Attachment C - Specifications - Pages 1-2.docx

DOCX document 21 KB Posted

Attached to
Roof Replacement - DOC - Addendum No. 2 - Adding an Attachment and Extending the BOD Date Issue State and local contract opportunity
Solicitation number
3000024576
Issued by
East Baton Rouge Parish, Baton Rouge City, Louisiana

About this file

This document is an Attachment C - Specifications for a roofing project for the Louisiana Department of Corrections (DOC) located at their Headquarters in Baton Rouge. The project involves the comprehensive removal of the existing roof system and installation of a new architectural shingle roof at 504 Mayflower St. The scope of work requires the contractor to provide all necessary labor, materials, tools, and equipment to completely replace the roofing system, including removing existing roofing materials, replacing damaged decking, and installing a new asphalt shingle system. Work is to be performed during normal business hours (Monday through Friday, 7:00 A.M. to 3:30 P.M.), with the contractor required to check in with security daily and adhere to the facility's non-smoking policy.

The project specifications mandate specific installation requirements, including hand-driving six nails per shingle, using ice and water shield underlayment in valleys, replacing lead pipe boots with neoprene boots, and ensuring compliance with local building codes and manufacturer specifications. The contractor will be responsible for proper disposal of existing roofing materials and providing a one-year warranty on workmanship. A jobsite visit contact, Scotty Henderson from DOC Facilities Services, is available at 225-342-8644 for additional information. The contractor must provide all necessary lifting equipment and perform the work in a professional manner meeting all federal, state, and local code requirements.

View the file

Other files for this state and local contract opportunity

Other files attached to Roof Replacement - DOC - Addendum No. 2 - Adding an Attachment and Extending the BOD Date Issue, newest first.
File Type Posted
3000024576-2.pdf PDF
Attachment E - Price Sheet - Page 1.docx DOCX document
Addendum No. 1.docx DOCX document
Addendum No. 1.docx DOCX document
3000024576-1.pdf PDF
3000024576.pdf PDF
Attachment B - Job Site Verification Form - Page 1.docx DOCX document
Attachment D - Building Layout - Pages 1-2.pdf PDF
Attachment A - Special Terms and Conditions Pages 1-14.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 3000024576

Scope of Work:

The Contractor shall furnish all labor, materials, tools, equipment, and supplies necessary to remove and dispose of existing roof materials and install new architectural shingles for the Louisiana Department of Corrections (DOC).

Location:

Department of Corrections, Headquarters 504 Mayflower St.

Baton Rouge, LA 70802

Jobsite Visit Contact:

Scotty Henderson, DOC Facilities Services 225-342-8644 scott.henderson@la.gov

Specifications:

The Contractor shall perform the following:

· Removal of existing shingled roofing system and installation of new asphalt shingled system.

· Removal of any roof top vents, exhaust hoods, etc. The removal and proper disposal of all existing roofing materials and/or roofing related appliances determined to be removed down to the roof deck.

· Replacement of any damaged deck with new decking materials with size and thickness to ensure a dry, structurally and thermally sound, clean and smooth surface for new roofing system.

· Installation of a new asphalt system using methods recommended by roofing manufacturer, in accordance with local building codes.

· Shingles to be hand driven with six nails per shingle. All valleys to have ice and water shield underlayment. Remove and replace all lead pipe boots with neoprene pipe boots.

General Terms:

· The Contractor shall ensure installation complies with local building codes, safety standards and manufacturer specifications.

· The Contractor shall provide all lifting equipment necessary for safe removal and installation.

· All work being performed is required during normal business hours: Monday through Friday 7:00 A.M. to 3:30 P.M.

· Work shall be performed in a workmanlike manner according to standard, and meet all code requirements, federal, state and local by the Contractor.

· Workmanship shall be covered by a one year warranty for all installation work.

· The Contractor shall be required to check in with Security each work day.

· This is non-smoking facility.

File details come from the government source that posted it. Updated .