This document contains a base proposal item price breakdown template for project number 558-17-150 to renovate the PACU at the Durham VAMC. The template includes line items for labor and material costs by construction division, with columns for total division costs, overhead percentage, profit percentage, and bond percentage. However, no numerical values are provided within the template.

The related federal contract opportunity is a solicitation for project number N041-659-22-104 to replace AHUs at the Durham VAMC. The solicitation is a request for proposal with selection criteria provided, but the government will not pay costs associated with responding and is under no obligation to award a contract. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 6.

View the file

Other files for this federal contract opportunity

Other files attached to N041--659-22-104: AHU Replacement (VA-22-00011507), newest first.
File Type Posted
site visit pt1_.pdf PDF
RFI _ AHU (002)_.pdf PDF
36C24622R0004_6.docx DOCX document
site visit pt2_.pdf PDF
36C24622R0004_5.docx DOCX document
36C24622R0004_4.docx DOCX document
RFI _ AHU_.pdf PDF
AHU Part 1.pdf PDF
AHU Part 2.pdf PDF
AHU Part 3.pdf PDF
36C24622R0004_3.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment B -wage determination.pdf PDF
36C24622R0004_2.docx DOCX document
00-Salisbury AHU Final CD Specifications 210920.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number: 558-17-150 Edward L Roy: VA assigned project #

Date:
Project TitleRenovate PACU

Edward L Roy: VA assigned Project Title

Project LocationDurham VAMC
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .