Attachment C - Specifications - Pages 1-4.docx

DOCX document 27 KB Posted

Attached to
Overhead Ceiling Fans - DMA
Solicitation number
3000026046
Issued by
East Baton Rouge Parish, Baton Rouge City, Louisiana

About this file

This is a specifications document for RFx 3000026046 issued by the Louisiana Department of Military Affairs (DMA) for the supply and installation of three High Volume Low Speed (HVLS) industrial ceiling fans at Field Maintenance Shop #8 located at 8130 Innovation Park Drive in Baton Rouge, Louisiana. The project requires the procurement and installation of 18-foot diameter HVLS fans meeting specified performance standards, with power requirements of 400-480V, 3-phase electrical service. The contractor must provide all labor, materials, equipment, and supervision necessary to complete the installation, including site verification, mounting and structural work, electrical connections, controls configuration, and commissioning. The scope encompasses installation of mounting hardware, extension tubes, brackets, safety systems, wiring, conduit, breakers, disconnects, and terminations in compliance with the National Electrical Code (NEC) and manufacturer specifications. Upon completion, the contractor must remove all debris, provide operational demonstrations, deliver as-built documentation, manuals, warranty documents, and maintenance instructions to agency personnel.

The contractor is responsible for submitting manufacturer data sheets and specifications for any "or equal" items prior to ordering, with all submittals requiring pre-approval by the Project Manager. Work hours are limited to Tuesday through Friday, 7:00 AM to 5:30 PM, with the site closed on recognized state and federal holidays. The contractor must comply with multiple regulatory standards including 40 CFR 112, STI SP001, STI R893, NFPA 30, UL-142, UL-2085, OSHA, and all applicable state and local safety and environmental requirements. A one-year workmanship warranty is required, and the contractor must provide a construction schedule (Gantt chart format) 48 hours prior to work commencement, along with a detailed schedule of values for invoicing purposes using the AIA Application for Payment format or equivalent. Weekly or monthly progress meetings will be scheduled to review payment applications, completion status, inspections, and potential scheduling conflicts.

View the file

Other files

File Type Posted
3000026046.pdf PDF
Attachment A - Special Terms and Conditions Pages 1-14.docx DOCX document
Attachment B - Job Site Verification Form - Page 1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 3000026046

**If bidding other than specified, please provide manufacturer’s specs for “or equal” items. **

Scope of Work:

The Contractor shall furnish all labor, materials, equipment, tools, supervision, and services necessary to supply and install three High Volume Low Speed (HVLS) industrial ceiling fans for the Department of Military Affairs (DMA).

Location:

Field Maintenance Shop #8 8130 Innovation Park Drive Baton Rouge, LA 70820

DMA Contact:

Thomas Breaux, (337) 678-9597, thomas.l.breaux.nfg@army.mil

Specification:

The Contractor shall perform the following:

· Procured HVLS fans shall meet or exceed the following minimum characteristics:

· Fan Diameter: 18 feet

· Power Requirements: 400–480V, 3‑phase

· Airflow Performance: Powerfoil X4 or Equal

Specify Brand/Model Bidding: _________________

· Motor and Drive: Industrial‑grade, energy‑efficient motor suitable for continuous operation

· Controls: Digital controller capable of variable speed adjustment and integration with facility electrical systems

· Construction: Heavy‑duty materials suitable for industrial environments

· Safety Features: Redundant safety cables, hub retention systems, and compliance with applicable safety standards

· Installation Requirements

· Site Verification: The Contractor shall inspect mounting locations, structural supports, and clearances. The Contractor shall verify electrical service availability and compatibility with fan requirements.

· Mounting and Structural Work: The Contractor shall install all required mounting hardware, extension tubes, brackets, and safety systems. The Contractor shall ensure all structural attachments meet manufacturer and code requirements.

· Electrical Work: The Contractor shall connect fans to existing electrical infrastructure where feasible. The Contractor shall provide all wiring, conduit, breakers, disconnects, and terminations required for complete and safe installation. The Contractor shall ensure compliance with NEC and manufacturer specifications.

· Controls and Commissioning: The Contractor shall install and configure fan controllers. The Contractor shall test all fans for proper operation, speed control, vibration, and safety systems. The Contractor shall provide operational demonstration to the Agency personnel.

· Cleanup and Turnover

· The Contractor shall remove all installation debris and restore work areas to clean condition.

· The Contractor shall provide the Agency with all manuals, warranty documents, and maintenance instructions.

· The Contractor shall deliver final as‑built documentation reflecting installation details.

Terms and Conditions:

· The Contractor shall include manufacturer data sheets, installation requirements, warranty documentation, and electrical specifications.

· The Contractor shall coordinate delivery schedules with the Agency to avoid operational disruptions.

· The Contractor shall submit all fire marshal and LDEQ paperwork for the scope of work for the project.

· The Contractor shall be responsible for providing any lifting capability to complete all new installations and repairs.

· The Contractor shall ensure all work is completed to the following regulations and industry standards applicable to above ground storage tank systems: 40 CFR 112, STI SP001, STI R893, NFPA 30, UL-142 and UL-2085.

· The Contractor shall be responsible for reviewing and verifying specifications.

· The Contractor shall be responsible for field verifying all dimensions and existing site conditions of work to be performed.

· The Contractor shall inspect and verify information provided herein on existing materials, fixtures, equipment, etc. is correct and inform Project Manager (PM) of any errors or questions prior to or during pre-construction meeting.

· The Contractor shall make any sensitive items secure at the end of each workday by any means necessary to secure same and by the approval of the unit POC.

· The Contractor shall take all precautions necessary to prevent damages when making repairs. This includes movement and parking of equipment on grass or unimproved areas surrounding the site.

· The Contractor shall call LA 1-Call and all utility companies prior to digging.

· All work must comply with all applicable State and Local Safety and Environmental requirements. Occupational Safety and Health Administration (OSHA), National Electrical Code (NEC), Parish, City and State regulations will be required. The Contractor shall supply all of their employees with PPE.

· The Contractor shall warranty their workmanship, repairs, and installations for a minimum of a 1 year period.

· The Contractor shall be responsible for properly containerizing, removing and disposing of all waste generated while on any LAARNG site during the retrofit and repair process.

· Hours of operation Tuesday - Friday, 7:00 AM to 5:30 PM and closed on all recognized state and federal holidays.

· The Contractor shall contact, prior to mobilization and demobilization, the PM for staging and for satisfactory completion.

· The Contractor shall be responsible to provide storage containers. If an onsite storage area is required, the Contractor shall confirm a storage location for any materials, fixtures, equipment, trailers, etc. stored on site during the term length of the contract. The location will be approved by the PM during the pre-construction meeting.

· The Contractor shall provide a construction work schedule (Gnant like) 48 hours prior to start of work detailing each task of work.

· The Contractor shall provide a detailed schedule of values for approval prior to beginning work and shall invoice for the completed work using the approved schedule of values. It is preferred that invoices for payment of completed work be submitted using the "AIA Application for Payment" or similar detailed format form.

· The PM shall schedule weekly / monthly progress meetings to discuss and review payment applications, current completion status, inspections, potential delays, scheduling conflicts, material delays, etc.

· All specification sheets and submittals must be pre-approved by the PM prior to ordering.