Attachment A4- Proposed Project Schedule.pdf
PDF 656 KB Posted
- Attached to
- RFP-48-27 CM/GC KSU Health Sciences Center
- Solicitation number
- RFP 785 2700000052 1
- Issued by
- Elliott County, Kentucky
About this file
This is a Proposed Project Schedule document for the KSU Health Science Center Construction Manager/General Contractor (CM/GC) project in Kentucky. The schedule outlines a comprehensive design and construction timeline beginning with predesign in September 2025 and extending through final project completion and building operations in 2030. Key project phases include predesign (54 days), schematic design Phase A (104 days), design development Phase B (90 days), construction documents Phase C (120 days), bidding (30 days), and construction from December 2029 through June 2032, with substantial completion targeted for June 2027 and final completion by February 2030. The schedule integrates KSU's academic calendar, incorporating fall, spring, and summer terms with identified holiday and spring break periods to coordinate project activities with institutional operations. Milestones are distributed across 2025 through 2030, with critical review periods scheduled after each design phase.
The document specifies durations for supporting activities including CM selection (prior to construction), FF&E installation and move-in (60 days), equipment pre-purchase (45 days), and RTA document preparation (7 days). The overall construction duration is estimated at 900 days (30 months) from start of construction to substantial completion. The project schedule demonstrates a phased approach aligned with standard architectural and construction industry practices, with defined start and end dates for each deliverable and review checkpoint to ensure coordinated project advancement through design and construction phases.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACADEMIC CALENDAR
JA S O N D
FALL TERM
MILESTONES DURATION
(DAYS)
START
DATE
END
DATE
FALL /
SPRING /
SUMMER
KSU HEALTH SCIENCE CENTER PROJECT SCHEDULE
J F M A M J J A S O N D
SPRING TERM FALL TERM
RUN DATE: 06/08/26
J F M A M J J A S O N D
SPRING TERM FALL TERM
PREDESIGN
SCHEMATIC DESIGN (PHASE A)
DESIGN DEVELOPMENT (PHASE B)
PHASE C REVIEW
BIDDING
FF&E INSTALLATION / MOVE-IN
CM SELECTION
(3+ mo.)
(3 mo.)
(4 mo.)
(2 wks)
(3 mo.)
(1 mo.)
(2 mo.)
PREDESIGN REVIEW
(7+ wks)
PHASE A REVIEW 14
(2 wks)
PHASE B REVIEW
(2 wks)
09/23/25 01/05/26
01/06/26 03/01/26
03/02/26 05/31/26
06/01/26 06/15/26
06/16/26 10/14/26
10/15/26 10/29/26
02/28/27 03/14/27
03/23/27 06/21/27
01/09/30 02/08/30
RTA DOCUMENTS 7
(1 wk)
SPRING TERM
J F M A M
03/22/2703/15/27
KSU Spring Break
A M J J A S O N D
FALL TERM
(4 mo.)
10/30/26 02/27/27CONSTRUCTION DOCUMENTS - PHASE C
KSU Holiday Break
BIDDING
(1 mo.) 12/09/29 01/08/30
START OF CONSTRUCTION TO SUBSTANTIAL COMPLETION
SUBSTANTIAL COMPLETION TO FINAL COMPLETION
EQUIPMENT PRE-PURCHASE
(6+ wks)
12/08/2906/22/27
(30 mo.)
KSU Holiday Break
KSU Spring Break
KSU Spring Break
KSU Holiday Break
12/29/26
J F M A MA M J J A S O N D
06/16/26 07/31/26
10/30/26
KSU 2025 BUSINESS PLAN
START OF CONSTRUCTION BUILDING IN OPERATION
SUMMER TERM SUMMER TERM SUMMER TERM SPRING TERM FALL TERMSUMMER TERM
KSU Holiday Break
KSU Spring Break
J F
SPRING TERM
KSU Holiday Break
| Drafting Views (Detail) |
| Schedule_26 06 08 |
File details come from the government source that posted it. Updated .