Attachment D - Base Proposal Item Price Breakdown.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- N041--659-22-104: AHU Replacement (VA-22-00011507) Federal contract opportunity
- Solicitation number
- 36C24622R0004
About this file
This document contains a base proposal item price breakdown template for project number 558-17-150 to renovate the PACU at the Durham VAMC. The template includes line items for labor and material costs by construction division, with columns for total division costs, overhead percentage, profit percentage, and bond percentage. However, no numerical values are provided within the template.
The related federal contract opportunity is a solicitation for project number N041-659-22-104 to replace AHUs at the Durham VAMC. The solicitation is a request for proposal with selection criteria provided, but the government will not pay costs associated with responding and is under no obligation to award a contract. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 6.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| site visit pt1_.pdf | ||
| RFI _ AHU (002)_.pdf | ||
| 36C24622R0004_6.docx | DOCX document | |
| site visit pt2_.pdf | ||
| 36C24622R0004_5.docx | DOCX document | |
| 36C24622R0004_4.docx | DOCX document | |
| RFI _ AHU_.pdf | ||
| AHU Part 1.pdf | ||
| AHU Part 2.pdf | ||
| AHU Part 3.pdf | ||
| 36C24622R0004_3.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment B -wage determination.pdf | ||
| 36C24622R0004_2.docx | DOCX document | |
| 00-Salisbury AHU Final CD Specifications 210920.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number: 558-17-150 Edward L Roy: VA assigned project #
| Date: | |
| Project Title | Renovate PACU |
Edward L Roy: VA assigned Project Title
| Project Location | Durham VAMC | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .