This announcement is a request for proposal for project 659-22-104 AHU Replacement. The Department of Veterans Affairs is seeking proposals to replace air handler units at multiple buildings at the Salisbury VAMC located in Salisbury, North Carolina. The project is estimated between $5-10 million. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due by March 7, 2022. Technical capability, past performance, and price will be evaluated. The solicitation provides instructions for preparing and submitting proposals in three separate parts addressing technical approach, past performance references, and pricing.

View the file

Other files for this federal contract opportunity

Other files attached to N041--659-22-104: AHU Replacement (VA-22-00011507), newest first.
File Type Posted
36C24622R0004_6.docx DOCX document
site visit pt1_.pdf PDF
RFI _ AHU (002)_.pdf PDF
site visit pt2_.pdf PDF
36C24622R0004_5.docx DOCX document
36C24622R0004_4.docx DOCX document
RFI _ AHU_.pdf PDF
AHU Part 1.pdf PDF
AHU Part 2.pdf PDF
AHU Part 3.pdf PDF
36C24622R0004_3.docx DOCX document
Attachment D - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet
Attachment B -wage determination.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
00-Salisbury AHU Final CD Specifications 210920.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24622R0004

SUBJECT*
659-22-104: AHU Replacement

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
28144
SOLICITATION NUMBER*
36C24622R0004
RESPONSE DATE/TIME/ZONE
03-07-2022 15:30 EASTERN TIME, NEW YORK, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
N041
NAICS CODE*
236220

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs Network Contracting Office 6 1601 Brenner Ave Salisbury NC 28144

POINT OF CONTACT*

Contracting Officer Sean Cosby sean.cosby@va.gov 910-488-2120

PLACE OF PERFORMANCE

ADDRESS
W.G. Hefner VA Medical Center

1601 Brenner Ave

Salisbury North Carolina

POSTAL CODE
28144
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
sean.cosby@va.gov

EMAIL DESCRIPTION

DESCRIPTION

THIS ANNOUNCEMENT IS A REQUEST FOR PROPOSAL. SELECTION CRITERIA IS PROVIDED. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.

Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice

*= Required Field
Combined Synopsis/Solicitation Notice

Combined Synopsis/Solicitation Notice

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5.

REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE

DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL

SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

1. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than ____ ___________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

of70 36C24622R0004 X 01-25-2022 659-22-104 Department of Veterans Affairs Network Contracting Office 6 1601 Brenner Ave Salisbury NC 28144 Department of Veterans Affairs Network Contracting Office 6 1601 Brenner Ave Salisbury NC 28144 Sean Cosby 704-638-9000 x13219 Request for Proposal: AHU Multiple Buildings 659-22-104 Project Location: Salisbury VAMC Salisbury, NC 28144 Project Description: This project will replace selected Air Handler Units at the Salisbury VAMC.

Contractors must be registered in Vendor Information Pages (https://vetbiz.va.gov/vip/).

THIS IS A 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE IAW 38.U.S.C. 8127 ( d) Participants interested in attending site visit please RSVP by Feb 4, 2022 to sean.cosby@va.gov Site Visit: Feb 8th 2022 @ 1100 EST | Meet outside between Building 21 and 21B Salisbury VAMC, Salisbury, NC 28144 Deadline for receipt of questions /RFI's: Feb 11th 2022 @1600 EST Deadline for proposals: March 7th 2022 @1530 EST submit proposals to sean.cosby@va.gov with a copy to Marty Bost marty.bost@va.gov

Magnitude of construction: $5,000.000 and $10,000,000.

LINE ITEM 001: Contractor shall provide all supervision, labor, materials and equipment necessary to in accordance with the plans and specifications.

Surgical masks are required for participants attending the site visit.

Participants a ttending the site visit are required to be screened for COVID-19 upon entrance to the facility.

X X 52.211-10 X 03-07-2022 X Page 1 of

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required p erformance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23.

ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT

WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise s pecified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center PO Box 149971 Austin TX 78714-9971

Page 1 of Table of Contents

PART I - THE SCHEDULE4
SECTION A - SOLICITATION/CONTRACT FORM4
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)4
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK5
A.3 PRICE/COST SCHEDULE8
ITEM INFORMATION8
A.4 DELIVERY SCHEDULE8
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT8
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS12
2.1 EVALUATION FACTORS FOR AWARD19
2.2 52.215-5 FACSIMILE PROPOSALS (OCT 1997)28
2.3 52.216-1 TYPE OF CONTRACT (APR 1984)29
2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)29
2.5 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)30
2.6 52.228-1 BID GUARANTEE (SEP 1996)31
2.7 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)31
2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)32
2.9 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)32
2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)33
2.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)33
2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)33
REPRESENTATIONS AND CERTIFICATIONS35
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION)35
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)38
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)41
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)43
GENERAL CONDITIONS46
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)46
4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)46
4.3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)47
4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)48
4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)49
4.6 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)49
4.7 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)52
4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)53
4.9 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION)54
4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS55
4.11 52.244-2 SUBCONTRACTS (JUN 2020)55
4.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)58
4.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)59
4.14 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)61
4.15 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)63
4.16 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION)64
4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)66
4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)67
4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)68
4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)68
4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)69
4.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)70
4.23 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)72
4.24 MANDATORY WRITTEN DISCLOSURES72
SECTION E - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS73

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
GRAND TOTAL
__________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

STATEMENT OF WORK

Contractor to supply all material and labor for renovation and installation of AHUs listed below, all associated demolition, trash/debris removal, parts, materials, and equipment are the responsibility of the contractors and shall be executed per division 002. All demolition shall be performed without degradation to the remaining items and structures. new ahus shall be installed per local, state, and federal code requirements. contractors shall adhere to division 001 for general requirements, safety, schedule, quality control, environmental management, shop drawings, testing, construction waste management, and sustainable construction requirements.

All AHUs selected for replacement shall be designed per the VA specifications, design guide, infection control guidelines, NFPA / life safety code and NEC. All new controls for AHUs will be Siemens controls. tab must be completed on all buildings for chill water.

An estimate for this work is provided for the project. the estimate includes temporary air handling units, crane services, curbs for RTUs, concrete pads for AHUs, and controls. the estimate is based on utilizing a generator whenever a temporary ahu is required the estimate includes Siemens controls and new control panels. The VA requested fire alarm updates to the workstation with all the AHU replacements.

BUILDING 5

AHU 24

AHU 25

AHU 46

AHU 47

BUILDING 6

AHU 4

AHU 7

AHU 27

AHU 30

AHU 31

AHU 50

BUILDING 16

AHU 39

BUILDING 21

AHU 1

AHU 2

AHU 3

AHU 4

AHU 5

AHU 6

AHU 7

AHU 8

Applicable Codes and Standards

All new work is designed to comply with the most current edition of the following codes and standards:

• NFPA 101, Life Safety Code

• International Building Code (Only when specifically referenced in VA Design Documents)

• DOE Federal Energy Standard 10 CFR Part 435

• NFPA 70 National Electrical Code

• OSHA Standards

• International Mechanical Code (Only when specifically referenced in VA Design Documents)

• Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)

• Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)

• Energy Policy Act of 2005 (EPAct)

• Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)

• Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation management

• ASHRAE Standard 170- Edition as referenced by the HVAC Design Manual

• VA Criteria available in the Facilities Management Technical Information Library o Master Construction Specifications o PG 18-3 Design and Construction procedures o PG 18-4 Standard Details and CAD Standards o PG 18-5 Equipment Guide List o H 18-8 Seismic Design Handbook o PG 18-10 Design Manuals (by discipline)

▪ HVAC Design Manual for New, Replacement, Addition, and Renovation of Existing VA Facilities March 2020

▪ VA Electrical Design Manual – December 2019

▪ PG 18-15 Minimum Requirements for A/E Submissions, Volume C

▪ PG 18-17 Environmental Compliance Manual

▪ NFPA 70 National Electrical Code 2020

▪ NFPA 72 National Fire Alarm Code 2016

▪ ASHRAE 90.1 – 2010 Energy Standard for Buildings Except Low-Rise Residential Buildings

▪ NFPA 101 - Life Safety Code Where the above referenced and/or other criteria conflict, the design team will comply with the most stringent standard.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO OFFERORS

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.

(a) GENERAL INSTRUCTIONS:

1. All proposal preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.

2. The price, technical response and past performance of each Offeror will be evaluated independently. Offerors shall separately document each of the three factors. Each of the three offer sections shall therefore be labeled with the Offerors name, business address, and VA Solicitation Number.

3. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including these instructions, the terms and conditions, representations and certifications, and technical and past performance requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

The offer shall consist of three (3) separate parts:

• Part I – TECHNICAL CAPABILITY

• Part II – PAST PERFORMANCE

• Part III – PRICE

(b) SPECIFIC INSTRUCTIONS

1. PART I - TECHNICAL PROPOSAL – Submit electronic PDF document(s) by email.

Management Approach, Corporate Experience, Key Personnel Qualifications, and Quality Control Plan.

Format as follows:

TAB A: General Information

a. Cover page with Solicitation Number and Project Title

b. Table of Contents

c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principle points of contact with addresses, phone numbers and email addresses.

d. In accordance with VHA Directive 7715, Safety and Health During Construction, the offeror shall have no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years, and a current Experience Modification Rate (EMR) equal to or less than 1.0. Offeror shall provide (1.) completed OSHA Form 300A for the three (3) year period, (2.) a memorandum statement regarding OSHA and EPA violations, and a (3.) letter from their worker’s compensation insurer disclosing their Experience Modification Rate (EMR) rating. Documentation submitted with the offer must be complete and must demonstrate compliance to be considered acceptable.

TAB B: TECHNICAL CAPABILITY

a. General Qualifications – Subfactor 1

b. Experience & Ability of Key Personnel – Subfactor 2

c. Subcontractor list and Qualifications – Subfactor 3

d. Project Management Plan – Subfactor 4

2. PART II – PAST PERFORMANCE - Submit Past Performance Questionnaires to references. (Solicitation Attachment C)

a. Past Performance Questionnaires: The contractor shall send out the attached past performance questionnaires to each of their references listed under the Corporate Experience technical factor or any other references that the Offeror deems necessary. The Government will evaluate the quality and extent of Offeror’s performance deemed relevant and recent to the requirements of this solicitation.

b. The references must return the survey directly to the Government Contracting Officer listed on the survey, via email, by the due date for proposals.

3. PART III - PRICE PROPOSAL - Submit electronic PDF document(s) by email.

TAB A: General Information

a. Cover page with Solicitation Number and Project Title

b. Table of Contents

c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principle points of contact with addresses, phone numbers and email addresses.

TAB B: Offer, Guarantee, and Certifications

a. Complete the SF 1442, Blocks 14, 15, 17, 19, 20A, 20B, 20C and 30. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 30b. One copy of the SF 1442 must bear an original, authorized signature. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP. All sections of the RFP, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract.

b. Complete the PROPOSAL ITEM LIST. As part of their proposal, each Offeror shall be required to complete the attached Base Proposal Item Price Breakdown Form. (Solicitation Attachment D)

c. Complete 52.204-8 Annual Representations and Certifications, paragraph (d) applies to this contract. 52.209-5--complete sections (a) (1) and (2), and 52.209-7 paragraph (b). Print out these provisions in their entirety and submit it with the proposal. Offerors shall submit only those pages that require fill-in.

d. Acknowledgement of Amendments

e. Copy of VetBiz Registry printout showing your firm as a verified SDVOSB.

(c) GENERAL INFORMATION

1. Format for proposal Part I & II shall be as follows:

a. A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.

b. Typing shall not be less than font size 11.

2. Offers shall be submitted via email to the Contracting Officer Sean Cosby at sean.cosby@va.gov with a copy to Marty Bost at marty.bost@va.gov prior to the due date and time identified in the solicitation. Multiple emails will likely be required to submit all attachments. Server capacity is 10MB for file attachments, per email.

3. Each response shall address each factor in the sequence listed and clearly identify which factor is being addressed.

4. There shall be no mention of costs in the Technical Proposal.

5. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by the Contracting Office and Salisbury VA Medical Center:

• New Year’s Day – 1 January

• Martin Luther King’s Birthday – Third Monday in January

• Presidents Day – Third Monday in February

• Memorial Day – Last Monday in May

• Juneteenth – 19 June

• Independence Day – 4 July

• Labor Day – First Monday in September

• Columbus Day – Second Monday in October

• Veterans Day – 11 November

• Thanksgiving Day – Fourth Thursday in November

• Christmas Day – 25 December

• Any other Federal Holiday granted by the President of the United States

DESCRIPTION OF WORK: Contractor shall provide all labor, materials, tools, equipment, and qualified supervision for the replacement of Air Handler Units of Multiple Buildings at the VA Medical Center Salisbury, NC, for project titled 659-22-104, AHU Replacement.

MAGNITUDE OF CONSTRUCTION: Between $5,000,000 and $10,000,000.

PROPOSAL SUBMISSION: Proposals will be submitted through email. Please submit proposals to sean.cosby@va.gov

SELECTION CRITERIA: Technical Capability, Past Performance, and Price will be the evaluation factors utilized to determine the successful proposal. All evaluation factors other than price, when combined, are significantly more important than price alone.

SDVOSB SET-ASIDE AND REQUIRED REGISTRATION AT VETBIZ: This procurement is 100% set-aside for Service-Disabled, Veteran-Owned Small Business (SDVOSB). Offers are solicited only from SDVOSB concerns and offers received from concerns that are not from SDVOSB concerns shall not be considered. See FAR Clause 52.219-27, VAAR Clause 852.219-10 and 804.1102. All SDVOSB must be certified by the Center for Veterans Enterprise (CVE) at www.vetbiz.gov, to be eligible to participate.

TUBERCULOSIS PRE-CONSTRUCTION RISK ASSESSMENT: In accordance with VHA Directive 2011-036, CEOSH Construction Safety Guidebook, 2012 1.1.1 VHA Policy, CDC 2005 Guidelines for Preventing the Transmission of Mycobacterium tuberculosis in Health-Care Settings.

(a) The contractor must provide written certification that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the worksite and have been found to have negative TUBERCULOSIS screening reactions. Contractors will be required to show documentation of negative TUBERCULOSIS screening reactions for any additional workers who are added after the 90-day requirement before they will be allowed to work on the work site.

NOTE: This can be the Center for Disease Control (CDC) and Prevention and two-step skin testing or a Food and Drug Administration (FDA)-approved blood test.

(b) Contract employees manifesting positive screening reactions to the tuberculin must be examined according to current CDC guidelines prior to working on VHA property.

(c) Subsequently, if the employee is found without evidence of active (infectious) pulmonary TUBERCULOSIS, a statement documenting examination by a physician must be on file with the employer (construction contractor), noting that the employee with a positive tuberculin screening test is without evidence of active (infectious) pulmonary TUBERCULOSIS.

(d) If the employee is found with evidence of active (infectious) pulmonary TUBERCULOSIS, the employee would require treatment with a subsequent statement to the fact on file with the employer before being allowed to return to work on VHA property.

RESIDENT ENGINEER: All reference to "Resident Engineer" and “Contracting Officer’s Technical Representative” in the solicitation/specifications and drawings will be changed to "Contracting Officer’s Representative".

GENDER: Wherever masculine gender is used in the solicitation and contract documents, it shall be considered to include both masculine and feminine.

CONTRACTOR RESPONSIBILITY: Contractor shall be required to complete all contract work and schedule a final inspection within the specified contract performance period. Should the Contractor fail to complete the contract work (including scheduling of the final inspection), and it is determined by the Government to be a Contractor-caused delay, the Contractor shall be in default status. If the Government determines it to be in the best interest of the Government to allow the Contractor to continue to perform contract work, the Contractor shall provide equitable consideration to the Government for additional time granted for completion of contract work. Such agreement shall not be deemed a waiver of the Government’s right to terminate this contract in the event the Contractor fails to complete the contract work (including scheduling of the final inspection) on or before the completion date.

TRAINING: Effective July 1, 2005, all employees of the general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or other relevant competency training, as determined by the COTR with input from the ICRA (Infection Control Risk Assessment) team. The General Contractor’s competent person shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the Contracting Officer for review and approval prior to any work being performed. There shall be no exceptions to this requirement.

KEYS: All keys provided the Contractor for use during the project shall be returned to the Contracting Officer's Representative (COR) at completion of the work or upon request. No keys shall be reproduced by the Contractor. There shall be a charge of $10.00 for each key that is lost or not returned to the COR. Payment shall be made to the VA Medical Center, Salisbury, North Carolina upon receipt of a Bill of Collection.

PREPARATION OF BIDS/OFFERS/PROPOSALS: Neither the VAMC nor the NCO 6 CAS will pay for any costs incurred in preparation and submission of bids or proposals.

PRIVACY AND CONFIDENTIALITY: Contractors to the Department of Veteran Affairs may be unintentionally exposed to sensitive information. Information may be overheard, seen on documents or electronic devices, or observed that could potentially violate the privacy and confidentiality of our veterans, employees, volunteers, and their families. Regulations such as, but not limited to the Health Insurance Portability and Accountability Act of 1996 (HIPAA), Freedom of Information Act (FOIA) and Privacy Act of 1974 have been enacted to protect sensitive information from being improperly disclosed. Information should not be divulged or released to anyone unless specifically authorized by this contract or its’ attached documents in accordance with the contracted services. Failure to comply with applicable statutes and regulation can result in the termination of this contract and civil and criminal penalties, including fines and imprisonment. All suspected or actual breeches of privacy and confidentiality should be reported immediately to the Contracting Officer, Contracting Officer’s Representative (COR) or the Facility Privacy Officer.

NOTE: All computer connections will be made by VA personnel. The contractor will not have access to IT equipment rooms in general. When access is required for cable pulling, etc., the contractor shall be accompanied by a member of Facility Management Service or OI&T staff during the entire tenure of the access. Requirements for this access will be minimal.

VETS 100: Title 38, USC Section 4212(d) and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS 100 reporting information can be done electronically at: http://www.dol.gov/vets/vets100filing.htm. Award cannot be made unless the awardee has filed their VETS 100 report. Therefore, all bidders/offerors are encouraged to file every year.

SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.beta.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Contractors are encouraged to ensure that they are registered in SAM prior to submitting their bid.

CONTRACTOR NORMAL WORK HOURS: The contractor work hours are from 8:00 am to 4:30 pm, Monday through Friday, excluding federal holidays. Federal holidays that fall on a non-work day –Saturday or Sunday-the holiday usually is observed on the Monday if holiday in on Sunday or on Friday if holiday is on Saturday. If the contractor desires to work an alternate schedule or on holidays a written request must be furnished to the COR. All federal holidays are observed as non work days. Federal holidays can be found on the following web site: http://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/#url=2013. These days will be identified during preconstruction.

A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines above or submit this information will result in a determination of “Non-Responsibility” for the bidder/offeror. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility will make the bidder/offeror ineligible for award.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

2.1 EVALUATION FACTORS FOR AWARD

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.

(a) The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Part I – TECHNICAL CAPABILITY Part II – PAST PERFORMANCE Part III –PRICE

(b) BASIS FOR CONTRACT AWARD: This is a competitive Best Value Tradeoff (Tradeoff) source selection in which technically acceptable competing Offerors will be assigned a Past Performance Confidence Assessment Rating and will then be evaluated for Price fairness and reasonableness. All evaluation factors other than price, when combined, are significantly more important than price alone. The government reserves the right to award a contract to other than the lowest priced offer if the lowest priced Offeror is determined to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision, where the perceived benefits of the higher priced proposal, and the rationale for tradeoffs, shall be documented in the contract file in accordance with FAR 15.406.

(c) By submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being determined unacceptable. The evaluation process shall proceed as follows:

PART I – TECHNICAL CAPABILITY

Offers will first be evaluated for responsiveness to the solicitation requirements, by the Contracting Officer, without regard to evaluation of specific technical capability, past performance or price factors. Exchanges may occur to identify/confirm missing documentation and a determination will be made regarding whether the Offeror should/can be allowed to submit any missing/deficient documentation. Responsive offers will be provided to the Technical Evaluation Board (TEB) for the next evaluation stage. The technical capability of all offers will be evaluated on strengths and weaknesses. General Qualifications, Corporate Experience, Key Personnel Qualifications, Quality Control Plan sub-factors will be evaluated equally.

NOTE: Offerors that do not receiving ratings of Satisfactory or higher for all technical sub-factors will not be evaluated for Past Performance and will not be considered for award (i.e., fail to meet minimums as defined by attached Specifications). General Qualifications, Corporate Experience, Key Personnel Qualifications, Quality Control Plan sub-factors will be weighted equally, and all areas must have SATISFACTORY rating or better. The Technical capability sub-factors ratings of SATISFACTORY or better will be required in order to be considered for award.

Evaluators shall assign a rating based on the minimum requirements stated below.

A. Sub-Factor 1 – General Qualifications

Types of Rating Methods
Rating Descriptors

Adjectival

Excellent
Proposal demonstrates superior understanding of requirements and approach that exceeds performance or capability standards. Has one or more strengths that will significantly benefit the government. Risk of unsuccessful performance is extremely low.
Good
Proposal demonstrates good understanding of requirements and approach that meets performance or capability standards. Has one or more strengths that will benefit the government. Risk is very low.
Satisfactory
Proposal demonstrates acceptable understanding of requirements and approach that meets performance or capability standards. Acceptable solutions are identified. No major strengths are identified. Risk is minimal.
Marginal
Proposal demonstrates shallow understanding of requirements and approach that only marginally meets performance or capability standards necessary for acceptable contract performance. Several moderate-range risk elements are identified.
Unsatisfactory
Proposal fails to meet performance or capability standards. Requirements can only be met with major changes to the proposal. Risk of unsuccessful performance is high.

A description of the organization’s general qualifications

MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a brief narrative outlining the following:

a. The Offeror has clearly demonstrated that they have general qualifications to perform the duties of the project.

b. The Offeror has clearly demonstrated that they have experience with projects related to the statement of work attached to the solicitation

B. Sub-Factor 2 – Corporate Experience

Types of Rating Methods
Rating Descriptors

Adjectival

Excellent
Demonstration that the Company has extensive experience, as a Prime Contractor, in renovations or expansion projects within the Department of Veteran Affairs Medical Centers. Level of experience can be directly tied to strengths that will significantly benefit the Government. The Scope of previous projects are nearly identical to the scope of this project. Risk of unsuccessful performance is extremely low.
Good
Demonstration that the Company has some experience in the renovations of Medical Centers within the Federal Government (VA or DoD) or Commercial Hospitals as a Prime contractor. Level of experience can be directly tied to strengths that will benefit the government. Risk of unsuccessful performance is very low.
Satisfactory
Demonstration that the Company has some experience in the renovations and expansions of Government Buildings as a Prime Contractor. Risk of unsuccessful performance is minimal.
Marginal
Demonstration that the Company has some experience in the renovations and expansions of Government Buildings operating in subcontractor capacity.
Unsatisfactory
Contractor fails to make any disclosure with regards to experience in construction whether it can be deemed relevant or irrelevant and fails to provide any references for works previously performed.

1. CRITERIA: Offerors must provide a minimum of five (5) and a maximum of eight (8) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principle objective was structural repair/structural renovations of hospitals within the United States, with a total contract value exceeding $500,000) to the requirement being solicited. Experience of subcontractors may be used to fulfill this requirement, but future unavailability of the subcontractor to perform work may result in contract termination.

2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a minimum of five (5) and a maximum of eight (8) examples of their choice of completed projects or in progress of similar contracts in size and scope (minimum threshold: Projects where the principle objective was interior architectural, mechanical, electrical and plumbing upgrade renovations and building additions of hospitals within the United States, with a total contract value exceeding $500,000). In describing the construction experience, provide the following information:

a. Project title, location and brief description of the project and contracting method (design-build, design-bid-construct, CM at risk, Turnkey, etc.).

b. Project owner and name and telephone number of owner’s contact person.

c. Indicate your firm’s role as a prime contractor or subcontractor, etc.

d. Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s).

e. Project Statistics including start and completion dates (original vs. actual) for design and construction; cost (with brief explanation of what is included in the cost); square footage; and any awards (prizes) received.

f. Confirmation that the prime contractor and subcontractors are licensed for the work being performed in the state where the project is located, where specified, or otherwise in the state from which the contractor or subcontractor originates. Work requiring license in the State of North Carolina includes all Contractors, HVAC, Plumbing, Electrical work, and Asbestos/lead Project Monitoring.

C. Sub-Factor 3 – Key Personnel Qualifications

Types of Rating Methods
Rating Descriptors

Adjectival

Excellent
Proposal demonstrates superior understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have a vast background in performance of exact works of this project for a Department of Veterans Affairs Medical Center. Strengths of Personnel have been clearly articulated how experiences to bring significant benefit to the success of this project. Risk of unsuccessful performance is extremely low.
Good
Proposal demonstrates understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have some background in performance of similar works of this project at the Dept of Veterans Affairs Medical Center, DoD Medical Center or Commercial Medical Center. Strengths of Personnel articulate benefit to the success of this project. Risk is very low.
Satisfactory
Proposal demonstrates understanding of key personnel requirements regarding relevant experience and personnel meet the education/certification requirements. Articulation of the experience of Personnel bring benefit to the success of this project.
Marginal
Contractor addresses Key Personnel Requirements by only providing information that demonstrates minimum acceptability and fails to address relevancy of experiences and fails to articulate how the personnel aid in the successful and timely completion of the project.
Unsatisfactory
Contractor fails to fully address Key Personnel Requirements by failing to proffer evidence of understanding of the Key Personnel Requirements, fails to proffer evidence of minimum education and certifications of proposed Key Personnel and fails to articulate how the personnel aid in the successful and timely completion of the project.

1. CRITERIA: Offeror must provide an organizational chart identifying key on-site personnel with a description of their work experience relating to projects similar in size and scope (multidiscipline construction projects with a minimum threshold value of $500,000) to the requirement being solicited. The key personnel required for this contract are the Superintendent, Site Safety and Health Officer, and Quality Control Manager.

2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides:

a. An organizational block identifying on-site key personnel associated with this requirement to include:

i. Each individual’s name, title, duty, years of experience and experience level relating to similar contracts in size and scope (multidiscipline construction projects with a minimum threshold value of $500,000).

ii. Narratives for the key personnel identified shall have experience for projects of similar size and scope (multidiscipline construction projects with a minimum threshold value of $500,000), showing project history with these key personnel in relations to the project’s description. The Quality Control Manager and the Site Safety and Health Officer may not be the same individual.

D. Sub-Factor 4 – Quality Control Plan

Types of Rating Methods
Rating Descriptors

Adjectival

Excellent
Proposal demonstrates superior understanding of requirements and approach that exceeds performance or capability standards. Has one or more strengths that will significantly benefit the government. Risk of unsuccessful performance is extremely low.
Good
Proposal demonstrates good understanding of requirements and approach that meets performance or capability standards. Has one or more strengths that will benefit the government. Risk is very low.
Satisfactory
Proposal demonstrates acceptable understanding of requirements and approach that meets performance or capability standards. Acceptable solutions are identified. No major strengths are identified. Risk is minimal.
Marginal
Proposal demonstrates shallow understanding of requirements and approach that only marginally meets performance or capability standards necessary for acceptable contract performance. Several moderate-range risk elements are identified.
Unsatisfactory
Proposal fails to meet performance or capability standards. Requirements can only be met with major changes to the proposal. Failure in demonstration of understanding of requirements is such that it can be assumed the intent of the contractor is for Government Personnel to perform quality control for the contractor in lieu of Quality Assurance.

1. CRITERIA: Offeror must provide a plan to implement the requirements of Contract Clause 52.246-12, Inspection of Construction, and specifications. The plan shall identify personnel, procedures, control, and instructions. A finalized, more detailed Quality Control Plan (QCP) will be required to be submitted and approved after contract award, which include the identification of all contract submittals, tests, records, and forms.

2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standards of acceptability are met when the Offeror provides:

a. A description of the quality control system, including a chart showing lines of authority and acknowledgement that the Quality Control (QC) Manager shall implement the three-phase control system for all aspects of work specified. The Quality Control Manager shall report to the project manager or someone higher in the Contractor’s organization. Project Manager in this context shall mean the individual with responsibility for the overall management of the project including quality and production. The proposal provides a Quality Control approach that effectively addresses the internal processes to identify and prevent deficiencies in the quality of construction. This approach shall also show the plans for implementation ensuring the compliance of regulatory and Specification statutes are strictly adhered to. The approach shall also clearly address the QC organizational lines of authority and the Offeror’s approach to monitor corrective actions ensuring successful and timely problem resolution. The detailed QC approach shall identify how quality inspections will meet the minimum requirements of the Specifications. The QCP shall effectively address how the Offeror will correct identified discrepancies found during QC checks and the process to provide resolution to the CO/COR for any discrepancies identified in the Specifications or design. The QCP shall include the Offeror’s method for identifying subcontractors to meet the specific requirements of all trades specifications included in the project, see each specification section for QC details.

PART II – PAST PERFORMANCE

Next, the Government will evaluate the Offeror’s demonstrated past performance of recent and relevant projects for those Offerors that received Satisfactory or better technical ratings for all technical sub-factors, in order to determine the Offeror’s ability to perform the contract successfully and help determine responsibility. Past performance information shall include, but not be limited to: evaluation of past performance of the firm having experience in construction or renovation of hospitals, quality, timely performance, management effectiveness, and safety. An overall Past Performance Confidence Assessment Rating will be assigned, but each past performance reference will first be evaluated for “recency” and “relevancy”. Therefore, the following ratings tables will be used. “Recent” past performance is defined as projects completed within the last five years, from the date of issuance of solicitation. Past Performance references meeting the “minimum threshold” criteria, but not related to hospital renovations, will be rated “Somewhat Relevant”. Past Performance references meeting the “minimum threshold” criteria, which included hospital renovations will be assigned a relevancy rating based on the below rating definitions, with regard to the tasks outlined in the Specification of similar scope and complexity.

Past Performance Relevancy Rating Method

Adjectival Rating
Description
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Confidence Assessment Rating Method

Adjectival Rating
Description
Substantial Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a

reasonable expectation that the Offeror will successfully perform the required effort.

Limited Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence
Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence
No recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be

reasonably assigned.

A. CRITERIA: Offerors must provide a minimum of five (5) and a maximum of eight (8) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principle objective was renovations to hospital facilities within the United States, with a total contract value exceeding $500,000). The Offeror must provide for each reference, the reference's company name, POCs, address, contact information to include phone number and e-mail address, project description, dollar value and period of performance. SEE NOTE BELOW, regarding the past performance questionnaire. Past Performance of subcontractors may be used, but future unavailability of the subcontractor to perform work may result in contract termination.

B. EVALUATION AND PERFORMANCE CONFIDENCE ASSESSMENT RATING: The Government will consider and evaluate the Offeror's past performance information, to include the completed past performance questionnaire surveys and the Past Performance Information Retrieval System (PPIRS), which are deemed recent and relevant for the requirements of this RFP, including evaluation of the Offeror’s adherence to period of performance/time of construction and construction according to contract specifications and design without deficiencies. The Government may also use information submitted by the Offeror, to included references, and other sources such as other Federal Government offices to include the Past Performance Information Retrieval System (PPIRS), and commercial sources, to assess performance. “Recent” past performance is defined as projects completed within the last five years, from the date of issuance of solicitation.

C. Relevance ratings and Performance Confidence Assessment ratings will be assigned, as defined in the above tables.

NOTE: The contractor shall send out the attached past performance questionnaires (Solicitation Attachment) to each of their references listed under the Experience technical factor or any other references that the Offeror deems necessary.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .