcontract it issues under this contract.

WAPA reserves the right to remove any contract employee from WAPA’s property pending the conclusion of the Foreign National background check.

(End of Clause)

WES-H-2015 SAFETY AND HEALTH – HIGH RISK (WAPA, MAY 2018)

In performing the work required by this contract, the Contractor shall comply with all applicable Federal, State, or local safety, health, or industrial safety codes including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration; Safety and Health Standards 29 CFR 1910, 29 CFR 1925; and the Construction Safety and Health regulations promulgated under Section 107 of the Contract Work Hours and Safety Standards Act, 29 CFR 1926. If there is a conflict between the requirements of the applicable Federal, State, or local safety, health, or industrial safety codes, the more stringent requirements shall prevail. Prior to the performance of work involving the use of cranes, a copy of the crane inspection records, operators and riggers certifications, and completed on-site crane load test form shall be furnished to WAPA’s on-site representative. The United States is liable only for negligence on the part of its employees in accordance with the Federal Tort Claims Act, as amended.

Prior to starting work, an on-site safety meeting shall be held with Western's representative to address and discuss safety procedures related to the work required.

In addition, the contractor agrees to the following requirements:

(1) A hazard evaluation will be developed for each major work component.

(2) A safety meeting will be held to discuss potential hazards and their mitigation before work begins.

(3) The Contractor agrees that Western has the right to remove any supervisor that does not adhere to said requirements.

(End of Clause)

Section I - Contract Clauses

52.202-1 DEFINITIONS. (NOV 2013)

52.203-3 GRATUITIES. (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)

52.203-7 ANTI-KICKBACK PROCEDURES. (MAY 2014)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY.

(MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY. (MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS. (OCT 2010)

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM

EMPLOYEES OF WHISTLEBLOWER RIGHTS. (APR 2014)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS. (JAN 2017)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER. (MAY 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS. (OCT 2018)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (OCT 2018)

52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS. (OCT 2016)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE. (JUL 2016)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS. (DEC 2014)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR

PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES. (JUL 2018)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT. (AUG 2019)

(a) Definitions. As used in this clause-

Covered foreign country means The People's Republic of China.

Covered telecommunications equipment or services means-

(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);

(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Critical technology means-

(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).

Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.

(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub.L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph

(c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in Federal Acquisition Regulation 4.2104.

(c) Exceptions. This clause does not prohibit contractors from providing-

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(d) Reporting requirement. (1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:

(i) Within one business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.

(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.

(End of clause)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT. (OCT 2015)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS. (OCT 2018)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS. (NOV 2015)

52.214-26 AUDIT AND RECORDS – SEALED BIDDING (OCT 2010)

52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA - MODIFICATIONS -

SEALED BIDDING. (AUG 2011)

52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS - SEALED BIDDING. (OCT 2010)

52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING. (JAN 1986)

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV 2011)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (OCT 2018)

52.219-14 LIMITATIONS ON SUBCONTRACTING. (JAN 2017)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (JUL 2013)

(a) Definitions. As used in this clause-

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .