This document is a Bid Schedule for an Invitation for Bid (IFB) issued by the Arizona Department of Administration General Services Division for the Homolovi Ruins State Park Waste Water System project (Project No. PCS-22-124). The bid was submitted by Standard Construction Company, Inc., an Arizona-based contractor with license number AZ ROC 166948-A, located in Avondale, AZ.

The bid includes a base bid of $1,619,323.91 and three additive alternates: Storage Tank Upgrades ($367,101.94), Distribution Booster Pumps ($468,641.34), and Dump Station Expansion ($334,307.93). The total project cost with all alternates is $2,789,375.12. The project scope involves comprehensive infrastructure improvements, including general conditions, demolition, concrete work, utility installations (water and sewer lines), site improvements, electrical and communication systems, and various specialized components such as water heaters, pumps, tanks, and access systems. The bid includes detailed line items with specific quantities, unit prices, and tax calculations at a rate of 6.1295%. The bidder has committed to keeping the bid valid for 90 calendar days and is prepared to execute the contract within 10 days of acceptance.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Summary Solicitation No. BPM006646 Project Name: IFB - Homolovi Ruins State Park - Waste Water System Agency Project No. PCS-22-124 Arizona Department of Administration General Services Division 1400 W Washington St., Ste. B200 Phoenix, AZ 85007

ATTACHMENT B BID SCHEDULE
Bid Summary
Base Bid$ 1,619,323.91
Additive Alternate 1$ 367,101.94
Additive Alternate 2$ 468,641.34
Additive Alternate 3$ 334,307.93

Unit prices for shall include all labor, materials, water disposal, bailing, shoring, removal, disposal, overhead, profit, insurance, and all other related costs and work to complete the IFB - Homolovi Ruins State Park - Waste Water Systems.

Bidder understands that the Owner reserves the right to reject any or all Bids, or portions thereof, and to waive any informalities in the bidding.

The Bidder agrees that this Bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving Bids.

Upon receipt of written notice of the acceptance of this Bid, Bidder shall execute AND Agreement within 10 days and deliver a Performance Bond, Payment Bond, and Certificates of Insurance.

Bid Security the sum of
$ 161,932.39*BASE BID ONLY
is to become the property of the Owner in the event the Contract and Bond(s) are not executed and provided within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby. **Please submit a copy of the Bid Security with your submission in APP with an original to follow via mail within seven (7) days of the Bid Due Date**
RESPECTFULLY SUBMITTED BY:
BY:Steve Sutton
TITLE:President
FIRM:Standard Construction Company, Inc.
ADDRESS810 E. Western Avenue
CITY, STATE, ZIPAvondale, AZ 85323
PHONE:623-583-9500
FAX:N/A
Seal - if Bid by a corporation
AZ Contractor's License No:AZ ROC 166948-A
License Type:General engineering

Bid Schedule Solicitation No. BPM006646 Project Name: IFB - Homolovi Ruins State Park - Waste Water System Agency Project No. PCS-22-124 Arizona Department of Administration General Services Division 1400 W Washington St., Ste. B200 Phoenix, AZ 85007

ATTACHMENT B BID SCHEDULE

LocationBASE BID
ITEM NO.DESCRIPTIONEstimated QTYUnit of MeasureUnit PricePrice extension
1General Conditions1LS$526,000.00$526,000.00
2Existing Conditions - Demolition1LS$250,000.00$250,000.00
3Concrete150CY$300.00$45,000.00
4Water Heater1EA$8,000.00$8,000.00
5Restroom Space Heater4EA$3,000.00$12,000.00
6Shade Canopy/Ramada Structure1EA$50,000.00$50,000.00
72" Copper line, valves and appurtenances75LF$500.00$37,500.00
84" PVC Sewer line, valves and appurtenances1LS$30,000.00$30,000.00
94" PVC Water line, valves and appurtenances1LS$25,000.00$25,000.00
10Backflow preventer and appurtenances2EA$30,000.00$60,000.00
11Pull Box1EA$6,300.00$6,300.00
12Sewer Cleanouts6EA$5,000.00$30,000.00
13Site Improvements, Earthwork, Paving, Fences1LS$150,000.00$150,000.00
14Site Utilities1LS$27,000.00$27,000.00
15Landscaping1LS$15,000.00$15,000.00
16Electrical, Lighting1LS$30,000.00$30,000.00
17Communications1LS$9,000.00$9,000.00
186" PVC Sewerline, valves and appurtenances (Septic system inlet line replacements)1LS$60,000.00$60,000.00
192" Waterline, valves and appurtenances1LS$35,000.00$35,000.00
20Ranger Residence Booster Pump Skid1LS$80,000.00$80,000.00
21Bladder Tank1LS$40,000.00$40,000.00
22$0.00
23$0.00
24$0.00
25$0.00

Subtotal BASE BID SUBTOTAL $1,525,800.00

TAX Your Tax Rate (Enter Rate Here)--------------------------------------------------------------> 6.1295% $93,523.91

BASE BID GRAND TOTAL (TO INCLUDE TAX) $1,619,323.91

Location ADDITIVE ALTERNATE NO. 1 - Storage Tank Upgrades

ITEM NO.DESCRIPTIONEstimated QTYUnit of MeasureUnit PricePrice extension
1General Conditions1LS$95,000.00$95,000.00
2Existing Conditions - Demolition1LS$35,000.00$35,000.00
3Site Improvements, Earthwork, Paving, Fences1LS$4,000.00$4,000.00
4Concrete4CY$2,500.00$10,000.00
5Storage Tank Level Gauge1EA$7,400.00$7,400.00
6Tank Access Ladder1EA$10,000.00$10,000.00
7Tank Safety Access Handrail and Gate1EA$8,300.00$8,300.00
8Roof Manhole Vent1EA$12,700.00$12,700.00
9PAX Solar Mixer and Solar Battery1LS$11,400.00$11,400.00
10Interior Tank Lining and Coating1LS$56,700.00$56,700.00
11Exterior Tank Lining and Coating1LS$25,300.00$25,300.00
12Cathodic Protection System1LS$24,000.00$24,000.00
13Seam Sealing1LS$21,600.00$21,600.00
14Electrical1LS$20,500.00$20,500.00
15Communications1LS$4,000.00$4,000.00
16$0.00
17$0.00

Subtotal ADD ALT NO. 1 SUBTOTAL $345,900.00

TAX Your Tax Rate (Enter Rate Here)--------------------------------------------------------------> 6.1295% $21,201.94

ADDITIVE ALTERNATE NO. 1 GRAND TOTAL (TO INCLUDE TAX) $367,101.94

Location ADDITIVE ALTERNATE NO. 2 - Distribution Booster Pumps

ITEM NO.DESCRIPTIONEstimated QTYUnit of MeasureUnit PricePrice extension
1General Conditions1LS$90,000.00$90,000.00
2Existing Conditions - Demolition1LS$58,000.00$58,000.00
3Distribution Booster Pump Skid1LS$48,000.00$48,000.00
4Chlorine Feed System (w/ tank)1LS$27,500.00$27,500.00
5Chlorine testing equipment1LS$24,400.00$24,400.00
6Chlorine injection system1LS$18,000.00$18,000.00
74 inch piping, valves and appurtenances1LS$36,375.00$36,375.00
86 inch piping, valves and appurtenances1LS$26,300.00$26,300.00
92 inch SST piping, valves and appurtenances1LS$13,400.00$13,400.00
10Sample Port1EA$8,400.00$8,400.00
11Pressure Relief Valve1EA$13,600.00$13,600.00
12Pipe Supports1LS$3,700.00$3,700.00
13Flanged Coupling Adapters2EA$3,800.00$7,600.00
141/2" piping, valves and appurtenances1LS$10,100.00$10,100.00
151/4" chlorine injection tubing inside 2" containment piping1LS$8,800.00$8,800.00
16Electrical1LS$42,000.00$42,000.00
17Communications1LS$5,400.00$5,400.00
18$0.00
19$0.00

Subtotal ADD ALT NO. 2 SUBTOTAL $441,575.00

TAX Your Tax Rate (Enter Rate Here)--------------------------------------------------------------> 6.1295% $27,066.34

ADDITIVE ALTERNATE NO. 2 GRAND TOTAL (TO INCLUDE TAX) $468,641.34

Location ADDITIVE ALTERNATE NO. 3 - Dump Station Expansion

ITEM NO.DESCRIPTIONEstimated QTYUnit of MeasureUnit PricePrice extension
1General Conditions1LS$85,000.00$85,000.00
2Existing Conditions - Demolition1LS$23,500.00$23,500.00
3Site Improvements, Earthwork, Paving, Fences1LS$57,000.00$57,000.00
4Concrete720CY$55.56$40,000.00
5Landscaping1LS$15,000.00$15,000.00
61-inch Waterline, valves and appurtenances1LS$7,500.00$7,500.00
7Potable Water Station2ea.$9,000.00$18,000.00
86-inch wate line, valves and appurtenances1LS$15,000.00$15,000.00
9Sewer Cleanouts2ea.$5,000.00$10,000.00
10Concrete Headwall1ea.$16,000.00$16,000.00
11Stormdrain System Extension40LF$400.00$16,000.00
12Sewer Hatch2ea.$3,000.00$6,000.00
13Communications1LS$6,000.00$6,000.00
14$0.00
15$0.00
16$0.00

Subtotal ADD ALT NO. 3 SUBTOTAL $315,000.00

TAX Your Tax Rate (Enter Rate Here)--------------------------------------------------------------> 6.1295% $19,307.93

ADDITIVE ALTERNATE NO. 3 GRAND TOTAL (TO INCLUDE TAX) $334,307.93

Total with all 3 Alts $2,789,375.12 image1.png